Project No. 18WOP / SCALE 1:500@A3 / Date of Issue 31.08.18 WILLASTON PLAYSPACE // OPTION 1.1 0m 20m Issues Significant distance from other recreation facilities Visually disconnected from other facilities in precinct Access to services (trenching) Netball facilities create pinch points and convoluted access/ wayfinding Opportunities Connection to residential area Existing car parking to be formalised (outside of project budget) Potential connection of playspace to scouts outdoor area Existing trees and shade Not fenced, community access Existing embankment buffer to road Integrated design of the playspace and pump track will create additional community benefits from a single space for the community use Playspace Pump track Planted embankment Landscaped buffer Realigned fence line to BMX track Open up scouts nature play area Picnic Shelter Existing and new natural shade Formalised car park Existing netball warm up Existing embankment to BMX track 1 1 2 3 3 4 5 5 6 6 9 9 7 7 10 11 8 2 4 8 11 10 4

Issues 3 Opportunities Connection to residential area ...€¦ · landscape contractors and plumber. irrigation systems to be on automatic timer with in-line drippers for garden beds

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Issues 3 Opportunities Connection to residential area ...€¦ · landscape contractors and plumber. irrigation systems to be on automatic timer with in-line drippers for garden beds

PLAN

L00

ALL PLANTS TO BE FERTILISED WITH A SLOW RELEASEORGANIC FERTILISER, TO MANUFACTURERSINSTRUCTIONS UPON PLANTING

ALL TREES TO BE STAKED AND TIED WITH A MINIMUM OFTWO STAKES.

SOIL TO BE PROFILES FROM 75mm BELOW DAMP PROOFCOURSE TO SURROUNDING EXISTING GRADE.

NEW QUALITY SANDY LOAM (DEPTH OF 75mm), SACOMPOST (DEPTH OF 25mm) AND GYPSUM (DEPTH OF25mm - APPLICATION TO MANUFACTURER'SINSTRUCTIONS) TO BE CULTIVATED TO A DEPTH OF400mm.

CROSS RIP EXISTING SOIL TO A DEPTH OF 400mm TOFINISHED LEVEL PROFILE.

ALL CONTAMINATED SOIL, RUBBISH AND RUBBLE TO BEREMOVED FROM SITE AS WELL AS THE TOP 100mm OFEXISTING SOIL.

SOIL CULTIVATION:

NOTES

STORM WATER AND DRAINAGE TO BE REVIEWED BYLANDSCAPE CONTRACTORS AND PLUMBER.

IRRIGATION SYSTEMS TO BE ON AUTOMATIC TIMERWITH IN-LINE DRIPPERS FOR GARDEN BEDS (AT 300mmCENTRES).IRRIGATION DESIGN TO BE UNDERTAKEN BYLANDSCAPE SUBCONTRACTOR.

STORM WATER EXIT TO STREET TO BE REVIEWED,CROSSOVER TO KERB REQUIRED, LAISE WITH COUNCIL.

LEGEND

WAX WAX Design Pty.Ltd3/241 Pirie StreetAdelaide, SA 5000T 08 8215 0144E [email protected]

CONSULTANT

DRAWING TITLE

SCALE

PROJECT No. DRAWING No.

DATE DRAWN BY

CHECKED BY

NORTH

COPY RIGHTS OF THIS DRAWING ARE THE PROPERTY OF WAX DESIGN.

1. ALL MEASUREMENTS ARE FOR THE PURPOSE OF DESIGN ONLY.2. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE WORKS

COMMENCE.3. WAX DESIGN MUST BE NOTIFIED IN WRITING OF ANY

DISCREPANCIES.4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL

RELEVANT SPECIFICATIONS, REPORTS AND DRAWINGS.

TOWN OF GAWLER

WILLASTON OVAL PLAY SPACE

18WOP

04/04/18

00.00.00 Preliminary _ __

DATE DRAWING STATUS REV. INIT.

NOTES

PROJECT

CLIENT

KB

AB

1:500@A3

Project No. 18WOP / SCALE 1:500@A3 / Date of Issue 31.08.18

WILLASTON PLAYSPACE // OPTION 1.1

0m 20m

Issues• Significant distance from other

recreation facilities• Visually disconnected from

other facilities in precinct • Access to services (trenching)• Netball facilities create pinch

points and convoluted access/wayfinding

Opportunities• Connection to residential area

• Existing car parking to beformalised (outside of project budget)

• Potential connection ofplayspace to scouts outdoor area

• Existing trees and shade• Not fenced, community access• Existing embankment buffer to

road

• Integrated design of the playspace and pump track will create additional community benefits from a single space for the community use

Playspace

Pump track

Planted embankment

Landscaped buffer

Realigned fence line to BMX track

Open up scouts nature play area

Picnic Shelter

Existing and new natural shade

Formalised car park

Existing netball warm up

Existing embankment to BMX track

1

1

2

3

3

4

5

5

6

6

9

9

7

7

10

11

8

2

4

8

11

10

4

Page 2: Issues 3 Opportunities Connection to residential area ...€¦ · landscape contractors and plumber. irrigation systems to be on automatic timer with in-line drippers for garden beds

Project No. 18WOP / SCALE 1:500@A3 / Date of Issue 31.08.18

WILLASTON PLAYSPACE // OPTION 2.1

PLAN

L00

ALL PLANTS TO BE FERTILISED WITH A SLOW RELEASEORGANIC FERTILISER, TO MANUFACTURERSINSTRUCTIONS UPON PLANTING

ALL TREES TO BE STAKED AND TIED WITH A MINIMUM OFTWO STAKES.

SOIL TO BE PROFILES FROM 75mm BELOW DAMP PROOFCOURSE TO SURROUNDING EXISTING GRADE.

NEW QUALITY SANDY LOAM (DEPTH OF 75mm), SACOMPOST (DEPTH OF 25mm) AND GYPSUM (DEPTH OF25mm - APPLICATION TO MANUFACTURER'SINSTRUCTIONS) TO BE CULTIVATED TO A DEPTH OF400mm.

CROSS RIP EXISTING SOIL TO A DEPTH OF 400mm TOFINISHED LEVEL PROFILE.

ALL CONTAMINATED SOIL, RUBBISH AND RUBBLE TO BEREMOVED FROM SITE AS WELL AS THE TOP 100mm OFEXISTING SOIL.

SOIL CULTIVATION:

NOTES

STORM WATER AND DRAINAGE TO BE REVIEWED BYLANDSCAPE CONTRACTORS AND PLUMBER.

IRRIGATION SYSTEMS TO BE ON AUTOMATIC TIMERWITH IN-LINE DRIPPERS FOR GARDEN BEDS (AT 300mmCENTRES).IRRIGATION DESIGN TO BE UNDERTAKEN BYLANDSCAPE SUBCONTRACTOR.

STORM WATER EXIT TO STREET TO BE REVIEWED,CROSSOVER TO KERB REQUIRED, LAISE WITH COUNCIL.

LEGEND

WAX WAX Design Pty.Ltd3/241 Pirie StreetAdelaide, SA 5000T 08 8215 0144E [email protected]

CONSULTANT

DRAWING TITLE

SCALE

PROJECT No. DRAWING No.

DATE DRAWN BY

CHECKED BY

NORTH

COPY RIGHTS OF THIS DRAWING ARE THE PROPERTY OF WAX DESIGN.

1. ALL MEASUREMENTS ARE FOR THE PURPOSE OF DESIGN ONLY.2. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE WORKS

COMMENCE.3. WAX DESIGN MUST BE NOTIFIED IN WRITING OF ANY

DISCREPANCIES.4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL

RELEVANT SPECIFICATIONS, REPORTS AND DRAWINGS.

TOWN OF GAWLER

WILLASTON OVAL PLAY SPACE

18WOP

04/04/18

00.00.00 Preliminary _ __

DATE DRAWING STATUS REV. INIT.

NOTES

PROJECT

CLIENT

KB

AB

1:500@A3

Issues• Poor passive surveillance after

hours• Public access on game days

restricted• Existing stormwater/ water

quality• Less accessible from residential

areas• Connection to services Opportunities• Create amenity space adjacent

BMX track, creating larger BMXprecinct

• Utilise flatter area adjacent car park for more formal play

• Build on existing informal playin trees

• Native plantings and revegetation to provide buffer to fence line

• Site lines to oval and BMX track• Connection to club rooms• Utilise existing shade• Greater connectivity to the

recreational facilities on precinct• Potential disabled car park

access from existing car park

Playspace

Marshalling area for BMX Club

Existing shade and nature play opportunities

Native revegetation

Natural shade and landscape buffer

Riparian planting and storm watermanagement

Oval viewing

Potential disabled car park access

Existing fence line

Pedestrian access

Potential future pedestrian access and car parking

1

2

33

4

45

5

66

7

7

8

9

10

11

11

9

8

2

1

0m 20m

10

Page 3: Issues 3 Opportunities Connection to residential area ...€¦ · landscape contractors and plumber. irrigation systems to be on automatic timer with in-line drippers for garden beds

Project No. 18WOP / SCALE 1:500@A3 / Date of Issue 11.05.18

WILLASTON PLAYSPACE // OPTION 3

AERIAL

L00

WAX WAX Design Pty.Ltd3/241 Pirie StreetAdelaide, SA 5000T 08 8215 0144E [email protected]

CONSULTANT

DRAWING TITLE

SCALE

PROJECT No. DRAWING No.

DATE DRAWN BY

CHECKED BY

NORTH

COPY RIGHTS OF THIS DRAWING ARE THE PROPERTY OF WAX DESIGN.

1. ALL MEASUREMENTS ARE FOR THE PURPOSE OF DESIGN ONLY.2. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE WORKS

COMMENCE.3. WAX DESIGN MUST BE NOTIFIED IN WRITING OF ANY

DISCREPANCIES.4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL

RELEVANT SPECIFICATIONS, REPORTS AND DRAWINGS.

TOWN OF GAWLER

WILLASTON OVAL PLAY SPACE

18WOP

04/04/18

00.00.00 Preliminary _ __

DATE DRAWING STATUS REV. INIT.

NOTES

PROJECT

CLIENT

KB

AB

1:1500@A3

0m 30m

Issues• Public access on game days

restricted• Slope vs DDA compliance• Ground compacted from car

parking use• Lack of access from residential

area

Opportunities• Existing services n nearby

building• Utilise existing shade• Formalise viewing area• Amenity for game day users

and activation of ‘back corner’ ofoval space

Playspace

Shade

Buffer Planting

Oval Viewing/ Amenity Area

Car Parking

Electrical Infrastructure

Service Access

Fence line

1

2

3

4

5

6

7

1

2

2

3

4

5

6

7

8

8

Page 4: Issues 3 Opportunities Connection to residential area ...€¦ · landscape contractors and plumber. irrigation systems to be on automatic timer with in-line drippers for garden beds

Project No. 18WOP / SCALE 1:500@A3 / Date of Issue 11.05.18

WILLASTON PLAYSPACE // OPTION 4

PLAN

L00

ALL PLANTS TO BE FERTILISED WITH A SLOW RELEASEORGANIC FERTILISER, TO MANUFACTURERSINSTRUCTIONS UPON PLANTING

ALL TREES TO BE STAKED AND TIED WITH A MINIMUM OFTWO STAKES.

SOIL TO BE PROFILES FROM 75mm BELOW DAMP PROOFCOURSE TO SURROUNDING EXISTING GRADE.

NEW QUALITY SANDY LOAM (DEPTH OF 75mm), SACOMPOST (DEPTH OF 25mm) AND GYPSUM (DEPTH OF25mm - APPLICATION TO MANUFACTURER'SINSTRUCTIONS) TO BE CULTIVATED TO A DEPTH OF400mm.

CROSS RIP EXISTING SOIL TO A DEPTH OF 400mm TOFINISHED LEVEL PROFILE.

ALL CONTAMINATED SOIL, RUBBISH AND RUBBLE TO BEREMOVED FROM SITE AS WELL AS THE TOP 100mm OFEXISTING SOIL.

SOIL CULTIVATION:

NOTES

STORM WATER AND DRAINAGE TO BE REVIEWED BYLANDSCAPE CONTRACTORS AND PLUMBER.

IRRIGATION SYSTEMS TO BE ON AUTOMATIC TIMERWITH IN-LINE DRIPPERS FOR GARDEN BEDS (AT 300mmCENTRES).IRRIGATION DESIGN TO BE UNDERTAKEN BYLANDSCAPE SUBCONTRACTOR.

STORM WATER EXIT TO STREET TO BE REVIEWED,CROSSOVER TO KERB REQUIRED, LAISE WITH COUNCIL.

LEGEND

WAX WAX Design Pty.Ltd3/241 Pirie StreetAdelaide, SA 5000T 08 8215 0144E [email protected]

CONSULTANT

DRAWING TITLE

SCALE

PROJECT No. DRAWING No.

DATE DRAWN BY

CHECKED BY

NORTH

COPY RIGHTS OF THIS DRAWING ARE THE PROPERTY OF WAX DESIGN.

1. ALL MEASUREMENTS ARE FOR THE PURPOSE OF DESIGN ONLY.2. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE WORKS

COMMENCE.3. WAX DESIGN MUST BE NOTIFIED IN WRITING OF ANY

DISCREPANCIES.4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL

RELEVANT SPECIFICATIONS, REPORTS AND DRAWINGS.

TOWN OF GAWLER

WILLASTON OVAL PLAY SPACE

18WOP

04/04/18

00.00.00 Preliminary _ __

DATE DRAWING STATUS REV. INIT.

NOTES

PROJECT

CLIENT

KB

AB

1:500@A3

0m 30m

Issues• Proximity of dog park to

playspace• Public access on game days

restricted• Blocking potential views to oval• Sloped embankment & DDA

compliance• Lack of shade

Opportunities• Utilise fl at area to connect to car

park and provide DDA access• Utilise embankment for chal-

lenging play• Utilise existing irrigation and

service connections• Provide additional shade and

seating opportunities• Connect dog park to main oval

Playspace

DDA Compliant Play

Shade

Mound Planting

Buffer Planting

Oval Viewing

Existing Car Park

Stormwater

Fence line

1

2

3

4

5

6

7

8

1

23

3

45

6

7

8

9

9

Page 5: Issues 3 Opportunities Connection to residential area ...€¦ · landscape contractors and plumber. irrigation systems to be on automatic timer with in-line drippers for garden beds

Project No. 18WOP / SCALE 1:500@A3 / Date of Issue 24.05.18

WILLASTON PLAYSPACE // OPTION 5

PLAN

L00

ALL PLANTS TO BE FERTILISED WITH A SLOW RELEASEORGANIC FERTILISER, TO MANUFACTURERSINSTRUCTIONS UPON PLANTING

ALL TREES TO BE STAKED AND TIED WITH A MINIMUM OFTWO STAKES.

SOIL TO BE PROFILES FROM 75mm BELOW DAMP PROOFCOURSE TO SURROUNDING EXISTING GRADE.

NEW QUALITY SANDY LOAM (DEPTH OF 75mm), SACOMPOST (DEPTH OF 25mm) AND GYPSUM (DEPTH OF25mm - APPLICATION TO MANUFACTURER'SINSTRUCTIONS) TO BE CULTIVATED TO A DEPTH OF400mm.

CROSS RIP EXISTING SOIL TO A DEPTH OF 400mm TOFINISHED LEVEL PROFILE.

ALL CONTAMINATED SOIL, RUBBISH AND RUBBLE TO BEREMOVED FROM SITE AS WELL AS THE TOP 100mm OFEXISTING SOIL.

SOIL CULTIVATION:

NOTES

STORM WATER AND DRAINAGE TO BE REVIEWED BYLANDSCAPE CONTRACTORS AND PLUMBER.

IRRIGATION SYSTEMS TO BE ON AUTOMATIC TIMERWITH IN-LINE DRIPPERS FOR GARDEN BEDS (AT 300mmCENTRES).IRRIGATION DESIGN TO BE UNDERTAKEN BYLANDSCAPE SUBCONTRACTOR.

STORM WATER EXIT TO STREET TO BE REVIEWED,CROSSOVER TO KERB REQUIRED, LAISE WITH COUNCIL.

LEGEND

WAX WAX Design Pty.Ltd3/241 Pirie StreetAdelaide, SA 5000T 08 8215 0144E [email protected]

CONSULTANT

DRAWING TITLE

SCALE

PROJECT No. DRAWING No.

DATE DRAWN BY

CHECKED BY

NORTH

COPY RIGHTS OF THIS DRAWING ARE THE PROPERTY OF WAX DESIGN.

1. ALL MEASUREMENTS ARE FOR THE PURPOSE OF DESIGN ONLY.2. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE WORKS

COMMENCE.3. WAX DESIGN MUST BE NOTIFIED IN WRITING OF ANY

DISCREPANCIES.4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL

RELEVANT SPECIFICATIONS, REPORTS AND DRAWINGS.

TOWN OF GAWLER

WILLASTON OVAL PLAY SPACE

18WOP

04/04/18

00.00.00 Preliminary _ __

DATE DRAWING STATUS REV. INIT.

NOTES

PROJECT

CLIENT

KB

AB

1:500@A3

0m 30m

Issues• Proximity of dog park to

playspace• Public access on game days

restricted• Sloped embankment & DDA

compliance• Lack of shade

Opportunities• Connection to existing car park,

clubrooms and dog park• Utilise embankment for chal-

lenging play• Utilise existing irrigation and

service connections• Provide additional shade and

seating opportunities• Connect dog park to main oval

Playspace

Shade

Mound Planting

Existing Car Park

Fence line

Stormwater

Connection to car park

Connection to dog park

Buffer planting

1

2

3

4

5

6

41

9

2

3

5

6

7

8

7

8

9