14
IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

Embed Size (px)

Citation preview

Page 1: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

IVBSS Program Overview and Accomplishments

Presented by:

Jim Sayer

UMTRIITS America 2007 Annual Meeting & Exposition

Palm Springs, CA

June 6, 2007

Page 2: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

2

The Team

Page 3: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

3

What is IVBSS FOT?

• UMTRI-led cooperative agreement with U.S. DOT– National Highway Traffic Safety Administration

(NHTSA) and Federal Motor Carrier Safety Administration (FMCSA)

• Develop integrated crash warning systems in light vehicles and heavy trucks

• 4-year, $31.6M program– $25M from U.S. DOT, $6.6M from project partners

Page 4: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

4

IVBSS Subsystems

• Forward crash warning– Address rear-end crashes

• Lateral drift warning– Address lane/road departure crashes

• Lane change/merge warning– Address lane change crashes

• Curve Speed Warning– Address road departures in curves

– Light vehicle platform only

Page 5: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

5

The Vehicles

• Two fleets of vehicles– 16 cars (Honda Accord EX)– 10 trucks (International 8600 Series)

Page 6: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

6

Program Vehicles and Timing

EngineeringDevelopment

Vehicles

Prototype Vehicles

Pilot Vehicles

Extended Pilot FOT

FOTData

Collection

Nov ‘05 Nov ‘06 Nov ‘07 April ’08 Aug ’08 Sept ‘09

Phase I Phase II

Page 7: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

7

The Integration Challenge

• IVBSS evaluates integration from a variety of perspectives:– Enhanced performance of any one subsystem– Enhanced safety with multiple threats– Benefits of a fully integrated driver-vehicle

interface– The role of the surrounding environment on a

driver’s decision to perform certain actions

Page 8: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

8

Value of the IVBSS FOT

• Evaluate driver assistance/warning systems– Objective data on system performance– Objective data on system utilization– Objective data on accident reduction potential– Subjective data on willingness to buy and use

• Fundamental data on driver/traffic behavior– With and without the systems– Ability to address a multitude of questions

Page 9: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

9

Summary of Progress

• Systems Engineering– Functional partitioning– System architectures developed– Interface control documentation– Functional requirements– System performance specification

IVB

SS

Sy

ste

m C

AN

Bu

s (5

00

K)

Driv

er

Fa

ce

Ca

me

ra

Sh

are

d

Ca

me

ras

La

tera

l Drift

Wa

rnin

g

(LD

W) M

od

ule

CM

OS

C

am

era

Ce

llula

rA

nte

nn

a

IVB

SS

Drive

r D

isplay

Yaw

Ra

te

Sen

so

r

Ine

rtial

Sen

so

rs

Fro

nt

Lo

ng

R

an

ge

GP

SA

nte

nn

aD

igita

l M

ap

Cu

rve

Sp

ee

d

Wa

rnin

g

(CS

W) M

od

ule

Ga

tew

ay

Da

ta

Ac

qu

isitio

n

Sy

ste

m (D

AS

) M

od

ule

Veh

icle

CA

N B

us

- Hig

h S

pe

ed

Veh

icle

CA

N B

us

- Lo

w S

pe

ed

(NI C

ha

ss

is)

(cR

IO)

(cR

IO)

FC

WA

rbD

VI

WarningEnabled

FC

W C

AN

Bu

s (5

00

K)

LC

M C

AN

Bu

s (5

00K

)

Haptic Controller

OE

M

Au

dio

S

ystem

AudioController

Right Side Vision Module

CM

OS

Ca

me

ra

Forward Vision Platform

Left Side Vision Module

CM

OS

Ca

me

ra

Sn

oo

ze

Vo

lum

e

Sen

sit-

Ivity

(2)

De

velopm

ent Veh

icle Arch

itecture

D. B

ezzina, M. G

abel

Re

v 2.7 De

cemb

er 5, 2006

Printed C

opies of T

his Docum

ent A

re Not C

ontro

lled

LC

M

Am

p

MP

3 P

layer

Sid

e

Mirro

r (Ico

ns)

CM

OS

C

am

era

S/R

R

ear

Left

Ba

ck

S/R

Re

ar R

igh

tB

ack

SA

M V

S/R

R

ear

Left

Sid

e

S/R

Re

ar R

igh

t S

ide

SA

M V

S/R

F

ron

tL

eftS

ide

S/R

Fro

nt

Rig

ht

Sid

e

SA

M VH

eadrest

Speakers

VS

A

Page 10: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

10

Summary of Progress

• Subsystem Development– Subsystem hardware purchases– Subsystem modeling– Concepts of operation– Build-up of development vehicles– Arbitration development

Page 11: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

11

Summary of Progress

• DVI Development– DVI prototype hardware development– Testing of tone characteristics– Significant simulator upgrades– Simulator testing

• Vehicle Integration– Six light vehicles being built– Mule vehicle and one tractor built

Page 12: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

12

Summary of Progress

• Verification Test Procedures– Collaboration with U.S. DOT/Volpe/NIST– Test procedures developed – Test plan generated – Simulations have been developed

• Phase 1 Testing– First trips to test tracks have taken place– Jury drives to take place soon

Page 13: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

13

Summary of Progress

• Data Acquisition System (DAS) – Prototype DASs built– Plans for FOT DASs under development– Data sharing network defined and being set-up

Page 14: IVBSS Program Overview and Accomplishments Presented by: Jim Sayer UMTRI ITS America 2007 Annual Meeting & Exposition Palm Springs, CA June 6, 2007

ITS America 2007 Annual Meeting June 6, 2007

Concluding Remarks

• Accomplishments to Date:– Extensive subsystems development– Prototype vehicle builds and system testing– Verification test procedures and preliminary testing– DVI testing and development

• Activities in 2007– Perform the verification testing– FOT planning– Jury drives and in-vehicle DVI evaluations