Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public. इंटरनेट मानक !ान $ एक न’ भारत का +नम-णSatyanarayan Gangaram Pitroda “Invent a New India Using Knowledge” प0रा1 को छोड न’ 5 तरफJawaharlal Nehru “Step Out From the Old to the New” जान1 का अ+धकार, जी1 का अ+धकारMazdoor Kisan Shakti Sangathan “The Right to Information, The Right to Live” !ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता ह Bharthari—Nītiśatakam “Knowledge is such a treasure which cannot be stolen” IS 9401-7 (1984): Method of measurement of works in river valley projects (dams and appurtenant structures): Part 7 Joints [WRD 23: Measurement and Cost Analysis of Works For River Valley Projects]

IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

  • Upload
    others

  • View
    25

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

Disclosure to Promote the Right To Information

Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public.

इंटरनेट मानक

“!ान $ एक न' भारत का +नम-ण”Satyanarayan Gangaram Pitroda

“Invent a New India Using Knowledge”

“प0रा1 को छोड न' 5 तरफ”Jawaharlal Nehru

“Step Out From the Old to the New”

“जान1 का अ+धकार, जी1 का अ+धकार”Mazdoor Kisan Shakti Sangathan

“The Right to Information, The Right to Live”

“!ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता है”Bhartṛhari—Nītiśatakam

“Knowledge is such a treasure which cannot be stolen”

“Invent a New India Using Knowledge”

है”ह”ह

IS 9401-7 (1984): Method of measurement of works in rivervalley projects (dams and appurtenant structures): Part 7Joints [WRD 23: Measurement and Cost Analysis of Works ForRiver Valley Projects]

Page 2: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints
Page 3: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints
Page 4: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

Indian StandardMETHOD OF MEASUREMENT OF

WORKS IN RIVER VALLEY PROJECTS( DAMS AND APPURTBN~NT STRUCTURES)

PART 7 JOINTS

<f) C'b,ig'd 1985

INDIAN STANDARDS INSTITUTIONMANAK BHAVAN, 9 BAHADUa SHAH ZAPAR MitRO

NEW DELHI 110002

Page 5: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

IS : 9401 ( Part 7 ) • 1984

Indian StandardMETHOD OF MEASUREMENT OF

WORKS IN RIVER VALLEY PROJECTS(DAMS AND APPURTENANT STRUCTURES)

PART 7 JOINTS

Measurement of Works of River Valley ProjectsSectional Committee, BD(~ 69

C"ai'ma~

StiR) S. P. CAPIUJIAN

Redecon ( India) Pvt Ltd,8-92. Himalaya House,

Kasturba Gandhi Marg, New Delhi

M"nb" s R.prlse,,' '''tSHRI K. D. AR('O'~' Engineers India Limited, New Dr-lhi

SHRI G. K. NA1'ltAJA~ ( .iltenuu« )SUBI J. nARADUIt Irrigation Depart menr , Government of Bihar,

PatnaSURI MAltAVIlt JhD"~ARIA Ferro-Conc rr te Consultants Pvt Ltd, Indore

SSRI ASHOK BJHASARIA ( ..111""41')CHIEF ENQINEJt:n (NSP ) Irrigation Department, Oovernment of Andhra

Pradesh, HyderabadCJUEF ENOINEEU ( SP) ( Alternate )

C11IEF ENlaNKI·~R ( PRO.JJt~(~'J·s) \V.lt~r and Power ..( Irrigation) Department,Government of Kerala, T'rivandrum

DEPU'!'Y CH1EJ" ENQIN)';l'R( IRJUOATION) (Alternnte )

SHRI S. M. DF:B

DtRBCTOJ\ (R " C )SHBI OAI PRAKASH Gup'l'"

SURI s. M, J08HISBRIG.G.KARMARKARPBO)' S. KBI811.NAl\IOOUTBYSHRI B. N. MA'1'l1UR

Irrigation It Waterways Department, Governmentof West Bengal, Calcutta

Central Water Commission, New DelhiIrrigation Department, Government of Uttar

Pradesh, Luc1cnowGammon India Limited, BombavInstitution of Surveyors, DelhiIndian Institute of Technology, New DelhiIrrigation Department, Government of Rajasthan.

Jaipur

( eonlinlUtl 011 /JGI' 2 )

o c.",.;,AI 1985INDIAN STANDARDS INSTITUTION

Thia publication i. protected UDder the I,..,. C¥:1riI'" .4" (XIV or 1957) andreproduction in whole or in part by aDy meaDI except with writteD permiuion of thepabl.her .hall be deemed to b. aa iDCriDcement or copyright under the said Act.

Page 6: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

IS I HOI ( Part 7 ) • 1984

( C.,.,inultl from /1111' 1 )

M..b.,sS.B1 G. A. MU8TA:rJ'A

SBRI T. RANGANNASHRI M. B. VITTAI.. Rxo

SRRI P. s. R.\OSHRI D. M. SAVUR

SHRI P. s. SUBItAMANJAKSUPERINTENJ>INO E ~ GIN JI:: lC It.

(NIPC)SHnI v. V~~KATE8WAJ\AT..U

DR V Al\8J1NICY ( Alterna', )SHBI VITJ-IAL l'lAK

Re/Jr,j,nting

Public Works Department, Government ofJammu &; Kashmir, Srinagar

Irrilation Department, Govemment of Gujarat,Gandhina.ar

Karnataka Power Corporation Ltd, BanlaloreIrrigation Department, Government of Karnataka,

Hanealort-Haryana Irrilation Department, ChandigarhIiindustan Construction Co Ltd, BombayTarapore and Company t MadrasIrrigation Department, Government of

Maharashtra, Rombay~a,ional Projects Construction Corporation

Limited, New Delhi

National Hydro-elecrric POWf'r CorporationLimited, New Delhi

KUKARI E. IJlvATIA. ( AI',,"41, )SHRI G. RAMAN, Director General, lSI (Ex-officio Member)

Director ( Civ Enlg )S,cr61t:Jry

5nHI K. M. MA'ruuRSenior Deputy Director ( Civ Engg ). lSI

2

Page 7: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

AMENDMENT NO.1 MARCH 1996TO

IS 9401 ( Part 7 ) : 1984 METHOD OFMEASUREMENT OF WORKS IN RIVER VALLEY

PROJECTS ( DAMS AND APPURTENANTSTRUCTURES)PART 7 JOINTS

( Page 5, clause 3.%.9) - Substitute 'IS 9401( Part 3 ) : 1994' for 'IS:9401 (Part 3) - 1980'.

( Page S, loot-note marked '.' ) - Substitute 'Method of measurement of worts in

river valley projects (dams and appurtenant structures) : Pan 3 Groutina (fint ,.evision)' for theexisting title.

(RVD23)

Page 8: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

AMENDMENT NO.2 FEBRUARY 1999TO

IS 9401 ( PART 7 ) : 1984 METHOD OFMEASUREMENT OF WORKS IN RIVER VALLEY

PROJECTS (DAMS AND APPURTENANT STRUcrURES)PART7 JOINTS

( Page4, clause1.3 ) -Insert tbe following:

4C) Areas shall be worked out to the nearest 0.01 m2.,

(RVD23 )

Reprography Unit,BIS, NewDelhi, India

Page 9: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

IS : '401 ( Part 7 ) • 1114

Indian StandardMETHOD OF MEASUREMENT OF

WORKS IN RIVER VALLEY PROJECTS( DAMS AND APPURTENANT STRUCTURES)

PART 7 JOINTS

o. FOREWORD

1.1 This Indian Standard ( Part 7 ) was adopted by the Indian StandardsInstitution on 14 December 1984, after the draft finalized by theMeasurement of Works of River Valley Projects Sectional Committeehad been approved by the Civil Engineering Division Council.

0.2 In the measurement of quantities in construction of river valleyproject! a large diversity of methods exists at present according to localpractices. This lack of uniformity creates complication regardingmeasurements and payments. This standard is intended to provide auniform basis for measurement of joints in the construction of river valleyprojects.

0.3 In reporting the result of measurements made in accordance with thisstandard, if the final value, observed or calculated, is to be rounded off,it shall be done in accordance with IS : 2-1960*.

I. SCOPE

1.1 This standard covers the method of measurement of joints andconnected auxiliary works in river valley projects, such as dams, hydraulicstructures, canals and power houses.

2.GENERAL2.1 CI.bbial .f Item. - Items may be clubbed together providedtbat break-up of clubbed items i. on the basis of detailed descriptions ofitems as stated in this standard.

2.2 BookillC of Dime.Bio•• - In booking dimensions, the order shallbe consistent and generally in the sequence of length, breadth or widthand height or depth or thickness.

-Rula for rouadiDg off num('rical valufIls (rll"s6d).

3

Page 10: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

IS : 9401 (Part 7 ) • 198.

2.3 Mea.aremeats -- All work shall be measured net in the decimalsystem, as fixed in place, unless otherwise stated herein, as given below:

a) Dimensions shall be measured to the nearest 0·01 m; and

b) Weight shall be worked out to the nearest 0·01 kg.

2.4 DeseriptioD of Items - Description of each item shall, unlessotherwise stated, be held to include conveyance, delivery, handling,loading, unloading, storing, waste, returning of packings scaffolding, tool'}and tackle fixing complete as necessary.

3. MEASUREMENT OF JOINTS

3.1 COD.traction Joints - The entire work of construction joints shallbe included in the schedule of item for concrete, masonry, etc. Theitems, such as preparation of surface by sand blasting or by air waterjet or placing of mortar in between two successive lifts shall not bemeasured separately.

3.2 Co.traction JoiBt, EspaasioD Joiat, LODgitudiaal JOiDt aadTraDsverse JOiDt - These joints shalJ be measured in the followingcategories.

3.2.1 Shear beys - The entire work of constructing the shear keys shallbe included in the schedule of items for the joint.

3.2.2 Metal Seal«_.- Measurement for supplying and fixing metal sealingstrips shall be in running metres along the central line of metal seals.The shape, width material and thickness shall be specified. No extraallowance shall be made for jointing and brazing of the metal strips.

3.2.3 PVC Rubb,r Wattr Stops -- Measurement of supplying and fixingwater stops shall be in running metre measured alone the centre line ofthe water stop. The width, shape and thickness of water stop shall bespecified. No extra allowance shall be made for splicing of water stopsor for junctions.

3.2.4 Ancho, Rods - Measurement of anchor rods or dowel bars usedfor fixing metal lealing strips, etc, shall be made on the basis of weightof anchor rods or dowel bars in kilograms actually embedded.

3.2.5 Asphalt S,Gls .-:.Mearurement of asphalt seals ahall be made ODthe basis of the weisht" of the asphalt in kilograms actually filled in thejoint seals. No separate measurement shall be made for heating' ofasphals Cor filling in the joint seals. Forming of asphalt seal slot .-,.11DOt be made separatelyJ and shall be included in this item.

4

Page 11: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

IS : 9401 ( Part 7 ) • 19M

3.2.6 Fibre Type Joint Filler - Measurement for supplying and fixing inposition fibre type joint filler shall be made on the basis of the area ofjoint filler in square metre specifying the thickness.

3.2.7 Steam Heating Pipes - Steam heating pipes which are fixed insidethe asphalt seal slots for heating the seals shall be measured in runningmetres along the central line of pipes actually embedded specifying thegauge, diameter and material. No extra allowance shall be made forsupporting clips and jointing of pipes.

3.2.8 Plugging of Asphalt Seal Slots - Measurement for plugging ofasphalt seals at top by cast iron plugs shall be made on the basis of theweight of cast iron plugs actually placed on the top of asphalt seal, statingsize, shape, thickness and quality of cast iron.

3.2.9 Grouting of Joints -l\1easurement for grouting where requiredshall be made according to IS : 9401 ( Part 3 )-1980*.

3.2.10 Hook-ups to Joint Grout Sysltm - Measurement for hook-ups tojoint grout system shall be made on the basis of the number of supplylines hooked into. Return lines, vent lines, vent return lines hooked ontoto complete the grouting of any grouting system shall not be measuredseparately.

-Method oCmealurement of work. In river valley projects (dam. and appurtenantItructuru): Part 3 Groutin••

5

Page 12: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

"INTERNATIONAL SYSTBM OF UNITS (81 UNITS)

••• Dalt8

Q.O'AKI'ITY U.IT SYKBOL

Lenltb metre aM... kilolram klTime lecond IElectric curreDt ampere AThermoclyDamlc kelvin Ittemperature

Lumiaoua iDteDaity candela cdAmouDt or lubltaoce mol. mol....1........, Val••

Q.1J"TI~T UNIT SYMBOL

Plane ...1. radian radSolid au.le Iteradian I'Dewl"•• Valt.

QpAlfTlTY UNIT SYMBQL DJ:FINITIOlf

Force ,aewtoD N 1 N - 1 kg.m/.·EaersY .jollll- J 1 J - 1 N.mPower watt W lW - 1 J/IFlus weber Wb 1 Wb 1 V.Il'1us demity teala T 1 T .. 1 Wb/rtl'Frequency berts H. 1 Hz - 1 ell (1.1 )

Blectric conductance Ilemeu S 1 S - 1 A/VElectlOlDotive Coree volt V 1 V - 1 W/APnuure, IlI'UI, puca) Pa I P. - I N/m l

Page 13: IS 9401-7 (1984): Method of measurement of works in river ... · indian standard method of measurement of works in river valley projects ( dams and appurtbn~ntstructures) part 7 joints

INDIAN STANDARDS INSTITUTION

-.nale .hav.n, • S.tt,clar Sbah Z.f.r Mara. NIW DILHI11100ITelephon••: 2161lt, 170111 Telegrams: Manak.an.tb.

eCommon to .U Office. )

ref.phone

41 24-l'17328

·W••tern : Manaka'aya, EI MIDC. Marol. Andherl ( East ), BOMBAY 400093 I 32 8~ SIS

tEaltern I 1/14 C.I.T. Scheme VII M, V.I.P. Road, Manlktola, 8e 24 IICALCUTTA 700054

Southern: e.I.? Campu., MADRAS 80011'

North.rn : 811 Pha.. VII, Iftdultrla' Focal Point,S.A.S. NA8AR 1fJOO1t ( PunJab)

B"nc. Olfle,lt

·"uahp.', Nurmohamed Shatllh U.rg. Khanpur. AHMADABAD 88000'

'F' Blocll, Unitt Bldg, Nara.lrnharala Square, BAN6ALORE 510002

Gangot,1 Complex. 8hadbhad. Road. er. T. Nagar, BHOPAL 402003

liE Kalpana Ar••• eHU8ANESHWAR 711014

.....C L. N. Qupta Marg. HYDERABAD 500001Rt4 Yuflhl.ter Marg. C Scheme. JAIPUR 802005t17/418 B amY.'. Nlgar, KANPUR 208005

Patllputra Indust,la' Estate, P4TH A 100018Hant•• Blcto ( Ind Floor}, Rly Station Road. TRIVANDRUII 1.1001

.,..

'"uecf/on OI/Ie. ( With Safe Point): •

Inatltutlen of EnOln..,. CIndl.) Bulletlno. 1•• ShlvaJl Milar; "UNE 41tOOl

{ la ..RU ..

1141051171.11117

~"III ••671.

11801

~".,

Itt.1