Why is monitoring and evalution a challenge in sustainable urban mobility planning? Authors: City of Dresden Dr Kerstin Burggraf Institute for Transport Studies University of Leeds Dr Astrid Gühnemann Contributions from: Institute for Transport Studies University of Leeds Prof. Anthony D May OBE FREng January 2014

is monitoring and evalution a challenge urban mobility

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Microsoft Word - Challenge_Description_WP5_20140128_final.docxWhy is monitoring and evalution a challenge  in sustainable urban mobility planning? 
        Authors:  City of Dresden  Dr Kerstin Burggraf  Institute for Transport Studies University of Leeds  Dr Astrid Gühnemann    Contributions from:  Institute for Transport Studies University of Leeds  Prof. Anthony D May OBE FREng      January 2014   
2
2      What is meant by monitoring and evaluation? ............................................................................. 3 
4      What research and information is available on monitoring and evaluation? ............................... 5 
5      How does CH4LLENGE address monitoring and evaluation? ........................................................ 8 
6      Further reading ............................................................................................................................ 10 
1  Aims of CH4LLENGE 
The EU cofunded project CH4LLENGE addresses significant barriers for the wider takeup of SUMPs 
in Europe.  In a  joint undertaking  together with  research and  resource  institutions,  the project will 
support European cities at different stages of advancing the takeup of SUMPs. Building on previous 
experiences  and  lessons  from  earlier  and  ongoing  national  and  European  SUMP  initiatives,  the 
consortium has identified common challenges which pose significant barriers in the wider takeup of 
SUMPs  in  Europe.  The  project will work  on  innovative  and  transferable  solutions  for  four  SUMP
challenges. 
 
The following sections explain in detail why monitoring and evaluation in particular is a challenge for 
the takeup of SUMPs in European cities.  
 
2  What is meant by monitoring and evaluation? 
Monitoring and evaluation can be applied as management tools both for individual measures and for 
the overall SUMP planning process.   A related process, appraisal, is used in developing proposals for 
individual measures and for the overall SUMP. 
A very short description about it is the following: 
monitoring: continuous data collection and data analyses during implementation, 
evaluation: systematic determination of measure’s merit and significance during and after 
implementation  with conclusions, 
appraisal: evaluation of the impacts and worth of measures before implementation. 
4
Monitoring and evaluation activities should be conducted on a regular cycle, although their 
frequency might vary with evaluation taking place at longer time intervals.  They are important tools 
in the development and implementation of Sustainable Urban Mobility Plans (SUMPs) that serve the 
purpose of timely identification of problems, potential successes and the need for readjustment of a 
SUMP and its instruments. Providing regular information to decision makers, potential funding 
bodies and local stakeholders can help to convince them that a SUMP has or will deliver benefits to 
the community, provides value for money and is worth continuing, or requires modifications to be 
successful. 
Appraisal (exante evaluation) is conducted in the development of proposals for a measure or an 
overall SUMP, to assess whether the proposals will be effective and represent value for money, or 
need enhancement. Evaluation (expost evaluation) takes place after implementation of a measure 
or an overall SUMP, and is used to assess whether the measure (or SUMP) has been effective, and 
does represent value for money, or whether it needs modification or enhancement. 
Key steps in monitoring, appraisal and evaluation are 
Definition of objectives 
For appraisal (exante evaluation) 
o Determining a dominimum base against which to assess the proposal 
o Predicting the effects of the proposal 
For evaluation (expost evaluation) 
o Measuring the before conditions 
o Measuring the after conditions 
Analysis, interpretation and, if appropriate, assessing value for money. 
The “Guidelines for Developing and Implementing a Sustainable Urban Mobility Plan” 
(www.mobilityplans.eu/docs/SUMPguidelines_web0.pdf) give the following description:  
„Monitoring and evaluation need to be built into the plan as essential management tools to keep 
track of the planning process and measure implementation, but also so that you can learn from the 
planning experience, understand what works well and less well, and to build the business case and 
evidence base for the wider application of similar measures in the future.” 
Typical barriers towards an effective use of evaluation and monitoring are lack of financial and staff 
resources as well as gaps in technical knowledge with regards to defining performance indicators, 
data retrieval and collection, data preparation and data understanding.  
A key element in Sustainable Urban Mobility Planning is evaluation and monitoring progress. Local 
authorities often underestimate the need for monitoring and evaluation in SUMP. This challenge 4 
will provide guidance on monitoring and evaluating both measures and the whole SUMP 
development process for application by the cities. 
The objective is to provide methodologies and feasible ways to assess change and evaluate the 
effectiveness of a SUMP. 
5
Figure 1: SUMP monitoring and evaluation process (CH4LLENGE, City of Dresden)  
3  Why is monitoring and evaluation important for SUMPs? 
Cities get knowhow and advice for local implementation for monitoring and evaluation.     Monitoring and evaluation of measures and the SUMP process have benefits to     efficiency of planning processes and implementation of measures, 
higher quality of a SUMP itself and the SUMP process, 
assess and raise the quality of measures and measure bundles and packages, 
fill the gap between the objectives, the plan and its implementation, 
quality management for all partners: planners, operators, politicians etc., 
save resources. 
 
4  What research and information is available on monitoring and 
evaluation? 
There are broad information on monitoring and evaluation available from recent European projects: 
Projects/source  Topics covered  Link 
CIVITAS  MIMOSA (2013) 
Handbook “Evaluation matters  a  practitioners guide to sound evaluation for  urban mobility measures” 
http://www.civitas.eu/docs/Civitas MimosaCityBrochure.pdf 
http://www.citymobil project.eu/site/en/documenten.ph p 
ADVANCE  (20112014) 
ADVANCE develops, tests and applies an  Audit Scheme to assess the quality of  sustainable urban mobility planning 
www.advanceproject.org 
QUEST   (20112013) 
Quest is a Quality Management tool to help  small and mediumsized cities to set up and  further develop their sustainable mobility  policies and actions with assistance of an  external auditor.  Recommendations with regard to Urban  Mobility Assessment from the review of  approaches to evaluation (Deliverable 3.1) 
http://www.quest project.eu/index.php?id=7 
CIVITAS ELAN  (2012) 
ELAN experiments at all stages from project  planning and implementation, to monitoring  and evaluation. 
http://www.civitas initiative.org/content/elan 
www.mobilityplans.eu/docs/SUMP guidelines_web0.pdf 
http://www.cost.eu/domains_acti ons/tud/Actions/356 
MAX (2009)  MaxSumo.  Guidance on  how to plan,  monitor and  evaluate  mobility  projects 
MaxSumo offers an opportunity to  effectively plan, monitor and evaluate  mobility projects and programmes aimed at  behavioural change.  Available in EN, DE, ES, FR, NL, PL, PT, SE 
www.epomm.eu/index.  phtml?ID1=2359&id=2359 
DISTILLATE  (2008) 
Project C  Indicators:  Product C1: Designing a monitoring strategy  to support effective delivery of sustainable  transport goals;  Product C2: Advice on selecting indicators  for sustainable transport;  Product C3: Monitoring across sectors and  spatial levels for sustainable transport: a  good practice guide 
www.distillate.ac.uk,  http://www.its.leeds.ac.uk/project s/distillate/outputs/products.php 
Measuring indicators, p. 59 f., 61  Evaluation methods (Cost effectiveness,  Costbenefit analysis, least cost planning,  multiple criteria analysis), p. 79 
www.osmoseos.org/  documents/316/GUIDEMAPSHand book_web[1].pdf 
GUIDEMAPS  (2004)  Handbook,  Volume 2:  Fact Sheets 
Measuring indicators, p. 70 f.  Tools for tracking progress, p. 73  Measuring outcome indicators, p. 76  Post implementation evaluation, p. 78 
www.osmoseos.org/  documents/316/GUIDEMAPSHand book_web[1].pdf 
PROPOLIS  (20002003) 
PROPOLIS focused on developing  methodologies and tools for assessment of  urban sustainability and on evaluation of  different land use and transport policies 
http://www.transport research.info/web/projects/projec t_details.cfm?ID=4385 
http://www.konsult.leeds.ac.uk/p ublic/level1/sec00/index.htm,   
PROSPECTS  (2003),  A  Methodological  Guidebook 
Appraisal and evaluation, p. 25 f., 33 ff.  Implementation and monitoring, p. 27 ff.  Basics of CBA, p. 99 f. 
www.ivv.tuwien.ac.at/forschung/p rojekte/international projects/prospects2000.html 
PROSPECTS  (2002),  Evaluation tools  (Deliverable 2) 
Covering a wide range of methods and tools  for evaluation. See whole document. 
www.ivv.tuwien.ac.at/forschung/p rojekte/international projects/prospects2000.html 
 
These sources highlight a number of barriers to the effective adoption of monitoring and evaluation: 
Many cities have some experiences in monitoring of measures. But they do not have 
experiences in monitoring the SUMP process. There are very few experiences with 
evaluation, either for measures or for the SUMP process. The level of experience with 
monitoring and evaluation activities varies strongly between cities with only limited tradition 
in preparation of SUMPs where urban transport planning is often either strongly 
infrastructure based or part of landuse planning and cities which have a longestablished 
tradition of transport planning (see ADVANCE project).  
Differing definitions exist for the indicators to be monitored ranging from indicators for 
particular impacts (e.g. environmental impacts in COST356), over those for the evaluation of 
particular types of measures (e. g. for Advanced Transport Systems in MAESTRO or CityMobil 
or for mobility management measures in MAXSumo) to complete indicator sets (e. g. in 
DISTILLATE). However, in practice there is little consistency in what is monitored in different 
cities or over time.  
8
In several cities there are data available, but there is no connection to the SUMP and its 
objectives. The data are used for the whole development, not for certain measures. The 
cities do not really have a monitoring and evaluation strategy but they see the need of it. 
Monitoring and evaluation is not very high on the political agenda.  
Involving stakeholder groups in the evaluation process and using monitoring data to inform 
the public are of growing importance but seen as difficult and potentially prone to pressure 
from interest groups (see e. g. DISTILLATE project conclusions). Examples from Dutch 
planning demonstrate how stakeholders could be involved at different steps of the 
evaluation process (Macharis et al., 2013).  
There are only limited experiences on how monitoring and evaluation should be managed 
and who should do it (the city administration with focus on measures or an external 
body/consultant with focus on SUMPprocess). 
Monitoring and evaluation need capacities and also money (for behaviour surveys e. g.). But 
the costs of monitoring and evaluation are much less than the costs of inefficient measures 
and ineffective strategies.  
 
5  How does CH4LLENGE address monitoring and evaluation? 
The level of using monitoring and evaluation in practice in European cities differs. All CH4LLENGE 
cities reported that evaluation and monitoring are seen as important by the administrations, but 
political commitment is sometimes low and generally a lack of manpower and budget can be 
observed.  
The cities need a work method to be more efficient in data collection, monitoring and evaluation 
(continuously every one, two, or more years). They need a standardised method/an algorithm. This is 
reflected by the results of the CH4LLENGE survey and the workshops. The Leeds workshop 
participants agreed that a list of indicators with core indicators and recommendations for the most 
important indicators would be most helpful. It should be differentiated between output indicators 
and intermediate indicators. Further, the cities need a guideline to practice monitoring and 
evaluation (methods of measurement, time scales etc.).  
Generally, it should be differentiated between large scale monitoring and evaluation in big cities and 
smaller scale monitoring and evaluation in smaller cities. It should also be differentiated between 
monitoring and evaluation of small measures (as a more qualitative one) and of bigger measures/ 
measure packages/ SUMPs (as a more quantitative one). Financing of monitoring and evaluation 
tasks needs to be addressed, planned and realised. Data collection itself is usually unproblematic, but 
many cities lack resources to analyse the collected data subsequently. Therefore, the cities need “pro 
evaluation” arguments for the politicians, the political discussion and for the administration itself. 
Also an efficient institutional cooperation is required for monitoring and evaluation. 
9
The participating cities will overcome these barriers by piloting strategies and develop clear handson 
guidance for decision makers and practitioners in local authorities in form of practical resource kits.  
The work has started with a survey of the nine partner cities and the 30 follower cities which gives 
information about the local situation, the level of practical application and of problems of monitoring 
and evaluation. 
Then key evaluation parameters and core indicator sets will be identified and local monitoring and 
evaluation programmes will be defined. 
In local pilots the advanced cities will set up monitoring and evaluation programmes for SUMP 
processes and for selected measures with support of the project experts. Piloting will be applied to 
selected measures (already implemented or currently being implemented outside the project’s 
budget) or to the entire SUMP process (both only for optimising cities that already have a SUMP in 
place).  
Based on pilots in the cities CH4LLENGE will identify lessons and develop a SUMP evaluation and 
monitoring kit helping other European cities to plan their own evaluation and monitoring processes 
in the framework of their own SUMP. 
The new experiences and knowledge gained in this CH4LLENGE workpackage monitoring and 
evaluating progress will help to qualify local SUMP processes and develop further the European 
Guidelines. 
Figure 2: Further qualifying SUMP monitoring and evaluation (CH4LLENGE, City of Dresden) 
For more information join us on www.sumpchallenges.eu 
 
 
Barham, P. et al. (2012) State of the Art of Urban Mobility Assessment. QUEST Quality management toll for Urban Energy efficient Sustainable Transport. Deliverable 3.1 http://www.quest- project.eu/files/upload/files/QUEST_State_of_the_Art_of_urban_mobility_assessment.pdf (last accessed 18/12/2013)
Beukers,E. et al. (2012) Why Cost Benefit Analysis is perceived as a problematic tool for assessment of transport plans: A process perspective, Transportation Research Part A: Policy and Practice, Volume 46, Issue 1, January 2012, Pages 68-78
Bickel, P. et al. (2004) HEATCO - Developing Harmonised European Approaches for Transport Costing and Project Assessment: Deliverable 5 - Proposal for Harmonised Guidelines. http://heatco.ier.uni-stuttgart.de (last accessed 18/12/2013)
Department for Communities and Local Government, UK (2009) Multi-criteria analysis: a manual. https://www.gov.uk/government/publications/multi-criteria-analysis-manual-for-making- government-policy (last accessed 18/12/2013)
HM Treasury (2003) The Green Book – Appraisal and Evaluation in Central Government. 2003 edition, updated July 2011. https://www.gov.uk/government/publications/the-green-book-appraisal-and-evaluation-in- central-governent (last accessed 18/12/2013)
ITS (no date) KONSULT Decision Maker’s Guidebook. http://www.konsult.leeds.ac.uk/public/level1/sec01/index.htm (last accessed 18/12/2013)
Lautso, K. et al. (2004) PROPOLIS – Planning and Research of Policies for Land Use and Transport for Increasing Urban Sustainability. Final Report, second edition, February 2004 http://www.transport-research.info/web/projects/project_details.cfm?ID=4385 (last accessed 18/12/2013)
Lichfield, N. (1996) Community Impact Evaluation. London: UCL Press
Litman, T. (2011) Sustainability and Livability: Summary of Definitions, Goals, Objectives and Performance Indicators. Monograph Victoria Transport Policy Institute. http://www.vtpi.org/sus_liv.pdf (last accessed 18/12/2013)
Litman, T. (2012) Well Measured: Developing Indicators for Sustainable and Livable Transport Planning. Monograph Victoria Transport Policy Institute. http://www.vtpi.org/wellmeas.pdf (last accessed 18/12/2013)
Mackie, P. & Worsley, T. (2013) International comparisons of transport appraisal practice: overview report. Report for the Department for Transport. https://www.gov.uk/government/publications/international-comparisons-of-transport-appraisal- practice (last accessed 18/12/2013)
Marsden, G. et al. (2005) Improved Indicators for Sustainable Transport and Planning. DISTILLATE Deliverable C1 – Sustainable Transport Indicators: Selection and Use. Leeds, York, 2005 http://www.distillate.ac.uk/outputs/reports.php (last accessed 18/12/2013)
11
Marsden, G. et al. (2006a) CityMobil - Towards advanced transport for the urban environment: Evaluation framework. Deliverable 5.1.1 http://www.citymobil-project.eu/site/en/documenten_deliverables.php (last accessed 18/12/2013)
Marsden, G. et al. (2006b) Selecting indicators for strategic performance management. in Management and Public Policy 2006. Transportation Research Board Natl. Research Council, Washington, pp. 21-29, 85th Annual Meeting of the Transportation-Research-Board, Washington, 22-26 January.
Mouter, N. et al. (2013), Attitudes towards the role of Cost–Benefit Analysis in the decision-making process for spatial-infrastructure projects: A Dutch case study, Transportation Research Part A: Policy and Practice, Volume 58, December 2013, Pages 1-14
Nelson, D., Sharkow, D. (1995) Least-Cost Planning: A Tool for Metropolitan Decision-Making, Transportation Research Record, #1499, National Academy of Sciences/Engineering, Washington, D.C., 1995
Nijkamp, P. & van Delft , A (1977) Multi-Criteria Analysis and Regional Decision-Making. Studies in Applied Regional Science. Springer Verlag
Odgaard, T. et al. (2005) Current practice in project appraisal in Europe – Analysis of country reports. HEATCO Deliverable 1 http://heatco.ier.uni-stuttgart.de/hd1final.pdf (last accessed 18/12/2013)
Tavistock Institute & AECOM (2010) Guidance for transport impact evaluations: choosing an evaluation approach to achieve better attribution. Report for the Department of Transport. http://webarchive.nationalarchives.gov.uk/20110202223908/http://www.dft.gov.uk/pgr/evalua tion/evaluationguidance/transportimpact/ (last accessed 18/12/2013)
van der Voet, M. et al. (2013) Sustainable Urban Transport Planning. The QUEST management tool and the ADVANCE Audit Scheme – a review of two practical tools to improve mobility planning. Discussion paper. http://www.quest-project.eu/files/7/d-8.1-quest-advance-discussion-paper.pdf (last accessed 18/12/2013)
Vickerman, R. (2007) Cost-benefit analysis and large-scale infrastructure projects: state of the art and challenges, Environment and Planning B: Planning and Design, 34, p. 598-610
Wefering, F. et al. (2013) Guidelines. Developing and Implementing a Sustainable Urban Mobility Plan. December 2013. http://mobilityplans.eu/docs/file/guidelines_developing-and-implementing-a- sump_final_december_2013.pdf (last accessed 18/12/2013)
German literature: 
Landeshauptstadt München - Referat für Stadtplanung und Bauordnung, Mentz, Horst; Erfolgskontrollen und Monitoring der Verkehrsentwicklungsplanung München, Dresden, 2012/10/15 http://www.dresden.de/de/03/verkehr/verkehrsplanung/verkehrsentwicklungsplanung/vep/045_O effentliche_Veranstaltungen.php
12
Forschungsgesellschaft für Straßen- und Verkehrswesen e. V.; Hinweise zur Anwendung von Qualitätsmanagement in kommunalenVerkehrsplanungsprozessen, FGSV Verlag, Köln, 2007