11
BAYOU AVIATION LA DOTD Aviation Newsletter Volume VI December 2016 AVIATION TEAM Bradley Brandt Director Michael Burrows C.M. Assistant Director LaToya Joseph Administrative Asst. Allen Taylor Airways Manager Danielle Gaylor Program Manager Jason Duet Program Manager Christina Wilson Program Manager Joshua Duplantis Program Manager Tonjia Summerell Asst. Program Manager Heidi Higginbotham Asst. Program Manager Robert Sehon Safety Officer Jason Ball Safety Officer LOUISIANA DEPARTMENT OF TRANSPORTATION & DEVELOPMENT AVIATION SECTION 1201 Capital Access Rd. Baton Rouge, LA 70802 Phone: (225) 379-3050 www.dotd.la.gov/aviation On March 11, 2017 the NOLA 99s are again organizing a Fly it Forward event at Louisiana Regional Airport. e NOLA 99s have been supporting the World Wide Week for many years with the goal of introducing more girls to aviation. http://www.womenofaviationweek. org/get-involved/fly-it-forward-flights/ e NOLA 99s are pleased to have EAA 244 volunteer pilots assist with the flights. Jointly our goal is to introduce 108 girls of any age to aviation during our 2017 WOAW activities. Together we challenge more pilots and airports to join us. Across Louisiana there have only been two airports where WOAW activities have been held. Organizing the Fly It Forward activities has become increasingly easier over the years, even for flying events. If you have any questions about how to get started here is the official iWOAW site: http://www.womenofaviationweek.org/about/women-of- aviation-week/# e 2017 iWOAW theme should motivate lots of Louisiana aviation interest, considering the large helicopter industry in the state … it was 1937 when Hanna Reitsch took the controls of a Focke-Achgelis 61 helicopter and became the world’s first female helicopter pilot. In celebration, the theme for the 7th annual Women Of Aviation Worldwide Week, March 6-12, 2017, will be “Let’s whirl. 80 years of female helicopter pilots.” To celebrate Hanna Reitsch’s breakthrough and highlight helicopter aviation, the Institute for Women Of Aviation Worldwide (iWOAW) will broadcast interviews of women involved in all aspects of helicopter manufacturing and operations throughout the Week and encourage event organizers to share them with their local guests. Let’s Whirl in 2017 By: Janet Gonzales Louisiana Regional Airport Manager

Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Transit Detours, Iris Station, and Pinecrest

Creek RelocationMay 2, 2017

Charles Wheeler/Chris Swail

Page 2: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Purpose of Presentation

Outline Iris Street Station concept

General arrangement of Iris Street bridge over LRT

Pinecrest Creek relocation concept

Traffic and transit detours

Construction staging plans for station/bridge

Next steps in the procurement process

Page 3: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Background

Current Transitway crosses Iris Street at grade

Existing Transitway needs to be grade separated at Iris Street

Iris Street half up and over LRT tracks/LRT half down and under Iris St is preferred

Pinecrest Creek Culvert (120 metres) in conflict with station/tracks

Must be relocated from east to west side of Transitway

Page 4: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Pinecrest Creek Realignment at Iris Station

N

Page 5: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Iris Station Concept

Iris Station centered under new Iris St bridgeEntrances on south side of Iris Street bridge

east/west of LRT alignmentNo elevators…..MUPs connect to LRT platform

belowMUPs will be winter maintained at all timesMUP connection to NCC pathway system beside

station/under bridge on west side of LRT alignment

New pedestrian crosswalk to cross Iris Street

Page 6: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Iris Station Plan

Page 7: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Iris Station Renderings

Page 8: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Iris Street Bridge

Half up Iris St bridge means driveways east/west of valley unaffected by new grade separation

2 lanes bridge , sidewalks on either side

Crosswalk on west side of LRT connects NCC MUP at grade

In addition to NCC MUP connection under Iris St

Kiss and Ride on west side of bridge (both directions)

Page 9: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

More Graphics from Elie (use or discard)

Page 10: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Rationale for Pinecrest Creek Relocation

EA alignment (with creek staying on east side of LRT) resulted in roller coaster ride for LRT alignment

LRT down under Iris St bridge then up/over new Pinecrest Creek culvert: LRT alignment under Iris Bridge is constrained Poor ride quality for riders Excessive wheel/rail wear Increased maintenance costs

Relocating creek to west side of LRT eliminates creek culvert north of station as an alignment constraint

Flatter LRT alignment/same extent of creek relocation as EA concept

Page 11: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Pinecrest Creek Realignment at Iris Station

N

Page 12: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Pinecrest Creek Relocation

Implications of creek relocation:

Eliminates roller coaster alignment

Creek can meander up to 40 metres wide

Reduced water velocities

Less erosion/sediment

Improved bridge clearances for LRT

Similar length/tree loss to EA concept just in different location

Page 13: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Traffic and Transit Detours Needed to construct bridge, LRT Station, and creek

relocation Maintain buses on Transitway until station construction

is underway When Transitway is closed, buses to operate to

Baseline Station via Woodroffe/Iris Woodroffe widening/intersection improvements Earliest start of construction – Spring 2019 Transitway closed/buses on Iris to Baseline – Summer

2022 Detour in place for 18 months to December 2023

revenue service date

Page 14: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Construction – Phase 1

Page 15: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Construction – Phase 2

Page 16: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Partial Detour – Phase 3

Page 17: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Full Detour – Phase 4

Page 18: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Final Station Configuration

Page 19: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Woodroffe Ave Improvements

Page 20: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Revegetation of Affected Areas Areas impacted by construction will be

replanted

Construction on NCC lands:

2 for 1 tree replacement policy

Inventory of all trees already undertaken

New Pinecrest creek bed will be naturalized

Page 21: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Renaturalization of Pinecrest Creekbed

Page 22: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Connectivity

Page 23: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Next Steps

1. Address feedback from the community in upcoming RFP

2. RFP out to tender, Late June ,2017

3. RFP bids received, March, 2018

4. Award of Stage 2 contract, June, 2018

5. Construction start, late 2018/early 2019

6. Confederation West LRT open for revenue service, end of 2023

Page 24: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Butternut Tree Inventory

Page 25: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

LRT Alignment at Iris St

Page 26: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Iris Station Transit Network Servicing

Page 27: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Iris Street Bridge

Page 28: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Meandering Creek Plan

Page 29: Iris Station Pinecrest Creek Relocation · 5/2/2017  · Purpose of Presentation Outline Iris Street Station concept ... Eliminates roller coaster alignment Creek can meander up to

Creek Cross-Section