GENERAL NOTES 1. ALL CONTRACTORS MUST MAKE AN ON SITE INSPECTION WITH SHERIDAN COLLEGE'S PROJECT COORDINATOR PRIOR TO SUBMITTING ANY TENDERS. NO EXTRAS WILL BE ALLOWED AFTER THE LETTING OF THE CONTRACT FOR ANY EVENTUALITIES WHICH MAY HAVE BEEN FORESEEN BY SUCH PRIOR INSPECTION. 2. THE WORK SITE IS LOCATED AT THE TRAFALGAR CAMPUS IN OAKVILLE. 3. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS ON SITE AND REPORT ANY DISCREPANCIES TO SHERIDAN P.C. PRIOR TO TENDER CLOSING. WRITTEN DIMENSIONS ARE TO TAKE PRECEDENCE OVER SCALED DIMENSIONS. 4. ALL CONTRACTORS AND SUBCONTRACTORS SHALL ADHERE TO LATEST EDITION OF THE PLUMBING CODE, ONTARIO ELECTRICAL SAFETY CODE, ONTARIO BUILDING CODE AND MUNICIPAL REGULATIONS. 5. PERSONAL PROTECTIVE EQUIPMENT MUST BE WORN BY WORKERS AT ALL TIMES (IE. SAFETY FOOTWEAR, HATS, GLASSES, ETC.) WHERE APPLICABLE. FAILURE TO DO SO MAY RESULT IN SUSPENSION OR CONTRACT TERMINATION. 6. SHERIDAN COLLEGE BUILDING AND PROPERTIES CONTAIN HAZARDOUS ELECTRICAL LINES & EQUIPMENT. SHERIDAN COLLEGE MUST BE INFORMED AHEAD OF TIME OF ANY SITE VISITS, INSPECTIONS OR WORK BY CONTRACTORS AT ALL TIMES IN OR AROUND COLLEGE. PRIOR TO CONSTRUCTION, UNDER NO CIRCUMSTANCES SHALL A CONTRACTOR, THEIR REPRESENTATIVES OR WORKERS ENTER COLLEGE PROPERTY WITHOUT SIGNING IN WITH SECURITY. THESE RESTRICTIONS APPLY TO ALL SUBCONTRACTORS EMPLOYED BY THE GENERAL CONTRACTOR. PLEASE CONTACT SHERIDAN COLLEGE'S PROJECT COORDINATOR TO MAKE ARRANGEMENTS. 7. UPON AWARD OF CONTRACT, CONTRACTOR TO PROVIDE DETAILED CONSTRUCTION SCHEDULE. 8. SUBMIT ALL SHOP DWGS + SPECIFICATIONS TO SHERIDAN P.C. FOR REVIEW AND APPROVAL 9. SHERIDAN TO BE NOTIFIED OF ALL NOISY ACTIVITIES WHICH MAY DISTURB SURROUNDING; STUDENTS, FACULTY + STAFF. COORDINATE W/ SHERIDAN. 10. WORK SHALL BE EXECUTED BY EXPERIENCED WORKERS WITH RESPECT TO THE DUTIES FOR WHICH THEY ARE EMPLOYED. 11. KEEP PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS & RUBBISH. UPON COMPLETION OF WORK, CLEAN AND REMOVE FROM WORK SITE ALL DEBRIS, SURPLUS MATERIAL, TOOLS & EQUIPMENT OF THE TRADES. LEAVE THE BUILDING AND THE SITE IN A NEAT AND TIDY CONDITION TO THE SATISFACTION OF THE PROJECT COORDINATOR. 12. ANY FINISHES THAT MAY BE DAMAGED DURING THE COURSE OF THIS WORK TO BE MADE GOOD AS PER EXISTING AND THE SATISFACTION OF SHERIDAN COLLEGE'S PROJECT COORDINATOR. 13. REFER TO THE TECHNICAL REQUIREMENTS ON DRAWINGS. 14. CONTRACTOR(S) ARE RESPONSIBLE TO PAY FOR ON-SITE DAILY PARKING PERMIT(PAY-BY-PLATE) AND TO PARK IN THE CONTRACTOR DESIGNATED PARKING SPACES ONLY, UNLESS OTHERWISE NOTED. FAILURE TO OBTAIN PARKING PERMIT MAY RESULT IN FINES TO THE CONTRACTOR(S) NOT AT THE EXPENSE OF SHERIDAN COLLEGE. 15. CONTRACTOR(S) ARE RESPONSIBLE TO SIGN IN AND SIGN OUT AT THE SECURITY DESK ON A DAILY BASIS. 16. UPON PROJECT COMPLETION, GENERAL CONTRACTOR SHALL PROVIDE SHERIDAN WITH CLOSE-OUT DOCUMENTATION (2 HARD COPIES AND 1 ELECTRONIC COPY SUBMISSION OF DRAWINGS, LETTER(S) OF WARRANTY, SUB-TRADE CONTRACT INFORMATION, AS-BUILT(S), TEST REPORTS, INSPECTIONS, PERMITS, SHOP DRAWINGS, MAINTENANCE AND OPERATION MANUALS, PRODUCT DATA SHEETS, SCHEDULES, ETC.) SHERIDAN COLLEGE PROJECT MANAGER NATHAN CASE, FACILITIES PROJECTS (905) 845-9430 x2433 [email protected] SHERIDAN COLLEGE PROJECT MANAGER SHAMSA KASSIM, FACILITIES PROJECTS (905) 845-9430 x8082 M:416 886 2449 [email protected] Davis Campus 7899 McLaughlin Road Brampton, ON L6Y 5G5 J106 CHILD & YOUTH CARE LAB CONTACT INFORMATION DRAWING INDEX ARCHITECTURAL: DWG No. DWG TITLE A1 SITE & KEY PLAN A2 ARCHITECTURAL NOTES & ABBREVIATION A3 DEMOLITION FLOOR PLAN A4 DEMOLITION CEILING PLAN A5 PROPOSED FLOOR PLAN A6 PROPOSED CEILING PLAN A7 PROPOSED FURNITURE PLAN A8 ELEVATIONS & DETAILS A9 ELEVATIONS A10 ELEVATIONS MECHANICAL: DWG No: DWG TITLE M-0 TITLE SHEET M-1.1 GENERAL MECHANICAL SPECIFICATIONS M-1.2 HVAC SPECIFICATIONS M-1.3 HYDRONIC SYSTEMS SPECIFICATIONS M-1.4 PLUMBING SPECIFICATIONS M-1.5 FIRE PROTECTION SPECIFICATIONS AND LEGEND I M-1.6 MECHANICAL LEGEND II M-1.7 MECHANICAL SCHEDULES AND DETAILS M-2.1 LAB DEMOLITION FLOOR PLAN - HVAC M-2.2 NEW LAB FLOOR PLAN - HVAC M-2.3 NEW LAB FLOOR PLAN - HVAC PIPING M-3.1 NEW LAB FLOOR PLAN - PLUMBING AND DRAINAGE M-4.1 NEW LAB FLOOR PLAN - FIRE PROTECTION ELECTRICAL: DWG No. DWG TITLE E1 ELECTRICAL NOTES & SPECIFICATIONS E2 POWER & SYSTEMS DEMOLITION PLAN E3 LIGHTING DEMOLITION PLAN E4 POWER & SYSTEMS PROPOSED PLAN E5 LIGHTING PROPOSED PLAN E6 ELECTRICAL - DALI DETAILS

J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

GENERAL NOTES

1. ALL CONTRACTORS MUST MAKE AN ON SITE INSPECTION WITH SHERIDAN COLLEGE'S PROJECT COORDINATOR PRIOR TO SUBMITTING ANY TENDERS. NO

EXTRAS WILL BE ALLOWED AFTER THE LETTING OF THE CONTRACT FOR ANY EVENTUALITIES WHICH MAY HAVE BEEN FORESEEN BY SUCH PRIOR

INSPECTION.

2. THE WORK SITE IS LOCATED AT THE TRAFALGAR CAMPUS IN OAKVILLE.

3. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS ON SITE AND REPORT ANY DISCREPANCIES TO SHERIDAN P.C. PRIOR TO TENDER CLOSING. WRITTEN

DIMENSIONS ARE TO TAKE PRECEDENCE OVER SCALED DIMENSIONS.

4. ALL CONTRACTORS AND SUBCONTRACTORS SHALL ADHERE TO LATEST EDITION OF THE PLUMBING CODE, ONTARIO ELECTRICAL SAFETY CODE, ONTARIO

BUILDING CODE AND MUNICIPAL REGULATIONS.

5. PERSONAL PROTECTIVE EQUIPMENT MUST BE WORN BY WORKERS AT ALL TIMES (IE. SAFETY FOOTWEAR, HATS, GLASSES, ETC.) WHERE APPLICABLE.

FAILURE TO DO SO MAY RESULT IN SUSPENSION OR CONTRACT TERMINATION.

6. SHERIDAN COLLEGE BUILDING AND PROPERTIES CONTAIN HAZARDOUS ELECTRICAL LINES & EQUIPMENT. SHERIDAN COLLEGE MUST BE INFORMED

AHEAD OF TIME OF ANY SITE VISITS, INSPECTIONS OR WORK BY CONTRACTORS AT ALL TIMES IN OR AROUND COLLEGE. PRIOR TO CONSTRUCTION, UNDER

NO CIRCUMSTANCES SHALL A CONTRACTOR, THEIR REPRESENTATIVES OR WORKERS ENTER COLLEGE PROPERTY WITHOUT SIGNING IN WITH SECURITY.

THESE RESTRICTIONS APPLY TO ALL SUBCONTRACTORS EMPLOYED BY THE GENERAL CONTRACTOR. PLEASE CONTACT SHERIDAN COLLEGE'S PROJECT

COORDINATOR TO MAKE ARRANGEMENTS.

7. UPON AWARD OF CONTRACT, CONTRACTOR TO PROVIDE DETAILED CONSTRUCTION SCHEDULE.

8. SUBMIT ALL SHOP DWGS + SPECIFICATIONS TO SHERIDAN P.C. FOR REVIEW AND APPROVAL

9. SHERIDAN TO BE NOTIFIED OF ALL NOISY ACTIVITIES WHICH MAY DISTURB SURROUNDING; STUDENTS, FACULTY + STAFF. COORDINATE W/ SHERIDAN.

10. WORK SHALL BE EXECUTED BY EXPERIENCED WORKERS WITH RESPECT TO THE DUTIES FOR WHICH THEY ARE EMPLOYED.

11. KEEP PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS & RUBBISH. UPON COMPLETION OF WORK, CLEAN AND REMOVE FROM WORK SITE

ALL DEBRIS, SURPLUS MATERIAL, TOOLS & EQUIPMENT OF THE TRADES. LEAVE THE BUILDING AND THE SITE IN A NEAT AND TIDY CONDITION TO THE

SATISFACTION OF THE PROJECT COORDINATOR.

12. ANY FINISHES THAT MAY BE DAMAGED DURING THE COURSE OF THIS WORK TO BE MADE GOOD AS PER EXISTING AND THE SATISFACTION OF SHERIDAN

COLLEGE'S PROJECT COORDINATOR.

13. REFER TO THE TECHNICAL REQUIREMENTS ON DRAWINGS.

14. CONTRACTOR(S) ARE RESPONSIBLE TO PAY FOR ON-SITE DAILY PARKING PERMIT(PAY-BY-PLATE) AND TO PARK IN THE CONTRACTOR DESIGNATED

PARKING SPACES ONLY, UNLESS OTHERWISE NOTED. FAILURE TO OBTAIN PARKING PERMIT MAY RESULT IN FINES TO THE CONTRACTOR(S) NOT AT THE

EXPENSE OF SHERIDAN COLLEGE.

15. CONTRACTOR(S) ARE RESPONSIBLE TO SIGN IN AND SIGN OUT AT THE SECURITY DESK ON A DAILY BASIS.

16. UPON PROJECT COMPLETION, GENERAL CONTRACTOR SHALL PROVIDE SHERIDAN WITH CLOSE-OUT DOCUMENTATION (2 HARD COPIES AND 1 ELECTRONIC

COPY SUBMISSION OF DRAWINGS, LETTER(S) OF WARRANTY, SUB-TRADE CONTRACT INFORMATION, AS-BUILT(S), TEST REPORTS, INSPECTIONS, PERMITS,

SHOP DRAWINGS, MAINTENANCE AND OPERATION MANUALS, PRODUCT DATA SHEETS, SCHEDULES, ETC.)

SHERIDAN COLLEGE PROJECT MANAGER

NATHAN CASE, FACILITIES PROJECTS

(905) 845-9430 x2433

[email protected]

SHERIDAN COLLEGE PROJECT MANAGER

SHAMSA KASSIM, FACILITIES PROJECTS

(905) 845-9430 x8082 M:416 886 2449

[email protected]

Davis Campus

7899 McLaughlin Road

Brampton, ON

L6Y 5G5

J106

CHILD & YOUTH CARE LAB

CONTACT INFORMATION

DRAWING INDEX

ARCHITECTURAL:

DWG No. DWG TITLE

A1 SITE & KEY PLAN

A2 ARCHITECTURAL NOTES & ABBREVIATION

A3 DEMOLITION FLOOR PLAN

A4 DEMOLITION CEILING PLAN

A5 PROPOSED FLOOR PLAN

A6 PROPOSED CEILING PLAN

A7 PROPOSED FURNITURE PLAN

A8 ELEVATIONS & DETAILS

A9 ELEVATIONS

A10 ELEVATIONS

MECHANICAL:

DWG No: DWG TITLE

M-0 TITLE SHEET

M-1.1 GENERAL MECHANICAL SPECIFICATIONS

M-1.2 HVAC SPECIFICATIONS

M-1.3 HYDRONIC SYSTEMS SPECIFICATIONS

M-1.4 PLUMBING SPECIFICATIONS

M-1.5 FIRE PROTECTION SPECIFICATIONS AND LEGEND I

M-1.6 MECHANICAL LEGEND II

M-1.7 MECHANICAL SCHEDULES AND DETAILS

M-2.1 LAB DEMOLITION FLOOR PLAN - HVAC

M-2.2 NEW LAB FLOOR PLAN - HVAC

M-2.3 NEW LAB FLOOR PLAN - HVAC PIPING

M-3.1 NEW LAB FLOOR PLAN - PLUMBING AND DRAINAGE

M-4.1 NEW LAB FLOOR PLAN - FIRE PROTECTION

ELECTRICAL:

DWG No. DWG TITLE

E1 ELECTRICAL NOTES & SPECIFICATIONS

E2 POWER & SYSTEMS DEMOLITION PLAN

E3 LIGHTING DEMOLITION PLAN

E4 POWER & SYSTEMS PROPOSED PLAN

E5 LIGHTING PROPOSED PLAN

E6 ELECTRICAL - DALI DETAILS

Page 2: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

UP

UP

UP

J1

24

a

J1

24

b

J1

24

cJ1

24

d

J1

09

J1

09

a

J1

09

b

J1

07

J1

05

J1

03

J1

01

J1

00

a

J1

00

J1

02

J1

04

J1

06

J1

06

a

J1

08

a

J1

08

b

J1

20

J1

12

J1

10

J1

16

J1

16

a

J1

25

J1

22

J1

22

a

JS

10

1

JS

10

2

JS

10

3

JS

10

4

I.T

.

EL

EV

AT

OR

MA

CH

IN

E R

M

SP

RIN

KLE

R

RM

TIM

H

OR

TO

NS

B.F

. W

/R

M

EL

EC

TR

IC

AL

RM

20

4 F

t.²

201

F

t.²

33

1 F

t.²

72

5 F

t.²

22

2 F

t.²

34

9 F

t.²

45

9 F

t.²

12

37

F

t.²

32

7 F

t.²

12

54

F

t.²

961

F

t.²

36

4 F

t.²

33

6 F

t.²

733

8 F

t.²

10

8 F

t.²

85

F

t.²

44

F

t.²

71 F

t.²

EL

EV

.

NO

.2

EL

EV

.

NO

.1

20

89

F

t.²

90

0 F

t.²

227

Ft.²

57

8 F

t.²

10

3 F

t.²

18

0 F

t.²

25

7 F

t.²

263

F

t.²

23

4 F

t.²

J124e

OF

FIC

E

320 S

Q.F

T

J124d

OF

FIC

E

204 S

Q.F

T

J124c

OF

FIC

E

201 S

Q.F

T

J124b

OF

FIC

E

331 S

Q.F

T

J109

WO

RK

RO

OM

725 S

Q.F

T

J109a

CH

EC

K O

UT

222 S

Q.F

T

J109b

BO

OK

D

RO

P

J107

I.T

.

349 S

Q.F

T.

J120

ELE

V.M

AC

H. R

OO

M

108 S

Q.F

T

J112

B.F

. W

AS

HR

OO

M

85 S

Q.F

T

J108b

ME

NS

282 S

Q.F

T

J110

ELE

CT

RIC

AL R

OO

M

336 S

Q.F

T

J108a

WO

ME

NS

282 S

Q.F

T

J116

ST

OR

AG

E

459 S

Q.F

T

J122

CO

RR

ID

OR

578 S

Q.F

T

ELE

V. 1

ELE

V.2

J124a

LE

AR

NIN

G C

OM

MO

NS

7338 S

Q.F

T

J122a

VE

ST

IB

ULE

103 S

Q.F

T

J116a

SP

RIN

KLE

R R

OO

M

44 S

Q.F

T

J125

CO

RR

ID

OR

180 S

Q.F

T

J106a

OB

SE

RV

AT

IO

N

327 S

Q.F

T

J106

CO

NS

ULT

AT

IO

N LA

B

1237 S

Q.F

T

J104

CLA

SS

RO

OM

1254 S

Q.F

T.

J100a

ST

UD

Y A

RE

A

227 S

Q.F

T

J102

JA

N.

71 S

Q.F

T

J101

CLA

SS

R

OO

M

961 S

Q.F

T.S

Q.F

T

J103

TIM

H

OR

TO

NS

364 S

Q.F

T.

J105

LO

UN

GE

900 S

Q.F

T.

J100

CO

RR

ID

OR

-0"

-0"

-0"

J5

J4

J3

J2

J1

J6

J7

A C

R

A C

R

A C

R

A C

R

2

S1

J-WING - FIRST FLOOR

NTS

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

SITE & KEY PLAN

AS NOTED

A1

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N

N

PROJECT LOCATION

PARKING

X

1

S1

DAVIS CAMPUS SITE PLAN

NTS

J-WING

CENTRE

STUDENT

RESIDENCE

ANNEX

BUILDING

H-WING

BUILDING

STUDENT

CENTRE

McLAUGHLIN

BUILDING

GRAVEL ROAD

OVERFLOW

PARKING

M

cLA

U

G

H

LIN

R

O

A

D

COMMERCIAL

RETAIL

CENTRE

BRAMPTON SPORTS

CENTRE

COLLEGE

GATEWAY

LONG TERM

CARE CENTRE

(BY OTHERS)

SHERIDAN COLLEGE DR.

FACILITIES PARKING

LOT

MA

IN

TE

NA

NC

E

YA

RD

POND

WOODED

AREA

WOODED

AREA

STEELS AVENUE

WOODED

AREA

SPORTS

FIELD

B-WING

BUILDING

C-WING

SCOPE OF WORK

J106

ENTRANCE

AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
FC
Page 3: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

DENOTES EXISTING TO BE

REMOVED

D

DENOTES EXISTING TO REMAINE

DENOTES EXISTING TO BE

RELOCATED

R

DENOTES EXISTING IN RELOCATED

POSITION

RP

DENOTES WEATHERPROOFWP

GROUND FAULT INTERRUPTERGFI

DENOTES DEVICE TO BE MOUNTED

COUNTER HEIGHT

CH

DENOTES DEVICE TO BE FLUSH

MOUNTED IN MILLWORK

MW

DENOTES WIRE GUARDWG

DENOTES KEY OPERATEDK

DENOTES TWIST LOCKTL

WITHW/

COMPLETE WITHC/W

GYPSUM WALLBOARDGWB

GEORGIAN WIRED GLASSGWG

ON CENTRE (s)O/C

TYPICALTYP

REVERSE OSMOSISRO

COLD WATERCW

HOT WATERHW

ABBREVIATIONS:

ACOUSTICAL TILE/PANELACT

BOTH SIDESB/S

ABOVE FINISHED FLOORAFF

CENTRE ON CENTREC/C

DIAMETERDIA

DRAWINGDWG

EQUALEQ

HOLLOW METALHM

HEATING/ VENTILATION/ AIR

CONDITIONING

HVAC

NOT TO SCALENTS

OPEN WEB STEEL JOISTOWSJ

UNDERSIDEU/S

RUBBER BASERB

STAINLESS STEELSS

TELEPHONETEL

TELEVISIONTV

VACUUMV

GASG

COMPRESSED AIRCA

FLOOR DRAINFD

SYMBOL DEFINITION

CIRCUITCCT

QUANTITYQTY

DENOTES SHERIDAN NETWORK

(RELATES TO DATA DROP

REQUIREMENTS)

S

DENOTES LOCAL NETWORK

(RELATES TO DATA DROP

REQUIREMENTS)

L

LEGENDS:

1

AX

1

AX

1

AX

1

AX

1

ARCHITECTURAL:

####

SPECIFICATION / MATERIAL TAG

SYMBOL DEFINITION

PARTITION / WALL TAG

EXTERIOR ELEVATION MARKER

INTERIOR ELEVATION MARKER

SECTION MARKER

DETAIL CALL OUT

PAINT COLOR TAG

P1

FLOOR TYPE TAG

F#

WINDOW TAG

DOOR TAG

W#

D#

EXISTING ELEVATION

NEW ELEVATION

0

0

0

.

0

0

0

000.000

BB11

FM Office

- sq ft.

ROOM TAG

EXISTING WALL ASSEMBLY TO

REMAIN

NEW WALL ASSEMBLY

EXISTING WALL ASSEMBLY TO BE

DEMOLISHED

LINE TYPE DENOTES EXISTING

OBJECT TO REMAIN

LINE TYPE DENOTES EXISTING

OBJECT TO BE DISPOSED OFFSITE

OR DISASSEMBLED AND

RELOCATED - REFER TO NOTES FOR

FURTHER INSTRUCTION

MISCELLANEOUS:

DENOTES REFER TO NOTE (s)

SYMBOL DEFINITION

DENOTES GENERAL TASK (s) FOR

SCOPE OF WORK AREA

1

1

GENERAL CONSTRUCTION NOTES

1. MATERIALS, CONSTRUCTION & INSTALLATION METHODS SHALL COMPLY WITH

THE LATEST EDITION OF THE ONTARIO BUILDING CODE CONTAINING O. REG.

350/06, REGIONAL MUNICIPALITY PUBLIC WORKS DEPARTMENT AND THE

LOCAL BUILDING DEPARTMENT AND FIRE DEPARTMENT BY-LAWS DESIGN

CRITERIA, CONSTRUCTION STANDARDS AND SPECIFICATIONS. ALL WORK

SHALL ALSO COMPLY WITH OTHER CODES, STANDARDS AND REGULATIONS

REFERRED TO IN THE ABOVE DOCUMENTS AND ADOPTED BY THE AUTHORITIES

HAVING JURISDICTION.

2. IF DRAWINGS & SPECIFICATIONS CONFLICT WITH REGULATIONS & BY-LAWS,

CONTRACTOR(S) SHALL NOTIFY CONSULTANT IN WRITING FOR CLARIFICATION.

IN NO INSTANCE REDUCE STANDARDS OF DRAWINGS BY APPLYING ANY

CODES OR STANDARDS. ALL MATERIALS AND METHODS MUST AT LEAST

MATCH EXISTING BASE BUILDING STANDARDS - BUILDING OWNER /

OPERATOR TENANT MECHANICAL REQUIREMENTS FORM AN INTEGRAL PART OF

THESE SPECIFICATIONS.

3. DRAWINGS ONLY SHOW GENERAL INTENT AND SCOPE OF WORK AND NOT

EXACT DETAILS OF INSTALLATION. CONTRACTOR SHALL PROVIDE ALL

MATERIALS & ACCESSORIES NECESSARY FOR COMPLETE AND FULLY

OPERATIONAL MECHANICAL SYSTEMS SHOWN. BEFORE SUBMITTING PRICES,

CONTRACTORS SHALL REVIEW ALL PERTINENT DRAWINGS & ANY RELEVANT

ON-SITE CONDITIONS TO VERIFY THAT WORK CAN BE CARRIED OUT AS

SHOWN ON DRAWINGS. NO CLAIMS FOR EXTRA PAYMENTS WILL BE

CONSIDERED FOR FAILURE TO DO SO. CONTRACTOR(S) WILL ALSO MAKE

ALLOWANCES IN TENDERING FOR SPACE LIMITATIONS & THE SIMULTANEOUS

WORKING OF DIFFERENT TRADES. ANY DRAWING OF FLOOR SLABS MUST BE

CARRIED OUT AS PER BUILDING MANAGER'S STANDARDS, WITH X-RAY IF

REQUIRED.

4. THE CONSULTANT RESERVES THE RIGHT TO MAKE REASONABLE CHANGES

REQUIRED TO ACCOMMODATE CONDITIONS ARISING DURING THE PROGRESS OF

THE WORK, AT NO EXTRA COST TO THE OWNER.

5. CONTRACTORS SHALL MAINTAIN MARKED-UP PRINTS OF "AS-BUILT"

CONDITIONS AS THE JOB PROGRESSES AND, AT THE END OF CONSTRUCTION,

CONTRACTOR SHALL OBTAIN & PAY FOR ONE SET OF REPRODUCIBLE

DRAWINGS AND TRANSFER ALL "AS-BUILT" CONDITIONS TO THESE DRAWINGS.

THESE DOCUMENTS, SHOWING APPROXIMATE FINAL LOCATIONS & ELEVATIONS

OF ALL MECHANICAL SYSTEMS, ESPECIALLY ANY BURIED & CONCEALED

WORKS, SHALL BE PROVIDED TO THE CONSULTANT FOR REVIEW & RECORD.

6. CONTRACTORS SHALL PROVIDE SIX COPIES OF CLEARLY IDENTIFIED, PROJECT

SPECIFIC, SHOP DRAWINGS FOR ALL FIXTURES AND EQUIPMENT FOR

APPROVAL BEFORE ORDERING. EQUIPMENT, DEVICES & FIXTURES SHALL BE

SUPPLIED WITH ALL ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.

CONTRACTOR WILL REVIEW SHOP DRAWINGS PRIOR TO SUBMISSION, THUS

INDICATING THAT HE HAS DETERMINED & VERIFIED THAT ALL MATERIALS,

CATALOG NUMBERS ETC., PERFORMANCES, SIZES AND AVAILABLE SPACE AND

FIELD CONDITIONS MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.

ALL MATERIALS USED MUST BE NEW, CLEAN AND FREE OF DEFECTS.

7. AT THE END OF THE PROJECT, CONTRACTORS SHALL PROVIDE 4 OPERATING

AND MAINTENANCE INSTRUCTION MANUALS WITH WARRANTIES, CERTIFICATIONS,

REPORTS, OPERATING INSTRUCTIONS AND A COPY OF CONSULTANT REVIEWED

SHOP DRAWINGS.

8. CONTRACTORS SHALL ONLY MAINTAIN QUALIFIED PERSONNEL & SUPPORTING

STAFF, AT THE SITE, WHO ARE EXPERIENCED IN COMPARABLE PROJECTS. IF

THE BUILDING MANAGER REQUIRES WORK TO BE DONE AFTER HOURS, THIS

MUST BE ALLOWED FOR AND ARRANGEMENTS MADE BY THE CONTRACTOR

FOR ACCESS. CONTRACTORS SHALL BE RESPONSIBLE FOR MAINTAINING

GOOD ORDER AND DISCIPLINE AMONG THEIR EMPLOYEES, AND FOR REMOVING

DEBRIS AND MAINTAINING A CLEAN WORK AREA, DURING, AND UPON

COMPLETION OF THE PROJECT.

9. CONTRACTORS SHALL WARRANTY HIS WORK, PARTS AND LABOR, FOR A

PERIOD OF 1 YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER.

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

A2

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

ARCHITECTURAL NOTES &

ABBREVIATIONS

Page 4: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

J125

CORRIDOR

180 SQ.FT

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

DEMOLITION FLOOR PLAN

1

A3

DEMOLITION FLOOR PLAN

3/16" = 1'-0"

NOTES:

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

A3

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

NN

1

3

4

REMOVE AND DISPOSE OFFSITE EXISTING FLOORING AND

WALL BASE THROUGHOUT, UNLESS WHERE OTHERWISE

NOTED.

5

DISASSEMBLE AND DISPOSE OFF SITE ALL FURNITURE

UNLESS OTHERWISE NOTED.

COORDINATE SCOPE OF MECHANICAL, ELECTRICAL, AND

PLUMBING DEMOLITION DRAWINGS. SEE SPECIFICATIONS.

REMOVE AND PROTECT TACK BOARD AND WHITE BOARD TO BE

REUSED IN SAME SPACE. PLEASE REFER TO PROPOSED FLOOR

PLAN AND ELEVATIONS. COORDINATE WITH SHERIDAN P.M.

1

1

1

2 KEEP AND PROTECT EXISTING PROJECTOR WITH ITS CAGE.

2

1

1

1

Page 5: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

J125

CORRIDOR

180 SQ.FT

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

9

'

-

8

"

9

'

-

8

"

9

'

-

8

"

9

'

-

8

"

9

'

-

8

"

9

'

-

8

"

DEMOLITION CEILING PLAN

1

A4

DEMOLITION CEILING PLAN

3/16" = 1'-0"

NOTES:

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

A4

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

1

2

COORDINATE SCOPE OF MECHANICAL, ELECTRICAL, AND

PLUMBING DEMOLITION AND PROPOSED DRAWINGS.

DEMOLISH AND DISPOSE OFFSITE ALL EXISTING CEILING

TILES, ALL SUSPENDED CEILING HANGERS, AND T-BARS,

UNLESS OTHERWISE NOTED.

3 MODIFY ALL FIRE DEVICES AND SPEAKERS TO ACCOMMODATE

NEW CEILING FINISH.

Page 6: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

41'-0"10'-10"

7'-10"

29

'-8

"

5'-3

3

4

"

1'-3"

3'-10

1

2

"4'-0

1

2

"

7'-10"1'-3"

5'-5

1

8

"3'-10

1

2

"5'-8

5

8

"

J125

CORRIDOR

180 SQ.FT

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

29

'-8

"

16

'-4

"

19'-0"22'-0"

1'-3" 1'-5"

P1

P1

1

A9

1

A10

3

A9

3

A10

2

A10

4

A10

5

A10

P2P2P2P2 P2

P2

P2

P2P2P2

P2

P2

P2

F1

F1

2

A9

F2

F1 F2

P2

P4

P3

P3

P4

FLOORING SCHEDULE

SIZE: 9.85" X 39.4"

F1

CARPET FLOORING 1

MILLIKEN - FLOOR COVERING

COLOUR: DRY DOCK COL 126-5

SIZE: 9.85" X 39.4"

CARPET FLOORING 2

MILLIKEN - FLOOR COVERING

COLOUR: FELT GREY COL 5

SIZE: 9.85" X 39.4"

CARPET FLOORING 3

MILLIKEN - FLOOR COVERING

COLOUR: OCEAN MIST COL 126

WALL BASE: JOHNSONITE - TRADITION 20

CHARCOAL WG

PROFILE/ HEIGHT: HIGH COVE/ 4"

SIZE: 9.85" X 39.4"

F2

VINYL FLOORING 4

MILLIKEN - PIKE IN CLOUD

COLOUR: PIK144 VERTICAL ASHLAR

P1

P2

P3

PAINT SCHEDULE

ACCENT WALL

SW - 6790 ADRIATIC SEA, SATIN FINISH

WALLS

SW - 7646 FIRST STAR, SATIN FINISH

P4

DOORS

SW - 7646 FIRST STAR, SATIN FINISH

DOOR FRAMES

SW - 7645 THUNDER GRAY, SCUFF-X,

PEARL (BENJAMIN MOORE)

PROPOSED FLOOR PLAN

1

A5

PROPOSED FLOOR PLAN

3/16" = 1'-0"

NOTES:

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

A5

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

NN

1 PROVIDE BACKING IN DRY WALL IN ALL AREAS WHERE THERE

WILL BE CABINETS, SINK, WHITE BOARD AND TACK BOARD.

REFER TO PROPOSED FURNITURE PLAN AND ELEVATIONS

FOR LOCATIONS. TO BE COORDINATED ON SITE TOO.

3

PATCH & PREP FLOOR TO ACCOMMODATE NEW FLOORING

2

PREP AND PATCH WALL FOR PAINTING, REFER TO PAINT

SCHEDULE FOR PROPOSED PAINT COLORS. UNLESS

OTHERWISE NOTED

4

SUPPLY AND INSTALL FLOORING, TRANSITION STRIP(S) AND

WALL BASE AS PER SPECIFICATIONS AND DRAWING.

5

6

TRENCH PATHWAYS TO ACCOMMODATE SERVICES AS PER

DRAWINGS. COORDINATE WITH MECHANICAL AND ELECTRICAL

FOR ADDITIONAL PATCH WORK/FLOORING. BACKFILL AND

POUR CONCRETE UPON SERVICE RUN COMPLETION.

RE-INSTALL TACK BOARDS AND WHITE BOARD ON NEW

LOCATIONS. REFER TO ELEVATIONS AND FURNITURE PLAN.

7

COORDINATE WASHROOM FLOORING INSTALL WITH SHERIDAN

COLLEGE. TO BE INSTALLED BY OTHERS.

DOOR TO BE PAINTED ONLY INSIDE OF THE ROOM.8

8

Page 7: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

J125

CORRIDOR

180 SQ.FT

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

9'-8"

9'-8"

9'-8"

9'-8"

9'-8"

S

S

S

S

S

S

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

EMG

PROPOSED CEILING PLAN

1

A6

PROPOSED CEILING PLAN

3/16" = 1'-0"

NOTES:

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

A6

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

1SUPPLY AND INSTALL 24" X 24" T.BAR AND TILES AS PER

SPECIFICATIONS. REFER TO DRAWING FOR FINISHED

HEIGHTS. ENSURE ALL FURNITURE, WALLS, FLOORING ARE

PROTECTED. COORDINATE FINAL HEIGHTS WITH P.M. PRIOR

TO INSTALL.

NOTE:

T.BAR LAYOUT TO MATCH DRAWING, COORDINATE WITH

LIGHTING LAYOUT. VERIFY WITH SHERIDAN COLLEGES P.M.

PRIOR TO INSTALL.

SPECIFICATION: ARMSTRONG - ULTIMA LAY-IN - 1910 FINE

TEXTURE 24"X24"x3/4", GRID FACE 15/16", SQUARE LAY-IN,

WHITE

2

3

REFER TO MECHANICAL DRAWINGS FOR PROPOSED H.V.A.C.

4

REFER TO ELECTRICAL DRAWINGS FOR PROPOSED LIGHTING.

RELOCATE ALL FIRE DEVICES TO ACCOMMODATE NEW

CEILING FINISH

Page 8: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

J125

CORRIDOR

180 SQ.FT

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

EXISTING

VERTICAL

TACK BOARD

EXISTING

VERTICAL

TACK BOARD

48 - STRIVE STACKING CHAIRS WITH CASTERS

24 - MOBILE FLIP TABLES WITH CASTERS

8 - STORAGE UNITS

2 - VERTICAL EXISTING TACK BOARDS

EXISTING

TACK BOARD

TABLE STORAGE AREA

CHAIR

STORAGE

AREA

MICROWAVE

CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN

CHAIR

STORAGE

AREA

CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN

PROPOSED FURNITURE

PLAN

1

A7

PROPOSED FURNITURE PLAN

3/16" = 1'-0"

NOTES:

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

A7

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

1 FURNITURE BY OTHERS

Page 9: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

J125

CORRIDOR

180 SQ.FT

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

A C R

HARD SURFACE -

VINYL FLOORING

SOFT SURFACE -

CARPET FLOORING

TR

AN

SIT

IO

N

ST

RIP

F1

F1

F2

F1 F2

TRANSITION

STRIP

SOFT SURFACE -

CARPET FLOORING

FLOORING SCHEDULE

SIZE: 9.85" X 39.4"

F1

CARPET FLOORING 1

MILLIKEN - FLOOR COVERING

COLOUR: DRY DOCK COL 126-5

SIZE: 9.85" X 39.4"

CARPET FLOORING 2

MILLIKEN - FLOOR COVERING

COLOUR: FELT GREY COL 5

SIZE: 9.85" X 39.4"

CARPET FLOORING 3

MILLIKEN - FLOOR COVERING

COLOUR: OCEAN MIST COL 126

WALL BASE: JOHNSONITE - TRADITION 20

CHARCOAL WG

PROFILE/ HEIGHT: HIGH COVE/ 4"

SIZE: 9.85" X 39.4"

F2

VINYL FLOORING 4

MILLIKEN - PIKE IN CLOUD

COLOUR: PIK144 VERTICAL ASHLAR

PROPOSED FLOOR PLAN

1

A8

PROPOSED FLOORS PLAN

3/16" = 1'-0"

NOTES:

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

A8

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

1

SUPPLY AND INSTALL FLOORING, TRANSITION STRIP(S) AND

WALL BASE AS PER SPECIFICATIONS AND DRAWING.

Page 10: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

ELEVATIONS

1

A9

J106 NORTH ELEVATION

1/4" = 1'-0"

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

A9

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

2

A9

J106 EAST ELEVATION

1/4" = 1'-0"

3

A9

J106 SOUTH ELEVATION

1/4" = 1'-0"

AutoCAD SHX Text
TACK BOARD
AutoCAD SHX Text
SINK
AutoCAD SHX Text
STORAGE CABINET
AutoCAD SHX Text
STORAGE CABINET
AutoCAD SHX Text
STORAGE CABINET
AutoCAD SHX Text
STORAGE CABINET
AutoCAD SHX Text
WHITE BOARD
AutoCAD SHX Text
WHITE BOARD
AutoCAD SHX Text
WHITE BOARD
AutoCAD SHX Text
TACK BOARD
AutoCAD SHX Text
TACK BOARD
Page 11: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

ELEVATIONS

1

A10

J106A NORTH ELEVATION

1/4" = 1'-0"

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

A10

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

4

A10

J106 WEST ELEVATION

1/4" = 1'-0"

5

A10

J106 WEST ELEVATION

1/4" = 1'-0"

2

A10

J106A EAST ELEVATION

1/4" = 1'-0"

3

A10

J106A SOUTH ELEVATION

1/4" = 1'-0"

Page 12: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 13: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 14: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 15: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 16: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 17: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 18: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 19: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 20: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 21: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 22: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 23: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 24: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 25: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed
Page 26: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

LEGENDS:

SYMBOL

ELECTRICAL:

CEILING SUSPENDED LUMINAIRE

TYPE 'L1' AS SPECIFIED

DEFINITION

SPECIAL LUMINAIRE TYPE, REFER

TO LUMINAIRE SCHEDULE FOR

MORE DETAIL

TRACK MOUNTED LUMINAIRE, TYPE

AS SPECIFIED

POLE MOUNTED LUMINAIRE, TYPE

'H1' AS SPECIFIED

H1

SPECIFIED LUMINAIRE CONNECTED

TO EMERGENCY POWER SUPPLY

AND/OR NIGHT LIGHT CIRCUIT

ONE, TWO & THREE GANG SINGLE

POLE LIGHT SWITCHES (3-DENOTES

THREE WAY, LV-DENOTES LOW

VOLTAGE, H-DENOTES 347V)

DIMMER SWITCH (LV - DENOTES

0-10V DIMMING)

DALI WALL STATION (SUPPLIED BY

SHERIDAN) IN SINGLE GANG BOX C/W 3/4"

C IN WALL SPACE UP TO CEILING SPACE.

'KP-2D', 'KP-4D' OR 'KP-6D' DENOTES TWO,

FOUR OR SIX BUTTON VERSION C/W

MASTER ON/OFF & RAISE/LOWER.

DALI OCCUPANCY SENSOR (SUPPLIED

BY SHERIDAN). SHORT RANGE.

COOPER #: FLT-MTS6-DALI.

15A-1P, 120V, 5-15R CONFIGURATION

SINGLE RECEPTACLE WALL

MOUNTED

20A-1P, 120V, 5-20R CONFIGURATION

SINGLE RECEPTACLE WALL

MOUNTED

15A-1P, 120V, 5-15R CONFIGURATION

DUPLEX RECEPTACLE WALL

MOUNTED

20A-1P, 120V, 5-20R CONFIGURATION

DUPLEX RECEPTACLE WALL

MOUNTED

15A-1P, 120V, 15-15R

CONFIGURATION QUAD

RECEPTACLE WALL MOUNTED

OC1

S S

LV

S

T

S

3

D

DALI OCCUPANCY SENSOR (SUPPLIED

BY SHERIDAN). LONG RANGE.

COOPER #: FLT-MTS12-DALI.

KP-4

KP-2

D

S

S

H

GREENGATE SHORT RANGE OCCUPANCY

SENSOR (SUPPLIED BY SHERIDAN). .

COOPER #: OAC-DT-1000-R

DPP

Dali Power Pack, FLT-SP-347-DC1

OC2

OC3

L1

F1

CEILING SUSPENDED LUMINAIRE

TYPE 'F1' AS SPECIFIED

GREENGATE LONG RANGE OCCUPANCY

SENSOR (SUPPLIED BY SHERIDAN). .

COOPER #: OAC-DT-2000-ROC4

Dali Digital to Analog Converter,

FLT-DAC-DALI-DC1

DAC

DR

Dali Relay, FLT-HPRS-DALI

KP-6D

DUAL TECH LV OCCUPANCY SENSOR -

WALL MOUNT (GREENGATE)

OC5

SYMBOL

ELECTRICAL:

DEFINITIONSYMBOL

ELECTRICAL:

DEFINITION

15A -1P, 120V, 15-15R

CONFIGURATION DUPLEX

RECEPTACLE FLOOR MOUNTED

15A -1P, 120V, 15-15R

CONFIGURATION DUPLEX

RECEPTACLE CEILING MOUNTED

15A-1P, 120V, 15-15R

CONFIGURATION DUPLEX SPLIT

RECEPTACLE WALL MOUNTED

120V ELECTRICAL CONNECTION TO

EQUIPMENT AS NOTED

FB-X

FLOOR BOX TYPE X

POWER CORD REEL WITH CEILING

MOUNTED T-SLOT 20A-1P DUPLEX

OUTLET.

PCR

208V, 1Ø ELECTRICAL CONNECTION

TO EQUIPMENT AS NOTED

208V, 3Ø ELECTRICAL CONNECTION

TO EQUIPMENT AS NOTED

GREENGATE SHORT RANGE OCCUPANCY

SENSOR (SUPPLIED BY SHERIDAN). .

COOPER #: OAC-DT-1000-R

Dali Power Pack, FLT-SP-347-DC1

GREENGATE LONG RANGE OCCUPANCY

SENSOR (SUPPLIED BY SHERIDAN). .

COOPER #: OAC-DT-2000-R

Dali Digital to Analog Converter,

FLT-DAC-DALI-DC1

DR

Dali Relay, FLT-HPRS-DALI

DUAL TECH LV OCCUPANCY SENSOR -

WALL MOUNT (GREENGATE)

CEILING OR WALL MOUNTED 'EXIT'

LIGHT (SHADED QUADRANTS DENOTE

FACE DIRECTIONS) AND DIRECTIONAL

ARROWS AS INDICATED

COMMUNICATIONS (IT & SECURITY):

PROJECTOR C/W MOUNTING

APPARATUS

SYMBOL DEFINITION

ULTRA SHORT THROW PROJECTOR

C/W MOUNTING APPARATUS

EMERGENCY PHONE

ACCESS CARD READER (K -

DENOTES C/W KEYPAD)

WIRELESS ACCESS POINT

IP CLOCK

TELEPHONE

DATA OUTLET

FIRE AND LIFE SAFETY:

EXISTING FIRE SEPARATION TO

REMAIN

SYMBOL DEFINITION

0 HOUR FIRE SEPARATION

30 MINUTE (1/2 HR) FIRE

SEPARATION

45 MINUTE (3/4 HR) FIRE

SEPARATION

1 HOUR FIRE SEPARATION

1.5 HOUR SEPARATION

2 HOUR FIRE SEPARATION

0 0

1/2

3/4

1

1.5

2

1/2

3/4

1

1.5

2

LOCATION OF FIRE EXTINGUISHER

LOCATION OF FIRE HOSE CABINET

FIRE SPEAKER

FIRE SPEAKER W/ STROBE LIGHT

PULL STATION LOCATION

SPRINKLER HEAD LOCATION

HEAT DETECTOR

SMOKE DETECTOR

ACR - KACR

IP

TEL

#

FE

FHC

HD

SD

FLOOR MOUNTED DATA OUTLET

#

CEILING MOUNTED DATA OUTLET

#

SECURITY CAMERA

A/V SPEAKER

S

ZONE 1

ZONE 2

ZONE 3

ZONE 4

PROPOSED MECHANICAL/

ELECTRICAL CONTROLS

INSTALL THERMOSTAT AND ELECTRICAL CONTROLS SIDE BY

SIDE AT SAME A.F.F. ELEVATION BY THE DOOR. EXACT

LOCATIONS TBD. TO BE COORDINATED WITH MECHANICAL

AND ELECTRICAL.

40.5"

ZONE 1

ZONE 2

ZONE 3

ZONE 4

40.5"

O/C A.F.F. +/-O/C A.F.F. +/-

2'X2' RECESSED LED TROFFER LIGHT FIXTURE, 41W, 3024LM, 4000K, 347V,

COOPER METALUX ENCOUNTER PART #:

TYPE DESCRIPTION

LAMP DATA

MANUFACTURER / SEE NOTEMOUNTING

VOLTAGE

LUMINAIRE SCHEDULE

TYPE WATTS

T-BAR

RECESSED

35

F2

2'X2' RECESSED LED TROFFER LIGHT FIXTURE, 41W, 3024LM, 4000K, 347V,

DIMMING (10%-100%), DALI DRIVER, AND WHITE FINISH.

(ALL DALI LOOPS TO BE PROVIDED BY ELECTRICAL CONTRACTOR.)

COOPER METALUX ENCOUNTER PART #:

22EN-LD1-34-347-L840-5LTD-1-U

(SUPPLIED BY SHERIDAN COLLEGE)

347

LED

4000K

3466LM

TYPE S IP CLOCK REQUIREMENTS

MIN. 1" (25 mm) CONDUIT

ANGLED TOWARD MAIN

RUN (BY DIVISION 16).

DECIRA STYLE ADAPTER

BLANK

CAT6 MODULAR OUTLET

BLANK

SINGLE GANG BOX

COVERPLATE (BY DIV. 16)

TYPE S

TYPE S - WALL MOUNT CLOCK LOCATION

ONE (1) CATEGORY 6 DATA DROP

(BY COMMS) MOUNTED AT 12"

ABOVE ENTRANCE DOOR FRAME

TYPE S

1'-0"

5

7

8

"3

7

8

"

RECESSED AREA

BEHIND CLOCK

DESIGNATED

FOR DATA

CENTERED OVER DOOR FRAME

DENOTES DEVICE TO BE MOUNTED

COUNTER HEIGHT

CH

DENOTES TWISTLOCKTL

ABBREVIATIONS:

EXISTING TO REMAINE

DENOTES EXISTING ITEM TO BE

RELOCATED

R

DENOTES EXISTING ITEM TO BE REMOVEDD

DENOTES WEATHERPROOFWP

DENOTES EXISTING ITEM IN RELOCATED

POSITION.

RP

DEFINITION

GROUND FAULT INTERRUPTERGFI

SYMBOL

DENOTED PROPOSED ITEM TO BE ADDED.P

C IN WALL SPACE UP TO CEILING SPACE.

'KP-2D', 'KP-4D' OR 'KP-6D' DENOTES TWO,

GREENGATE SHORT RANGE OCCUPANCY

GREENGATE LONG RANGE OCCUPANCY

WALL MOUNTED EMERGENCY

LIGHTING BATTERY UNIT BU-1, C/W

DUPLEX OUTLET

RECESSED CEILING MOUNTED

EMERGENCY LIGHTING REMOTE

HEAD

SINGLE OR DOUBLE SURFACE

MOUNTED EMERGENCY LIGHTING

REMOTE HEADS

347V OR 600V ELECTRICAL

CONNECTION TO EQUIPMENT AS

NOTED

ELECTRICAL PANEL

CONTACTOR

HAND DRYER

DISCONNECT SWITCH - UNFUSED

DISCONNECT SWITCH - FUSED

WALL MOUNTED JUNCTION BOX FOR

POWER CONNECTION TO MODULAR

FURNITURE (F-DENOTES FLOOR,

C-DENOTES CEILING)

WALL MOUNTED JUNCTION BOX FOR

COMMUNICATION CABLING FOR

MODULAR FURNITURE (F-DENOTES

FLOOR, C-DENOTES CEILING)

EXISTING HARDWIRED ANALOG

CLOCK

BU - 1

J

C

HD

P

C

PAC POLE (SINGLE CHANNEL)

PAC POLE (SPLIT MULTI-CHANNEL)

JUNCTION BOX

AUTOMATIC DOORAD

SYMBOL DEFINITION

GREENGATE SHORT RANGE OCCUPANCY

GREENGATE LONG RANGE OCCUPANCY

DENOTES ISOLATED GROUND RECEPTACLEIG

ELECTRICAL NOTES &

SPECIFICATIONS

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

E1

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

ELECTRICAL NOTES

INSTALLATION REQUIREMENTS

1. ALL EQUIPMENT MATERIAL, DEVICES AND WIRING SHALL CONFORM TO THE

CANADIAN ELECTRICAL CODE OR CODE HAVE JURISDICTION FOR THE

PURPOSE FOR WHICH THEY ARE TO BE USED AND SHALL BEAR THE

APPROVAL OF THE CSA AND/OR ULC OR HAVE SPECIAL APPROVAL OF THE

INSPECTION AUTHORITY.

2. ALL MATERIAL AND EQUIPMENT SHALL BE NEW. WHERE MANUFACTURER IS

NOT SPECIFIED, MATERIAL AND EQUIPMENT SHALL BE OF HIGH

COMMERCIAL QUALITY AND CONSISTENT WITH BASE BUILDING STANDARDS.

3. VERIFY ON SITE EXISTING CIRCUITS USED, SPARE BREAKERS AND SPACES

AVAILABLE IN EXISTING PANEL BOARDS.

4. ALL CONDUIT SHALL BE MINIMUM OF

3

4

" (21mm) UNLESS OTHERWISE NOTED.

NO SECTION OF CONDUIT SHALL BE LONGER THAN 30 METERS (100 FEET) OR

CONTAIN MORE THAN TWO 90-DEGREE BENDS BETWEEN PULL BOXES.

5. AC90 (BX) ARMORED CABLE CAN BE USED IN EXISTING WALL PARTITIONS.

CONDUIT SHALL BE USED AT ALL NEW WALL PARTITIONS AND EXPOSED

CEILING SPACE. DO NOT RUN ARMORED CABLE IN EXPOSED AREAS OR INTO

PANEL BOARDS.

6. ALL WIRING SHALL BE COPPER, TYPE RW-90 XLPE INSULATION. MINIMUM

WIRE SIZE FOR 120V BRANCH WIRING SHALL BE NO.12 AWG COPPER. IF

DISTANCE BETWEEN ELECTRICAL PANEL AND FIRST OUTLET EXCEEDS 80

FEET, A NO. 10 AWG COPPER SHALL BE USED (UP TO 120 FEET). VOLTAGE

DROP IN ANY CIRCUIT SHALL NOT EXCEED 3%.

7. PROVIDE A DEDICATED NEUTRAL AND GROUND WIRE OF THE SAME AWG AS

THE CIRCUIT CONDUCTOR FOR ALL CIRCUITS IDENTIFIED ON THE

DRAWINGS.

8. IN SYSTEM FURNITURE CONNECTION, A MINIMUM OF #10 AWG MUST BE

USED FOR THE NEUTRAL FROM THE ELECTRICAL PANEL TO THE CLOSEST

JUNCTION BOX TO THE CIRCUIT TERMINATION.

9. GROUNDING OF CONDUIT SYSTEMS: ALL CONDUIT SYSTEMS ARE TO BE

INDEPENDENTLY GROUNDED WITH THE USE OF A DEDICATED GROUND

WIRE. CONDUIT IS NOT TO BE USED AS GROUNDING OR BONDING METHODS.

10. CONVENIENCE AND DEDICATED CIRCUIT DUPLEX RECEPTACLES SHALL BE

LEVITON, DECORA SERIES OR APPROVED EQUAL.

11. 347 V LIGHT SWITCHES SHALL BE LEVITON, DECORA SERIES OR APPROVED

EQUAL.

12. ALL LIGHTING FIXTURES SHALL BE AS SPECIFIED, COMPLETE WITH LAMPS

AND ACCESSORIES.

13. ALL EXISTING RELOCATED AND NEW FLUORESCENT LUMINAIRES SHALL BE

INDEPENDENTLY SUPPORTED FROM CEILING STRUCTURE.

14. ALL BASE BUILDING FIXTURES ON EMERGENCY POWER SHALL BE

HARDWIRED.

15. OUTLETS SHALL NOT BE INSTALLED BACK TO BACK IN PARTITIONS.

STAGGER TO PREVENT SOUND TRANSFER.

16. ALL SURFACE MOUNTED POWER & COMM RECEPTACLES TO BE PROVIDED

WITH CAST ALUMINIUM FS OR FD TYPE OUTLET BOXES. (HUBBELL KILLARK

FS/FD SERIES OR APPROVED EQUIVALENT).

GENERAL REQUIREMENTS

1. COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF ALL

APPLICABLE CODES, THE REQUIREMENTS OF FEDERAL, PROVINCIAL AND

MUNICIPAL CODES, LOCAL BY-LAWS, THE APPLICABLE STANDARDS OF THE

UNDERWRITERS' ASSOCIATION AND ALL AUTHORITIES HAVING

JURISDICTION. ALSO, COMPLY WITH THE STANDARDS FOR THE BUILDING(S)

IN WHICH THE WORK IS TO TAKE PLACE.

2. THE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS SHALL BE READ IN

CONJUNCTION WITH THE ELECTRICAL DRAWINGS AND SPECIFICATIONS.

3. ARRANGE FOR INSPECTION OF ALL WORK BY THE AUTHORITIES HAVING

JURISDICTION OVER THE WORK. ON COMPLETION OF THE PROJECT,

PRESENT TO SHERIDAN THE FINAL UNCONDITIONAL CERTIFICATE OF

APPROVAL FROM THE INSPECTION AUTHORITIES.

4. DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW THE SCOPE OF

THE WORK, GENERAL ARRANGEMENT AND LOCATION OF THE EQUIPMENT

AND OUTLETS. THEY ARE NOT INTENDED TO SHOW THE DETAILS OF THE

INSTALLATION. VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF ALL

WIRING DEVICES.

5. ALL LUMINARIES, EQUIPMENT AND MATERIALS SHALL BE C.S.A. APPROVED.

6. PROVIDE FIREPROOF SEALS IN ACCORDANCE WITH THE LOCAL CODES AND

STANDARDS AND THE ONTARIO BUILDING CODE.

7. PROVIDE ALL ELECTRICAL WIRING TO FURNITURE SYSTEMS. CONNECTION

BY OTHERS.

8. SUPPLY AND INSTALL ALL CONDUIT FOR DATA. SUPPLY AND INSTALLATION

OF DATA CABLING BY OTHERS.

9. CONTRACTOR TO COMPLETE ALL LOAD CALCULATIONS & TO COMPLETE

WORK ACCORDING TO ESA STANDARDS AND APPLICABLE CODES

DEMOLITION AND WORK IN EXISTING BUILDING

1. DISCONNECT AND REMOVE ALL ELECTRICAL EQUIPMENT INCLUDING

LUMINARIES, RECEPTACLES AND WIRING FROM AREAS BEING ALTERED OR

DEMOLISHED. WIRING, CONDUIT AND EQUIPMENT REQUIRED TO MAINTAIN

SERVICES IN OTHER PARTS OF THE BUILDINGS SHALL BE TEMPORARILY

SUPPORTED, REROUTED, SERVICED OR RELOCATED AS REQUIRED.

OBSOLETE CONDUITS AND CABLES SHALL BE DISCONNECTED FROM THEIR

SOURCE OF SUPPLY AND REMOVED. ALL EXISTING WIRING NOT REMOVED

SHALL BE DISCONNECTED, MADE SAFE, IDENTIFIED AND BLANKED-OFF.

2. COORDINATE REQUIRED SHUTDOWNS OF EXISTING BASE BUILDING

SYSTEMS WITH SHERIDAN. EXISTING BUILDING MUST BE KEPT IN

OPERATION AT ALL TIMES. ASSUME FULL RESPONSIBILITY FOR DISRUPTION

TO EXISTING SERVICES.

3. NEW CONDUITS AND OTHER NEW SERVICES SHALL BE CAREFULLY ROUTED

SO THAT THEY DO NOT INTERFERE WITH ANY EXISTING INSTALLATIONS.

4. COORDINATE WITH SHERIDAN ALL CONDUITS RUNNING IN OTHER TENANT

AREAS.

Page 27: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

J125

CORRIDOR

180 SQ.FT

A C R

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

S

S

S S

S

S

S

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

E2

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

POWER & DATA -

DEMOLITION PLAN

1

E2

POWER & DATA - DEMOLITION PLAN

3/16" = 1'-0"

NOTES:

11

1

1 1

1

1

REMOVE AND PROTECT EXISTING SPEAKERS AND FIRE

SPEAKERS, RE-INSTALL ONCE THE NEW CEILING TILES ARE

INSTALLED. REFER TO PROPOSED CEILING PLAN.

2

2

2 REUSE EXISTING WIRELESS ACCESS POINTS.

1

1

AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
R
Page 28: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

J125

CORRIDOR

180 SQ.FT

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

F1

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

E3

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

LIGHTING -

DEMOLITION PLAN

1

E3

LIGHTING - DEMOLITION PLAN

3/16" = 1'-0"

NOTES:

1

2

DISCONNECT AND DISPOSE OFF SITE ALL EXISTING LIGHT

FIXTURES INCLUDING ALL ASSOCIATED CONDUIT, WIRING,

LIGHT SWITCHES AND ALL ASSOCIATED LIGHTING CONTROLS.

ALL MATERIALS TO BE DISPOSED OFF SITE ACCORDING TO

CURRENT ENVIRONMENTAL PRACTICES. PROVIDE DISPOSAL

CERTIFICATE FOR ALL REMOVED AMPS. ASSIST WITH

SHERIDAN SUSTAINABILITY REPRESENTATIVE AS REQUIRED

FOR COMPLETION OF OAKVILLE HYDRO INCENTIVE

APPLICATION.

AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
Page 29: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

J125

CORRIDOR

180 SQ.FT

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

A C R

EXISTING

VERTICAL

TACK BOARD

EXISTING

VERTICAL

TACK BOARD

48 - STRIVE STACKING CHAIRS WITH CASTERS

24 - MOBILE FLIP TABLES WITH CASTERS

8 - STORAGE UNITS

2 - VERTICAL EXISTING TACK BOARDS

A C R

EXISTING

TACK BOARD

TABLE STORAGE AREA

CHAIR

STORAGE

AREA

MICROWAVE

CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN

CHAIR

STORAGE

AREA

CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN

AD AD

AD

AD

PP21 - CCT1

PP21 - CCT1

FOR MICROWAVE

PP21 - CCT2

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

E4

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

POWER & DATA -

PROPOSED PLAN

1

E4

POWER & DATA - PROPOSED PLAN

3/16" = 1'-0"

NOTES:

9

9

SUPPLY AND INSTALL A SHERIDAN APPROVED AUTOMATIC

DOOR OPENER, CONFIRM DOOR OPERATOR DETAILS WITH

PRE-QUALIFIED DOOR HARDWARE AND ACCESS CONTROL

VENDOR.

1 NOTE:

A. WIRING CLOSET TO BE USED: J109/107

B. LABELING CONVENTION USED: WIRING CLOSET # - LOCATION

ON THE PATCH PANEL (FOR EXAMPLE: C135-115-47)

C. PRIOR TO ANY I.T. RELATED WORK, GC AND/OR DATA

VENDOR SHALL CONTACT:

MARTIN NOWAKOWSKI 416-577-4969

DARKO RADMAN 647-234-4196

2 PROVIDE WARRANTY CERTIFICATE UPON PROJECT COMPLETION

TO SHERIDAN'S P.M.

3 PROVIDE ELECTRONIC COPY OF BOTH SUMMARY AND TEST

RESULTS (FOR ALL JOBS) TO SHERIDAN'S P.M.

4 PROVIDE ELECTRONIC COPY OF AS-BUILT O SHERIDAN'S P.M. IN

BOTH AUTOCAD AND PDF FORMAT.

5 FOR ADDITIONAL INFORMATION REFER TO THE "COMMUNICATIONS

INFRASTRUCTURE DESIGN GUIDE V.5 (SEPT. 2013)

6 SUPPLY AND INSTALL ALL DATA CABLING AS SPECIFIED. LABEL ALL

POWER AND DATA OUTLETS. FOR LOCATION AND LABELING

CONVENTION COORDINATE WITH SHERIDAN COLLEGE ELECTRICAL

ENGINEER AND IT GUIDELINES. DATA IS TO BE FED FROM WIRING

CLOSET ****. 1' PATCH CABLES AT CLOSET ONLY BLUE JACK

TERMINATION.

7 ELECTRICAL CONTRACTOR TO REVIEW ACTUAL SITE CONDITIONS

AND ADJUST CIRCUIT NUMBERS AS REQUIRED. ELECTRICAL

CONTRACTOR TO PROVIDE RED LINE MARK-UPS AND UPDATED

PANEL SCHEDULES AT THE END OF THE PROJECT.

8 COORDINATE ALL NEW POWER AND DATA LOCATIONS WITH

SHERIDAN PC PRIOR TO INSTALLATION.

10

RELOCATE ANY ELECTRICAL AS REQUIRED TO SUIT CEILING

REMOVAL AND INSTALLATION OF NEW CEILING. PROVIDE

TEMPORARY LIGHTING AS REQUIRED.

10

10

9

11

12

12

SUPPLY AND INSTALL NEW ACCESS CARD READER , SPEC

WILL BE PROVIDED BY PRE-QUALIFIED VENDOR.

EXTEND PROJECTOR CIRCUIT FOR NEW PROJECTOR OUTLET

IN CEILING SPACE.

11

Page 30: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

J125

CORRIDOR

180 SQ.FT

J106a

OBSERVATION

327 SQ.FT

J106

CONSULTATION LAB

1237 SQ.FT

A C R

EXISTING

VERTICAL

TACK BOARD

EXISTING

VERTICAL

TACK BOARD

48 - STRIVE STACKING CHAIRS WITH CASTERS

24 - MOBILE FLIP TABLES WITH CASTERS

8 - STORAGE UNITS

2 - VERTICAL EXISTING TACK BOARDS

EXISTING

TACK BOARD

TABLE STORAGE AREA

CHAIR

STORAGE

AREA

9'-8"

9'-8"

9'-8"

9'-8"

9'-8"

S

S

S

S

S

S

MICROWAVE

CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN

CHAIR

STORAGE

AREA

CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

F2

KP-4

KP

-4

J

KP-2

EMG

OC2

OC2

OC2

DPP

OC4

OC4

KP-2

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

AS NOTED

E5

-

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

LIGHTING -

PROPOSED PLAN

1

E5

LIGHTING - PROPOSED PLAN

3/16" = 1'-0"

NOTES:

LIGHT FIXTURES, DALI OCCUPANCY SENSORS, DALI WALL SWITCHES TO BE SUPPLIED BY SHERIDAN

COLLEGE. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONDUIT, WIRING AND MISC. MATERIAL

FOR A FULLY COMPLETE AND OPERATIONAL LIGHTING SYSTEM. ALL LIGHTING AND CONTROLS TO BE

INSTALLED TO SUIT MANUFACTURER'S RECOMMENDATIONS. REFER TO DALI LIGHTING CONTROL LAYOUT

DETAILS. FINAL DALI COMMISSIONING BY SHERIDAN COLLEGE/ COOPER LIGHTING. CONTRACTOR TO

COORDINATE AND ASSIST WITH COMMISSIONING OF DALI DEVICES AS REQUIRED.

PRIOR TO FINAL COMMISSIONING BY COOPER LIGHTING/ SHERIDAN COLLEGE, CONTRACTOR TO VERIFY

DALI WIRING BY FOLLOWING STEPS OUTLINED IN 'ELECTRICAL CONTRACTOR TESTING PROTOCOL

PRODUCTION CHECKLIST" DOCUMENT. CONTRACTOR MUST VERIFY VOLTAGE(S) OF DALI LOOP(S) TO

ENSURE IT IS LOW VOLTAGE (24V) PRIOR TO LANDING WIRES ON SHERIDAN LCP TERMINAL STRIPS.

NO MARRETS ALLOWED FOR ANY LIGHTING CONTROLS (DALI ON 0-10V) WIRING TERMINATIONS. USE

ONLY PUSH-IN WIRE CONNECTIONS (WAGO 221 SERIES) WITH CABLE RELEASE LEVERS AND RATED FOR

600V. ALL DALI WIRING TO BE PURPLE JACKETED AND ALL 0-10V WIRING TO BE GREY JACKETED

NEW LIGHT FIXTURE TO BE POWERED FROM EXISTING 347V NORMAL

POWERED LIGHTING CIRCUIT IN THE AREA. TYPICAL FOR AREA OR

FLOOR.

NEW LIGHT FIXTURE TO BE POWERED FROM EXISTING 347V

EMERGENCY LIGHTING CIRCUIT IN THE AREA. TYPICAL FOR AREA OR

FLOOR.

CEILING MOUNTED OCCUPANCY SENSOR. EXACT LOCATION OR

MOUNTING HEIGHT TO BE INSTALLED TO SUIT SITE CONDITIONS TO

ENSURE PROPER COVERAGE FOR ROOM AND TO SUIT

MANUFACTURER'S RECOMMENDATIONS. STEM MOUNT TO AVOID

CEILING INTERFERENCES AND COORDINATE LOCATIONS WITH

SHERIDAN PROJECT COORDINATOR. TYPICAL.

DALI LOOP WIRING (MIN2#16 AWG PURPLE WIRES C/W 600V INSULATION

RATING OR BELDEN 62004E.007.1000 PLENUM RATED CABLING C/W

VIOLET JACKET). REFER TO DALI LIGHTING CONTROL LAYOUT DETAILS

ON DRAWING E5. THE SHOWN DALI WIRING INTERCONNECTIONS ARE

ONLY DIAGRAMATIC. ORDER OF CONNECTIONS IN DRAWING IS

FLEXIBLE. HOME RUN DALI LOOP TO BE PROVIDED BACK TO LIGHTING

CONTROL PANEL (LCP) AS INDICATED. MECHANICALLY PROTECT DALI

WIRING IN CONDUIT (MINIMUM 3/4"C) WHEN ROUTED IN EXPOSED

CEILINGS OR NOT IN CABLE TRAY. ROUTING OF DALI PLENUM RATED

CABLES IN EXISTING CABLE TRAYS MUST BE REVIEWED/APPROVED

WITH SHERIDAN PROJECT COORDINATOR.

DALI WALL STATION IN RECESSED IN SINGLE GANG OUTLET BOX C/W

STAINLESS STEEL COVER PLATE. GANG MULTIPLE WALL STATIONS

WHERE MULTIPLE WALL STATIONS USED. TYPICAL.

EXTEND DALI LOOP WIRING (IN 3/4" CONDUIT) BACK TO EXISTING

SHERIDAN COLLEGE LIGHTING CONTROL PANEL BREAKOUT BOX

LOCATED IN IT CLOSET J107.

DALI POWER PACK. PROVIDE LOW VOLTAGE CONNECTION TO

GREENGATE SENSORS TO SUIT MANUFACTURER'S RECOMMENDATION.

PROVIDE #16/5 AWG LOW VOLTAGE WIRING BETWEEN DALI POWER

PACK AND SENSOR WIRED IN PARALLEL. [RED - RED (15VDC), BLUE -

BLUE (CONTROL), BLACK (COMMON), YELLOW - YELLOW (OCC), WHITE -

BROWN (COMMISSIONING).]

2

3

4

6

7

8

1

5

8

6

4

5

2

3

7

Page 31: J106 CHILD & YOUTH CARE LAB - Anacond Contracting Inc. · these documents, showing approximate final locations & elevations of all mechanical systems, especially any buried & concealed

NOTES

1. FOR A TYPICAL LIGHTING CIRCUIT FEEDING A

COMBINATION OF DALI DIMMABLE BALLASTS, FIELD

RELAYS DACS AND DIMMING MODULES, MAKE SURE TO

SPLIT UP THE CIRCUIT INTO DIFFERENT BRANCHES FOR

EACH FIELD RELAY AND DAC MODULES.

2. EACH FIFTH LIGHT LIGHTING CONTROL PANEL (LCP )

REQUIRES A DEDICATED 120VAC, 20A POWER FEED FROM

THE NORMAL-POWER ELECTRICAL PANEL. LOCATION OF

EACH LCP MUST BE CONFIRMED AND VERIFIED ONSITE.

3. EACH CAT6 RUN MUST NOT EXCEED A DISTANCE OF 100

METERS.

4. FOR DALI BUS TERMINATION OF BALLASTS, LED

MODULES, DAC MODULES, FIELD RELAYS, DIMMING

MODULES AND SENSORS , REFER TO THE "LIGHTING

CONTROL PANEL SCHEDULES" PROVIDED BY FIFTH LIGHT.

5. LINE VOLTAGE GROUND WIRE TO BE RUN

INDEPENDENTLY AS PER ELECTRICAL SPECIFICATIONS.

Power

Pack

FIFTH LIGHT DALI FIELD RELAY

FIELD

RELAY

LINE IN/BLACK

LINE OUT/BLACK

GROUND (EARTH GROUND)

LINE VOLTAGE

NEUTRAL

DALI BUS WIRE

DALI BUS WIRE

LIGHTING LOAD

LIGHTING LOAD

6

1. EACH DALI BUS REQUIRES TWO (2) #16 AWG WIRES MINIMUM. EACH PAIR OF DALI WIRES

CAN BE RUN IN FREE AIR OR IN THE SAME POWER CONDUIT AS THE LIGHTING BRANCH

CIRCUIT CONDUCTORS IF THE WIRES ARE INSULATED FOR AT LEAST THE SAME VOLTAGE

AS THAT OF THE CIRCUIT HAVING THE HIGHEST VOLTAGE. CONTRACTOR IS RESPONSIBLE

TO ENSURE INSTALLATION MEETS ALL LOCAL ELECTRICAL CODES.

2. EACH DALI BUS MUST NOT EXCEED A MAXIMUM DISTANCE OF 300 METERS BETWEEN THE

FURTHEST DALI DEVICE AND THE DESIGNATED LIGHTING CONTROL PANEL (LCP).

3. EACH DALI BUS CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI DEVICES, WHICH CAN BE

CONNECTED IN PARALLEL BUS CONFIGURATION. CONTRACTOR TO FOLLOW DALI BUS

DESIGN PROVIDED ON THE LIGHTING PLAN(S).

4. CONTRACTOR TO TERMINATE ALL DALI BUS WIRES AT A DESIGNATED LCP ACCORDING TO

THE "LCP SCHEDULE(S)" PROVIDED .

5. FOR A LIGHTING CIRCUIT FEEDING A COMBINATION OF DALI BALLASTS, FIELD RELAYS,

DAC AND DIMMING MODULES, MAKE SURE TO SPLIT UP THE CIRCUIT INTO DIFFERENT

BRANCHES FOR EACH FIELD RELAY AS SPECIFIED ON THE LIGHTING PLAN(S).

6. NEUTRAL AND GROUND WIRES ARE NOT REQUIRED FOR EACH FIELD RELAY.

NOTES

TO OTHER

LIGHTING LOADS

FIFTH LIGHT DALI-ANALOG CONVERTER (DAC) MODULE

DAC

MODULE

LINE IN/BLACK

LINE OUT/BLACK

GROUND (EARTH GROUND)

LINE VOLTAGE

NEUTRAL

DALI BUS WIRE

DALI BUS WIRE

LIGHTING LOAD

LIGHTING LOAD

6

1. EACH DALI BUS REQUIRES TWO (2) #16 AWG WIRES MINIMUM. EACH PAIR OF DALI WIRES

CAN BE RUN IN FREE AIR OR IN THE SAME POWER CONDUIT AS THE LIGHTING BRANCH

CIRCUIT CONDUCTORS IF THE WIRES ARE INSULATED FOR AT LEAST THE SAME VOLTAGE

AS THAT OF THE CIRCUIT HAVING THE HIGHEST VOLTAGE. CONTRACTOR IS RESPONSIBLE

TO ENSURE INSTALLATION MEETS ALL LOCAL ELECTRICAL CODES.

2. EACH DALI BUS MUST NOT EXCEED A MAXIMUM DISTANCE OF 300 METERS BETWEEN THE

FURTHEST DALI DEVICE AND THE DESIGNATED LIGHTING CONTROL PANEL (LCP).

3. EACH DALI BUS CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI DEVICES, WHICH CAN BE

CONNECTED IN PARALLEL BUS CONFIGURATION. CONTRACTOR TO FOLLOW DALI BUS

DESIGN PROVIDED ON THE LIGHTING PLAN(S).

4. CONTRACTOR TO TERMINATE ALL DALI BUS WIRES AT A DESIGNATED LCP ACCORDING TO

THE "LCP SCHEDULE(S)" PROVIDED .

5. FOR A LIGHTING CIRCUIT FEEDING A COMBINATION OF DALI BALLASTS, FIELD RELAYS,

DAC AND DIMMING MODULES, MAKE SURE TO SPLIT UP THE CIRCUIT INTO DIFFERENT

BRANCHES FOR EACH DALI-ANALOG CONVERTER (DAC) MODULE AS SPECIFIED ON THE

LIGHTING PLAN(S).

6. NEUTRAL AND GROUND WIRES ARE NOT REQUIRED FOR EACH DAC MODULE.

7. POLARITY FOR 0-10V WIRES MUST BE STRICTLY FOLLOWED FROM ONE FIXTURE TO THE

NEXT.

NOTES

+

-

+

-

TO OTHER

LIGHTING LOADS

TO OTHER

0-10V DIMMING FIXTURES

7

RED

N/WHITE

L/BLACK

DALI/PURPLE

DALI/PURPLE

RED

BLUE

BLUE

GND/GREEN

GROUND (EARTH GROUND)

NEUTRAL

LINE VOLTAGE

DALI LOOP TO OTHER BALLASTS (MAX. OF 63 PER LOOP)

DALI BALLAST

GENERIC DALI DIMMING BALLAST (1-LAMP FIXTURES)

FIXTURE CHASSIS

BALLAST DISCONNECT

TO LAMP HOLDERS

1. EACH DALI LOOP REQUIRES TWO (2) #16 AWG MINIMUM. PURPLE WIRES C/W

600V INSULATION RATING WHEN ROUTED WITH POWER WIRING IN CONDUIT

OR PLENUM-RATED CABLING C/W VIOLET JACKET (BELDEN 6200UE.0071000

C/W VIOLET JACKET).

2. EACH PAIR OF DALI WIRES CAN BE RUN IN FREE AIR OR IN THE SAME

POWER CONDUIT AS THE LIGHTING BRANCH CIRCUIT CONDUCTORS IF THE

WIRES ARE INSULATED FOR AT LEAST THE SAME VOLTAGE AS THAT OF THE

CIRCUIT HAVING THE HIGHEST VOLTAGE.

3. EACH DALI BUS LOOP MUST NOT EXCEED A MAXIMUM DISTANCE OF 300

METERS BETWEEN THE FURTHEST DALI DEVICE AND THE DESIGNATED

LIGHTING CONTROL PANEL (LCP).

4. EACH DALI BUS LOOP CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI

BALLASTS, WHICH CAN BE CONNECTED IN PARALLEL BUS CONFIGURATION.

THE NEAREST DALI DEVICE CAN BE "HOME-RUN" BACK TO THE DESIGNATED

LCP.

5. ELECTRICAL CONTRACTOR TO TERMINATE ALL DALI LOOP WIRES AT THE

LCP ACCORDING TO THE "LCP SCHEDULES" PROVIDED.

NOTES

DALI BUS

DALI BUS

FIFTH LIGHT DALI MULTI-TECH SENSOR

"DALIx"

1. EACH DALI BUS REQUIRES TWO (2) #16 AWG WIRES MINIMUM. EACH PAIR OF DALI WIRES CAN BE RUN IN FREE AIR OR IN

THE SAME POWER CONDUIT AS THE LIGHTING BRANCH CIRCUIT CONDUCTORS IF THE WIRES ARE INSULATED FOR AT

LEAST THE SAME VOLTAGE AS THAT OF THE CIRCUIT HAVING THE HIGHEST VOLTAGE. CONTRACTOR IS RESPONSIBLE TO

ENSURE INSTALLATION MEETS ALL LOCAL ELECTRICAL CODES.

2. EACH DALI BUS MUST NOT EXCEED A MAXIMUM DISTANCE OF 300 METERS BETWEEN THE FURTHEST DALI DEVICE AND

THE DESIGNATED LIGHTING CONTROL PANEL (LCP).

3. EACH DALI BUS CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI DEVICES, WHICH CAN BE CONNECTED IN PARALLEL BUS

CONFIGURATION. CONTRACTOR TO FOLLOW DALI BUS DESIGN PROVIDED ON THE LIGHTING PLAN(S).

4. CONTRACTOR TO TERMINATE ALL DALI BUS WIRES AT A DESIGNATED LCP ACCORDING TO THE "LCP SCHEDULE(S)"

PROVIDED .

NOTES

FIFTH LIGHT DALI 4 BUTTON KEYPAD w/ RAISE LOWER

DALI KEYPAD

DALI LOOP

DALI LOOP

1. EACH DALI BUS REQUIRES TWO (2) #16 AWG WIRES MINIMUM. EACH PAIR OF DALI WIRES CAN BE RUN IN FREE AIR OR IN

THE SAME POWER CONDUIT AS THE LIGHTING BRANCH CIRCUIT CONDUCTORS IF THE WIRES ARE INSULATED FOR AT

LEAST THE SAME VOLTAGE AS THAT OF THE CIRCUIT HAVING THE HIGHEST VOLTAGE. CONTRACTOR IS RESPONSIBLE TO

ENSURE INSTALLATION MEETS ALL LOCAL ELECTRICAL CODES.

2. EACH DALI BUS MUST NOT EXCEED A MAXIMUM DISTANCE OF 300 METERS BETWEEN THE FURTHEST DALI DEVICE AND

THE DESIGNATED LIGHTING CONTROL PANEL (LCP).

3. EACH DALI BUS CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI DEVICES, WHICH CAN BE CONNECTED IN PARALLEL BUS

CONFIGURATION. CONTRACTOR TO FOLLOW DALI BUS DESIGN PROVIDED ON THE LIGHTING CONTROL LAYOUT(S).

4. CONTRACTOR TO TERMINATE ALL DALI BUS WIRES AT A DESIGNATED LCP ACCORDING TO THE "LCP SCHEDULE(S)"

PROVIDED .

5. EACH DALI KEYPAD IS IDENTIFIED BY "DLx" LABEL ON THE LIGHTING CONTROL LAYOUT(S), WHERE 'x" DENOTES DALI BUS

NUMBER.

NOTES

"DLx"

5

ZONE 1

ZONE 2

ZONE 3

ZONE 4

##########

AS NOTED

E6

-

Project Specific:

Drawn By:

Drawing No.:

Checked By:

· Drawings are meant to be read, and not scaled

· Dimensions to be verified on site

· Contractors must check and verify all dimensions and

report discrepancies to the Project Coordinator before

commencing with work

· All drawings remain the property of Sheridan College

and shall not be reproduced or reused without written

consent.

Construction North True North

General Notes:

Issues/RevisionsNo.

Project Name:

Seal:

Sheet Name:

Consultant(s):

Date

Issued Date:

Revision: Scale:

J106

CHILD & YOUTH CARE LAB

1

ISSUED FOR TENDER 05/19

S.K. N.C.

04-2019

N N

· Dispose of all material and debris within scope of

work offsite

· Make good of all areas affected by work to Sheridan

Standards.

· Coordinate all required testing and inspections

· Protect furniture, equipment and items to remain (ie.

flooring) during construction.

· Electrical Contractor shall verify capacity and location

of electrical panel required to complete scope of

work.

· Data Contractor shall verify capacity and location of

wiring closet required to complete scope of work.

· Refer to tender, specifications, instructions and all

other documents related to scope of work to complete

project.

Davis Campus

7899 McLauglin Road

Brampton, ON

(905) 459-7533

Trafalgar Campus

1430 Trafalgar Road

Oakville, ON

(905) 845 - 9430

AutoCAD SHX Text
LCP#2
AutoCAD SHX Text
2
AutoCAD SHX Text
LIGHTING PANEL
AutoCAD SHX Text
FLT LIGHTING CONTROL PANEL
AutoCAD SHX Text
POWER CABLE (#12/2 AWG)
AutoCAD SHX Text
5
AutoCAD SHX Text
TYPICAL DALI BUS LOOP (#16/2 AWG)
AutoCAD SHX Text
POWER TO OTHER FIXTURES
AutoCAD SHX Text
DALI MULTI SENSOR DAYLIGHT
AutoCAD SHX Text
DALI DIMMABLE LED DRIVER
AutoCAD SHX Text
DAC MODULE
AutoCAD SHX Text
FIFTHLIGHT TYPICAL RISER DIAGRAM
AutoCAD SHX Text
CAT6 CABLE
AutoCAD SHX Text
DALI POWER PACK
AutoCAD SHX Text
LOW-VOLTAGE
AutoCAD SHX Text
SENSOR
AutoCAD SHX Text
LOW VOLTAGE (#16/3 AWG)
AutoCAD SHX Text
ZONE 1
AutoCAD SHX Text
ZONE 2
AutoCAD SHX Text
ZONE 3
AutoCAD SHX Text
ZONE 4
AutoCAD SHX Text
6 BUTTON DALI KEYPAD
AutoCAD SHX Text
ZONE 5
AutoCAD SHX Text
ZONE 6
AutoCAD SHX Text
OAC-DT/P-*-R
AutoCAD SHX Text
ZONE 1
AutoCAD SHX Text
ZONE 2
AutoCAD SHX Text
ZONE 3
AutoCAD SHX Text
ZONE 4
AutoCAD SHX Text
4 BUTTON DALI KEYPAD W/ RAISE LOWER
AutoCAD SHX Text
OAWC-D-120W-R
AutoCAD SHX Text
ELECTRICAL ROOM