INVITATION TO TENDER PROCEDURE

IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a

Smoke Extraction system and a Compressed Air Distribution

B. Jenssen 09.07.2015

Page 3: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Key dates Invitation to Tender issued: 01.07.2015

Compulsory bidders’ conference: 09.07.2015

Bids to be returned to CERN by

26 Aug 2015 – 4:00 pm (uploaded)

Contract negotiation and notification in Aug 2015

Start of the contract: Aug 2015

Delivery of documentation as in Technical Specification § 3.6.1, § 3.6.2 and § 3.6.3

5 October 2015

Successful factory test Technical Specification § 4.4.1 30 November 2015

Start of installation 16 December 2015

End of commissioning 15 May 2016

Final acceptance 29 May 2016

B. Jenssen 09.07.2015

Page 4: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

IT documents

Tender form with Annex I “Cost-Break-down;

Technical specification + annexes

“Selection and Adjudication criteria for Supply Contract” dated May 2015

Working on the CERN site

General Conditions for Invitations to Tender CERN/FC/5312-I/Rev.

General Conditions of CERN Contracts CERN/FC/5312-II/Rev.

B. Jenssen 09.07.2015

Page 5: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Clarification Process

Requests for clarification should be

received earlier than 16 Aug 2015

All questions shall be addressed in writing to

[email protected]

Please put: cc:

[email protected]

[email protected]

B. Jenssen 09.07.2015

Page 6: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Clarification Process

CERN’s response will be sent to all bidders,

including the request for clarification but

without identifying its source

Bidders shall acknowledge receipt of the

email

Cover letter with bid shall acknowledge each

individual CERN clarification correspondence

received

B. Jenssen 09.07.2015

Page 7: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Selection and Adjudication CriteriaAdjudication basis:

The contract shall be awarded on a

« lowest compliant* » basis

to the bidder whose bid complies with the technical, financial and

delivery requirements and is the lowest**

*Note• On a FCA basis, if the ratio of DAP price of the lowest FCA bid to the lowest DAP bid doesn’t exceed 1.10; • On a DAP basis, if the above-mentioned ratio exceeds 1.10.

** Subject to the rules aiming at achieving well balanced industrial return coefficient

for Member States (MS)PB= Poorly Balanced

WB= Well Balanced

B. Jenssen 09.07.2015

Page 8: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Selection and Adjudication CriteriaSelection and adjudication criteria – Concept

Improve the distribution of our purchases among CERN MS

• The country of origin is the country where the supplies (including their components and sub-assemblies) are manufactured or undergo the last major transformation by the contractor or his sub-contractor(s).

• Industrial return coefficient: The ratio between that Member State's percentage share of all purchases of supplies (excluding purchases funded by non-Member States) during the preceding four calendar years and that State's percentage contribution to the budget over the same period.

• Well balanced Member states: BU - CH – FR – HU – IT - PT

• The tender shall be treated as that from a poorly balanced PB MS provided that the value of supplies originating in one or more PB MS is not less than 60 % of the total amount of the contract.

B. Jenssen 09.07.2015

Page 9: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Basis of award

The alignment rules

• 1- Lowest bidder from PB MS Contract awarded• 2- Lowest bidder from well balanced (WB) MS

(If bid from PB MS is within a difference of < 20% negotiations)

• 1st bidder from PB MS aligns awarded the Contract• If not - 2nd bidder from PB (within 20%) aligns awarded

Contract• If not – Contract awarded to lowest bidder

B. Jenssen 09.07.2015

Page 10: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Price Basis

• All prices shall be quoted in CHF or EUR or the preferred currency of the bidder (if you wish to be paid in this currency), free of taxes, not subject to revision

• Any quantities indicated in the Annex I to the Tender form “Cost break down” are only indicative. Any volume change will not change the price of the contract, which is a lump sum contract.

• Report the prices form Annex I “Cost break-down” into the tender form. • Validity of the bid: 6 months from the closing date.

B. Jenssen 09.07.2015

Page 11: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

OPTION (ref. Tender form § 2)

• CERN reserves the right not to order the Air Barrier (ref. Technical Specification §3.5.7). In that case the amount quoted for the Air Barrier will be deducted from total price. The contractor will be notified at the same time as the contract award and it shall have not effect on the other prices quoted.

B. Jenssen 09.07.2015

Page 12: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

ALTERNATIVE PROPOSALS (§ 14 General Conditions for Invitations to Tender by CERN)

• There is no obligation, but we encourage bidders to submit with the bid any alternative solutions in addition to the conforming bid

B. Jenssen 09.07.2015

Page 13: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

VAT

Prices shall take into account CERN’s exoneration from VAT and import duties

VAT shall be subject to the rules and invoicing instructions as defined under the following link:

http://cern.ch/doc/vat.html OR http://cern.ch/doc/tva.html

B. Jenssen 09.07.2015

Page 14: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

PAYMENT CONDITIONS (ref. Tender form § 4)

2Rating of BBB+ at least and contractor to give written proof of such.

B. Jenssen 09.07.2015

Page 15: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Penalties I of II (Tender form § 7)

B. Jenssen 09.07.2015

Page 16: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Penalties II of II (Tender form § 7)

B. Jenssen 09.07.2015

Page 17: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Return Date

Bids shall be RECEIVED by CERN (uploaded):

26 Aug 2015 - 4 P.M

at the latest

B. Jenssen 09.07.2015

Page 18: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

Contact for Information

Bjorn Jenssen

Tel: +41 22 767 44 05

Fax: +41 22 766 80 89

E-mail: [email protected]

Always put in cc:

[email protected]

[email protected]

B. Jenssen 09.07.2015

Page 19: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke

B. Jenssen 09.07.2015

Page 20: INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke