매설배관의 파손 및 위험성 평가
중앙대학교 윤 기 봉
IAP (Integrity Assessment Program)
Failure probability 예측 : impractical Relative risk assessment : index-based methodology
pipeline risk assessment 파손 가능성을 높이는 모든 hazard
파손 발생에 의한 가능한 모든 impact
risk를 감소시키는 최적의 조치 결정. Normalize 또는 scaled하여 failure probability 평가
각 업체의 데이터, 일반적데이터, 통계적접근법
KOGAS 도입 검토중 (Bass-Trigon Software)
Integrity Assessment Program (IAP) Overview
Integrity Assessment Algorithm
Total Risk(0 to 100)
Risk of Failure (ROF)(0 to 10)
Consequence of Failure (COF)(0 to 10)
35%External
Corrosion(0 to 10)
5%Internal
Corrosion(0 to 10)
30%ThirdParty
(0 to 10)
15%Design/Materials(0 to 10)
10%Ground
Movement(0 to 10)
5%Proced. &Operations
(0 to 10)
0%SCC
(0 to 10)
30%Impact on
Environment(0 to 10)
30%Impact onBusiness(0 to 10)
40%Impact on Population
(0 to 10)
X
ROF sub-categories Environmental factor
: 각 failure category에 영향을 주는 환경조건
Design Factor : 각 failure category에 영향을 주는 설계조건
Integrity Monitoring Factor : 주어진 environment에서 design 등을 monitor하는 방법
Rehabilitation Factor : risk를 감소시키는 activity
COF sub-categories Sensitivity Factor
: 파손시 주변에 미치는 영향의 sensitivity Volume Factor
: 파손시 방출되는 volume
Integrity Assessment Algorithm - Likelihood
Integrity Assessment Algorithm - Consequences
Consequence of Failure(COF)
Impact onEnvironment
WaterCrossings
SensitiveAreas
PropertyDamages
Crossings
Soil Type
InitialVolumeLoss
Stabil.Loss
ProductType
DispersionPotential
Impact onBusiness
BusinessImpact
SystemRedund.
Number ofCustomers
Hours Outof Service
InitialVolumeLoss
Stabil.Loss
ProductType
DispersionPotential
Impact onPopulation
ClassLocation
Encroach-ments
Crossings
InitialVolumeLoss
Stabil.Loss
ProductType
DispersionPotential
Sens. Volume
ROF중 External Corrosion Failure 평가예
High, Low, Average ROF Graph
COF중 Impact on Environment의 평가예
20 30 40 50 60 70100
Rupture Volume - <100 BBls+ >100 BBls
010 30%
WaterCrossings
- no+ yes
010 10%
Environ. Sens.Areas
- no+ yes
010 40%
DispersionPotential
- low+ high
010 20%
Score 100% 6 10 4 1 1 0 0
Distance in Miles
Section of Pipe Does not Meet Criteria
- Factor scores are calculated for every ten miles.
- The user defines the scoring, benchmarks and the variables to be used in the program and the size of the segment or section.
Relative Benefit/Cost Analysis
Project
Proj.Cost($M)
BaseROF
Score
NewROF
Score
ChngROF
Score
BaseCOF
Score
NewCOF
Score
ChngCOF
Score
OtherBenefit($M)
Benefit/CostRatio
Base Case - 7.00 - - 5.89 5.89 - - (ROFS x COFS) –(ROFS x COFS)
(Proj. Cost – OtherBenefits)/100
PressureTesting
400 7.00 6.00 1.00 5.89 5.89 - 300 5.9
In-LineInspection
500 7.00 5.77 1.23 5.89 5.89 - - 1.5
Third PartyProjects
75 7.00 5.93 1.07 5.89 5.89 - - 8.4
OverallReplacement
21,000 7.00 0.95 6.05 5.89 4.69 1.20 300 0.2
Quantitative Benefit/Cost Analysis
Project
Proj.Cost($M)
BaseROF
Score
NewROF
Score
ChngROF
Score
BaseCOF
Score
NewCOF
Score
ChngCOF
Score
OtherBenefit($M)
Benefit/CostRatio
Base Case - 1.32 - - 510 510 - - (ROFR x COF$) –(ROFR x COFS)(Proj. Cost –
OtherBenefits)/1000
PressureTesting
400 1.32 1.04 (0.28) 510 510 - 300 1.4
In-LineInspection
500 1.32 0.99 (0.33) 510 510 - - 0.3
Third PartyProjects
75 1.32 0.97 (0.35) 510 510 - - 2.4
OverallReplacement
21,000 1.32 0.14 (1.18) 510 178 (332) 300 0.03
Summary of Benefit/Cost Analyses
Project Rank Project Cost($M)
Relative B/C Quantitative B/C
Third PartyProjects
1 75 8.4 2.4
PressureTesting
2 400 5.9 1.4
In-LineInspection
3 500 1.5 0.3
OverallReplacement
4 21,000 0.2 0.03
Manufacturing Process
KGS 권고 안전성 평가 절차
누
출
원
인
누
출
방
지
대
책
부 식
제3공사
용접/시험
운전/보수
설 계
SCORING시스템
Thomas 모델
이 력 자 료 산업체이력자료
길이, 직경, 두께, 용접
배관 SCORE 값 누출빈도
주요 외부요인과 그 세부항목들
부 식 제 3자 용접/시험 설계 운 전
환경요소
·설비/계면
·대기분위기
·유체 부식성
·토양 부식성
·배관 나이
·인접 금속으로
의 전류누출
·교류전류 효과
·기계적 부식
방지조치
·코팅조건
·코팅검사
·음극방식
·Smart Pigs
·Dumb Pigs
환경요소
·3공사 빈도
·지상 시설물
방지조치
·매설깊이
·지상표면조건
·파손방지조치
(Barrier)
·배관위치표시
·직통전화 체계
·순찰빈도
·주민교육
환경요소
·원주방향 용접
·길이방향 용접
방지조치
·방사선 검사
·수압시험
·시스템 안전율
(최대허용 운전
압력/ 정상 운전
압력)
·원방감시시스
템(SCADA)
·안전 프로그
램
·교육/훈련
·절차서
·보수(문서화,
절차서, 계
획)
외부요인의 가중치 Scoring 예
외부요인 가중치(±편차) 범 위
1. 부 식 50(±20) 30 ∼ 70
2. 제 3자 25(±15) 10 ∼ 40
3. 용접/시험 15(±10) 5 ∼ 25
4. 설계요인 5(±3) 2 ∼ 8
5. 운전/보수 5(±4) 1 ∼ 9
총 계 100(±52) 48 ∼ 152
배관관리 대책(부식 항목) 수립의 예
허용 최고값 현재 상태대책-1
(강제배류기설치 후)
대책-2
(배관 교체후)
대책-3
(코팅 검사후)
대책-4(PIG를 사용한 관 부식검사)
1. 환경 3 3 3 3 3 32. 토양특성 10 10 10 10 10 10
3. 매설년도 15 7 7 15 7 7
4. 타 금속배관 5 5 5 5 5 5
5. AC 전철 5 5 5 5 5 5
6. DC 전철 10 0 8 0 0 0
7. 코팅 조건 20 0 0 20 15 9
8. 코팅 검사 4 0 0 0 4 0
9. 음극 방식 20 0 20 0 0 0
10. PIG 사용 10 0 0 0 0 10
11. 순찰 4 4 4 4 4 4
점수(SCORE) 70 44 46 53 53
요 약
KOGAS 도입 검토중인 IAP KGS 권고안 도시가스 지하배관에 대한 안전성 평가
Algorithm Scrubbing Team RBI를 통한 RBMS를 GSMS 체계하에 도입