154

Issues+Processes: Articulation of Design and Technical

Embed Size (px)

DESCRIPTION

Compilation architectural design projects by Ahmad Fuad Shafie (BSc Arch - UiTM)

Citation preview

Page 1: Issues+Processes: Articulation of Design and Technical
Page 2: Issues+Processes: Articulation of Design and Technical
Page 3: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

1

03 House: Retreat for the Designer

23 Urban Infill: Bazuki’s Art Gallery & Cafe

45 Bukit Larut Eco-Lodge

67 The Groove: Early Childhood Center

87 Luxury Housing: Putra Park Residences

123 Hidayatul Integrated Islamic School

TABLE OF CONTEN

TS

Page 4: Issues+Processes: Articulation of Design and Technical

2

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

AcknowledgementI would like to acknowledge and

sincerely thank all my lecturers in

guiding and teaching me throughout my

architecture years. Also not to forget my

family for their upmost and continuous

support for all my highs and lows and

last but not least, to my dear friends

that have helped and getting involved in

helping me achieve what I have achieved.

Page 5: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

3

HOUSE:RETREAT FOR THE

DESIGNERlocation : desa paku, malacca

Page 6: Issues+Processes: Articulation of Design and Technical

4

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

A place to give yourself a treat of an exotic ambiance and true hospitality. With the central traditional Malay Malacca house, located on more than 3 acres, it is a restful place to enjoy the blooms of rare to find flowers and the sounds of nature. Desa Paku House and Garden is located 22km from the town of Malacca, in the district of Alor Gajah. It is a traditional Malay House to dwell in Malacca in the land area of 4 acres of gardens with a collection of more than 200 species of flora and fauna and six breeding ponds that attracts.

Page 7: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

5

HOU

SE: RETREAT FOR THE D

ESIGN

ERlocation : desa paku, m

alaccaSketches to actual product with the adventure experience and interest, is the key to come out with the vista design expression in minimalist transformation. In other way, transform is the main idea to have the interlocking space in multipurpose usage, directly to have the maximum use. With hobby of my client to do the carpentry work, sure he more feel satisfied to create the portable product. That’s the interior happen in this building, which is it will have the portable, movement and multi-function furniture, to create the perfect use of space. Appreciate the site element, additive and substractive to be comply on the form and façade.

The use of multi-function space, for maximum movement and use. Division of internal space is just a bit, but can be practiced for many uses, hobbies and interests associated with the end user. With a focus wall-less design, and a lot of openings, in buildings or on furniture, effects air flow can move smoothly and recycle and reject the negative air in the building. Directly, this design is an approach to achieve passive cooling design.

Page 8: Issues+Processes: Articulation of Design and Technical

6

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 9: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

7

HOU

SE: RETREAT FOR THE D

ESIGN

ERlocation : desa paku, m

alacca

top: macro analysis from site constraint

bottom: site photos, to show 360 degrees radius of site context

Page 10: Issues+Processes: Articulation of Design and Technical

8

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 11: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

9

HOU

SE: RETREAT FOR THE D

ESIGN

ERlocation : desa paku, m

alacca

top: form development studies, related to design principal and element

left: process of site observation based on building rotation and position

Page 12: Issues+Processes: Articulation of Design and Technical

10

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

top left: sectional diagram studies on space relationship

bottom: sectional development towards site context and

environmental effect

Page 13: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

11

HOU

SE: RETREAT FOR THE D

ESIGN

ERlocation : desa paku, m

alacca

top: study mock up, on facade and space relationship, in-cooperate with technical approach

Page 14: Issues+Processes: Articulation of Design and Technical

12

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 15: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

13

HOU

SE: RETREAT FOR THE D

ESIGN

ERlocation : desa paku, m

alacca

site plan,, include roof plan, to show the micro context between building, lake and existing forest

Site Plan

Page 16: Issues+Processes: Articulation of Design and Technical

14

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

North-East Elevation

Lower Floor Plan

Page 17: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

15

HOU

SE: RETREAT FOR THE D

ESIGN

ERlocation : desa paku, m

alacca

Ground Floor Plan

Section A-A

Page 18: Issues+Processes: Articulation of Design and Technical

16

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

top right: south east elevation, the building done with elevated approach, to control the land profiile

bottom: perspective, human eye view from lake

Page 19: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

17

HOU

SE: RETREAT FOR THE D

ESIGN

ERlocation : desa paku, m

alacca

South-East Elevation

Page 20: Issues+Processes: Articulation of Design and Technical

18

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 21: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

19

physical model, include the detailing of floor and roof

HOU

SE: RETREAT FOR THE D

ESIGN

ERlocation : desa paku, m

alacca

Page 22: Issues+Processes: Articulation of Design and Technical

20

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

physical model, include the detailing of floor and roof

Page 23: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

21

HOU

SE: RETREAT FOR THE D

ESIGN

ERlocation : desa paku, m

alacca

Page 24: Issues+Processes: Articulation of Design and Technical

22

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

“Less is more.”Ludwig Mies van der Rohe

Page 25: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

23

URBAN INFILL:BAZUKI’S ART

GALLERY & CAFElocation : medan pasar, kuala lumpur

Page 26: Issues+Processes: Articulation of Design and Technical

24

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

With the treatment on site, the approach to reduce heat in the building became the main planning to create a productive space. In fact, the client’s approach prefer on peace, simplicity and minimal in all aspects, will be the concept of design in form and space. Space accessible, transparent and peaceful is for people to appreciate more details about art and journey. With pond at the ground level enhance the space become more luxury and natural, which bring the outside element through inside the space.

Mr Bazuki is a Reuters photographer and journalist, based in Kuala Lumpur. He discovered his passion for photography while studying architecture at Louisiana State University.

Page 27: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

25

URBAN

INFILL: BAZU

KI’S GALLERY

location : medan pasar, kuala lum

pur

Page 28: Issues+Processes: Articulation of Design and Technical

26

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 29: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

27

URBAN

INFILL: BAZU

KI’S GALLERY

location : medan pasar, kuala lum

purleft: clock tower, which it act as landmark and focal at medan pasar

right: medan pasar piazza, newly constructed under Kuala Lumpur Local Council, which this place will be much more attractive by tourist

bottom: panoramic view of medan pasar west block

Page 30: Issues+Processes: Articulation of Design and Technical

28

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

top right: space flow and circulation analysis based on shematic diagram section

bottom right: study on corridor which proposed to having the sitting area, instead only circulation

bottom left: site study and analysis, with nearby context, which this area is urban and congested with traffic and pollution impact

Page 31: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

29

URBAN

INFILL: BAZU

KI’S GALLERY

location : medan pasar, kuala lum

pur

Page 32: Issues+Processes: Articulation of Design and Technical

30

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

left: party diagram of space flow and users movement inside the

building, using the basic element of architecture design

bottom: the ventilation flow on multi boxes arrangement

Page 33: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

31

URBAN

INFILL: BAZU

KI’S GALLERY

location : medan pasar, kuala lum

pur

right: concept sketch of building facade and section flow

left: the study of water effect on pollution at medan pasar, which at

least can reduce a bit, than nothing

Page 34: Issues+Processes: Articulation of Design and Technical

32

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Site Plan

Page 35: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

33

Location Plan

URBAN

INFILL: BAZU

KI’S GALLERY

location : medan pasar, kuala lum

pur

j al a

n

me

da

n

pa

sa

r

left: site plan, shows the relation with heighbourhood building and roof plan, which is the design used skylight as a roof, to allow the natural lighting go through inside the space

right: location plan show the shoplot at the era of world war 2, which been develop by british goverment

Page 36: Issues+Processes: Articulation of Design and Technical

34

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

top: level 1 plan, the entrance, with water element, which will be the starting point for the visitors

bottom: level 1A plan, split level floor, accomodate only for private office for Mr Bazuki’s, which it split with other spaces

Page 37: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

35

Level 1 - Plan

Level 1A - Plan

URBAN

INFILL: BAZU

KI’S GALLERY

location : medan pasar, kuala lum

pur

Page 38: Issues+Processes: Articulation of Design and Technical

36

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

top: level 2 plan, bar that facing road side, enhancing the inside view towards the overall medan pasar’s walkside

bottom: level 3 plan, dining at the top which will be the end of the space journey for the visitors

Page 39: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

37

Level 2 - Plan

Level 3 - Plan

URBAN

INFILL: BAZU

KI’S GALLERY

location : medan pasar, kuala lum

pur

Page 40: Issues+Processes: Articulation of Design and Technical

38

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Front Elevation

Interior perspective

bottom left: front elevation of the gallery, the luxury of timber louvers and glass louvers, incooperating with extruded double boxes, make the gallery more iconic in simplicty

approach and material expression on off-form concrete.

top right: interior perspective to show the triple volume void inside the building, which

upper floor can see underneath it.

bottom right: section to show the split floor level, connecting with staircase

Page 41: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

39

Section 2-2

Interior perspectiveU

RBAN IN

FILL: BAZUKI’S G

ALLERYlocation : m

edan pasar, kuala lumpur

Page 42: Issues+Processes: Articulation of Design and Technical

40

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Section 1-1

Page 43: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

41

top: section 1-1, shows the different level of spaces, which is also be position in different place, to having the transformation feeling and scenery for the visitor impression. the staircase placed at the centre, which it will be

centralize to all spaces, and easier for users to move in one to another spaces

URBAN

INFILL: BAZU

KI’S GALLERY

location : medan pasar, kuala lum

pur

Page 44: Issues+Processes: Articulation of Design and Technical

42

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 45: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

43

URBAN

INFILL: BAZU

KI’S GALLERY

location : medan pasar, kuala lum

pur

physical sectional model, to show the space relationship and form making, include the detailing of screen, give a good result on shade pattern inside the building

Page 46: Issues+Processes: Articulation of Design and Technical

44

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

“All architecture is shelter, all great architecture is the design of space that contains, cuddles, exalts, or stimulates the persons in that space”Philip Johnson

Page 47: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

45

BUKIT LARUTECO-LODGE

location : taiping, perak

Page 48: Issues+Processes: Articulation of Design and Technical

46

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

In challenge of sloping site, the eco-lodge more on approaching the site context and building identity itself. The design produced based on needs of the enviro and the users. Which we know that Maxwell Hill faced highest rainfall in Malaysia. So, the design is more to achieve the “Breeze”. Breeze can be happen when the liquid split on it molecule. breeze is part of nature treatment, which the design injected with much more nature element.

The hanging bamboo is the building feature for the lodge. It represent the nature treatment on the design, instead using mild steel screen. The humble architecture is basically reflect with building surrounding, which there much more simple and minimalist.

Page 49: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

47

Other than that, the concerning about environmental is important in this design, to protect and conserve the existing forest and tree. With respect the good nature impact, the building appreciated the surrounding with opening face more to the taiping town. Plus, the opening also act as ventilation and part of “breeze way flow”. The lodge sit at the higher level, almost at the top of hill, which we know the wind velocity will resulting high effect. The design try to take advatage on this income, which design provide wind turbine to having sustainable outcome.

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Page 50: Issues+Processes: Articulation of Design and Technical

48

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

right: survey plan show the site leveling, which the land profile are not flat, but much

more interesting with multi-leveling

bottom: panoramic view from low level. not so much big trees, which easier to conserve

some of it. few part consist with big rock

Page 51: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

49

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Page 52: Issues+Processes: Articulation of Design and Technical

50

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

top left: sketch diagram for overall planning, which to identify the building separation and position

top right: site findings and analysis, to having the most effective design with site context and effects

bottom: the individual diagrams of space planning in each lodge, which all of it will have different end users

Page 53: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

51

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Page 54: Issues+Processes: Articulation of Design and Technical

52

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

top: form studies and development, through series of boxes, which the plane element injected in the process. This process is also concerning about the nature and environmental context, in

having the breeze, shade and views

Page 55: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

53

bottom: study about the environmental impacts to the design, which consider on heat, wind flow and materiality

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Page 56: Issues+Processes: Articulation of Design and Technical

54

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Lodge A

Administration

Lodge C

Observation

Page 57: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

55

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Site Plan

Lodge B

left: overall master plan, show the arrangement of every lodge, include the administration, which the position is based on land contour and profile

Page 58: Issues+Processes: Articulation of Design and Technical

56

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Lodge A : Ground Floor Plan

Page 59: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

57

Lodge A : First Floor Plan

Section

top: lodge A plans, this lodge is special for the owner of this project, which this is the most luxury and biggest

lodge in this development. with having outdoor pool, this lodge also have their own individual courtyard, connecting with main spaces for owner and guest

bottom: the level of slope quite a lot, which the design resulting with put the floor on the different level, based

on the land profile itself

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Page 60: Issues+Processes: Articulation of Design and Technical

58

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Lodge B : Ground Floor Plan

Page 61: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

59

Lodge B : First Floor Plan

Right Elevation

top: lodge B plans, this lodge is for tourist, in category of family group. the space arrangement is more straight forward,

but the leisure element still injected in the design which the pool (jacuzzi) placed at the center of the building, which it will

be the outdoor activity area, as well as courtyard

bottom: some of the building installed the wind turbine, to generate the electricity power, in having the most efficient and

sustainable design, in achieving the passive design stratergy

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Page 62: Issues+Processes: Articulation of Design and Technical

60

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Lodge C : Ground Floor Plan

Front Elevation

Page 63: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

61

Lodge C : First Floor Plan

top: lodge C plans, this lodge is for tourist, in category of friend group. the space arranged in dorm style, which the room just been divide by two, with double decker bed as the furniture inside it. the spaces quite simple, which

it more to view of taiping town

bottom: we can see, the highest point is the Lodge A, which accomodate by the owner of this development. The approach try to represent the ownership and status, which be more important on the client requirement and end

users needs.

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Page 64: Issues+Processes: Articulation of Design and Technical

62

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

bottom: the aerial view of overall development. Each of the lodge been rotate towards different point, basically based on the land profile and contour. As u can see, the front facade are all facing the view of taiping town, and also can see the sunset on the evening. With designeing the observation point at the centre, all lodge can pass through it, which all visitors can have their gathering activity too. With a simple approach on creating this development, the less we create, the more we give

Page 65: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

63

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Page 66: Issues+Processes: Articulation of Design and Technical

64

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 67: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

65

physical overall development model, which include the

conservation of existing trees on site, clearly can see the

buildings sit on the multi level land profile, to control and

appreciate the land form and nature impacts

BUKIT LARU

T ECO-LODG

Elocation : taiping, perak

Page 68: Issues+Processes: Articulation of Design and Technical

66

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

“I don’t divide architecture, landscape and gardening; to me they are one”Luis Barragan

Page 69: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

67

THE GROOVE: EARLY CHILDHOOD

DEVELOPMENT CENTER

location : shah alam, selangor

Page 70: Issues+Processes: Articulation of Design and Technical

68

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Connection between volume and nature linkage. This concept first come by the local council aim for Shah Alam, “Garden State”, and been elaborate with this project to success the low carbon design. Symbiosis approach in this project were finally revil after all surrounding been green, existing with additional. The garden court as the focal, connect the adjecent, with evaporate target cooling will satisfied the users and give the good impact to enviroment. Plus, to have the syncronization between site and the activity park (Dataran). Center court approach can be put inside the building to achieve the micro court, transform from the macro court (center court). In aiming to have the best environmental building or passive design, may allow the natural ventilation go inside the building. This targer can be successful with effective capacity of space, which may be to consider the opening and building height. Designing the public space with almost double volume height, this effective approach can be done. In appreciate the god given, human should respect the surrounding with make the human more effective and feel with the nature context.

Page 71: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

69

THE G

ROOVE: ECDC

location : shah alam

Page 72: Issues+Processes: Articulation of Design and Technical

70

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

left: sectional diagram, to see the context between site and park

right: site nalysis diagram, which this building will site nearby

commercial place

Page 73: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

71

THE G

ROOVE: ECDC

location : shah alam

Page 74: Issues+Processes: Articulation of Design and Technical

72

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 75: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

73

Site Plan

THE G

ROOVE: ECDC

location : shah alamLocation Plan

top left: site zoning exploded diagram

bottom left: diagramatic of services from form arrangment

Page 76: Issues+Processes: Articulation of Design and Technical

74

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 77: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

75

THE G

ROOVE: ECDC

location : shah alam

Ground Floor PlanOverall ground floor plan include site relationship

Page 78: Issues+Processes: Articulation of Design and Technical

76

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 79: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

77

THE G

ROOVE: ECDC

location : shah alam

Page 80: Issues+Processes: Articulation of Design and Technical

78

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 81: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

79

THE G

ROOVE: ECDC

location : shah alam

Page 82: Issues+Processes: Articulation of Design and Technical

80

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 83: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

81

THE G

ROOVE: ECDC

location : shah alam

All perspectives to show the scenery of the design through nature context which been injected in the design. Garden Kindergarten is more peace, calm and attractive children mind, in appreciating the environment

Page 84: Issues+Processes: Articulation of Design and Technical

82

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 85: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

83

THE G

ROOVE: ECDC

location : shah alam

Page 86: Issues+Processes: Articulation of Design and Technical

84

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 87: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

85

THE G

ROOVE: ECDC

location : shah alam

Physical study model on form and building proportion, which clearly looks humble and protective

Page 88: Issues+Processes: Articulation of Design and Technical

86

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

“Architecture is basically a container of something. I hope they will enjoy not so much the teacup, but the tea”Yoshio Taniguchi

Page 89: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

87

LUXURY HOUSING: PUTRA PARK RESIDENCES

location : putra height, selangor

Page 90: Issues+Processes: Articulation of Design and Technical

88

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Set amidst the remaining lush greens of Putra Height, ‘Putra Park Residences’ is a residential development consisting of 11 units of 2-storey luxury bungalow, 39 units of courtyard townhose, 1 community hub, MRT by pass station, guard house and observation tower respectively. The name of the development originated from the design of the development, each with a carved-out ‘window’; with large opening throughout which landscape flows continuously, weaving architecture, art and nature together. The development divided with two land parcel which connects and frames each of the parks; the clubhouse park, the green park and the active park, thereby creating a larger scale park environment. The visual axis also guide movement through the park, marked with pedestrian walk-way and outdoor furniture which function as distance indicators, rest stops and points of conversation.

Page 91: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

89

In having the eco-homes, “Windows on the Park” concept applied in the design for great living area. Technically, the concept is about nature and human, which to be synchronized and make it as a shelter and connection. To be straight, living in the green area with views and nature living can release the stress issue and control the environment at the radius area. In achieving this concept, mixed species of tree to be apply. With this consideration, it also can create the non-wild animal to make their own habitat, mixing with human being. Bird and squirrel is one of the animals that to be apply in the residential. There can make their own habitat, with peace green lush, connect and contexting with human being and human shelter. This living development to be consider as a big shade area, which is to make it quite similar with the forest living. With mixed trees, the development seems like creating and designing through nature living, or so call automatically develops from ground. In aesthetically, the developments are SYMBIOSIS LIVING!!

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 92: Issues+Processes: Articulation of Design and Technical

90

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Malaysia is going through its worst dengue outbreak ever, health officials said yesterday, with higher rainfall and public apathy being blamed for encouraging the widespread breeding of the Aedes mosquito.In the first 28 days of this year alone, 14 people have died and 5,062 cases have been recorded. This compares with five deaths and 2,855 cases in the same period last year.

Other than that, the residential is like “death township” once office hour on weekdays. There not having security in the residential itself once all the people in the development when to work. This issue happen once the development not consider the users and buyers, but only think about making profit.

Page 93: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

91

right: site zoning and context diagram, the process understanding the overall putra height resident, which also need to be consider before

designing the master plan

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 94: Issues+Processes: Articulation of Design and Technical

92

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Nowadays, the Malaysian is too busy with their work, without consider of their health and lifestyle. Hyper-tension can cause to the human from this statement. Because of distance to go to the best place in having their leisure time, Malaysian feels tired to go anywhere.

Page 95: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

93

sketch diagrams and planning studies, which to find the relationship between users and needs, in order to having the luxury planning and development

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 96: Issues+Processes: Articulation of Design and Technical

94

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

SIte Plan

Page 97: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

95

right: the conceptual development on overall planning, with consideration

of zoning and architectural element, in-cooperating with circulation

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 98: Issues+Processes: Articulation of Design and Technical

96

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Site Cross Section

Page 99: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

97

SIte Plan: Blow Up

left: legend, as guide to represent the design funtions and features in site plan

top right: blow up site plan, as we can see consist of two type of residential, which is townhouse and bungalow. the townhouse designed in terraces because of site slope issue

bottom: site cross section for overall development, to show the different level inside and outside site, with surrounding context

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 100: Issues+Processes: Articulation of Design and Technical

98

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 101: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

99

Detached Unit: Floor Plans

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 102: Issues+Processes: Articulation of Design and Technical

100

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 103: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

101

images show the connectivity between unit to unit, which each of the unit is responsible in respecting the neighbours needs. Plus, appreciate and re-design the setback, give the privacy to the neighbour, instead of open connected area

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 104: Issues+Processes: Articulation of Design and Technical

102

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 105: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

103

bottom: section for detached house, show the important and luxury courtyard as part of outdoor living space. Plus, the double frontage house make the scenery inside through outside more “expensive”. the ideas to having the social area at the back of the house, can counter the stress issue, in having the social context and activities among the nighbour after work

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 106: Issues+Processes: Articulation of Design and Technical

104

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 107: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

105

Attached Unit (townhouse): Floor Plans

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 108: Issues+Processes: Articulation of Design and Technical

106

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 109: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

107

Attached Unit (townhouse): Floor Plans

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 110: Issues+Processes: Articulation of Design and Technical

108

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 111: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

109

Attached Unit (townhouse): Floor Plans

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 112: Issues+Processes: Articulation of Design and Technical

110

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 113: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

111

sections of two unit townhouses, which to show the elevated courtyard construction wise

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 114: Issues+Processes: Articulation of Design and Technical

112

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 115: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

113

elevations, show the different level of two units townhouses, in having the luxury and choices for users, plus having the different experiences for the upper part

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 116: Issues+Processes: Articulation of Design and Technical

114

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 117: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

115

right: the axonometric of space diagram, finding the relationship between floor to floors, which is the zoning every floor controled and align, to create much more efficient, in different layout

left: blow up elevated courtyard

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 118: Issues+Processes: Articulation of Design and Technical

116

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 119: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

117

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 120: Issues+Processes: Articulation of Design and Technical

118

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 121: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

119

top left and right: the green spine garden, at the back of each unit, instead of just a premix backlane. the design is to creating the social and activities area among the neighbours. So, they can recognize and gather each other

bottom: view to townhouse units from primary road

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 122: Issues+Processes: Articulation of Design and Technical

120

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 123: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

121

Physical study model on form and building proportion, which clearly looks luxury in rhythm flow

PUTRA PARK RESID

ENCES

location : putra height, selangor

Page 124: Issues+Processes: Articulation of Design and Technical

122

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

“But the building’s identity resided in the ornament”Louis Sullivan

Page 125: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

123

INTEGRATED ISLAMIC SCHOOL:

HIDAYATUL MADRASAHlocation : bukit jelutong, selangor

Page 126: Issues+Processes: Articulation of Design and Technical

124

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Integrated Islamic School, School Of Modern Islam With Maintaining Some Characteristics Of Origin, And Also Adding Curriculum Which Is Strong And Competitive. Pursuant To Government Will, School Is Designed Based

On The Identity Of Malaysia, The Features With Maintaining An Pavilion. Consumer Priority Over The Main Student, School Is Also Taking The Environment Features. Location With Respect Qiblah And Existing Mosque,

The School Designed With Two Keys Primary, On The East And West. Other Than That, Sun Shading Device Applied To Achieve Students Comfort And Also Other Users In This Building. Recycling Energy Also Applied. The

Surrounding Landscape Does Not Only Serve As An Aesthetic Backdrop, But Is Also Integral To The School’s Curriculum Which Focuses On Nature And Sustainability.

Bully- Nowadays, We Can Hear From News And Any Mass Media Which Lot Of Student Involve In Bully Activities. Bully

Actually Happen When Student Not Enough Be Socialize Among Of Them, Which Some Of The Group Think That They Can Be “Conqurer” In Their Own School.

Absence- Student Always Absence, Cause From The Uncomfortable Spaces And No Excitement In Their School. Which

Actually They Prefer To Go To Some Activities Place, Than Their Education Place.

Page 127: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

125

Design ConceptCentralizing The Social Area, Which It Be Apply In Context Of Open Space, To Success The Mahram And Non-Mahram Issue. This Concept Applied To Having The Exchange Of Ideas With Among Of Them, And At The Same Time Success In Maturality Of The Student. The Series Of Courtyard In This Development Are Positioned Near By Main Space Which Student And Other Users Can Connect Together And Gather.

Design Approach- A Gathered Space For Student To Exchange Ideas Among Each Others- Design That Facilate Creative Solutin With New Taching Standard- Building In Priority Social Student Interaction- Series Of Courtyards, To Achive The Best Scenery, Which Also With Good Environmental Impact- Vista And Clear View From Each Huddles- Creating Enough Of Welcoming And Retreat Space For Student To Feel More Comfort

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

Page 128: Issues+Processes: Articulation of Design and Technical

126

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 129: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

127

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

top left: overall map of bukit jelutong, which the site sit at the centre of the development

top right: the site vista is facing the existing mosque and guthrie pavillion, which is the main building and character in

bukit jelutong development

bottom: panoramic view of proposed site

Page 130: Issues+Processes: Articulation of Design and Technical

128

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 131: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

129

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

left: the sketch development for overall planning, include the space arrangement, which need to syncronize with site, land form and needs

below: the rough site analysis and findings, to come out with high constraint result

Page 132: Issues+Processes: Articulation of Design and Technical

130

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

upper: the form morphology and analytical for integrated islamic school, which come out with 3 options. option 3 choosed for the final result development

Page 133: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

131

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

upper, the timeline and morphology of design option, for 12 weeks analytical studies and findings. the images show the progress development from 2 block, and end up with multi

separation building layout, to enhance more on the practicallity and human behaviour impact

Page 134: Issues+Processes: Articulation of Design and Technical

132

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Schedule of Accomodation

Page 135: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

133

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

SOA shows the division of space, which devide by 4 groups, not include the Other

Facilities group. The group is identified based on the function and end users need

Page 136: Issues+Processes: Articulation of Design and Technical

134

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Site Plan

Page 137: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

135

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangorKey Plan & Location Plan

left: site plan, which indicated the “huddles” category, follow the group of spaces

right: rough sketch of block development, incooperating with end users circulation and transition

below: key & location plan show the contexts of site surrounding

Page 138: Issues+Processes: Articulation of Design and Technical

136

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Ground Floor Plan

Page 139: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

137

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

Second Floor Plan

First Floor Plan

Plans: refer to SOA, the plans are follow by group of spaces, which indicated

by spaces colour, show the groups are well

planning in arrangement of most practical

school,based on the needs and function too

Page 140: Issues+Processes: Articulation of Design and Technical

138

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Section X-X

Section Y-Y

Site Cross Section

Page 141: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

139

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

Page 142: Issues+Processes: Articulation of Design and Technical

140

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Front Elevation

Page 143: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

141

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

Left Elevation

Right Elevation

Page 144: Issues+Processes: Articulation of Design and Technical

142

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Building Services Engineering is multi-disciplinary in nature. By definition, it is “the practice of the art and science of engineering for the purpose of achieving optimal integrated building systems incorporating environmental control and safety provisions for the comfort and wellbeing of the occupants of the built environment”.

Building Services Engineering is concerned with aspects of the built environment, involving air conditioning and mechanical ventilation, electrical light and power, fire services, Fire Safety Engineering, water and waste services, data and communications, security and access control, vertical transportation, acoustics in buildings and energy management.

Page 145: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

143

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

Page 146: Issues+Processes: Articulation of Design and Technical

144

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 147: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

145

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

Construction Sequence: the blow up of construction sequence of student facilities block, whic more applying the IBS System. The construction will be in modular, which easier to assemble and more fastest to having the new school

Page 148: Issues+Processes: Articulation of Design and Technical

146

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 149: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

147

top left: view from drop off student point towards the academic block, which rich with the mashrabiah / sun shading device

top right: the student facilities block, which enhance and focal to the extruded boxes, that can be see from main road

bottom: the main courtyard, and also as assembly hall, will be the social area, centralize and connect among the student to exchange the idea

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

Page 150: Issues+Processes: Articulation of Design and Technical

148

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

Page 151: Issues+Processes: Articulation of Design and Technical

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

149

HID

AYATUL IN

TEGRATED

MAD

RASAHlocation : bukit jelutong, selangor

Physical study model on form and building proportion,

which clearly looks humble and

protective

Page 152: Issues+Processes: Articulation of Design and Technical

150

ISSUES + PROCESSES : ARTICULATION OF DESIGN AND TECHNICAL

THE ENDThank you to reader, at least you appreciate my

portfolio!

Page 153: Issues+Processes: Articulation of Design and Technical
Page 154: Issues+Processes: Articulation of Design and Technical