ISPA Measure 200 5 BG 16 P PE 00 1. 1.Reconstruction of WWTP Sliven ( FIDIC Yellow Book ) 2.Construction/Reconstruction of Water Supply and Sewerage Network of Sliven (stage 1); LOT 1: Construction/Reconstruction of Sewerage Network. Integrated Water Project for the town of Sliven. - PowerPoint PPT Presentation
Citation preview
Integrated Water Project for the town of Sliven
1.Reconstruction of WWTP Sliven (FIDIC Yellow Book)
2.Construction/Reconstruction of Water Supply and Sewerage Network of Sliven (stage 1); LOT 1:Construction/Reconstruction of Sewerage
Network
ISPA Measure 2005 BG 16 P PE 001
Works Contract 1Reconstruction of WWTP Sliven
(FIDIC Yellow Book)
• Commencement Date: March 24, 2009
• Taking Over Certificate: July 21, 2011
• DNP started on: July 21, 2011
• Performance Certificate: October 18, 2012
• Physical Execution: 100 %
• Financial Execution: 83 %
WWTP Sliven
before reconstruction
Reconstruction of WWTP Sliven
Inlet chamber
Entrance and control building
Reconstruction of WWTP Sliven
Screening building
Reconstruction of WWTP Sliven
Grid tank
Blowers
Reconstruction of WWTP Sliven
Reconstruction of WWTP Sliven
PS for primary sludge - reconstruction
Primary Settlement Tank
Reconstruction of WWTP Sliven
Aeration Tank
Distribution Chamber of SSTSecondary Settlement Tank
Reconstruction of WWTP Sliven
Service Building at Heated Digesters
Reconstruction of WWTP Sliven
Facilities for Sludge treatment and utilization of biogas
Reconstruction of WWTP Sliven
Reconstruction of WWTP Sliven
SCADA MCC
Gasholder Torch
Reconstruction of WWTP Sliven
Reconstruction of WWTP Sliven
Commemorative table
Supervision Contracts
Contract № 1
• Commencement Date: March 23, 2009
• Completion Date: April 23, 2012
• Financial Execution: 100 %
Contract № 2 – funded by national budget
• Completion Date: December, 2012
Reconstruction of WWTP Sliven
Construction/Reconstruction of Sewerage Network – LOT1
• The final assessment for the result achieved in LOT 1 is about 23 % (excluding recovering of the roads).
• Sliven Municipality has submitted in MoEW documentation to apply for financing under the OP Environment. The new project includes the activities of LOT1 that were not completed by ISPA.
Compliance with Article 8of the Financing Memorandum
All conditions under Article 8 of the FM related to payments are considered fulfilled.
ISPA Measure 2005 BG 16 P PE 001
Integrated Water Project for the town of
Sliven
• Final Report was presented to the European Commission