Upload
farooq-ahmed
View
106
Download
0
Embed Size (px)
Citation preview
IRAT 2G-3G Pre Post KPI Comparison
GSM
confidentia
l
2 of 84
Pre Traffic
TRAFFIC
Constant traffic was observed after IRAT implementation. Major dip was observed after 15th Oct 2011 when there was a change in Business Strategy Plan.
confidentia
l 3 of 84
Post HOSR
HOSR
HOSR was poor after the implementation of IRAT. 0.5 to 1% degradation was observed.
confidentia
l 4 of 84
Drop Call Rate
Pre DCR Post DCR
Improvement in DCR was observed as traffic was shared with 3G as well dip in traffic due to change in Business Plan.
THANK YOU