CGLI 2330 Certificate in Electrotechnical Technology Level 3 Installation Technology: Unit 302/3 Inspection & Testing and Fault Diagnosis & Rectification Unit 13 Inspection and Testing Documentation The College at Clacton Unit 13 Page 1 January 2012 Inspection and Testing Documentation Unit Aims By the end of the unit participants should be able to: describe the certification process for a completed installation a) responsibilities of relevant personnel b) documentation i) Electrical Installation Certificate ii) Schedule of Inspections iii) Schedule of Test Results iv) Minor Works Certificate (Syllabus Reference: 2.2.09) describe procedures for dealing with a) report forms and documentation b) customer/client (Syllabus Reference: 2.2.11) Inspection & Testing Documentation Following the completion of all new electrical installation work or additional work to an existing installation, the installation must be inspected and tested and an installation certificate issued and signed by a competent person or persons. Specifically, the person or persons responsible for the following activities must be identified: Person(s) responsible for design Person responsible for construction Person responsible for inspection. The ‘competent person’ must have a sound knowledge of the work undertaken, be fully versed in the inspection and testing procedures contained in BS 7671 (IEE Regulations) employ adequate testing equipment. A certificate, inspection and test results should be issued to those ordering the work in the format given in the following pages.

IT3 U13 - Inspection and Testing Documentation - Complete

Embed Size (px)

DESCRIPTION

IT3 U13 - Inspection and Testing Documentation - Complete

Citation preview

Page 1: IT3 U13 - Inspection and Testing Documentation - Complete

CGLI 2330 Certificate in Electrotechnical Technology Level 3 Installation Technology: Unit 302/3 – Inspection & Testing and Fault Diagnosis & Rectification

Unit 13 – Inspection and Testing Documentation

The College at Clacton Unit 13 Page 1 January 2012

Inspection and Testing Documentation Unit Aims

By the end of the unit participants should be able to:

describe the certification process for a completed installation a) responsibilities of relevant personnel b) documentation

i) Electrical Installation Certificate ii) Schedule of Inspections iii) Schedule of Test Results iv) Minor Works Certificate

(Syllabus Reference: 2.2.09)

describe procedures for dealing with a) report forms and documentation b) customer/client

(Syllabus Reference: 2.2.11)

Inspection & Testing Documentation

Following the completion of all new electrical installation work or additional work to an existing installation, the installation must be inspected and tested and an installation certificate issued and signed by a competent person or persons. Specifically, the person or persons responsible for the following activities must be identified:

Person(s) responsible for design

Person responsible for construction

Person responsible for inspection.

The ‘competent person’ must have a sound knowledge of the work undertaken, be fully versed in the inspection and testing procedures contained in BS 7671 (IEE Regulations) employ adequate testing equipment.

A certificate, inspection and test results should be issued to those ordering the work in the format given in the following pages.

Page 2: IT3 U13 - Inspection and Testing Documentation - Complete

CGLI 2330 Certificate in Electrotechnical Technology Level 3 Installation Technology: Unit 302/3 – Inspection & Testing and Fault Diagnosis & Rectification

Unit 13 – Inspection and Testing Documentation

The College at Clacton Unit 13 Page 2 January 2012

ELECTRICAL INSTALLATION CERTIFICATE REQUIREMENTS FOR ELECTRICAL INSTALLATIONS – BS 7671 (IET WIRING REGULATIONS)

DETAILS OF THE CLIENT

………………………………………………………………………..………………………………………………………………………………

INSTALLATION ADDRESS

………………………………………………………………………..……………………………………………………………………………… ………………………………………………………………………..………………………………………………………………………………

DESCRIPTION AND EXTENT OF THE INSTALLATION Tick boxes as appropriate

New installation

Description of installation:

Addition to an

existing installation Extent of installation covered by this Certificate:

Alteration to an existing installation

(Use continuation sheet if necessary) See continuation sheet No: ….…...

FOR DESIGN I/We being the person(s) responsible for the design of the electrical installation (as indicated by my/our signatures below), particulars of which are described above, having exercised reasonable skill and care when carrying out the design hereby CERTIFY that the

design work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with BS 7671:2008, amended to ........... (date) except for the departures, if any, detailed as follows:

Details of departures from BS 7671 (Regulations 120.3 and 133.5):

The extent of liability of the signatory or the signatories is limited to the work described above as the subject of this Certificate.

For the DESIGN of the installation: **(Where there is a mutual responsibility for the design)

Signature: …………………. Date: ……… Name (IN BLOCK LETTERS): …………………………… Designer No 1

Signature: …………………. Date: ……… Name (IN BLOCK LETTERS): …………………………… Designer No 2**

FOR CONSTRUCTION I/We being the person(s) responsible for the construction of the electrical installation (as indicated by my/our signatures below), particulars of which are described above, have exercised reasonable skill and care when carrying out the construction hereby

CERTIFY that the construction work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with BS 7671:2008, amended to ........... (date) except for the departures, if any, detailed as follows:

Details of departures from BS 7671 (Regulations 120.3 and 133.5):

The extent of liability of the signatory is limited to the work described above as the subject of this Certificate.

For the CONSTRUCTION of the installation:

Signature: …………………. Date: ……… Name (IN BLOCK LETTERS): …………………………… Constructor

FOR INSPECTION & TESTING I/We being the person(s) responsible for the inspection & testing of the electrical installation (as indicated by my/our signatures below), particulars of which are described above, have exercised reasonable skill and care when carrying out the inspection &

testing hereby CERTIFY that the work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with BS 7671:2008, amended to ........... (date) except for the departures, if any, detailed as follows:

Details of departures from BS 7671 (Regulations 120.3 and 133.5):

The extent of liability of the signatory is limited to the work described above as the subject of this Certificate.

For the INSPECTION AND TEST of the installation:

Signature: …………………. Date: ……… Name (IN BLOCK LETTERS): …………………………… Inspector

NEXT INSPECTION I/We the designer(s), recommend that this installation is further inspected and tested after and interval of not more than …………. Years/months.

Page 3: IT3 U13 - Inspection and Testing Documentation - Complete

CGLI 2330 Certificate in Electrotechnical Technology Level 3 Installation Technology: Unit 302/3 – Inspection & Testing and Fault Diagnosis & Rectification

Unit 13 – Inspection and Testing Documentation

The College at Clacton Unit 13 Page 3 January 2012

PARTICULARS OF SIGNATORIES TO THE ELECTRICAL INSTALLATION CERTIFICATE

Designer (No 1)

Name: ………………………………. Company: …………………………………………………………. Address: ……………………………………………………......………………………………………………………. ………………………………………………. Postcode: …………………. Tel No: …………………….

Designer (No 2) (if applicable) Name: ………………………………. Company: …………………………………………………………. Address: ……………………………………………………......……………………………………………………….

………………………………………………. Postcode: …………………. Tel No: …………………….

Constructor

Name: ………………………………. Company: …………………………………………………………. Address: ……………………………………………………......………………………………………………………. ………………………………………………. Postcode: …………………. Tel No: …………………….

Inspector Name: ………………………………. Company: …………………………………………………………. Address: ……………………………………………………......……………………………………………………….

………………………………………………. Postcode: …………………. Tel No: …………………….

SUPPLY CHARACTERISTICS AND EARTHING ARRANGEMENTS Tick boxes and enter details, as appropriate

Earthing arrangements Number and Type of Live

Conductors

Nature of Supply Parameters Supply

Protective Device Characteristics TN-C

TN-S a.c d.c. Nominal voltage, U/Uo(1)

……..… V

TN-C-S Type ………... TT 1-phase, 2-wire 2-wire Nominal frequency, f

(1) ……..… Hz

IT

2-phase, 3-wire 3- wire Prospective fault current, Ipf(2)

. kA Rated

Other

source

3-phase, 3-wire other External loop impedance, Ze(2)

.... Ω current ........ A

of supply (to be detailed on Attached schedules)

3-phase, 4-wire (Note: (1) by enquiry, (2) by enquiry or by

measurement)

PARTICULARS OF INSTALLATION REFERRED TO IN THE CERTIFICATE Tick boxes and enter details, as appropriate

Means of earthing Maximum Demand

Distributor's facility Maximum demand (load) …………………… kVA/Amps Delete as appropriate

Details of Installation Earth Electrode (where applicable)

Installation earth electrode

Type Location Electrode Resistance to Earth

(e.g. rod(s), tape, etc)

………………………… ………………………… …………………… Ω

Main Protective Conductors

Earthing Conductor: material ……………… csa ……………mm2 Continuity and connection verified

Main Protective Bonding

Conductors material ……………… csa ……………mm2 Continuity and connection verified

To Incoming Water and/or Gas Service To Other Elements: ………………………………………………….

Main Switch or Circuit Breaker

BS, Type and No. of poles ……………………….. Current rating ………….. A Voltage rating ……….. V

Location ………………………………………….. Fuse rating or setting ………….. A

Rated Residual Operating Current IΔn = …. mA, and operating time of ….. ms (IΔn) (Applicable only where an RCD is suitable and is used as a main circuit breaker)

COMMENTS ON EXISTING INSTALLATION (in the case of an alteration or additions see Section 633): ………………………………………………………………………………………………………………………………………………………...

………………………………………………………………………………………………………………………………………………………... ………………………………………………………………………………………………………………………………………………………... ………………………………………………………………………………………………………………………………………………………...

SCHEDULES The attached schedules are part of this document and this Certificate is valid only when they are attached to it. …………. Schedules of Inspections and …………. Schedules of Test Results are attached.

(Enter quantities of Schedules attached).

Page 4: IT3 U13 - Inspection and Testing Documentation - Complete

CGLI 2330 Certificate in Electrotechnical Technology Level 3 Installation Technology: Unit 302/3 – Inspection & Testing and Fault Diagnosis & Rectification

Unit 13 – Inspection and Testing Documentation

The College at Clacton Unit 13 Page 4 January 2012

MINOR ELECTRICAL INSTALLATION WORKS CERTIFICATE (REQUIREMENTS FOR ELECTRICAL INSTALLATIONS - BS 7671 [IET WIRING REGULATIONS]) To be used only for minor electrical work which does not include the provision of a new circuit

PART 1: Description of minor works

1. Description of the minor works

2. Location/address

3. Date minor works completed

4. Details of departures, if any, from BS 7671:2008

PART 2: Installation details

1. System earthing arrangements TN-C-S TN-S TT

2. Method of fault protection

3. Protective device for the modified circuit Type …………………………… Rating ……………..

Comments on existing installation, including adequacy of earthing and bonding arrangements: (see Regulation 132.16)

PART 3: Essential tests

Earth continuity satisfactory

Insulation resistance:

Line/neutral …………………….. MΩ

Line/earth …………………….. MΩ

Neutral/earth …………………….. MΩ

Earth fault loop impedance ………………………………….... Ω

Polarity satisfactory

RCD operation (if applicable. Rated residual operating current IΔn …..... mA and operating time of .....…ms (at IΔn)

Part 4: Declaration

I/we CERTIFY that the said works do not impair the safety of the existing installation, that the said works have been designed, constructed, inspected and tested in accordance with BS 7671:2008 (IET Wiring Regulations), amended to ………… (date) and that the said works, to the best of my/our knowledge and belief, at the time of my/our inspection, complied with BS 7671 except as detailed in Part 1 above.

Name: …………………………………………………………. Signature: ………………………………………………….

For and on behalf of: ………………………………………… Position: ……………………………………………………

Address: ……………………………………………………….

…………………………………………………………………... Date: ………………………………………………………..

…………………………………………………………………...

Page 5: IT3 U13 - Inspection and Testing Documentation - Complete

CGLI 2330 Certificate in Electrotechnical Technology Level 3 Installation Technology: Unit 302/3 – Inspection & Testing and Fault Diagnosis & Rectification

Unit 13 – Inspection and Testing Documentation

The College at Clacton Unit 13 Page 5 January 2012

ELECTRICAL INSTALLATION CONDITION REPORT

SECTION A. DETAILS OF THE CLIENT/PERSON ORDERING THE REPORT

Name: ...........................................................................................................................................................................................................

Address: .......................................................................................................................................................................................................

........................................................................................................................................................................................................................

SECTION B. REASON FOR PRODUCING THIS REPORT

........................................................................................................................................................................................................................

Date(s) on which inspection and testing was carried: ,,,,…………………………………………………………………………………….

SECTION C. DETAILS OF THE INSTALLATION WHICH IS THE SUBJECT OF THIS REPORT

Occupier: .....................................................................................................................................................................................................

Address: .......................................................................................................................................................................................................

........................................................................................................................................................................................................................

Description of premises (tick as appropriate) Domestic Commercial Industrial Other (include brief description) .......................................................... Estimated age of wiring system ……………… years

Evidence of Additions/Alterations: Yes No Not apparent If yes, estimate age .......... years Installation records available? (Regulation 621.1) Yes No Date of last inspection ....................... (date)

SECTION D. EXTENT AND LIMITATIONS OF THE INSPECTION AND TESTING Extent of electrical installation covered by this report:

........................................................................................................................................................................................................................

........................................................................................................................................................................................................................

Agreed limitations including the reasons Regulation 634.2) ………………….…..…………………………………………………………….

........................................................................................................................................................................................................................

Agreed with: …………………………………………………………..………………………………………………………………………………

Operational limitations including the reasons (see page no ..............) …………………………………………………………………………

........................................................................................................................................................................................................................ The inspection and testing detailed in this report and accompanying schedules have been carried out in accordance with BS7671:2008

(IET Wiring Regulations) as amended to ………….. It should be noted that cables concealed within trunking and conduits, under floors, in roof spaces, and generally within the fabric of the building or underground, have not been inspected unless specifically agreed between the client and the inspector prior to the inspection.

SECTION E. SUMMARY OF THE CONDITION OF THE INSTALLATION

General condition of the installation (in terms of electrical safety)........................................................................................................

........................................................................................................................................................................................................................

........................................................................................................................................................................................................................ Overall assessment of the installation in terms of its suitability for continued use

SATISFACTORY/UNSATISFACTORY* (Delete as appropriate) *An unsatisfactory assessment indicates that a dangerous (code C1) and/or potentially dangerous (code C2) conditions have been identified.

SECTION F. RECOMMENDATIONS Where the overall assessment of the suitability of the installation for continued use above is stated as UNSATISFACTORY, I/we recommend that any observations classified as ‘Danger present’ (code C1) or ‘Potentially dangerous’ (code C2) are acted upon as a

matter of urgency. Investigation without delay is recommended for observations identified as ‘further investigation required’.

Observations classified as ‘Improvement recommended’ (code C1 should be given due consideration.

Subject to the necessary remedial action being taken, I/we recommend that the installation is further inspected and tested by .............. (date)

SECTION G. DECLARATION Inspected and tested by: Report authorised for issue by:

Name (capitals) ………………….……………………..………………. Name (capitals) ………………….…………………..……………….

Signature ...........................…………………………….……………… Signature ...........................………………………….………………

For/on behalf of ................................................................................ For/on behalf of ............................................................................

Position ............................................................................................. Position ........................................................................................

Address ............................................................................................ Address ........................................................................................

Date .................................................................................................. Date .............................................................................................

SECTION H. SCHEDULE(S)

............. schedule(s) of inspection and ............. schedule(s) of test results are attached. The attached schedule(s) are part of this document and this report is valid only when they are attached to it.

Page 6: IT3 U13 - Inspection and Testing Documentation - Complete

CGLI 2330 Certificate in Electrotechnical Technology Level 3 Installation Technology: Unit 302/3 – Inspection & Testing and Fault Diagnosis & Rectification

Unit 13 – Inspection and Testing Documentation

The College at Clacton Unit 13 Page 6 January 2012

SECTION I. SUPPLY CHARACTERISTICS AND EARTHING ARRANGEMENTS

Earthing

arrangements

Number and Type of Live

Conductors Nature of Supply Parameters

Supply Protective

Device

TN-C a.c d.c. Nominal voltage, U/Uo(1)

…..… V BS (EN) ….....……... TN-S 1-phase, 2-wire 2-wire Nominal frequency, f

(1) …..… Hz Type ….....……...

TN-C-S 2-phase, 3-wire 3- wire Prospective fault current, Ipf(2)

…..… kA TT 3-phase, 3-wire External loop impedance, Ze

(2) …..… Ω Rated current ............ A

IT 3-phase, 4-wire Note: (1) by enquiry (2) by enquiry or measurement)

Confirmation of supply polarity

Other sources of supply (as detailed on attached schedule)

SECTION J. PARTICULARS OF INSTALLATION REFERRED TO IN THE REPORT

Means of earthing Details of Installation Earth Electrode (where applicable)

Distributor's Facility Type ...............................................................................................................................................................

Location ....................................................................................................................................................... Installation Earth Electrode Resistance to Earth …………… Ω

Main Protective Conductors

Earthing Conductor Material .................. Csa .......................mm2 Connection/continuity verified

Main Protective Bonding Conductors

Material .................. Csa .......................mm2 Connection/continuity verified

To incoming water service To incoming gas service To incoming oil service To structural steel

To lightning protection To other incoming service(s) Specify .......................................................................................

Main Switch/Switch-Fuse/Circuit-breaker/RCD

Location ............................................. Current rating ........................................ A If RCD main switch

............................................................. Fuse/device rating or setting ................. A Rated residual operating current (In)............mA

BS (EN) .............................................. Voltage rating ........................................ V Rated time delay ........................................ ms

No of poles ......................................... Measured operating time (at In).................. ms

SECTION K. OBSERVATIONS

Referring to the attached schedules of inspection and test results, and subject to the limitations specified at the Extent and limitations of

inspection and testing section

No remedial action is required The following observations are made (see below)

OBSERVATIONS CLASSIFICATION

CODE

FURTHER

INVESTIGATION REQUIRED (YES/NO)

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

........................................................................................................................................ .................................... ................................

One of the following codes, as appropriate, has been allocated to each of the observations made above to indicate to the pers on(s)

responsible for the installation the degree of urgency of remedial action.

C1 – Danger present. Risk of injury. Immediate remedial action required

C2 – Potentially dangerous - urgent remedial action required

C3 – Improvement recommended

Page 7: IT3 U13 - Inspection and Testing Documentation - Complete

CGLI 2330 Certificate in Electrotechnical Technology Level 3 Installation Technology: Unit 302/3 – Inspection & Testing and Fault Diagnosis & Rectification

Unit 13 – Inspection and Testing Documentation

The College at Clacton Unit 13 Page 7 January 2012

SCHEDULE OF INSPECTIONS (for new installation work only) Methods of protection against electric shock Prevention of mutual detrimental influence

Both basic and fault protection (a) Proximity of non-electrical services and other influences

(i) SELV

(b) Segregation of band I and band II circuits or use of

(ii) PELV band II insulation

(iii) Double insulation (c) Segregation of safety circuits

(iv) Reinforced insulation Identification

Basic protection: (a) Presence of diagrams, instructions, circuit charts and

similar information (i) Insulation of live parts

(b) Presence of danger notices and other warning notices (ii) Barriers or enclosures

(c) Labelling of protective devices, switches and terminals (iii) Obstacles

(d) Identification of conductors (iv) Placing out of reach

Cables and conductors Fault protection:

Selection of conductors for current-carrying capacity and (i) Automatic disconnection of supply

Voltage drop

Presence of earthing conductor

Erection methods

Presence of circuit protective conductors

Routing of cables in prescribed zones

Presence of protective bonding conductors

Cables incorporating earthed armour or sheath, or run

Presence of supplementary bonding conductors within an earthed wiring system, or otherwise adequately

protected against nails, screws and the like Presence of earthing arrangements for combined

protective and functional purposes Additional protection provided by a 30mA RCD for cables in

concealed walls (where required in premises not under Presence of adequate arrangements for other

the supervision of a skilled or instructed person) source(s), where applicable

Connection of conductors FELV

Presence of fire barriers, suitable seals and protection Choice and setting of protective and monitoring

against thermal effects. devices (for fault and/or overcurrent protection)

General (ii) Non-conducting location:

Presence and correct location of appropriate devices Absence of protective conductors

for isolation and switching

(iii) Earth-free local equipotential bonding:

Adequacy of access to switchgear and other equipment

Presence of earth-free local equipotential bonding

Particular protective measures for special installations and

(iv) Electrical separation: locations

Provided for one item of current-using Connection of single-pole devices for protection or

equipment switching in line conductors only

Provided for more than one item of current- Correct connection of accessories and equipment

using equipment

Presence of undervoltage protective devices

Additional protection:

Selection of equipment and protective measures

Presence of residual current devices(s) appropriate to external influences

Presence of supplementary bonding conductors Selection of appropriate functional switching devices

Inspected by: ………………………………………….. Date: ……………………….

NOTES: to indicate an inspection has been carried out and the result is satisfactory

N/A to indicate the inspection is not applicable to a particular item An entry must be made in every box.

Page 8: IT3 U13 - Inspection and Testing Documentation - Complete

CGLI 2330 Certificate in Electrotechnical Technology Level 3 Installation Technology: Unit 302/3 – Inspection & Testing and Fault Diagnosis & Rectification

Unit 13 – Inspection and Testing Documentation

The College at Clacton Unit 13 Page 8 January 2012

GENERIC SCHEDULE OF TEST RESULTS

DB reference no ......................................................... Details of circuits and/or installed equipment vulnerable to Details of test instruments used (state serial and/or asset numbers)

Location ..................................................................... damage when testing .......................................................................... Continuity ……………………….............................................………………

Zs at DB (Ω) ............................................................... ................................................................................................................. Insulation resistance ...................................................................................

Ipf at DB (kA) ............................................................... ................................................................................................................. Earth fault loop impedance ........................................................................

Correct supply polarity confirmed ................................................................................................................. RCD ...........................................................................................................

Phase sequence confirmed (where appropriate) ................................................................................................................. Earth electrode resistance .........................................................................

Test Results

Tested by:

Ring final circuit continuity

()

Continuity

() (R1 + R2)

or R2

Insulation Resistance

(M) Pola

rity

Zs

()

RCD Remarks (continue on a separate sheet if necessary)

Name (Capitals) ..............................................................................................................

Signature .......................................................................... Date ............................

Circuit details (ms)

Overcurrent device Conductor details

Circuit n

um

ber

Circuit Description

BS

(E

N)

type

rating

(A

)

bre

akin

g

capacity (

kA

)

Refe

rence

Meth

od

Liv

e (

mm

2)

cpc (m

m2)

r 1 (

line)

r n (

ne

utr

al)

r2 (

cpc)

(R1 +

R2)*

R2

Liv

e-L

ive

Liv

e-E

@ I

n

@ 5

I n

Test

butt

on

op

era

tio

n

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

*Where there are no spurs connected to a ring final circuit this value is also the (R1 + R2) of the circuit.

For more information see pages 379 - 389 ‘Electrical Installations Level 3 2330 Technical Certificate’ – revised for the 17

th Edition IET Wiring Regulations (ISBN 978 0 435401 10 8).