    BENEFITS OF SMOOTHBENEFITS OF SMOOTHPAVEMENTSPAVEMENTS

  • 8/10/2019 IRI Construccion

    4/107

    Benefits of Smooth PavementsBenefits of Smooth Pavements

    1.1. Smoother roads are important to theSmoother roads are important to theroad users (taxpayer)road users (taxpayer)

    2. Smoother roads last longer 2. Smoother roads last longer 3. Smoother roads stay smoother longer 3. Smoother roads stay smoother longer 4. Smoother roads save money4. Smoother roads save money5. Smoother roads are safer 5. Smoother roads are safer 6. Smoother roads improve mobility6. Smoother roads improve mobility

  • 8/10/2019 IRI Construccion

    5/107

    1.1. Smoother Roads areSmoother Roads areImportant to the RoadImportant to the Road

    Users!Users!

  • 8/10/2019 IRI Construccion

    6/107

    Important to the Road UsersImportant to the Road Users

    1996 National Quality Initiative1996 National Quality Initiative(NQI) survey asked roadway(NQI) survey asked roadwayusers what they wanted improvedusers what they wanted improved

    in the highway system:in the highway system:Pavement Condition (31%)Pavement Condition (31%)Safety (21%)Safety (21%)Traffic Flow (19%)Traffic Flow (19%)

    Bridge Conditions (10%)Bridge Conditions (10%)

  • 8/10/2019 IRI Construccion

    7/107

    Important to the Road User Important to the Road User

    2000 Follow2000 Follow--up surveyup survey

  • 8/10/2019 IRI Construccion

    8/107

    Important to the Road User Important to the Road User

    Results from the AASHO road testResults from the AASHO road testshowed road users judge a roadshowed road users judge a roadprimarily by its ride qualityprimarily by its ride quality

  • 8/10/2019 IRI Construccion

    9/107

    2. Smoother Roads Last2. Smoother Roads LastLonger!Longer!

  • 8/10/2019 IRI Construccion

    10/107

    Smoother Roads Last Longer Smoother Roads Last Longer

    Research has shown thatResearch has shown thatpavements that are builtpavements that are builtsmoother last longer smoother last longer

    NCHRP 1-31

  • 8/10/2019 IRI Construccion

    11/107

  • 8/10/2019 IRI Construccion

    12/107

  • 8/10/2019 IRI Construccion

    13/107

    3. Smoother Roads stay3. Smoother Roads staySmoother Longer!Smoother Longer!

  • 8/10/2019 IRI Construccion

    14/107

  • 8/10/2019 IRI Construccion

    15/107

    Dynamic Loads Increase with RoughnessDynamic Loads Increase with Roughness

    Dynamic loadsDynamic loadsincrease withincrease withIRIIRI

    Different axleDifferent axletypes respondtypes responddifferentlydifferently

  • 8/10/2019 IRI Construccion

    16/107

    4. Smoother Roads Save4. Smoother Roads SaveMoney!Money!

  • 8/10/2019 IRI Construccion

    17/107

    Improved Gas Mileage:Improved Gas Mileage: WESTRACKWESTRACKBefore pavement rehabilitation: MileageBefore pavement rehabilitation: Mileage1.79 km/l (4.2 mi/gal)1.79 km/l (4.2 mi/gal)

    After rehabilitation After rehabilitation - - Roughness reducedRoughness reducedby 10%: Mileage 1.86 km/l (4.4 mi/gal)by 10%: Mileage 1.86 km/l (4.4 mi/gal)Roughness reduced by 10%, gas mileageRoughness reduced by 10%, gas mileageincreased by 4.5%increased by 4.5%

  • 8/10/2019 IRI Construccion

    18/107

    Improved Gas Mileage:Improved Gas Mileage: NCATNCATTrackTrack

    Fuel Economy and Roughness v s Time

    4.14.24.34.44.54.64.74.84.9

    55.1

    1-Oct-00 20-Nov-00 9-Jan-01 28-Feb-01 19-Apr-01 8-Jun-01 28-Jul-01 16-Sep-01

    Time

    m p g

    1.001.021.041.061.081.101.121.141.161.181.20

    I R I ( m / k m

    )

    mpg IRI

    Lower IRI BetterGas Mileage

  • 8/10/2019 IRI Construccion

    19/107

    The evidence that remains today from the paved roads ofThe evidence that remains today from the paved roads ofthe Roman Empire suggests that roughness must havethe Roman Empire suggests that roughness must have

    been a concern for chariot travel.been a concern for chariot travel.

    Adapted from Everything You Always Wanted to Know about the IRI, But Were Afraid to Ask! by Thomas D. Gillespie, Ph.D., UMTRI

  • 8/10/2019 IRI Construccion

    20/107

    Vehicle Maintenance Costs areVehicle Maintenance Costs areLower on Smoother RoadsLower on Smoother Roads

    HigherHigherroughnessroughnessincreasesincreasesvehiclevehiclerepair costrepair cost

  • 8/10/2019 IRI Construccion

    21/107

  • 8/10/2019 IRI Construccion

    22/107

    5. Smoother Roads are5. Smoother Roads are

    Safer!Safer!

  • 8/10/2019 IRI Construccion

    23/107

  • 8/10/2019 IRI Construccion

    24/107

    6. Smoother Roads6. Smoother Roads

    Improve Mobility!Improve Mobility!

  • 8/10/2019 IRI Construccion

    25/107

    Smoother Roads Improve MobilitySmoother Roads Improve Mobility

    Poor and roughPoor and roughpavements canpavements cancause vehicles tocause vehicles toreduce speed byreduce speed bybrakingbrakingCan affect smoothCan affect smoothtraffic flowtraffic flow

  • 8/10/2019 IRI Construccion

    26/107

    TRENDS IN SMOOTHNESSTRENDS IN SMOOTHNESSSPECICIFICATIONSSPECICIFICATIONS

  • 8/10/2019 IRI Construccion

    27/107

    Smoothness Specifications:Smoothness Specifications: Asphalt Concrete Pavements Asphalt Concrete Pavements

    A survey of State DOTs was conducted in A survey of State DOTs was conducted in2000 to find smoothness index used for2000 to find smoothness index used forconstruction acceptance (Rizzo, FHWA MIconstruction acceptance (Rizzo, FHWA MIdivision, results released in 2000)division, results released in 2000)

    Profile Index (16)Profile Index (16)IRI (4)IRI (4)Straightedge (6)Straightedge (6)

    Other (6)Other (6)

  • 8/10/2019 IRI Construccion

    28/107

    Smoothness Specifications:Smoothness Specifications:Concrete PavementsConcrete Pavements

    A survey of State DOTs was conducted in A survey of State DOTs was conducted in2000 to find smoothness index used for2000 to find smoothness index used forconstruction acceptance (Rizzo, FHWA MIconstruction acceptance (Rizzo, FHWA MIdivision, results released in 2000)division, results released in 2000)

    Profile Index (25)Profile Index (25)IRI (1)IRI (1)Straightedge (3)Straightedge (3)

    Other (2)Other (2)

  • 8/10/2019 IRI Construccion

    29/107

    Current StatusCurrent StatusMany states that used Profile Index (PI) forMany states that used Profile Index (PI) forconstruction acceptance are now using IRIconstruction acceptance are now using IRISeveral states that are currently usingSeveral states that are currently usingProfile Index (PI) for constructionProfile Index (PI) for constructionacceptance are looking into switching to IRIacceptance are looking into switching to IRI

    Among the states that are currently using Among the states that are currently usingIRI for construction acceptance are:IRI for construction acceptance are:Pennsylvania, Texas, New York, Maryland,Pennsylvania, Texas, New York, Maryland,Virginia, Minnesota, New Mexico, Louisiana,Virginia, Minnesota, New Mexico, Louisiana,

    Arkansas, Idaho, South Dakota, Montana, Arkansas, Idaho, South Dakota, Montana,Wyoming, WashingtonWyoming, Washington

  • 8/10/2019 IRI Construccion

    30/107

  • 8/10/2019 IRI Construccion

    31/107

    PENNSYLVANIAPENNSYLVANIASMOOTHNESSSMOOTHNESS

    SPECIFICATIONSPECIFICATION

  • 8/10/2019 IRI Construccion

    32/107

    Evolution of PennsylvaniaEvolution of PennsylvaniaSmoothness SpecificationsSmoothness Specifications

    In 2000, changed ride specificationsIn 2000, changed ride specificationsfrom PI to IRIfrom PI to IRI

    Bonus, penalty, and corrective actionBonus, penalty, and corrective action

    Maximum acceptable IRI for 0.1 mileMaximum acceptable IRI for 0.1 milesegment was 95 inches/mile (IRI issegment was 95 inches/mile (IRI isaverage IRI of left and right wheelaverage IRI of left and right wheelpaths)paths)

  • 8/10/2019 IRI Construccion

    33/107

    Evolution of PennsylvaniaEvolution of PennsylvaniaSmoothness SpecificationsSmoothness Specifications

    In 2002 lowered maximum acceptableIn 2002 lowered maximum acceptableIRI (for 0.1 mile segment) from 95 toIRI (for 0.1 mile segment) from 95 to70 in/mile for both asphalt and70 in/mile for both asphalt and

    concrete pavementsconcrete pavementsCorrective action needed if IRI > 70Corrective action needed if IRI > 70in/milein/mile

    Incentive pay available for smootherIncentive pay available for smootherpavementspavements

  • 8/10/2019 IRI Construccion

    34/107

    Current SpecificationCurrent Specification

    A lot is 0.1 mile of a single pavement A lot is 0.1 mile of a single pavementlanelane

    Mean IRI (average IRI of left and rightMean IRI (average IRI of left and rightwheel path) is used to determine ridewheel path) is used to determine ride

    qualityquality

  • 8/10/2019 IRI Construccion

    35/107

    Current Specification: AsphaltCurrent Specification: Asphalt

    Operation: scratch course, profileOperation: scratch course, profilemilling, leveling course, binder course,milling, leveling course, binder course,wearing coursewearing course

  • 8/10/2019 IRI Construccion

    36/107

    Current Specification: AsphaltCurrent Specification: Asphalt

    Operation: scratch course, profileOperation: scratch course, profilemilling, leveling course, binder course,milling, leveling course, binder course,wearing coursewearing course

  • 8/10/2019 IRI Construccion

    37/107

    Current Specification:Current Specification:ConcreteConcrete

  • 8/10/2019 IRI Construccion

    38/107

    Comparison Asphalt vsComparison Asphalt vsConcrete: ExpresswaysConcrete: Expressways

  • 8/10/2019 IRI Construccion

    39/107

    Corrective ActionCorrective Action

    Lots not meeting specification mustLots not meeting specification mustbe correctedbe correctedPavement tested after correctivePavement tested after correctiveactionaction

    Corrected lots can get incentiveCorrected lots can get incentive After corrective action, contractor After corrective action, contractormay leave a defective lot in place ifmay leave a defective lot in place ifDistrict Executive provides writtenDistrict Executive provides written

    approval and if the contractor acceptsapproval and if the contractor acceptsa $4,000 downward adjustment in thea $4,000 downward adjustment in theamount paid for the lotamount paid for the lot

  • 8/10/2019 IRI Construccion

    40/107

    AASHTO (AMERICAN AASHTO (AMERICAN ASSOCIATION OF ASSOCIATION OFSTATE HIGHWAYSTATE HIGHWAY

    AND ANDTRANSPORTATIONTRANSPORTATION

    OFFICIALS)OFFICIALS)PROVISIONALPROVISIONALSTANDARDSSTANDARDS

  • 8/10/2019 IRI Construccion

    41/107

    AASHTO Provisional Standards AASHTO Provisional Standardson Smoothnesson Smoothness

    MP 11: Standard EquipmentMP 11: Standard EquipmentSpecification for an Inertial Profiler Specification for an Inertial Profiler PP 49: Standard Practice for CertificationPP 49: Standard Practice for Certification

    of Inertial Profiling Systemsof Inertial Profiling SystemsPP 50: Standard Practice for OperatingPP 50: Standard Practice for OperatingInertial Profilers and EvaluatingInertial Profilers and EvaluatingPavement ProfilesPavement Profiles

    PP 51: Standard Practice for PavementPP 51: Standard Practice for PavementRide Quality when Measured UsingRide Quality when Measured UsingInertial Profiling SystemsInertial Profiling Systems

  • 8/10/2019 IRI Construccion

    42/107

  • 8/10/2019 IRI Construccion

    43/107

    Standard Equipment SpecificationStandard Equipment Specification(MP(MP--11)11)

    Describes the requirements of an inertialDescribes the requirements of an inertialprofiler profiler

    Accuracy requirements and calibration of Accuracy requirements and calibration ofheight sensor, accelerometer, distanceheight sensor, accelerometer, distancemeasuring instrumentmeasuring instrument

    Data filteringData filtering

    Data recording intervalData recording interval

    Operating speedOperating speed

    Data storageData storageCalculation of roughness indicesCalculation of roughness indices

  • 8/10/2019 IRI Construccion

    44/107

    Certification of Profilers (PPCertification of Profilers (PP--49)49)Describes certification procedures forDescribes certification procedures forprofilersprofilers

    Static check to check accuracy of heightStatic check to check accuracy of heightsensor sensor

    Distance measuring check to checkDistance measuring check to check

    accuracy of distance measuring instrumentaccuracy of distance measuring instrumentBounce test to check if accelerometers areBounce test to check if accelerometers areworking properlyworking properly

    Requirements of test sectionsRequirements of test sections

    Procedures to analyze data and verify IRIProcedures to analyze data and verify IRIvalues obtained by the profiler values obtained by the profiler

  • 8/10/2019 IRI Construccion

    45/107

    Operating Inertial Profilers andOperating Inertial Profilers andEvaluating Pavement Profiles (PP 50)Evaluating Pavement Profiles (PP 50)

    Describes procedures for verifying theDescribes procedures for verifying thecalibration of profiler components and forcalibration of profiler components and foroperating an inertial profiler operating an inertial profiler

    Verifying if the distance measuring systemVerifying if the distance measuring system

    and the height sensor is within the specifiedand the height sensor is within the specifiedaccuracyaccuracy

    Procedures to check if the accelerometers areProcedures to check if the accelerometers areworking correctlyworking correctly

    Procedures to follow during data collectionProcedures to follow during data collection(e.g., speed requirements, path to profile etc)(e.g., speed requirements, path to profile etc)Procedures to resolve disputesProcedures to resolve disputes

  • 8/10/2019 IRI Construccion

    46/107

  • 8/10/2019 IRI Construccion

    47/107

  • 8/10/2019 IRI Construccion

    48/107

    Belly Dump

    Cap. 20-22 Tons

  • 8/10/2019 IRI Construccion

    49/107

  • 8/10/2019 IRI Construccion

    50/107

    Belly Dump Trailers & WindrowHead in Texas

  • 8/10/2019 IRI Construccion

    51/107

  • 8/10/2019 IRI Construccion

    52/107

    Why Use MTVWhy Use MTV

    Eliminate Physical SegregationEliminate Physical SegregationReRe--Mix HMAMix HMAProvide Site StorageProvide Site StorageStop Truck DelaysStop Truck DelaysEliminate Paver Stops/StartEliminate Paver Stops/StartSmoother Roads Last Longer Smoother Roads Last Longer

    Require Less MaintenanceRequire Less Maintenance

  • 8/10/2019 IRI Construccion

    53/107

    What the Customer Demands:What the Customer Demands:Pavement SmoothnessPavement Smoothness

    Consistent Product QualityConsistent Product Quality

    Long Life PavementLong Life PavementUniformity of DensityUniformity of DensityEliminate Material SegregationEliminate Material Segregation

    Speed of constructionSpeed of construction

    Minimizing Traffic DelaysMinimizing Traffic Delays

    Low PriceLow Price

  • 8/10/2019 IRI Construccion

    54/107

    ARE WE THERE YET? ARE WE THERE YET?

  • 8/10/2019 IRI Construccion

    55/107

    Hwy. 70, Florida

  • 8/10/2019 IRI Construccion

    56/107

    Toronto, Ontario

  • 8/10/2019 IRI Construccion

    57/107

    I-80 , Ohio Turnpike, Truck Ends

  • 8/10/2019 IRI Construccion

    58/107

    No, Not Until We Solve Truck EndSegregation

  • 8/10/2019 IRI Construccion

    59/107

  • 8/10/2019 IRI Construccion

    60/107

  • 8/10/2019 IRI Construccion

    61/107

  • 8/10/2019 IRI Construccion

    62/107

    MTV Feeds Paver Over String LinesMTV Feeds Paver Over String Lines ::

  • 8/10/2019 IRI Construccion

    63/107

    San Francisco International

    Airport

  • 8/10/2019 IRI Construccion

    64/107

  • 8/10/2019 IRI Construccion

    65/107

    Paving High Banked RacePaving High Banked RaceTrack with MTV:Track with MTV:

  • 8/10/2019 IRI Construccion

    66/107

  • 8/10/2019 IRI Construccion

    67/107

  • 8/10/2019 IRI Construccion

    68/107

  • 8/10/2019 IRI Construccion

    69/107

  • 8/10/2019 IRI Construccion

    70/107

  • 8/10/2019 IRI Construccion

    71/107

  • 8/10/2019 IRI Construccion

    72/107

    Augers Are Used on Some Cedar RapidsPavers in Lieu of Slat Conveyors

    Carrying HMA From the Hopper to the Augers

  • 8/10/2019 IRI Construccion

    73/107

  • 8/10/2019 IRI Construccion

    74/107

    Superpave

  • 8/10/2019 IRI Construccion

    75/107

    6 Months

    Later

    End of Load

    Segregation

    WHY?

  • 8/10/2019 IRI Construccion

    76/107

    THERMAL SEGREGATIONTHERMAL SEGREGATIONTemperature DifferentialsTemperature Differentials

    WDOT & University of WashingtonWDOT & University of Washington--19961996Stephen Read/Dr. Joe MaloneyStephen Read/Dr. Joe MaloneyLead states of Washington, Minnesota, Texas,Lead states of Washington, Minnesota, Texas,CaliforniaCaliforniaSpecs in Washington, Arkansas, Texas,Specs in Washington, Arkansas, Texas,MassachusettsMassachusettsIncreased Interest (Auburn, Clemson, & TTI)Increased Interest (Auburn, Clemson, & TTI)ROADTEC ResearchROADTEC Research- -Technical AssistanceTechnical Assistance

  • 8/10/2019 IRI Construccion

    77/107

    *>232 9F

  • 8/10/2019 IRI Construccion

    78/107

    Segregation Free area

    *>232.9 F

    *232 9F

  • 8/10/2019 IRI Construccion

    79/107

    Spot 1226.0

    Spot 2224.5

    Spot 3214.2

    Spot 4206.5

    *>232.9 F

    *

  • 8/10/2019 IRI Construccion

    80/107

    Birth of a Pot HoleBirth of a Pot Hole

    Spot 1276.2

    Spot 2251.1

    Spot 3223.9

    Spot 4268.0

    Spot 5297.2

    *>310.0F

    *

  • 8/10/2019 IRI Construccion

    81/107

  • 8/10/2019 IRI Construccion

    82/107

  • 8/10/2019 IRI Construccion

    83/107

    *>268 1F

  • 8/10/2019 IRI Construccion

    84/107

    182.5

    231.1

    266.5

    >268.1 F

    *

  • 8/10/2019 IRI Construccion

    85/107

    Spot 1261.6

    Spot 2246.8

    Spot 3276.0

    Spot 4247.2

    Spot 5221.4

    *>290.0F

    *

  • 8/10/2019 IRI Construccion

    86/107

    End Dump/No MTVEnd Dump/No MTV

    290.5

    148.9

    >302.0

  • 8/10/2019 IRI Construccion

    87/107

    End Dump/No MTVEnd Dump/No MTV

    94.6%

    201.2

    89.8%

    154.392.7%176.6

    93.7%

    194.992.4%

    204.387.8%

    206.0

    *>237.6

    *

  • 8/10/2019 IRI Construccion

    88/107

    85.4%

    196.990.0%

    195.594.5%

    218.689.0%

    186.7

    94.2%

    223.7

    *>252.7F

    *

  • 8/10/2019 IRI Construccion

    89/107

    End Dump/Roadtec Shuttle BuggyEnd Dump/Roadtec Shuttle Buggy

    294.0

    148.9168.9

    *>164.4

    *

  • 8/10/2019 IRI Construccion

    90/107

    End Dump/Roadtec Shuttle BuggyEnd Dump/Roadtec Shuttle Buggy

    Min Mean Max

    251.8 260.0 263.3

    *>275.7

    *

  • 8/10/2019 IRI Construccion

    91/107

    End Dump/Roadtec Shuttle BuggyEnd Dump/Roadtec Shuttle Buggy

    280.7

    144.8

    *>289.9

    *

  • 8/10/2019 IRI Construccion

    92/107

    End Dump/Roadtec Shuttle BuggyEnd Dump/Roadtec Shuttle Buggy

    91.8%

    227.6

    91.8%

    231.3

    92.4%

    234.8

    93.8%237.0

    91.8%

    237.6

    *>252.7

    *

  • 8/10/2019 IRI Construccion

    93/107

    End Dump/BlawEnd Dump/Blaw Knox MCKnox MC

  • 8/10/2019 IRI Construccion

    94/107

    End Dump/BlawEnd Dump/Blaw--Knox MCKnox MC--3030

    226.6

    276.4

    *>295.7

    *

  • 8/10/2019 IRI Construccion

    95/107

    End Dump/BlawEnd Dump/Blaw--Knox MCKnox MC--3030

    205.3

    284.1

    229.4

    >302.0

  • 8/10/2019 IRI Construccion

    96/107

    Thermal SegregationThermal Segregation

    2020 DifferentialDifferential--1% to 2% Air1% to 2% AirVoidsVoids

    Over 7% Air Voids Reduces LifeOver 7% Air Voids Reduces LifeEach 1% Over Each 1% Over- -Reduces Life 10%Reduces Life 10%

  • 8/10/2019 IRI Construccion

    97/107

    UPDATEUPDATE

    TTITTI--Research on thermal segregationResearch on thermal segregation---- ----Tom ScullionTom Scullion

    Auburn Auburn --------Dr. M. StroupDr. M. Stroup--Gardiner Gardiner TRBTRB ReportReport--------Initial Ride Quality of HMAInitial Ride Quality of HMAPavementsPavementsClemsonClemson --------Dr. Serji A. AmirkhanianDr. Serji A. Amirkhanian

    TTI Development Team

    T S lli

  • 8/10/2019 IRI Construccion

    98/107

    Tom Scullion

    Wenting Liu

    Gerry Harrison

  • 8/10/2019 IRI Construccion

    99/107

    Real Time Thermo-imaging in Texas

  • 8/10/2019 IRI Construccion

    100/107

    DMI

    Sensor Bar

    MLS Test Pad Ty D sample IR dataMLS Test Pad Ty D sample IR data

  • 8/10/2019 IRI Construccion

    101/107

    MLS Test Pad Ty D sample IR dataMLS Test Pad Ty D sample IR data

  • 8/10/2019 IRI Construccion

    102/107

    CONCLUSION:CONCLUSION:

    Initial Ride Quality can be improved byInitial Ride Quality can be improved byminimizing stops and including a materialminimizing stops and including a materialtransfer devicetransfer deviceWhen used properly, MTVs improved theWhen used properly, MTVs improved theride quality and eliminated thermal &ride quality and eliminated thermal &physical segregationphysical segregationResults show no significant thermalResults show no significant thermalsegregation when a material transfersegregation when a material transferdevice was useddevice was used

    OWNERSHIP:

  • 8/10/2019 IRI Construccion

    103/107

    Purchase Price $ 375,000

    20% Residual Value $ 75,000

    NET: $ 300,000

    5 Year Depreciation $ 60,000

    1% Annual Insurance $ 3,000

    1% Tax $ 3,000

    ANNUAL TOTAL: $ 66,000

    Hourly Cost Based 500 hrs 750 hrs 1000 hrs 1200 hrs

    On Annual Usage $ 132.00 $ 88.00 $ 66.00 $ 55.00

    .

  • 8/10/2019 IRI Construccion

    104/107

  • 8/10/2019 IRI Construccion

    105/107

  • 8/10/2019 IRI Construccion

    106/107

    SAVINGSSAVINGS

    Eliminate Truck DelayEliminate Truck DelayReduce Trucking Costs (25%)Reduce Trucking Costs (25%)Increase Productivity (25%)Increase Productivity (25%)

  • 8/10/2019 IRI Construccion

    107/107

    ROADTECROADTEC SERVICESSERVICES

    Thermography ResearchThermography ResearchCertified Thermographer Certified Thermographer

    Research on your projects, your materials,Research on your projects, your materials,your timetableyour timetableEquipmentEquipmentBirth of a PotholeBirth of a Pothole