1BTS3900 indoor Macro BTS

BTS3900A Outdoor Macro BTS

DBS3900 Distribute BTSBBU3900RRUdimension 900mm x 600mm x 450mm(W x D x H)Weight 70 kg(no module) 135 kg(full module)configuration6RFU/12RFUdimension RF cabinet: 700mm x 600mm x 480mm(W x D x H)APM30 cabinet: 700mm x 600mm x 480mm(W x D x H)Weight 114 kgconfiguration6RFU/12RFUdimension RRU3926: 400 * 240 * 160mm (W x D x H)RRU3806: 485 285 170 mm(W x D x H)Weight 15 kg (RRU3936) 15 kg (RRU3826)Product Solution

HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

2Product Solution2100M 1T2RUMTS1x 80W WRFU(80W)U2100

2100M ,1T2R1x 80W RRU3826U2100

HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

Overview of Site ScenariosIndoor Macro:

Outdoor BTS+DBS:

HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

Page 5 of 13900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFANAirInletGATMBBUDCDU-01Space 2UNo.ComponentChange TypeRemarks1Filler panelReplacedReplace the filler panel with ELU.2ELUAdded3FanReplacedReplace the FAN unit with the FAN 03C unit.4GATMRemoved900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFAN 03New AirInletBBUDCDU-12ASpace 2UELUUpdate BTS3900 VAVD

No.Power Cable NameChange TypeFromTo1RFU ReplacedRFU0~5DCDU-12A Load0~52FANReplacedFan DCDU-12A Load63BBU ReplacedBBU EPUEDCDU-12A Load74GATMRemovedGATMSPARE1 or SPARE2 on the DCDU-015DCDU Input Added or reusedPDFDCDU-12A Power input No.Monitoring Signal Cable NameChange TypeFromToS1ELUAddedELUSensor on FANS2Upper GATMRemovedCOM2 on GATMCOM-in on FANS3SurgeProtection alarmRemovedExt_alm 0 on BBUSPD_ALM on DCDU01S4Upper GATMRemovedCOM1 on GATMMon0 on BBU UPEUS5FANAddedCOM IN on FANMON 0 on BBU UPEUChange the Component Change the Power CablesChange the Monitoring Signal CablesS1S5S2S3S4Call NOC to Confirm Cabinet Update Time Power on Cabinet, Call NOC to Confirm Status, 2G Call TestNo.ComponentChange TypeRemarks5DCDU-01ReplacedDCDU-01 with the DCDU-12A.BeforeAfterHUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

5Page 6 of 13900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFANAirInletGATMBBUDCDU-01Space 2UNo.ComponentChange TypeRemarks1Filler panelReplacedReplace the filler panel with ELU.2ELUReplaced3FanReplacedReplace the FAN unit with the FAN 03C unit.4GATMRemoved900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFAN 03New AirInletBBUDCDU-12ASpace 2UELUUpdate BTS3900 VBVD

No.Power Cable NameChange TypeFromTo1RFU ReplacedRFU0~5DCDU-12A Load0~52FANReplacedFan DCDU-12A Load63BBU ReplacedBBU EPUEDCDU-12A Load74GATMRemovedGATMSPARE1 or SPARE2 on the DCDU-015DCDU Input Added or reusedPDFDCDU-12A Power input No.Monitoring Signal Cable NameChange TypeFromToS1ELUAddedELUSensor on FANS2Upper GATMRemovedCOM2 on GATMCOM-in on FANS3SurgeProtection alarmRemovedExt_alm 0 on BBUSPD_ALM on DCDU01S4Upper GATMRemovedCOM1 on GATMMon0 on BBU UPEUS5FANAddedCOM IN on FANMON 0 on BBU UPEUChange the Component Change the Power CablesChange the Monitoring Signal CablesS1S5S2S3S4Call NOC to Confirm Cabinet Update Time Power on Cabinet, Call NOC to Confirm Status, 2G Call TestNo.ComponentChange TypeRemarks5DCDU-01ReplacedDCDU-01 with the DCDU-12A.BeforeAfterHUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

6Page 7 of 13

900M & 1800M

COMB.1800M & 2100M900M 2 pairs No.ComponentChange TypeRemarks1CabinetAdded/Add the CabinetNo.Cable NameChange TypeFromTo1CPRI cablesAddedCPRI0 on WRFU (slat 1,3,5)CPRI port (1,3,5) on WBBP board1DCDU power cableAddedPDFDCDU-12A Power input 2Cabinet Monitoring Signal CablesAddedCOM OUT on FAN(1st)COM IN on FAN(2nd)3Equipotential cableAddedPGND(1st)PGND(2nd)42100 EFU RF CableAddedTX-RXA,TX-RXB/Add the CablesPre install CombinerCutover the 1800M &2100M to the CombinerInstall 3G Transmission Cable, Call NOC to commission and integrateInstall UMPT&WBBPPower on Cabinet, Call NOC to Confirm Status, 2G 1800M and 3G 2100M Call TestNo.Cable NameChange TypeFromTo1GE/FE cableAddedFE0 on UMPTTransmission equipment

To TransmissionExtend 3G BTS3900(VC,VD+VD)900&1800>900&1800&2100 HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

Page 8 of 13

900M & 2100M

2100M900M 2 pairs No.ComponentChange TypeRemarks1CabinetAdded/Add the CabinetNo.Cable NameChange TypeFromTo1CPRI cablesAddedCPRI0 on WRFU (slat 1,3,5)CPRI port (1,3,5) on WBBP board1DCDU power cableAddedPDFDCDU-12A Power input 2Cabinet Monitoring Signal CablesAddedCOM OUT on FAN(1st)COM IN on FAN(2nd)3Equipotential cableAddedPGND(1st)PGND(2nd)42100 EFU RF CableAddedTX-RXA,TX-RXB/Add the CablesInstall Feeder for 2100MInstall 3G Transmission Cable, Call NOC to commission and integrateInstall UMPT&WBBPPower on Cabinet, Call NOC to Confirm Status, 3G 2100M Call TestNo.Cable NameChange TypeFromTo1GE/FE cableAddedFE0 on UMPTTransmission equipment

To TransmissionExtend 3G BTS3900(VC,VD+VD)900>900&2100

HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

8Page 9 of 13Update BTS3900A VAVD 900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFANCMUEAFANFANPanelDCDU13ADCDA13A900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFANFMUAFANPanelDCDU02DCDA02SLPUEPS4890PMU PSU PSU PSUBBUTM spaceFANSLPUEPU05PSU PSU PSUPMU PSU PSUBBUTM spaceELUELU

BeforeAfterDOORDOORDOORDOORNo.ComponentChange TypeRemarks1Front DoorReplaced2ELUAdded3FanReplacedChange the Component Call NOC to Confirm Cabinet Update Time APM304FMUAReplacedFMUA is replaced by CMEA5ELUAdded6PanelReplacedReplace the panel with ELU.RFCNo.Power Cable NameChange TypeFromTo1APM FANReplacedFanbox_PWREPU load22DCDU13A InputReplacedRFC1 output on EPUDCDU13A left (input)3BBU ReplacedBBU EPUEEPU load54Parallel connectionReplacedDCDU13A left DCDU13A rightChange the Power CablesNo.Power Cable NameChange TypeFromTo1RFU0,1,2ReplacedRFUDCDU13A left load 0,1,22RFU3,4,5ReplacedRFUDCDU13A right load 0,1,23CMUEAReplacedCMUEADCDU13A left load31EPD4890ReplacedEPU052DCDU02ReplacedDCDU13ANo.Monitoring Signal Cable NameChange TypeFromToS1ELUAddedFanbox_ELUELUS2Door state ReplacedDoor state sensorPMU_GateS3Fan in doorReplacedFan in doorFanbox FAN_EXTS4FanboxReplacedFanbox COM_INUPEU MON1S5PMUAddedPMU COM_INFanbox COM_OUTS1ELUAddedEMUAE_ELUELUS2Door state ReplacedDoor state sensorEMUAE_GateS3Temp.ReplacedTemp. SensorEMUAE_TEMS4DC SPDReplacedEMUAE_IN0,12 DCDU SPDS5EFANReplacedFAN1,2EMUAE EFAN1,2S6EFANReusedFAN3,4FixedS0CabinetReusedCMUEA COM INBBU MON0Change the Monitoring Signal CablesPower on Cabinet, Call NOC to Confirm Status, 2G Call TestS1S2S3S5S4S1S2S3S4S5S6S0S1S2S3S5S4S1S2S3S4S5S6S0HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

Page 10 of 13Update BTS3900A VBVD

BeforeAfterCall NOC to Confirm Cabinet Update Time APM30FAN900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFANPanelDCDU01SLPUEPS4890PMU PSU PSU PSUBBUTM spaceDOORDOOR900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFANPanelDCDU12AFANSLPUEPU05PSU PSU PSUPMU PSU PSUBBUTM spaceELUELUDOORDOORNo.ComponentChange TypeRemarks1Front DoorReplaced2ELUReplaced3FanReplacedChange the Component APM304FANReplaced5ELUReplacedRFC1EPD4890ReplacedEPU052DCDU01ReplacedDCDU12ANo.Power Cable NameChange TypeFromTo1APM FANReplacedFanbox_PWREPU load22DCDU12A InputReplacedRFC1 output on EPUDCDU12A (input)3BBU ReplacedBBU EPUEEPU load5Change the Power CablesNo.Power Cable NameChange TypeFromTo1RFU0,1,2,3,4,5ReplacedRFUDCDU12A left load 0,1,2,3,4,52RFC FANReplacedFANDCDU12A load6S2S1S2S3S5S4S1S3S0S2S1S2S3S5S4S1S3S0No.Monitoring Signal Cable NameChange TypeFromToS1ELUAddedFanbox_ELUELUS2Door state ReplacedDoor state sensorPMU_GateS3Fan in doorReplacedFan in doorFanbox FAN_EXTS4FanboxReplacedFanbox COM_INUPEU MON1S5PMUAddedPMU COM_INFanbox COM_OUTS1ELUAddedEMUAE_ELUELUS2Door state ReplacedDoor state sensorEMUAE_GateS3Temp.ReplacedTemp. SensorEMUAE_TEMS4DC SPDReplacedEMUAE_IN0,12 DCDU SPDS5EFANReplacedFAN1,2EMUAE EFAN1,2S6EFANReusedFAN3,4FixedS0CabinetReusedFAN COM INUPEU MON0Change the Monitoring Signal CablesPower on Cabinet, Call NOC to Confirm Status, 2G Call TestHUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

10Page 11 of 13Update DBS3900(APM30) VBVD

Call NOC to Confirm Cabinet Update Time No.ComponentChange TypeRemarks1Front DoorReplaced2ELUReplaced3FanReplaced4DCDU12BAddedChange the Component DCDU12BFANSLPUEPU05PSU PSU PSUPMU PSU PSUBBUTM spaceELUDOORFANSLPUEPS4890PMU PSU PSU PSUBBUTM spaceDOORS1S2S3S5S4TO 6RRUBeforeAfterTO 6RRU1EPD4890ReplacedEPU05S1S2S3S5S4No.Power Cable NameChange TypeFromTo1RRUReusedRRU0~5EPU Load0~52FANReplacedFan EPU Load63BBU ReplacedBBU EPUEEPU Load74DCDU Input Added EPU RFC LoadDCDU-12B Power input Change the Power CablesChange the Monitoring Signal CablesNo.Monitoring Signal Cable NameChange TypeFromToS1ELUAddedFanbox_ELUELUS2Door state ReplacedDoor state sensorPMU_GateS3Fan in doorReplacedFan in doorFanbox FAN_EXTS4Fan boxReplacedFanbox COM_INUPEU MON1S5PMUAddedPMU COM_INFanbox COM_OUTPower on Cabinet, Call NOC to Confirm Status, 2G Call TestHUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

11900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFANPanelDCDU12AFANSLPUEPU05PSU PSU PSUPMU PSU PSUBBUTM spaceDOORDOORDCDU12B

To Transmission

900M & 1800M

900M1800M & 2100MAdd DCDU, Add the 3G RRUNo.Cable NameChange TypeFromTo1DCDU power cableAddedEPU Load RFC2DCDU-12B Power input 2RRU CPRI cablesAddedCPRI-W on RRU CPRI port (1,3,5) on WBBP board3RRU Power CablesAddedRRU InputDCDU load 1,3,54RRU RF JumpersAddedRRUCombinerAdd the CablesPre install CombinerCutover the 1800M &2100M to the CombinerInstall 3G Transmission Cable, Call NOC to commission and integrateInstall UMPT&WBBPPower on Cabinet, Call NOC to Confirm Status, 2G 1800M and 3G 2100M Call TestNo.Cable NameChange TypeFromTo1GE/FE cableAddedFE0 on UMPTTransmission equipmentBTS3900A Extend 3G DBS3900(RT)900&1800>900&1800&2100 COMB.HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

12900GRFUPenal900GRFUPenal900GRFUPenalFANPanelDCDU12AFANSLPUEPU05PSU PSU PSUPMU PSU PSUBBUTM spaceDOORDOORDCDU12B

To Transmission

900M & 1800M

900M 2100MAdd DCDU, Add the 3G RRUNo.Cable NameChange TypeFromTo1DCDU power cableAddedEPU Load RFC2DCDU-12B Power input 2RRU CPRI cablesAddedCPRI-W on RRU CPRI port (1,3,5) on WBBP board3RRU Power CablesAddedRRU InputDCDU load 1,3,54RRU RF JumpersAddedRRUCombinerAdd the CablesInstall 3G Transmission Cable, Call NOC to commission and integrateInstall UMPT&WBBPPower on Cabinet, Call NOC to Confirm Status, 3G 2100M Call TestNo.Cable NameChange TypeFromTo1GE/FE cableAddedFE0 on UMPTTransmission equipmentBTS3900A Extend 3G DBS3900(RT)900>900&2100 HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

13900GRFU1800GRFU900GRFU1800GRFU900GRFU1800GRFUFANPanelDCDU12AFANSLPUEPU05PSU PSU PSUPMU PSU PSUBBUTM spaceDOORDOORDCDU12B

To Transmission

900M & 1800M

900M&1800M 2100MAdd DCDU, Add the 3G RRU, add 2100M antennaNo.Cable NameChange TypeFromTo1DCDU power cableAddedEPU Load RFC2DCDU-12B Power input 2RRU CPRI cablesAddedCPRI-W on RRU CPRI port (1,3,5) on WBBP board3RRU Power CablesAddedRRU InputDCDU load 1,3,54RRU RF JumpersAddedRRUCombinerAdd the CablesInstall 3G Transmission Cable, Call NOC to commission and integrateInstall UMPT&WBBPPower on Cabinet, Call NOC to Confirm Status, 3G 2100M Call TestNo.Cable NameChange TypeFromTo1GE/FE cableAddedFE0 on UMPTTransmission equipmentBTS3900A Extend 3G 2100 DBS3900(GF)

HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

14FANSLPUEPU05PSU PSU PSUPMU PSU PSUBBUTM spaceDOORDCDU12B

To Transmission

900M & 1800M

2100MAdd DCDU, Add the 3G RRU, add 2100M antennaNo.Cable NameChange TypeFromTo1DCDU power cableAddedEPU Load RFC2DCDU-12B Power input 2RRU CPRI cablesAddedCPRI-W on RRU CPRI port (1,3,5) on WBBP board3RRU Power CablesAddedRRU InputDCDU load 1,3,54RRU RF JumpersAddedRRUCombinerAdd the CablesInstall 3G Transmission Cable, Call NOC to commission and integrateInstall UMPT&WBBPPower on Cabinet, Call NOC to Confirm Status, 3G 2100M Call TestNo.Cable NameChange TypeFromTo1GE/FE cableAddedFE0 on UMPTTransmission equipmentDBS3900 Extend 3G 2100 DBS3900900&1800>900&1800&2100

HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

15FANSLPUEPU05PSU PSU PSUPMU PSU PSUBBUTM spaceDOORDCDU12B

To Transmission

900M & 1800M

Add DCDU, Add the 3G RRUNo.Cable NameChange TypeFromTo1DCDU power cableAddedEPU Load RFC2DCDU-12B Power input 2RRU CPRI cablesAddedCPRI-W on RRU CPRI port (1,3,5) on WBBP board3RRU Power CablesAddedRRU InputDCDU load 1,3,54RRU RF JumpersAddedRRUCombinerAdd the CablesInstall 3G Transmission Cable, Call NOC to commission and integrateInstall UMPT&WBBPPower on Cabinet, Call NOC to Confirm Status, 3G 2100M Call TestNo.Cable NameChange TypeFromTo1GE/FE cableAddedFE0 on UMPTTransmission equipmentDBS3900 Extend 3G 2100 DBS3900900>900&2100

HUAWEI TECHNOLOGIES CO., LTD.Huawei Confidential :32-35pt : R153 G0 B0 :FrutigerNext LT Medium : Arial

:30-32pt : R153 G0 B0:

:20-22pt (2-5) :18pt : :FrutigerNext LT Regular : Arial

:18-20pt(2-5):18pt ::

.

16Thank Youwww.huawei.com17