15

IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway
Page 2: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

22006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

Presentation

Page 3: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

32006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

Agenda

Agenda :

Company profileProducts and applicationsReasons why we introduced the IRIS Quality StandardDifficultiesFurther stepsTips and hints

Your data and security is our top priority

Page 4: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

42006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

● Privately owned Swiss companyLocated in Berne, Switzerland, since 1887

System supplier for onboard recording and control devices, indicators and wheel sensors

HaslerRail has a worldwide customer base in the railway industry

80 employees in Berne

30 engineers for R&D as well as for project management

1 Quality manager (Mr. André Hasler)

4

Company profile

Page 5: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

52006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

… Sophisticated Applications …TELOC® electronic onboard event recorders:

Modular

Special functions:

GPS positioning

Voice recording

Wireless transmission

ETCS integration (JRU)

SIL 2 to SIL 4 safety applications

Dead man control, roll back protection, zero speed detection

Products

Page 6: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

62006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

ETCS control cabinet, new SBB ICN tilting train

TELOC 2550 as JRU (Juridical Data Recorder)

ETCS Integration

Product integration

Page 7: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

72006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

HaslerRail reasons to introduce IRIS standard:

HaslerRail entirely depends on the railway industry.

HaslerRail priority is safety and security in the railway industry. With the IRIS certification we emphasize this commitment.

IRIS supports the continuous improvement of our products and our processes, which are key points in our strategy.

A systematic risk assessment process has been introduced to improve the transparency in projects.

As ISO standards do not cover certain aspects of our business, such as RAM / LCC calculations, we envisage future standardisation with our customers.

We expect to simplify supply chain processes together with our customers.

7

The IRIS experience

Page 8: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

82006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

Main difficulties encountered during the preparation for certification:

– Being a small company with limited resources was not an advantage as IRIS requested more documentation processes in comparison to ISO 9001.

– The required administrative work load was difficult to manage with the company’s existing workforce and normal daily tasks suffered in the process.

– The standard is still young, and therefore only preliminary documents were available during preparation.

– After the official release of the standard, only limited time was given for the preparation and certification.

– No experience could be obtained from other small companies for the introduction.

– Certain documents where not yet translated into German.

The IRIS experience

Page 9: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

92006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

The IRIS experience

Project key figures:

Project start: 1 January 2006 (Decision by HaslerRail’s management)

Certification audit held on 14 June 2006

Open IRIS CAR’s after audit: 5

Certified on: 14 August 2006

Costs:

Internal: 55 kEUR

External: 10 kEUR

Page 10: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

102006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

Particular aspects that we heeded during IRIS implementation:

Careful attention was given to our main processes:

New Vehicle Process (signalling & platforms)

Vehicle Modernisation Process (refurbishment)

Additional work was requested for:

Supplier evaluation / certification process

RAMS, LCC process and risk assessment

Information politics

Extensive effort was made to motivate employees

Support tools used for documentation:

Microsoft SW packets

SYCAT SW for process visualisation (still in introduction phase)

The IRIS experience

Page 11: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

112006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

Process sample

Customer Project Model:

Tollgates: Interaction between the customer and HaslerRail, these are criteria's allowing to move to next stepMilestones: Internal planning points to keep and control due dates

Han

dove

r M

eetin

g

Pro

ject

Par

ts

list

Sys

tem

Tes

t

Pro

ject

End

Kic

koff

Mee

ting

Offe

r A

ccep

tanc

e

Spe

cific

atio

n A

ccep

tanc

e

Sys

tem

A

ccep

tanc

e

Ord

er In

com

ing

Firs

t Art

icle

In

spec

tion

Sales Manager Project ManagerHead of

ASS

Risk Management Change Management Configuration Management

ASSGo LiveRealisationQuotation

Delivery &

Invoicing

Integration &

CommissioningProject

Development

Project

Detail Planning

Support &

WarrantyRepairs

Concept &

Project

Planning

Feasibility- &

Risk analysisSales

System

Engineering

Industrialization Logistics Serial test

Configuration &

System Test

Assembly

Safety / RAMS

Page 12: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

122006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

Han

dove

r M

eetin

g

Pro

ject

Par

ts li

st

Sys

tem

Tes

t

Pro

ject

End

Kic

koff

Mee

ting

Offe

r A

ccep

tanc

e

Spe

cific

atio

n A

ccep

tanc

e

Sys

tem

A

ccep

tanc

e

Ord

er In

com

ing

Firs

t Art

icle

In

spec

tion

Sales Manager Project ManagerHead of

ASS

Risik Management Change Management Konfiguration Management

ASSGo LiveRealisationQuotation

Delivery &

Invoicing

Integration &

CommissioningProject

Development

Project

Detail

Planning

Support &

WarrantyRepairs

Concept &

Project

Planning

Feasibility- &

Risk analysisSales

System

Engineering

Industrialization Logistics Serial test

Configuration &

System Test

Assembly

Safety / RAMS

On top controlling is applied as a support process

Customer Project Model

Process samples

Controlling

Page 13: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

132006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

Process samples

Page 14: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

142006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

Next steps:

System fine tuning

Training lessons for employees

Establish an improved and simplified system to quantify progress

Introduce score board presentation for results

Transfer the system’s documents to the SYCAT SW tool

Internal audits

The IRIS experience

Page 15: IRIS 02 · 2008-11-26 · HaslerRail reasons to introduce IRIS standard: HaslerRail entirely depends on the railway industry. HaslerRail priority is safety and security in the railway

152006We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express prior consent is strictly forbidden. © Hasler Rail AG

Peter Stauffer - CEO

Some final recommendations:

Pay attention to KO factors!

Plan training sessions for employees, so that they can understand the differences between IRIS and ISO 9001!

Project management is a key function, therefore test it carefully!

Keep it simple!

Good luck!

How to deal with Certification