8/10/2019 IRI Construccion
1/107
8/10/2019 IRI Construccion
2/107
November 8,2005November 8,2005
8/10/2019 IRI Construccion
3/107
BENEFITS OF SMOOTHBENEFITS OF SMOOTHPAVEMENTSPAVEMENTS
8/10/2019 IRI Construccion
4/107
Benefits of Smooth PavementsBenefits of Smooth Pavements
1.1. Smoother roads are important to theSmoother roads are important to theroad users (taxpayer)road users (taxpayer)
2. Smoother roads last longer 2. Smoother roads last longer 3. Smoother roads stay smoother longer 3. Smoother roads stay smoother longer 4. Smoother roads save money4. Smoother roads save money5. Smoother roads are safer 5. Smoother roads are safer 6. Smoother roads improve mobility6. Smoother roads improve mobility
8/10/2019 IRI Construccion
5/107
1.1. Smoother Roads areSmoother Roads areImportant to the RoadImportant to the Road
Users!Users!
8/10/2019 IRI Construccion
6/107
Important to the Road UsersImportant to the Road Users
1996 National Quality Initiative1996 National Quality Initiative(NQI) survey asked roadway(NQI) survey asked roadwayusers what they wanted improvedusers what they wanted improved
in the highway system:in the highway system:Pavement Condition (31%)Pavement Condition (31%)Safety (21%)Safety (21%)Traffic Flow (19%)Traffic Flow (19%)
Bridge Conditions (10%)Bridge Conditions (10%)
8/10/2019 IRI Construccion
7/107
Important to the Road User Important to the Road User
2000 Follow2000 Follow--up surveyup survey
8/10/2019 IRI Construccion
8/107
Important to the Road User Important to the Road User
Results from the AASHO road testResults from the AASHO road testshowed road users judge a roadshowed road users judge a roadprimarily by its ride qualityprimarily by its ride quality
8/10/2019 IRI Construccion
9/107
2. Smoother Roads Last2. Smoother Roads LastLonger!Longer!
8/10/2019 IRI Construccion
10/107
Smoother Roads Last Longer Smoother Roads Last Longer
Research has shown thatResearch has shown thatpavements that are builtpavements that are builtsmoother last longer smoother last longer
NCHRP 1-31
8/10/2019 IRI Construccion
11/107
8/10/2019 IRI Construccion
12/107
8/10/2019 IRI Construccion
13/107
3. Smoother Roads stay3. Smoother Roads staySmoother Longer!Smoother Longer!
8/10/2019 IRI Construccion
14/107
8/10/2019 IRI Construccion
15/107
Dynamic Loads Increase with RoughnessDynamic Loads Increase with Roughness
Dynamic loadsDynamic loadsincrease withincrease withIRIIRI
Different axleDifferent axletypes respondtypes responddifferentlydifferently
8/10/2019 IRI Construccion
16/107
4. Smoother Roads Save4. Smoother Roads SaveMoney!Money!
8/10/2019 IRI Construccion
17/107
Improved Gas Mileage:Improved Gas Mileage: WESTRACKWESTRACKBefore pavement rehabilitation: MileageBefore pavement rehabilitation: Mileage1.79 km/l (4.2 mi/gal)1.79 km/l (4.2 mi/gal)
After rehabilitation After rehabilitation - - Roughness reducedRoughness reducedby 10%: Mileage 1.86 km/l (4.4 mi/gal)by 10%: Mileage 1.86 km/l (4.4 mi/gal)Roughness reduced by 10%, gas mileageRoughness reduced by 10%, gas mileageincreased by 4.5%increased by 4.5%
8/10/2019 IRI Construccion
18/107
Improved Gas Mileage:Improved Gas Mileage: NCATNCATTrackTrack
Fuel Economy and Roughness v s Time
4.14.24.34.44.54.64.74.84.9
55.1
1-Oct-00 20-Nov-00 9-Jan-01 28-Feb-01 19-Apr-01 8-Jun-01 28-Jul-01 16-Sep-01
Time
m p g
1.001.021.041.061.081.101.121.141.161.181.20
I R I ( m / k m
)
mpg IRI
Lower IRI BetterGas Mileage
8/10/2019 IRI Construccion
19/107
The evidence that remains today from the paved roads ofThe evidence that remains today from the paved roads ofthe Roman Empire suggests that roughness must havethe Roman Empire suggests that roughness must have
been a concern for chariot travel.been a concern for chariot travel.
Adapted from Everything You Always Wanted to Know about the IRI, But Were Afraid to Ask! by Thomas D. Gillespie, Ph.D., UMTRI
8/10/2019 IRI Construccion
20/107
Vehicle Maintenance Costs areVehicle Maintenance Costs areLower on Smoother RoadsLower on Smoother Roads
HigherHigherroughnessroughnessincreasesincreasesvehiclevehiclerepair costrepair cost
8/10/2019 IRI Construccion
21/107
8/10/2019 IRI Construccion
22/107
5. Smoother Roads are5. Smoother Roads are
Safer!Safer!
8/10/2019 IRI Construccion
23/107
8/10/2019 IRI Construccion
24/107
6. Smoother Roads6. Smoother Roads
Improve Mobility!Improve Mobility!
8/10/2019 IRI Construccion
25/107
Smoother Roads Improve MobilitySmoother Roads Improve Mobility
Poor and roughPoor and roughpavements canpavements cancause vehicles tocause vehicles toreduce speed byreduce speed bybrakingbrakingCan affect smoothCan affect smoothtraffic flowtraffic flow
8/10/2019 IRI Construccion
26/107
TRENDS IN SMOOTHNESSTRENDS IN SMOOTHNESSSPECICIFICATIONSSPECICIFICATIONS
8/10/2019 IRI Construccion
27/107
Smoothness Specifications:Smoothness Specifications: Asphalt Concrete Pavements Asphalt Concrete Pavements
A survey of State DOTs was conducted in A survey of State DOTs was conducted in2000 to find smoothness index used for2000 to find smoothness index used forconstruction acceptance (Rizzo, FHWA MIconstruction acceptance (Rizzo, FHWA MIdivision, results released in 2000)division, results released in 2000)
Profile Index (16)Profile Index (16)IRI (4)IRI (4)Straightedge (6)Straightedge (6)
Other (6)Other (6)
8/10/2019 IRI Construccion
28/107
Smoothness Specifications:Smoothness Specifications:Concrete PavementsConcrete Pavements
A survey of State DOTs was conducted in A survey of State DOTs was conducted in2000 to find smoothness index used for2000 to find smoothness index used forconstruction acceptance (Rizzo, FHWA MIconstruction acceptance (Rizzo, FHWA MIdivision, results released in 2000)division, results released in 2000)
Profile Index (25)Profile Index (25)IRI (1)IRI (1)Straightedge (3)Straightedge (3)
Other (2)Other (2)
8/10/2019 IRI Construccion
29/107
Current StatusCurrent StatusMany states that used Profile Index (PI) forMany states that used Profile Index (PI) forconstruction acceptance are now using IRIconstruction acceptance are now using IRISeveral states that are currently usingSeveral states that are currently usingProfile Index (PI) for constructionProfile Index (PI) for constructionacceptance are looking into switching to IRIacceptance are looking into switching to IRI
Among the states that are currently using Among the states that are currently usingIRI for construction acceptance are:IRI for construction acceptance are:Pennsylvania, Texas, New York, Maryland,Pennsylvania, Texas, New York, Maryland,Virginia, Minnesota, New Mexico, Louisiana,Virginia, Minnesota, New Mexico, Louisiana,
Arkansas, Idaho, South Dakota, Montana, Arkansas, Idaho, South Dakota, Montana,Wyoming, WashingtonWyoming, Washington
8/10/2019 IRI Construccion
30/107
8/10/2019 IRI Construccion
31/107
PENNSYLVANIAPENNSYLVANIASMOOTHNESSSMOOTHNESS
SPECIFICATIONSPECIFICATION
8/10/2019 IRI Construccion
32/107
Evolution of PennsylvaniaEvolution of PennsylvaniaSmoothness SpecificationsSmoothness Specifications
In 2000, changed ride specificationsIn 2000, changed ride specificationsfrom PI to IRIfrom PI to IRI
Bonus, penalty, and corrective actionBonus, penalty, and corrective action
Maximum acceptable IRI for 0.1 mileMaximum acceptable IRI for 0.1 milesegment was 95 inches/mile (IRI issegment was 95 inches/mile (IRI isaverage IRI of left and right wheelaverage IRI of left and right wheelpaths)paths)
8/10/2019 IRI Construccion
33/107
Evolution of PennsylvaniaEvolution of PennsylvaniaSmoothness SpecificationsSmoothness Specifications
In 2002 lowered maximum acceptableIn 2002 lowered maximum acceptableIRI (for 0.1 mile segment) from 95 toIRI (for 0.1 mile segment) from 95 to70 in/mile for both asphalt and70 in/mile for both asphalt and
concrete pavementsconcrete pavementsCorrective action needed if IRI > 70Corrective action needed if IRI > 70in/milein/mile
Incentive pay available for smootherIncentive pay available for smootherpavementspavements
8/10/2019 IRI Construccion
34/107
Current SpecificationCurrent Specification
A lot is 0.1 mile of a single pavement A lot is 0.1 mile of a single pavementlanelane
Mean IRI (average IRI of left and rightMean IRI (average IRI of left and rightwheel path) is used to determine ridewheel path) is used to determine ride
qualityquality
8/10/2019 IRI Construccion
35/107
Current Specification: AsphaltCurrent Specification: Asphalt
Operation: scratch course, profileOperation: scratch course, profilemilling, leveling course, binder course,milling, leveling course, binder course,wearing coursewearing course
8/10/2019 IRI Construccion
36/107
Current Specification: AsphaltCurrent Specification: Asphalt
Operation: scratch course, profileOperation: scratch course, profilemilling, leveling course, binder course,milling, leveling course, binder course,wearing coursewearing course
8/10/2019 IRI Construccion
37/107
Current Specification:Current Specification:ConcreteConcrete
8/10/2019 IRI Construccion
38/107
Comparison Asphalt vsComparison Asphalt vsConcrete: ExpresswaysConcrete: Expressways
8/10/2019 IRI Construccion
39/107
Corrective ActionCorrective Action
Lots not meeting specification mustLots not meeting specification mustbe correctedbe correctedPavement tested after correctivePavement tested after correctiveactionaction
Corrected lots can get incentiveCorrected lots can get incentive After corrective action, contractor After corrective action, contractormay leave a defective lot in place ifmay leave a defective lot in place ifDistrict Executive provides writtenDistrict Executive provides written
approval and if the contractor acceptsapproval and if the contractor acceptsa $4,000 downward adjustment in thea $4,000 downward adjustment in theamount paid for the lotamount paid for the lot
8/10/2019 IRI Construccion
40/107
AASHTO (AMERICAN AASHTO (AMERICAN ASSOCIATION OF ASSOCIATION OFSTATE HIGHWAYSTATE HIGHWAY
AND ANDTRANSPORTATIONTRANSPORTATION
OFFICIALS)OFFICIALS)PROVISIONALPROVISIONALSTANDARDSSTANDARDS
8/10/2019 IRI Construccion
41/107
AASHTO Provisional Standards AASHTO Provisional Standardson Smoothnesson Smoothness
MP 11: Standard EquipmentMP 11: Standard EquipmentSpecification for an Inertial Profiler Specification for an Inertial Profiler PP 49: Standard Practice for CertificationPP 49: Standard Practice for Certification
of Inertial Profiling Systemsof Inertial Profiling SystemsPP 50: Standard Practice for OperatingPP 50: Standard Practice for OperatingInertial Profilers and EvaluatingInertial Profilers and EvaluatingPavement ProfilesPavement Profiles
PP 51: Standard Practice for PavementPP 51: Standard Practice for PavementRide Quality when Measured UsingRide Quality when Measured UsingInertial Profiling SystemsInertial Profiling Systems
8/10/2019 IRI Construccion
42/107
8/10/2019 IRI Construccion
43/107
Standard Equipment SpecificationStandard Equipment Specification(MP(MP--11)11)
Describes the requirements of an inertialDescribes the requirements of an inertialprofiler profiler
Accuracy requirements and calibration of Accuracy requirements and calibration ofheight sensor, accelerometer, distanceheight sensor, accelerometer, distancemeasuring instrumentmeasuring instrument
Data filteringData filtering
Data recording intervalData recording interval
Operating speedOperating speed
Data storageData storageCalculation of roughness indicesCalculation of roughness indices
8/10/2019 IRI Construccion
44/107
Certification of Profilers (PPCertification of Profilers (PP--49)49)Describes certification procedures forDescribes certification procedures forprofilersprofilers
Static check to check accuracy of heightStatic check to check accuracy of heightsensor sensor
Distance measuring check to checkDistance measuring check to check
accuracy of distance measuring instrumentaccuracy of distance measuring instrumentBounce test to check if accelerometers areBounce test to check if accelerometers areworking properlyworking properly
Requirements of test sectionsRequirements of test sections
Procedures to analyze data and verify IRIProcedures to analyze data and verify IRIvalues obtained by the profiler values obtained by the profiler
8/10/2019 IRI Construccion
45/107
Operating Inertial Profilers andOperating Inertial Profilers andEvaluating Pavement Profiles (PP 50)Evaluating Pavement Profiles (PP 50)
Describes procedures for verifying theDescribes procedures for verifying thecalibration of profiler components and forcalibration of profiler components and foroperating an inertial profiler operating an inertial profiler
Verifying if the distance measuring systemVerifying if the distance measuring system
and the height sensor is within the specifiedand the height sensor is within the specifiedaccuracyaccuracy
Procedures to check if the accelerometers areProcedures to check if the accelerometers areworking correctlyworking correctly
Procedures to follow during data collectionProcedures to follow during data collection(e.g., speed requirements, path to profile etc)(e.g., speed requirements, path to profile etc)Procedures to resolve disputesProcedures to resolve disputes
8/10/2019 IRI Construccion
46/107
8/10/2019 IRI Construccion
47/107
8/10/2019 IRI Construccion
48/107
Belly Dump
Cap. 20-22 Tons
8/10/2019 IRI Construccion
49/107
8/10/2019 IRI Construccion
50/107
Belly Dump Trailers & WindrowHead in Texas
8/10/2019 IRI Construccion
51/107
8/10/2019 IRI Construccion
52/107
Why Use MTVWhy Use MTV
Eliminate Physical SegregationEliminate Physical SegregationReRe--Mix HMAMix HMAProvide Site StorageProvide Site StorageStop Truck DelaysStop Truck DelaysEliminate Paver Stops/StartEliminate Paver Stops/StartSmoother Roads Last Longer Smoother Roads Last Longer
Require Less MaintenanceRequire Less Maintenance
8/10/2019 IRI Construccion
53/107
What the Customer Demands:What the Customer Demands:Pavement SmoothnessPavement Smoothness
Consistent Product QualityConsistent Product Quality
Long Life PavementLong Life PavementUniformity of DensityUniformity of DensityEliminate Material SegregationEliminate Material Segregation
Speed of constructionSpeed of construction
Minimizing Traffic DelaysMinimizing Traffic Delays
Low PriceLow Price
8/10/2019 IRI Construccion
54/107
ARE WE THERE YET? ARE WE THERE YET?
8/10/2019 IRI Construccion
55/107
Hwy. 70, Florida
8/10/2019 IRI Construccion
56/107
Toronto, Ontario
8/10/2019 IRI Construccion
57/107
I-80 , Ohio Turnpike, Truck Ends
8/10/2019 IRI Construccion
58/107
No, Not Until We Solve Truck EndSegregation
8/10/2019 IRI Construccion
59/107
8/10/2019 IRI Construccion
60/107
8/10/2019 IRI Construccion
61/107
8/10/2019 IRI Construccion
62/107
MTV Feeds Paver Over String LinesMTV Feeds Paver Over String Lines ::
8/10/2019 IRI Construccion
63/107
San Francisco International
Airport
8/10/2019 IRI Construccion
64/107
8/10/2019 IRI Construccion
65/107
Paving High Banked RacePaving High Banked RaceTrack with MTV:Track with MTV:
8/10/2019 IRI Construccion
66/107
8/10/2019 IRI Construccion
67/107
8/10/2019 IRI Construccion
68/107
8/10/2019 IRI Construccion
69/107
8/10/2019 IRI Construccion
70/107
8/10/2019 IRI Construccion
71/107
8/10/2019 IRI Construccion
72/107
Augers Are Used on Some Cedar RapidsPavers in Lieu of Slat Conveyors
Carrying HMA From the Hopper to the Augers
8/10/2019 IRI Construccion
73/107
8/10/2019 IRI Construccion
74/107
Superpave
8/10/2019 IRI Construccion
75/107
6 Months
Later
End of Load
Segregation
WHY?
8/10/2019 IRI Construccion
76/107
THERMAL SEGREGATIONTHERMAL SEGREGATIONTemperature DifferentialsTemperature Differentials
WDOT & University of WashingtonWDOT & University of Washington--19961996Stephen Read/Dr. Joe MaloneyStephen Read/Dr. Joe MaloneyLead states of Washington, Minnesota, Texas,Lead states of Washington, Minnesota, Texas,CaliforniaCaliforniaSpecs in Washington, Arkansas, Texas,Specs in Washington, Arkansas, Texas,MassachusettsMassachusettsIncreased Interest (Auburn, Clemson, & TTI)Increased Interest (Auburn, Clemson, & TTI)ROADTEC ResearchROADTEC Research- -Technical AssistanceTechnical Assistance
8/10/2019 IRI Construccion
77/107
*>232 9F
8/10/2019 IRI Construccion
78/107
Segregation Free area
*>232.9 F
*232 9F
8/10/2019 IRI Construccion
79/107
Spot 1226.0
Spot 2224.5
Spot 3214.2
Spot 4206.5
*>232.9 F
*
8/10/2019 IRI Construccion
80/107
Birth of a Pot HoleBirth of a Pot Hole
Spot 1276.2
Spot 2251.1
Spot 3223.9
Spot 4268.0
Spot 5297.2
*>310.0F
*
8/10/2019 IRI Construccion
81/107
8/10/2019 IRI Construccion
82/107
8/10/2019 IRI Construccion
83/107
*>268 1F
8/10/2019 IRI Construccion
84/107
182.5
231.1
266.5
>268.1 F
*
8/10/2019 IRI Construccion
85/107
Spot 1261.6
Spot 2246.8
Spot 3276.0
Spot 4247.2
Spot 5221.4
*>290.0F
*
8/10/2019 IRI Construccion
86/107
End Dump/No MTVEnd Dump/No MTV
290.5
148.9
>302.0
8/10/2019 IRI Construccion
87/107
End Dump/No MTVEnd Dump/No MTV
94.6%
201.2
89.8%
154.392.7%176.6
93.7%
194.992.4%
204.387.8%
206.0
*>237.6
*
8/10/2019 IRI Construccion
88/107
85.4%
196.990.0%
195.594.5%
218.689.0%
186.7
94.2%
223.7
*>252.7F
*
8/10/2019 IRI Construccion
89/107
End Dump/Roadtec Shuttle BuggyEnd Dump/Roadtec Shuttle Buggy
294.0
148.9168.9
*>164.4
*
8/10/2019 IRI Construccion
90/107
End Dump/Roadtec Shuttle BuggyEnd Dump/Roadtec Shuttle Buggy
Min Mean Max
251.8 260.0 263.3
*>275.7
*
8/10/2019 IRI Construccion
91/107
End Dump/Roadtec Shuttle BuggyEnd Dump/Roadtec Shuttle Buggy
280.7
144.8
*>289.9
*
8/10/2019 IRI Construccion
92/107
End Dump/Roadtec Shuttle BuggyEnd Dump/Roadtec Shuttle Buggy
91.8%
227.6
91.8%
231.3
92.4%
234.8
93.8%237.0
91.8%
237.6
*>252.7
*
8/10/2019 IRI Construccion
93/107
End Dump/BlawEnd Dump/Blaw Knox MCKnox MC
8/10/2019 IRI Construccion
94/107
End Dump/BlawEnd Dump/Blaw--Knox MCKnox MC--3030
226.6
276.4
*>295.7
*
8/10/2019 IRI Construccion
95/107
End Dump/BlawEnd Dump/Blaw--Knox MCKnox MC--3030
205.3
284.1
229.4
>302.0
8/10/2019 IRI Construccion
96/107
Thermal SegregationThermal Segregation
2020 DifferentialDifferential--1% to 2% Air1% to 2% AirVoidsVoids
Over 7% Air Voids Reduces LifeOver 7% Air Voids Reduces LifeEach 1% Over Each 1% Over- -Reduces Life 10%Reduces Life 10%
8/10/2019 IRI Construccion
97/107
UPDATEUPDATE
TTITTI--Research on thermal segregationResearch on thermal segregation---- ----Tom ScullionTom Scullion
Auburn Auburn --------Dr. M. StroupDr. M. Stroup--Gardiner Gardiner TRBTRB ReportReport--------Initial Ride Quality of HMAInitial Ride Quality of HMAPavementsPavementsClemsonClemson --------Dr. Serji A. AmirkhanianDr. Serji A. Amirkhanian
TTI Development Team
T S lli
8/10/2019 IRI Construccion
98/107
Tom Scullion
Wenting Liu
Gerry Harrison
8/10/2019 IRI Construccion
99/107
Real Time Thermo-imaging in Texas
8/10/2019 IRI Construccion
100/107
DMI
Sensor Bar
MLS Test Pad Ty D sample IR dataMLS Test Pad Ty D sample IR data
8/10/2019 IRI Construccion
101/107
MLS Test Pad Ty D sample IR dataMLS Test Pad Ty D sample IR data
8/10/2019 IRI Construccion
102/107
CONCLUSION:CONCLUSION:
Initial Ride Quality can be improved byInitial Ride Quality can be improved byminimizing stops and including a materialminimizing stops and including a materialtransfer devicetransfer deviceWhen used properly, MTVs improved theWhen used properly, MTVs improved theride quality and eliminated thermal &ride quality and eliminated thermal &physical segregationphysical segregationResults show no significant thermalResults show no significant thermalsegregation when a material transfersegregation when a material transferdevice was useddevice was used
OWNERSHIP:
8/10/2019 IRI Construccion
103/107
Purchase Price $ 375,000
20% Residual Value $ 75,000
NET: $ 300,000
5 Year Depreciation $ 60,000
1% Annual Insurance $ 3,000
1% Tax $ 3,000
ANNUAL TOTAL: $ 66,000
Hourly Cost Based 500 hrs 750 hrs 1000 hrs 1200 hrs
On Annual Usage $ 132.00 $ 88.00 $ 66.00 $ 55.00
.
8/10/2019 IRI Construccion
104/107
8/10/2019 IRI Construccion
105/107
8/10/2019 IRI Construccion
106/107
SAVINGSSAVINGS
Eliminate Truck DelayEliminate Truck DelayReduce Trucking Costs (25%)Reduce Trucking Costs (25%)Increase Productivity (25%)Increase Productivity (25%)
8/10/2019 IRI Construccion
107/107
ROADTECROADTEC SERVICESSERVICES
Thermography ResearchThermography ResearchCertified Thermographer Certified Thermographer
Research on your projects, your materials,Research on your projects, your materials,your timetableyour timetableEquipmentEquipmentBirth of a PotholeBirth of a Pothole