33
ISM Congress 2019, Irkutsk IRKUTSK NATIONAL RESEARCH TECHNICAL UNIVERSITY DEPARTMENT OF MINE SURVEYING AND GEODESY INTERNATIONAL SOCIETY FOR MINE SURVEYING (ISM) President of ISM Prof. Anatoly Okhotin

ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

ISM Congress 2019, Irkutsk

IRKUTSK

NATIONAL

RESEARCH

TECHNICAL

UNIVERSITY

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

INTERNATIONAL

SOCIETY FOR MINE

SURVEYING (ISM)

President of ISM

Prof. Anatoly Okhotin

Page 2: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

«KNOWLEDGE FOR YOURSELF,

ACHIEVEMENTS FOR MOTHERLAND!»

OUR

EXPERIENCE

Page 3: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

RESULT

LINK TO INDUSTRIES

SCIENCE

EDUCATION/ TRAINING

OUR EXPERIENCE DEPARTMENT OF

MINE SURVEYING

AND GEODESY

AT THE PEAK OF HIGH

TECHNOLOGIES!

Page 4: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

HAS

highly-qualified specialists

state-of-the art equipment which is

regularly renewed

well equipped auditoriums and

laboratories

EDUCATION

TURNED OUT

more than 2000 engineers-

mine surveyors

more than 800 engineers-

geodesists

more than 100 cartographers

DEPARMENT OF

MINE SURVEYING

AND GEODESY

DEPARTMENT

EDUCATION

Page 5: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

CENTRE OF SPACE ТECHNOLOGIES

AND SERVICES AT INRTU

SCIENCE

SCIENCE

Carrying out of topography by means of space

images as well as:

landscape changes monitoring;

harvest monitoring;

determination of erosion;

determination of illegal landfills;

Hardware-software complex

TT Systems 46

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 6: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

PERFORMED

PROJECTS

Topographical surveys and

survey observations;

Laying and monitoring of

geodynamic polygons.

LINKS WITH INDUSTRIES

CURRENT

EQUIPMENT

Leica;

Trimble;

PrinCe

provide high accuracy and efficiency

SURVEYS VIA GNSS

TECHNOLOGIES

LINKS WITH THE INDUSTRIES

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 7: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

LINKS WITH INDUSTRIES

ALLOW TO

OBTAIN

High automation level;

High productivity;

High detailing;

High measurement accuracy;

3D visualization in real-time operation mode;

Safety while surveying in remote and

dangerous locations;

Multipurpose usage of results.

allow to create high quality digital models

GROUND-BASED LASER SCANNING

LINKS WITH INDUSTRIES

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 8: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

LINKS WITH INDUSTRIES

PERFORMED

AND CURRENT

PROJECTS

Large-scale topographical surveys;

Creation of 3D models of manufacturing

entities;

Profiling of pit-shafts;

Monitoring of landslide processes;

Monitoring of deformations for RPP.

GROUND-BASED

LASER SCANNING LINKS WITH INDUSTRIES

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 9: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

LINKS WITH INDUSTRIES

Including scanning of facades, architectural monuments

and heritage buildings

Calculation of materials for costly façade constructions;

Determination of damaged and total façade areas in order to

estimate the restoring works content;

Keeping the object data in digital form and its further inquiry.

GROUND-BASED

LASER SCANNING LINKS WITH INDUSTRIES

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 10: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

• Reference-connective surveys;

• Establishing of reference mine surveying basing

(traverses);

• Profiling;

• Verification of deviation angles;

• Mine surveying observing stations;

• Providing for major connections;

• As-built survey of load-bearing structures.

FUNDUMENTAL

MINE-SURVEYING WORKS LINKS WITH INDUSTRIES

LINKS WITH INDUSTRIES

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 11: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

SURVEYS VIA MANNED

AIRCRAFTS AND UAVS LINKS WITH INDUSTRIES

LINKS WITH INDUSTRIES

EXECUTED

PROJECTS

Topographical surveys of

large areas;

Landscape processes

monitoring.

EQUIPMENT

IN USE

Manned aircrafts;

Unmanned helicopter

AEROSCOUT B1-100;

GeoScan 101

Drones

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 12: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

MINE SURVEYOR

FOR AN HOUR LINKS WITH INDUSTRIES

LINKS WITH INDUSTRIES

Works are performed quickly and accurately

Works are performed under the control of

highly qualified specialists

The service «Mine surveyor for an hour»

makes it unnecessary to have permanent mine

surveying service

«Mine surveyor for an hour

» - a successful project in Irkutsk

region

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 13: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

«Mine surveying ambulance» - speedy help in mine

surveying

MINE SURVEYOR

FOR AN HOUR LINKS WITH INDUSTRIES

LINKS WITH INDUSTRIES

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 14: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

RESULTS

RESULT

IN-SERVICE

EDUCATION

PROGRAMMES

CONNECTIONS

ALL OVER THE

WORLD

IMPROVEMENT

OF

AUDITORIUMS

EVEN MORE

NEW

EQUIPMENT

PROMOTION

OF SUCCESSFUL

STUDENTS

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 15: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

PROJECT “INTERNATIONAL SUMMER SCHOOL”

It is held among talented students specializing in mine surveying and geodesy.

THERE HAVE ALREADY BEEN HELD 2 SCHOOLS:

I SCHOOL - July 2017, Olkhon Island, lake Baikal

II SCHOOL - July 2018, China

INTERNATIONAL PROJECTS

Page 16: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

Digital economy is a system of economic, social and cultural relations based on the usage of digital information and communication technologies V.V.Putin – «I would like to suggest starting large-scale systemic programme for the development of the new technological type economy, so called digital economy. In order to realize this programme we are going to depend on particularly Russian companies, scientific, research and engineering centres in our country. That is an issue of national security and technological self-sufficiency of Russia, in the full sense of the word – our future.»

BIM CENTRE

On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness analysis for justification of investments and information modeling technologies at all stages of the «life-cycle» of a capital construction object.

Page 17: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

REGIONAL BIM CENTRES -

THE IMPLEMENT OF PRACTICAL

REALIZATION OF «DIGITAL ECONOMY»

INRTU – BIM CENTRE DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 18: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

INRTU – BIM CENTRE

BIM-

centre

Regional BIM-centre – generally available platform for the application of information modeling technologies for

the region

DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 19: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

Wide range of engineering specialities

Highly qualified specialists Training facilities Equidistant from customers location Facile adjustment of BIM processes Forceful Association of graduates

WHY CHOOSING BIM CENTRE AT INRTU? DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 20: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

Complicated-structured mining enterprises have been in great need of complete integration into digital format

for a long time

BIM FOR MINING SPHERE DEPARTMENT OF

MINE SURVEYING

AND GEODESY

Page 21: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

INTERNATIONAL CONGRESS FOR MINE SURVEYING ISM 2019

DEPARTMENT OF MINE

SURVEYING AND

GEODESY

For the first time in Russia

INTERNATIONAL

MINE SURVEYING CONGRESS

26-30 September 2019, city of Irkutsk

XVII CONGRESS OF ISM 2019

Page 22: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

• ISM – International Society for Mine Surveying

• ISM performs its activities as an independent international organization and is a non-profit-making and non-state association.

• ISM – the C category organization (MUTUAL COMMUNICATORY RELATIONS) according to the letter of UNESCO Director-General of 22nd June, 1977.

• The main objective of the Society is to promote international cooperation in the sphere of mine surveying and geodesy by means of exchange of experience between countries, as well as students, scientific colleagues and relevant specialists.

XVII International Mine Surveying Congress of ISM

26-30 September 2019, IRKUTSK

Page 23: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

ISM INCLUDES COUNTRIES FROM

• AFRICA

• EUROPE

• NORTH AMERICA

• SOUTH AMERICA

• ASIA

• OCEANIA

XVII International Mine Surveying Congress of ISM

26-30 September 2019, IRKUTSK

Page 25: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

Избрание президента ISM на

XVI Конгрессе, в 2016 году,

Австралия, Брисбен

XVII International Mine Surveying Congress of ISM

26-30 September 2019, IRKUTSK

Page 26: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

www.ism2019.com

XVII International Mine Surveying Congress of ISM

26-30 September 2019, IRKUTSK

Page 27: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

XVII International Mine Surveying Congress of ISM 26-30 September 2019, IRKUTSK

.

ORGANIZERS

Venue for the Congress:

«Baikal Business Centre»

http://bbc.ru/en/

Management of the Congress:

«Baikal action group»

Page 28: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

.

THE PROGRAMME:

26/09/2019 Arrival of ISM presidium members

27/09/2019 Arrival of other quests and participants

27/09/2019 Presidium meeting of the ISM Congress

28/09/2019 Opening ceremony

с 28/09/2019 till 29/09/2019 Scientific sessions

с 28/09/2019 till 29/09/2019 Exhibition of equipment

29/09/2019 Closing ceremony

CULTURAL PROGRAM:

• 27/09/2019 Irkutsk city tour

• 30/09/2019 Trip to lake Baikal

XVII International Mine Surveying Congress of ISM 26-30 September 2019, IRKUTSK

https://ism2019.com

Page 29: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

.

XVII International Mine Surveying Congress of ISM 26-30 September 2019, IRKUTSK

SCIENTIFIC SESSIONS:

NUMBER OF

SESSION

НАЗВАНИЕ СЕССИИ

SESSION 1 The technologies for mineral deposits development

SESSION 2 Prediction and monitoring of geomechanical and geodynamic processes while developing the deposits by means

of underground method and constructiong underground facilities

SESSION 3 Prediction and monitoring of geomechanical and geodynamic processes while developing the deposits by means

of opencast mining method

SESSION 4 Mine surveying and geodetic backup for the development of hydrocarbon deposits

SESSION 5 Industrial safety, resources conservation and environmental protection

SESSION 6 Usage of geoinformational technologies while deposits development, technological processes modeling

SESSION 7 The economy of mine surveying projects. New energy resources, their mine surveying and geodetic backup

PUBLICATIONS IN SCIENTIFIC JOURNALS, INCLUDING

SCOPUS

Page 30: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

XVII International Mine Surveying Congress of ISM 26-30 September 2019, IRKUTSK

OUR SSPONSORS:

• ALROSA

• HEXAGON GEOSISTEMS

• RIEGL

BECOMING SPONSORS:

• INK;

• GASPROM;

• VOSTSIBUGOL;

• GEOSCAN;

• HEXAGON GEOSISTEMS RUS;

• CHINA COAL SOCIETY;

• ARTGEO;

• SUEK;

• POLYUS GOLD;

• ROSNEFT;

• NORNICKEL

Page 31: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

WELCOME TO THE CONGRESS

ISM 2019!

September 26-30, 2019, city of IRKUTSK,

RUSSIA

Page 32: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness
Page 33: ISM Congress 2019, Irkutsk - con-fig.com · the full sense of the word – our future.» BIM CENTRE On 11 April, 2017 there was approved the action plan on introduction of cost-effectiveness

BACK TO THE BEGINNING

DEPARTMENT OF

MINE SURVEYING

AND GEODESY