For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE Environmental Protection – Sewerage and sewage treatment 399DS – Relocation of Sha Tin sewage treatment works to caverns Members are invited to recommend to the Finance Committee – (a) the upgrading of part of 399DS, entitled “Relocation of Sha Tin sewage treatment works to caverns – consultants’ fees and investigation”, to Category A at an estimated cost of $637.7 million in money-of-the-day prices; and (b) the retention of the remainder of 399DS in Category B. PROBLEM We need to conduct an investigation and design (I&D) study for the relocation of Sha Tin sewage treatment works (STSTW) to caverns (the relocation project) in order to release the existing site for housing and other uses. /PROPOSAL …..

ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

Embed Size (px)

Citation preview

Page 1: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

For discussion PWSC(2014-15)2 on 8 April 2014

ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE

HEAD 704 – DRAINAGE Environmental Protection – Sewerage and sewage treatment 399DS – Relocation of Sha Tin sewage treatment works to caverns

Members are invited to recommend to the Finance

Committee –

(a) the upgrading of part of 399DS, entitled

“Relocation of Sha Tin sewage treatment works

to caverns – consultants’ fees and investigation”,

to Category A at an estimated cost of

$637.7 million in money-of-the-day prices; and

(b) the retention of the remainder of 399DS in

Category B.

PROBLEM

We need to conduct an investigation and design (I&D) study for the relocation of Sha Tin sewage treatment works (STSTW) to caverns (the relocation project) in order to release the existing site for housing and other uses.

/PROPOSAL …..

Page 2: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

PWSC(2014-15)2 Page 2 PROPOSAL 2. The Director of Drainage Services, with the support of the Secretary for Development, proposes to upgrade part of 399DS to Category A at an estimated cost of $637.7 million in money-of-the-day (MOD) prices for carrying out an I&D study and the associated site investigation works for the relocation project. PROJECT SCOPE AND NATURE 3. We propose to upgrade part of 399DS to Category A, comprising –

(a) preliminary and detailed design of the works described in paragraph 5(a) to (d) below;

(b) detailed impact assessments on environment, traffic, geotechnical, sewerage, drainage, waterworks, utilities, blasting vibration and other relevant aspects;

(c) public engagement (PE) and consultation exercises with relevant stakeholders;

(d) associated site investigation works and supervision; and

(e) preparation of tender documents and assessment of tenders for the associated site investigation works and the future construction works for the relocation project.

A plan showing the preliminary location of the relocated STSTW is at Enclosure 1. 4. Subject to funding approval of the Finance Committee (FC), we plan to commence the proposed I&D study and the associated site investigation works in August 2014. In the detailed design, we will review the programme including the feasibility of shortening the construction period of the relocation project. The I&D study will be completed in stages by end 2022.

/5. …..

Page 3: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

PWSC(2014-15)2 Page 3 5. We will retain the remainder of 399DS in Category B, and will seek funding for these works to dovetail with the implementation programme of the relocation project. The scope of the remainder mainly covers –

(a) construction works for relocating STSTW to caverns, including the construction of caverns, portals, tunnels, sewage treatment facilities, ventilation shafts, ancillary buildings and associated facilities;

(b) modification, improvement and reprovisioning of the existing sewerage facilities upstream of the STSTW and the Tolo Harbour Effluent Export Scheme system (an existing effluent disposal system) in relation to relocation of the STSTW to caverns;

(c) rehabilitation, modification and improvement of the existing emergency submarine outfall and construction of a new outfall for connecting with the relocated STSTW;

(d) all necessary works, including environmental mitigation works, traffic diversion, utilities diversion, etc. that are incidental to paragraph 5(a), (b) and (c); and

(e) commissioning of the relocated STSTW and demolition

of the existing STSTW. JUSTIFICATION 6. There is a pressing need to increase land supply for various uses by sustainable and innovative approaches to support social and economic development. One practicable approach is rock cavern development. 7. According to the findings of the study on “Enhanced Use of Underground Space in Hong Kong” completed by the Civil Engineering and Development Department in 2011, about two-third of the land in Hong Kong is suitable for cavern development from topographical and geological perspectives. The study has also broadly demonstrated that a cavern scheme could be implemented to house the STSTW, the largest secondary sewage treatment works in Hong Kong with a designed sewage treatment capacity of 340 000 cubic metres per day, thereby releasing about 28 hectares (ha) of land occupied by the existing STSTW for more beneficial and compatible land uses.

/8. …..

Page 4: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

PWSC(2014-15)2 Page 4 8. The 2011-12 Policy Address announced that the Government would explore the use of rock cavern development as an innovative method to expand Hong Kong’s land resources. To take forward the initiative, the Drainage Services Department commenced a detailed feasibility study on the relocation of the STSTW to caverns (FSR) in May 2012. The FSR included relevant preliminary technical and impact assessments, a preliminary planning review for the future land use of the existing STSTW site for the purpose of establishing a business case for the relocation project, and a two-staged PE exercise. The main tasks of the FSR were completed in end 2013. The results confirmed that relocating the STSTW to the proposed cavern site at Nui Po Shan of A Kung Kok is technically feasible and financially viable. 9. The FSR has identified that the relocation project will give rise to the following social and environmental benefits –

(a) releasing about 28 ha of land close to the centre of Sha Tin New Town with sea frontage and pleasant environment in the neighbourhood for : (i) residential development to meet the housing need

of our society; (ii) commercial development thereby creating job

opportunities; and (iii) government, institution and community facilities

and public open space to meet the community needs and aspirations;

(b) improving the living environment of the surrounding

area upon relocation of the existing STSTW to caverns and creating a green and vibrant waterfront living environment with ample open space, continuous promenade and recreational facilities such as cycle tracks, other leisure purposes such as outdoor retail and food and beverage businesses, as well as water sports facilities along Shing Mun River;

(c) enhancing odour management of the STSTW housed in

caverns with rock as natural barrier, and taking the opportunity to review if more advanced technologies can be adopted for the sewage and sludge treatment facilities; and

/(d) …..

Page 5: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

PWSC(2014-15)2 Page 5

(d) enhancing the development opportunities of the surrounding area adjacent to the existing STSTW site after completion of the project and enhancing the accessibility of the area by improving transport infrastructure.

10. According to the results of the PE exercise, relocating government facilities to caverns and releasing such sites for housing and other uses is generally supported by the public. 11. We hence propose to carry out the proposed I&D study and the associated site investigation works for the relocation project as soon as possible. FINANCIAL IMPLICATIONS 12. We estimate the cost of the proposed I&D study and associated site investigation works to be $637.7 million in MOD prices (please see paragraph 13 below), broken down as follows – $ million

(a) Consultants’ fees for 194.2 (i) preliminary and detailed

design

135.0

(ii) detailed impact assessments on environment, traffic, geotechnical, sewerage, drainage, waterworks, utilities, blasting vibration and other relevant aspects

38.6

(iii) PE and consultation exercises with relevant stakeholders

10.2

(iv) preparation of tender documents and assessment of tenders for the associated site investigation works and the future construction works

9.5

(v) management of resident site staff for site investigation works

0.9

/(b) …..

Page 6: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

PWSC(2014-15)2 Page 6 $ million

(b) Remuneration of resident site staff for site investigation works

17.8

(c) Site investigation works 248.0 (d) Contingencies 46.0

Sub-total

506.0 (in September 2013 prices)

(e) Provision for price adjustment 131.7

Total

637.7 (in MOD prices)

Due to inadequate in-house resources, we propose to engage consultants to conduct the I&D study and supervise the associated site investigation works. A breakdown of the estimates for the consultants’ fees and resident site staff costs by man-months is at Enclosure 2. 13. Subject to funding approval, we will phase the expenditure as follows –

Year

$ million

(Sept 2013)

Price adjustment

factor

$ million (MOD)

2014 – 2015 8.0 1.05450 8.4

2015 – 2016 80.0 1.11777 89.4

2016 – 2017 123.0 1.18484 145.7

2017 – 2018 120.0 1.25593 150.7

2018 – 2019 80.0 1.33128 106.5

2019 – 2020 60.0 1.40117 84.1

2020 – 2021 20.0 1.47123 29.4

2021 – 2022 10.0 1.54479 15.4

2022 – 2023 5.0 1.61624 8.1

506.0 637.7

/14. …..

Page 7: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

PWSC(2014-15)2 Page 7 14. We have derived the MOD estimates on the basis of the Government’s latest set of assumptions on the trend rate of change in the prices of public sector building and construction output for the period from 2014 to 2023. We will engage consultants to undertake the proposed I&D study on a lump sum basis with provision for price adjustments. We will tender the proposed site investigation works under a standard re-measurement contract because the quantity of works involved may vary depending on actual ground conditions. The contract for site investigation works will provide for price adjustments. 15. The proposed I&D study and associated site investigation works will not give rise to any recurrent consequences. PUBLIC CONSULTATION 16. We have conducted a two-stage PE exercise under the FSR to seek the views of the public and stakeholders with a view to building consensus on the relocation project. The Stage 1 PE was conducted from November 2012 to March 2013 to share the overseas experience of cavern sewage treatment works and collect public opinion on the relocation project, while the Stage 2 PE was conducted from July to October 2013 to further consult the public on the results and recommendations of the preliminary technical assessments. During the PE exercise, we carried out a wide range of activities, including a media briefing, roving exhibitions, visits to Stanley sewage treatment works (an existing sewage treatment works in caverns), three focus group meetings with professional and environmental organisations, three community group meetings mainly for Sha Tin residents and a public forum. According to the results of the PE, it was generally agreed that the relocation project could benefit the community and enhance the environment in Sha Tin as a whole, especially on the aspects of odour and visual impacts. The reports of the Stage 1 and 2 PE were released in July 2013 and March 2014 respectively and uploaded to the project website. 17. During the PE exercise, some residents near the proposed relocation site expressed concerns about possible odour and traffic impacts caused by the new sewage treatment works in the cavern site and the effect of blasting vibration on buildings and structures during construction. We have addressed these issues in the preliminary impact assessments of the FSR, which showed that better odour management would be achieved with the relocated STSTW fully enclosed in rock caverns. Moreover, by adopting suitable control and mitigation measures, potential impacts such as those on traffic and caused by blasting will be reduced to acceptable levels in compliance with the relevant standards. These aspects will also be further reviewed during the proposed I&D study.

/18. …..

Page 8: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

PWSC(2014-15)2 Page 8 18. We consulted the Health and Environment Committee (H&EC) of the Sha Tin District Council (STDC) on the findings and recommendations of the FSR on 7 November 2013. H&EC of STDC generally supported the proposal to proceed further with the proposed I&D study and the associated site investigation works. 19. We consulted the Legislative Council Panel on Development on 25 March 2014. Members generally supported submitting the funding proposal of the proposed I&D study and the associated site investigation works to the Public Works Subcommittee. ENVIRONMENTAL IMPLICATIONS 20. The proposed I&D study and the associated site investigation works are not designated projects under the Environmental Impact Assessment (EIA) Ordinance (Chapter 499) and will not cause any long-term environmental impact. We have included in the project estimate the cost of implementing suitable mitigation measures to control the short-term environmental impacts arising from the site investigation works. 21. The proposed site investigation works will only generate very little construction waste. We will require the consultants to comprehensively examine measures to minimise the generation of construction waste and to reuse/recycle construction waste as much as possible for implementation in the construction stage of the relocation project in future. 22. The relocation project comprises designated projects under Schedule 2 of the EIA Ordinance and environmental permits are required for their construction and operation. We will conduct EIA studies to address the environmental impacts and prepare EIA reports to meet the requirements under the EIA Ordinance, and propose mitigation measures if necessary. We will submit the EIA reports to the Director of Environmental Protection for approval under the EIA Ordinance. We will follow the statutory procedures, including provision of the EIA reports for inspection and comment by the public and the Advisory Council on the Environment.

/HERITAGE …..

Page 9: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

PWSC(2014-15)2 Page 9 HERITAGE IMPLICATIONS 23. The proposed I&D study and the associated site investigation works will not affect any heritage site, i.e. all declared monuments, proposed monuments, graded historic sites/buildings, sites of archaeological interest and Government historic sites identified by the Antiquities and Monuments Office. LAND ACQUISITION 24. The proposed I&D study and the associated site investigation works will not require any land acquisition. BACKGROUND INFORMATION 25. On 11 May 2012, FC approved upgrading 379DS “Feasibility study on relocation of STSTW to caverns” to Category A with an approved project estimate of $57.9 million in MOD prices for carrying out the FSR. The FSR commenced in May 2012 for completion in May 2014. The main tasks under the FSR were completed in end 2013. 26. We upgraded 399DS to Category B in September 2013. 27. The proposed I&D study and the associated site investigation works will not directly involve any tree removal or planting proposals. We will require the consultants to take into consideration the need for tree preservation during the proposed I&D study. We will also incorporate tree planting proposals in the construction stage in future. 28. We estimate that the proposed I&D study and the associated site investigation works will create about 75 jobs (50 for labourers and another 25 for professional/technical staff) providing a total employment of 3 170 man-months.

------------------------------

Development Bureau March 2014

Page 10: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

Penfold Park

Golf Course

Waterfront Park

Golf Course

Sw P

Sw P

Sw P

Sha Tin Park

Sw P

Sw P

Town HallRacecourse

MA SHI CHAUPak Pai Kok

PAK SHEK

PAK TIN

HEIGHTS

SHA TIN

SHEUNG MA SHEK

Typhoon Shelter

Shuen Wan

TAI SHEK KWU

WU KAI SHA

Wu Kwai Sha Tsui

YIM TIN TSAI

YUEN CHAU TSAI

( A CHAU )

CENTRE ISLAND

KWAI CHUNG

PAK SHA TAU

CHAU KOK

YUEN

TEI LUNG HAU

CHAU

TUNG TAU

SHA TIN

TAI PO

TAI CHE TEI

SHEUNG KWAI CHUNG

Headland

Whitehead

¦è°^¤á¥~

Outdoor Recreation CentreSai Kung

Golf Course

ªaSw P

°ªº¸¤

±Y¯Bun Sha Pai

´Ã§Kwun Tsoi Pai

©U§LAP SAP CHAU

¦Ñª

÷´³Ngau Yue Tau

¥Õ¨PAK SHA CHAU

¤TªSAM PUI CHAU

¨FSha Tsui

²`¯

¦èSAI KUNG

SIU TSAN CHAU

¤jTAI CHAU

¯QWU CHAU

¦ÏYEUNG CHAU

Lo Fu Ngam

¾ôKiu Tau

HEUNG SZE SHAP

Sham Chung Kok

KIU TSUI BEACH

SAI S

HA

RO

AD

°¨

¾b

¤õ

¬

FO T

AN R

OA

D

2

9°¨

¾b¤

Water

Tunnel

¿é

¤ô

Water

Tunnel

¿é¤ô

399

604

399

400

300

200

200

200

100

300

200

100

100

100

300

373

399

604

399

400

300

200

200

200

100

300

200

100

100

100

300

373

´^ºÖPenfold Park

­»´ä¤¤

Sha Tin Park

´ç½üFerry Pier

Racecourse

°¨

­»´äÅé

LookoutÁA±

ÁA±Lookout

Sports Institute

Hong Kong

°t¤Ser Res

Ser Res°t¤

C

C

°t¤Ser Res

°AMan Hang

«nNam Shan

¤ûNgau Au

¤ûËNGAU AU SHAN

NUI PO AU

¤k±

ºÑÀÜ

Pictorial Garden

Ravana Garden

ÀØ´º

Â@´Royal Ascot

¥ÛªSHEK NGA PUI

Sheung Wo Che

ÁJ¥

Court

Sui Wo

¤jTai Che

¤jÂTai Lam Liu

TAI SHEK KWU

Å¥ÀÜ

¥Ý¼Wo Liu Hang

¶ÀªWong Nai Tau

Ä£¦Yiu On Estate

Estate

Chung On

ªá¤Fa Sam Hang

Court

Fung Shing

»A´ò

¤U¥Ha Wo Che

±dª

Court

Hong Lam

ÀA¾

Court

Kam On

ª¯¨KAU TO SHAN

¼sª

Court

Kwong Lam

¦Ñ¹

°¨®

Â@µoShatin Knoll

ªÜ»

Windsor Park

Ä_ü

Lo Shue Tin

¶®´

°¨¾

LUK CHAU AU

¾å®pMountain Shore

«Ò³Castello

Park Belvedere

Vista Paradiso

Garden Vista

®ü¨Ocean View

Court

Kam Fung

©Þ¤l

¤õ¬

Fo Tan Village

Village

Pat Tsz Wo

«°ª

ù

«í¦

Cheung Lek Mei

Village

Kau To

¼s·

Estate

Kwong Yuen

¸¨¸Lok Lo Ha

°¨Ma Niu

¥Û¥Shek Kwu Lung

¤ô¤BUFFALO HILL

¶À¤WEST BUFFALO HILL

®Ê¦The Grandville

´PSausalito

·s«°¥

PlazaNew Town

±s

À

Village

Kwai Tei

The Palazzo

ªY¦

Estate

Yan On

¹ÅµØ¬La Costa

Fo

Tan

¤õ

Racecourse

°¨

Univ

ersit

y

¤j

«í

Heng

On

¤j

¤Tai Shui

Hang

c:\te

mp\dsd_p

w\d

ms13843\D

SP

_399

DS

_11045.dgn

PL

OT

PE

N.T

BL

Col_

pdf.pltcfg

DSP/399DS/11045AS SHOWN

OR1:25000K. W. CHAN

Ir K. H. CHAN

Ir H. S. KAN

ENCLOSURE 1

ªþ¥

LOCATION

¦ìTOLO HARBOUR

¦RÅ

MA ON SHAN

°¨¾

SHA TIN

¨F

SCALE 1 : 200 000

¯Á¤ KEY PLAN¤ñ

SHING

MUN RIVER

SHA TIN RACECOURSE

¨F

¥Ð

«°ª

¨È¤

SHEK MUN

¥Û

VILLAGE

FISHERMEN

AH KUNG KOK

º®¥Á

¨È¤

A KUNG KOK

´I¦w

TAI SHUI HANG

KAM TAI COURT

ÀA®

¤j¤

CHEVALIER GARDEN

¤k±

NUI PO SHAN

©¹±Ò

TO KAI TAK RIVER

¹Ï¨

¨F¥

SHA TIN HOI

EXISTING SHA TIN SEWAGE TREATMENT WORKS (STSTW)

25 MAR 2014

25 MAR 2014

25 MAR 2014

LEGEND:

EXISTING THEES EFFLUENT EXPORT TUNNEL

FACILITIES OF RELOCATED STSTW

PROPOSED CAVERNS, VENTILATION SHAFTS, TUNNELS AND MAIN

ÀÀij­«¸m¨F¥Ð¦Ã¤

PROPOSED PORTAL FACILITIES OF RELOCATED STSTW

ÀÀij­«¸m¨F¥Ð¦Ã¤

PROPOSED ANCILLARY FACILITIES OF RELOCATED STSTW

²{¦³¦RÅS´ä¸g³B²

ÀÀij©¥¬}¡B³q­·½Ý¤«¡BÀG¹D¤Î

ÀÀij©¥¬}¡BÀG¹D¡B¥X¤J¤f¤Îªþ

²{¦³¨F¥Ð¦

±N¶i¦æ§ó§ï¡B§ïµ½©M­«

IMPROVED AND REPROVISIONED

EXISTING UPSTREAM SEWAGE PUMPING STATIONS TO BE MODIFIED,

NOTES:µ

REPROVISIONED ARE NOT SHOWN FOR CLARITY.

EXISTING UPSTREAM SEWERAGE TO BE MODIFIED, IMPROVED AND

1.

2.

ANCILLARY FACILITIES IS SUBJECT TO DETAILED DESIGN.

THE LAYOUT OF PROPOSED CAVERNS, TUNNELS, PORTALS AND

¬°«O«ù²M´·¡A±N¶i¦æ§ó§ï¡B§ïµ½©M­«¸

MODIFIED, IMPROVED AND REPROVISIONED

TOLO HARBOUR EFFLUENT EXPORT SCHEME (THEES) SYSTEM TO BE

±N¶i¦æ§ó§ï¡B§ïµ½©M­«¸mªº¦RÅ

- ·h¾E¨F¥Ð¦Ã¤ô

¤u°È¤uµ{­p¹º¶µ¥

SEWAGE TREATMENT WORKS TO CAVERNS

- RELOCATION OF SHA TIN

PWP ITEM NO. 399DS

Page 11: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

Enclosure 2 to PWSC(2014-15)2

399DS – Relocation of Sha Tin sewage treatment works to caverns

Breakdown of the estimates for consultants’ fees and resident site staff costs (in September 2013 prices) Consultants’ staff costs

Estimated man-months

Average MPS* salary point

Multiplier (Note 1)

Estimated fees

($ million)

(a) Consultants’ staff costs

(Note 2) –

(i) preliminary and detailed

design Professional Technical

724 803

38 14

2.0 2.0

97.6 37.4

(ii) detailed impact

assessments on environment, traffic, geotechnical, sewerage, drainage, waterworks, utilities, blasting vibration and other relevant aspects

Professional Technical

207 230

38 14

2.0 2.0

27.9 10.7

(iii) PE and consultation

exercises with relevant stakeholders

Professional Technical

46 86

38 14

2.0 2.0

6.2 4.0

(iv) preparation of tender

documents and assessment of tenders for the associated site investigation works and the future construction works

Professional Technical

41 86

38 14

2.0 2.0

5.5 4.0

Sub-total 193.3 (b) Resident site staff (RSS)

costs(Note 3) Professional Technical

103 205

38 14

1.6 1.6

11.1 7.6

Sub-total 18.7

Comprising –

(i) Consultants’ fees for management of RSS for site investigation works

0.9

(ii) Remuneration of RSS

responsible for site investigation works

17.8

Total 212.0 * MPS = Master Pay Scale

Page 12: ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE · For discussion PWSC(2014-15)2 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE

Enclosure 2 to PWSC(2014-15)2 Page 2 Notes 1. A multiplier of 2.0 is applied to the average MPS point to estimate the full staff costs,

including the consultants’ overheads and profit, as the staff will be employed in the consultants’ offices. A multiplier of 1.6 is applied to the average MPS salary point to estimate the cost of RSS supplied by the consultants. (As at now, MPS point 38 = $67,370 per month and MPS point 14 = $23,285 per month.)

2. The actual man-months and fees will only be known when we have selected the

consultants through the usual competitive bidding system.

3. The actual man-months and fees will only be known after completion of the site investigation works.