Underlining the differences between ResourceLeveling and Resource Smoothing?HOME (HTTP://WWW.IZENBRIDGE.COM) PMP (HTTP://WWW.IZENBRIDGE.COM/CATEGORY/PMP/)
UNDERLINING THE DIFFERENCES BETWEEN RESOURCE LEVELING AND RESOURCE SMOOTHING?
Under Project time management knowledge area there is a specific process called Develop Projectschedule. Under this process, we have Resource Optimization Techniques. Today we are discussingtwo important resource optimization techniques – Resource Leveling and Resource
Smoothing (resource smoothing technique is a new entry in the PMBOK® Guide Fifth Edition ). Now,as both of these techniques are resource optimization techniques so their primary focus is to allocateresources in such a way to bring maximum output effectively. Due to this reason PMP® test takersgenerally gets confused between these two terms.
source Leveling and Resource Smoothing, let us begin with how PMBOK® Guide Fifth Edition definesthese two techniques:
Resource leveling
“A technique in which start and finish dates are adjusted based on resource constraints with the goalof balancing demand for resources with the available supply.” – PMBOK® Guide Fifth Edition.
Resource Smoothing
“A technique that adjusts the activities of a schedule model such that the requirements for resourceson the project do not exceed certain predefined resource limits.”– PMBOK® Guide Fifth Edition.
9/8/2015 iZenBridge: PMI Agile Certification | PMP & Corporate TrainingiZenBridge: PMI Agile Certification | PMP & Corporate Training |Difference between Reso...
http://www.izenbridge.com/blog/underliningthedifferencesbetweenresourcelevelingandresourcesmoothing/ 2/8
When we are developing the schedule, we sequence the activities and then we assign resources andestimate duration. Now, while we are performing all these activities, our focus is generally tosequence activities based on their dependencies (mandatory or discretionary). After this, we may endup developing a schedule where some of the resources are over allocated. When we apply resourceleveling, we apply resource constraints (like we do not have more than 45 hours in a week) to ourschedule, applying this resource constraint may result in change of project schedule dependenciesand it may result in change in project duration. In the image above when we applied 45 hoursconstraint to 7 week project, then it became 9 week project schedule.
After applying resource leveling you have a resource constrained schedule, but you may still have thedesired level of allocation in your project plan to keep things well managed. Let’s say your desiredlevel of allocation per week is 38 hours, now by doing Resource Smoothing you try to adjust activitiesin such a way that you achieve this desired level of resource allocation. You may not be able to do itfor all the weeks since you do not think of changing the project duration while applying thissmoothing, so you do it only wherever slack is available.
Differentiating Resource Leveling and Resource smoothing
Resource leveling Resource Smoothing
It applies the resource constraints to theproject and may result in change in projectduration.
We apply resource smoothing after doing resourceleveling and we make use of slack, and will notresult in change of project duration.
Resource Leveling is primarily driven byresource constraints, like you do not havemore than 45 hours of the given resourcefor a week.
Resource smoothing is more to do with desiredlimits, like we do have 45 hours available for givenresource but we wish that we allocate 38 hours perweek so we have some breathing space.
The allocation limits identified in resourceleveling must be applied.
The desired limit identified in resource smoothingmay not be applied in some cases, if we do nothave slack.
The resource leveling is done first and thenwe do the resource smoothing. Since weneed to first accommodate the resourceconstraints before we can optimize it.
We apply resource smoothing after applyingresource leveling.
9/8/2015 iZenBridge: PMI Agile Certification | PMP & Corporate TrainingiZenBridge: PMI Agile Certification | PMP & Corporate Training |Difference between Reso...
http://www.izenbridge.com/blog/underliningthedifferencesbetweenresourcelevelingandresourcesmoothing/ 3/8
3 Comments iZenBridge Login1
Share⤤ Sort by Best
Join the discussion…
shoaib • a month ago
Thank you sir, really cleared my concepts :)
Recommend
I’m sure I have answered all your questions on Resource Leveling and Resource smoothing. You canjoin the discussion on the same in our Forum. You may also want to check our other blogs PMP®Trainings.
You may also like to watch a video presentation on the resource leveling and resource smoothing.
Resource Leveling and Resource Smoothing | iZenBridge
We help professionals in achieving accredited Project Management Certifications like PMP® and PMI‐ACP®. Subscribe to our mailing list and stay updated with our varied project management facilitation sessions.
9/8/2015 iZenBridge: PMI Agile Certification | PMP & Corporate TrainingiZenBridge: PMI Agile Certification | PMP & Corporate Training |Difference between Reso...
http://www.izenbridge.com/blog/underliningthedifferencesbetweenresourcelevelingandresourcesmoothing/ 4/8
What is Configuration Management?2 comments • 6 months ago
Ayesha Faraz — well explained.... thanx
Requirement Traceability Matrix (RTM) –What Is RTM And Why Do We Need It?2 comments • 6 months ago
Seema Sonkiya — Thanks Ken A :)
Control Chart as a Component of SevenBasic Quality Tool5 comments • 6 months ago
AvatarAlina — Thanks a lot Saket! :)
Vision, Mission, Objectives, Strategies andTactics1 comment • 7 months ago
AvatarSuryakant Shukla — Thanks for this helpfulblog.
ALSO ON IZENBRIDGE
• Reply •
Thank you sir, really cleared my concepts :) △ ▽
• Reply •
FG • 7 months ago
Good explanation !
As I understand it, each scheduling software has its own approach to the resource leveling and itdepends heavily on the algorithms each product uses, which results you get after resourceleveling. Correct ?
In other words: when we take an identical dataset containing for example 1000 activities and just 2resources. Calendars. milestones and so on, all set the same. When we don't do resource leveling, MS Project, Primavera P6 and other scheduling softwareshould calculate identical schedules. Correct ?
Depending on the resource leveling approach of each software, after applying resource leveling tothis schedule, results will almost certain differ from each other. Also correct ?
When this is the case, how do I now if the schedule from software A is better than the schedule ofsoftware B ?
△ ▽
• Reply •
Saket Bansal • 7 months ago> FG
I have used few scheduling software but for doing resource leveling always put own logicsince as PM we can only see how to optimize the schedule with limited resources.
Regards,Saket
△ ▽
WHAT'S THIS?
Share ›
Share ›
Share ›
9/8/2015 iZenBridge: PMI Agile Certification | PMP & Corporate TrainingiZenBridge: PMI Agile Certification | PMP & Corporate Training |Difference between Reso...
http://www.izenbridge.com/blog/underliningthedifferencesbetweenresourcelevelingandresourcesmoothing/ 5/8
blog.
SEARCH
SEARCH
WHAT PEOPLE SAY ABOUT US
Atin GuptaAtt Logics Pvt LTD
I was planning to doPMP study from thelast 2 years but wasunable as I prefer todo study in a group.Saket has provided aplatform for the
RECENT VIDEOS
9/8/2015 iZenBridge: PMI Agile Certification | PMP & Corporate TrainingiZenBridge: PMI Agile Certification | PMP & Corporate Training |Difference between Reso...
http://www.izenbridge.com/blog/underliningthedifferencesbetweenresourcelevelingandresourcesmoothing/ 6/8
BOOK ONE-ON-ONE PERSONAL CONSULTATION WITH SAKET BANSAL
BOOK NOW (HTTP://WWW.IZENBRIDGE.COM/CONTACT-US/)
RECENT POSTS
Kanban, it’s principles and how to get started! (http://www.izenbridge.com/blog/kanban-principles-get-started/) August 24, 2015
Changes in PMP after 11th January 2016 (http://www.izenbridge.com/changes-pmp-11th-january-2016/)August 19, 2015
Difference between Verification and Validation (http://www.izenbridge.com/blog/difference-between-verification-and-validation/) May 4, 2015
Conflict Management (http://www.izenbridge.com/blog/conflict-management/) April 14, 2015
Vision, Mission, Objectives, Strategies and Tactics (http://www.izenbridge.com/blog/vision-mission-objectives-strategies-and-tactics/) September 24, 2014
SIGN UP FOR IZENBRIDGE
Email Address*
First Name*
Last Name*
City*
Country*
* = required field
Subscribe
9/8/2015 iZenBridge: PMI Agile Certification | PMP & Corporate TrainingiZenBridge: PMI Agile Certification | PMP & Corporate Training |Difference between Reso...
http://www.izenbridge.com/blog/underliningthedifferencesbetweenresourcelevelingandresourcesmoothing/ 7/8
COURSES & RESOURCES
Courses (http://www.izenbridge.com/courses)
PMP ® (http://www.izenbridge.com/pmp)
PMI-ACP ® (http://www.izenbridge.com/pmi-acp)
CAPM ® (http://www.izenbridge.com/capm)
PMI-PBA (http://www.izenbridge.com/pmi-pba)
Scrum (http://www.izenbridge.com/scrum)
Upcoming Trainings (http://www.izenbridge.com/events)
Webinars (http://www.izenbridge.com/webinars)
Contact (http://www.izenbridge.com/contact-us)
Blog (http://www.izenbridge.com/blog)
IZENBRIDGE HOTLINKS
About izenBridge (http://www.izenbridge.com/about)
Meet Trainers (http://www.izenbridge.com/trainers)
Discussion Forum (http://forum.izenbridge.com/)
PMP ® v/s PMI-ACP ® (http://www.izenbridge.com/pmp-or-pmi)
Why iZenBridge? (http://www.izenbridge.com/why-to-choose-izenbridge/)
FAQs (http://www.izenbridge.com/faq)
Terms and Conditions (http://www.izenbridge.com/terms-and-conditions/)
Copyright Policy
Privacy Policy (http://www.izenbridge.com/privacy-policy)
Refund Policy (http://www.izenbridge.com/refund-policy)
Testimonials (http://www.izenbridge.com/testimonial)
REACH US
Still haven't found what you're looking for? For more information call us directly:
Training: (+91) 99108 02561 | [email protected]
9/8/2015 iZenBridge: PMI Agile Certification | PMP & Corporate TrainingiZenBridge: PMI Agile Certification | PMP & Corporate Training |Difference between Reso...
http://www.izenbridge.com/blog/underliningthedifferencesbetweenresourcelevelingandresourcesmoothing/ 8/8
ALL RIGHTS RESERVED IZENBRIDGE CONSULTANCY PRIVATE LIMITED. (HTTPS://TWITTER.COM/IZENBRIDGE) (HTTPS://WWW.FACEBOOK.COM/IZENBRIDGE?REF=HL)
?(HTTPS://WWW.YOUTUBE.COM/CHANNEL/UCANKPRSW5Q8HX_O6GHYIN7A)
(HTTPS://WWW.LINKEDIN.COM/COMPANY/IZENBRIDGE-CONSULTANCY-PRIVATE-LIMITED?TRK=TYAH)
(HTTPS://PLUS.GOOGLE.COM/+IZENBRIDGE1/POSTS)