INVITATION TO BID CANDLESTICK POINT BLOCK 11AS ‐ #464 Harney Way at Candlestick Point Drive (Street Address TBD) San Francisco, CA February 14, 2018 BID DUE DATE: Thursday, March 15, 2018 @ 2:00 p.m. REQUESTED BID TRADES: Design‐Build Trades: HVAC, Electrical, Plumbing, Fire Sprinkler, Solar Hot Water, Exterior Building Maintenance THIS IS A CAHILL/HERCULES PROJECT PROJECT DESCRIPTION: It is a 7‐story affordable housing building, with multiple wings and combination of Type III and Type V construction over a Type I podium. The area of the building is approximately 257,000 sf, consisting of 176 residential units. The Ground floor includes parking, retail shell, residential common areas, and several residential units. The upper floors include residential units with some amenity spaces. The podium area and street frontages include significant landscape and hardscape scope. OWNER: MERCY/SFHDC ARCHITECT: LMS Architects TENTATIVE SCHEDULE: Begin construction in September 2019. Duration is 22 months. LABOR REQUIREMENTS: Union Labor required for carpenters, laborers, operating engineers only / Prevailing Wage and Local hiring requirements for all trades. SUBCONTRACTING GOALS: SBE goals / LBE goals / OCII – see Exhibit C VOLUNTARY PRE‐BID MEETING: Wednesday, February 28, 2018 @ 10:00 a.m., at Cahill’s 425 California Street, suite 2200, San Francisco, CA 94104 office. There will be no jobsite walk. DEADLINE FOR BID RFI’s: Monday, March 5, 2018 @ 10:00 AM RFI Response Published to OCII Website: Thursday, March 8, 2018 (by end of business day) BID DOCUMENTS: All bid documents can be accessed through BuildingConnected. The link to the bid documents has also been sent to various Builder’s Exchanges and Organizations in the Bay Area for viewing. https://cahillcontractors.box.com/s/wcrmhhprazv7eonl5973r1xy9p64wgj2 BID PROCESS: All bid submissions and communication should be made on BuildingConnected. Please update your bidding status on BuildingConnected by Friday, February 16, 2018. CONTACT: For any questions regarding this project or BuildingConnected access, please contact Cahill Estimating at estimating@cahill‐sf.com.

INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

INVITATION TO BID  

CANDLESTICK POINT BLOCK 11AS ‐ #464 Harney Way at Candlestick Point Drive (Street Address TBD) 

San Francisco, CA  

February 14, 2018  

BID DUE DATE:  Thursday, March 15, 2018 @ 2:00 p.m.  REQUESTED BID TRADES:   Design‐Build Trades:  HVAC, Electrical, Plumbing, Fire Sprinkler, Solar Hot Water, Exterior Building Maintenance  THIS IS A CAHILL/HERCULES PROJECT  PROJECT DESCRIPTION: It  is  a  7‐story  affordable  housing  building,  with  multiple  wings  and  combination  of  Type  III  and  Type  V construction over a Type  I podium. The area of  the building  is approximately 257,000 sf,  consisting of 176 residential  units.    The  Ground  floor  includes  parking,  retail  shell,  residential  common  areas,  and  several residential units.  The upper floors include residential units with some amenity spaces. The podium area and street frontages include significant landscape and hardscape scope. 

OWNER:  MERCY/SFHDC ARCHITECT:   LMS Architects  TENTATIVE SCHEDULE:   Begin construction in September 2019.  Duration is 22 months. LABOR REQUIREMENTS:  Union Labor required for carpenters, laborers, operating engineers only / Prevailing Wage and Local hiring requirements for all trades.  SUBCONTRACTING GOALS:  SBE goals / LBE goals / OCII – see Exhibit C VOLUNTARY PRE‐BID MEETING:  Wednesday, February 28, 2018 @ 10:00 a.m., at Cahill’s 425 California Street, suite 2200, San Francisco, CA 94104 office.  There will be no jobsite walk. DEADLINE FOR BID RFI’s:  Monday, March 5, 2018 @ 10:00 AM RFI Response Published to OCII Website: Thursday, March 8, 2018 (by end of business day)  BID DOCUMENTS: All bid documents can be accessed through BuildingConnected.  The link to the bid documents has also been sent to various Builder’s Exchanges and Organizations in the Bay Area for viewing.    

https://cahillcontractors.box.com/s/wcrmhhprazv7eonl5973r1xy9p64wgj2  

BID PROCESS: All bid submissions and communication should be made on BuildingConnected.  Please update your bidding status on BuildingConnected by Friday, February 16, 2018.  CONTACT:  For any questions regarding this project or BuildingConnected access, please contact Cahill Estimating at estimating@cahill‐sf.com. 

Page 2: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

EXHIBIT B General Requirements February 14, 2018 

  

Subcontractor includes Project General Requirements as identified below: 

1. Flagging & Traffic Control ‐ Subcontractors are responsible for furnishing their own flagmen and traffic control, as required for their work. 

2. Cleanup – Cahill/Hercules will furnish debris boxes.  Subcontractors are responsible for their own cleanup and depositing their debris into the debris boxes.  Should a Subcontractor fail to clean up after themselves on a daily basis, Cahill/Hercules reserves the right to perform the cleanup and  back  charge  the  Subcontractor.    Subcontractors  are  required  to  follow  any  recycling guidelines of the project. 

3. Parking  a. No parking or delivery trucks are allowed in front of the adjacent properties. b. Onsite parking is not available.  Subcontractors are responsible for their own parking costs. 

 4. Mockup 

A full sized mockup of a typical unit will be built on site.  All subcontractors will be required to install their work in this mockup.  The cost to perform this out of sequence mockup is to be included in each bidder’s quotation.  Subcontractors should assume this mockup will be in addition to those scheduled for construction. 

5. Barricades ‐ If a subcontractor removes or modifies temporary barricades or railings installed by others, then it is the subcontractor's responsibility to reinstall the barricades or railings in such a manner as to maintain a safe working area.  If additional barricades/railings are required by a subcontractor's work, they shall be that subcontractor's responsibility to furnish & install. 

6. Sustainability Goals ‐ This will be a “green” project with the goal of achieving LEED Silver certification [or Green‐Point Rated].  Bidders should include all relevant costs associated with achieving this goal. 

7. Temp Fire Water ‐ The Fire Sprinkler bidders shall include the cost to maintain a temporary Fire Water Riser to each floor of the structure as it is being built. 

8. Temp Power ‐ The General Contractor shall furnish temporary 110 V power at several locations and  general  lighting.    Subcontractors  are  responsible  for  furnishing  their  own  temporary electrical distribution,  task  lighting and ventilation as necessary beyond  that provided by  the General Contractor. 

9. Temp Water  ‐ Temporary water shall be  furnished at a single  location, as determined by  the General Contractor.  

10. Permits ‐ The Owner will provide the building permits.  Subcontractors are required to provide and pay for any other trade permits and fees necessary for the completion of their work. 

Page 3: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 2 

11. Scaffold  –  Cahill/Hercules  will  provide  scaffold  for  the  exterior  skin  installation.  Any  other scaffold (rolling or otherwise) shall be the Subcontractor's responsibility. 

12. Crane Service / Hoisting – A tower crane will be provided by Cahill/Hercules until the structure is complete. This crane will have a minimum capacity of 6,000 lbs.  Subcontractors may schedule time to use this crane but must provide their own rigging.  Subcontractors are responsible for picks that are larger than the tower crane’s capacity.   

13. Personnel  Hoist  ‐  Cahill/Hercules  will  provide  a  6,000  lb  capacity  personnel  hoist  for  tools, equipment  and  small  material  deliveries  to  the  floors.    This  hoist  will  be  removed  once  an elevator is available for use. 

14. Layout  ‐ Cahill/Hercules will furnish line and grade at  locations designated by Cahill/Hercules.  Subcontractors  shall  be  responsible  for  transferring  elevations  and  dimensions  from  the designated line and grade locations as required to layout their own work.  The line and grade locations furnished by Cahill/Hercules shall be the minimum required for subcontractors to be able to transfer line and grade to their area of work. 

15. BIM ‐ Building Information Modeling (BIM) software will be used on this project.  Concrete, Wood Framing, Mechanical, Electrical, Plumbing and Fire Sprinkler Subcontractors must include the cost to coordinate their scope of work with the other trades, using collaborative construction software.  Subcontractors will be responsible for providing the Contractor with shop drawings that can be imported into Navisworks, a software program produced by AutoDesk.  Shop drawings shall be detailed in three dimensions to a level of detail that allows for effective management of conflicts between trades. 

 16. Quality Control:   Cahill/Hercules will prepare a Site Specific Quality Management Plan for the 

Project. Subcontractor shall cooperate with Cahill/Hercules on all aspects of the Plan when asked to do so,  including but not  limited  to participating  in or enabling pre‐work meetings,  first‐in‐place‐work  reviews, material  verification,  photo documentation  and  cover‐up  inspections.    If required by the Site Specific Quality Management Plan, Subcontractor may be required to submit a  Site  Specific Quality  Control  Plan  to  Cahill/Hercules  for  review  and  approval  by  Contractor before  work  can  commence.  In  accordance  with  the  Site  Specific  Quality  Control  Plan, Subcontractor shall designate a Site Quality Control Representative to manage its Site Specific Quality Control Plan. 

17. Testing:   Every Subcontractor agrees to perform the work,  including any required inspections and testing, in such a manner so as to preserve any and all manufacturer’s warranties. Contractor and/or Owner reserve the right to test Subcontractor’s work in accordance with this Subcontract Agreement,  the  Construction  Documents,  manufacturer’s  recommendations  and/or  industry practices.  The cost of initial testing to be borne by the Contractor and/or Owner. In the event of a  testing  failure  all  additional  costs,  including  re‐testing  and  re‐inspecting,  as  well  as  the additional testing due to increasing the sample size (provided the initial sample size is based on industry  standards or  is  communicated  to Subcontractor prior  to  the  start of  testing),  that  is triggered by Subcontractor's work that failed to comply with this Subcontract Agreement, the Construction Documents, the manufacturer's recommendations and/or industry practices, will be borne by the Subcontractor. 

Page 4: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 3 

a. Window Testing by Contractor and/or Owner:  A minimum 5% of the windows will be water tested  under  negative  air  pressure  in  conformance  with  the  Contract  Documents  and manufacturer's recommendations, and all remaining windows will be water spray tested. In the event of a conflict with testing procedures  listed  in the Contract Documents the more stringent requirements apply.  

b. Selection of testing company shall be by Contractor and/or Owner.  Contractor may perform spray‐only testing without the presence of a test company.  Contractor may perform aspects of negative air pressure testing in conjunction with a test company.  Subcontractor shall be present  for  the  first  test, at which  time any and all procedural objections, observations or corrections shall be brought forth by Subcontractor for discussion and resolution.  Thereafter, test results shall be accepted as valid.  Subcontractor will be given the opportunity to observe all subsequent testing.   

c. In the event of failure under water spray testing without negative air pressure, the window assemblies experiencing failure will be inspected, repaired as necessary, and re‐tested.  This shall also incur an increase in sample size for negative air pressure testing per (iv) below. 

d. In the event of failure under water testing with negative air pressure, the window assemblies experiencing failure will be inspected, repaired as necessary, and re‐tested.  After successfully passing re‐testing, all similar windows will be inspected and repaired as necessary.  Following re‐testing, inspection, and repairs, an additional 10% of the untested similar windows will be water tested under negative air pressure as noted above. 

e. In the event of a subsequent  failure,  the  inspection, repair, and re‐testing will continue as noted  above,  though  the  percentage  of  additional  similar  windows  to  be  tested  under negative air pressure will increase to 25%, and then to 40%, and finally to 100%. 

f. Contractor shall not be responsible for forensic testing of failed windows except to the extent required to differentiate between a window unit failure and a field installation failure. 

 

End of Exhibit B – General Requirements 

Page 5: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

EXHIBIT C Contracting & Workforce Hiring Goals 

February 14, 2018  

 The Developer of the project (MERCY CALIFORNIA & SFHDC) has committed to meeting the Office of Community Investment and Infrastructure’s (OCII) non‐discrimination, equal opportunity contracting and local workforce hiring participation goals.  The equal opportunity program documents are part of the specifications and are available at our office for review.  These documents will be included as Contract Documents in all subcontracts. By bidding on this project, you agree to comply with all relevant policies, should you be awarded a contract.  In general, the project goals can be summarized as follows: 

 A. Small Business Enterprises (SBE): 

The Office of Community Investment and Infrastructure (“OCII”) administers this project. The OCII Small Business Enterprise (“SBE”) Program is applicable to the Project with a 50% SBE participation goal. The Development Team  is committed to making a good  faith effort  to contract with certified SBEs. First consideration will be given in awarding contracts to project area  SBE’s  (i.e.  LBE  certified  firms  located  in  94124,94134 and 94107  followed  by  San Francisco‐based SBEs (LBE’s) and the then all other SBEs.  Non‐San Francisco‐based SBEs will be  used  to  satisfy  participation  goals  only  if  San  Francisco‐based  SBEs  are  not  available, qualified, or  if  their bids or  fees are significantly higher  than  those of non‐San Francisco‐based SBEs.   OCII no longer directly certifies SBEs however, OCII will honor firms certified with the City and County of San Francisco as a Local Disadvantaged Business Enterprises (LBEs) that are consistent with the SBE certification standards. In order for OCII to recognize a business as an economically disadvantaged SBE, the business must have an average gross receipt income based on  the  three most  recent  tax  returns  that does not exceed $14 Million Dollars  for Specialty Construction Contractors. OCII may request copies of tax returns for review.   OCII  will  accept  the  information  on  documented  small  economically  disadvantages businesses (SBE, MBE, DBE and WBE) certifications from the following jurisdictions: State of California‐‐Small Business Enterprises (SBE) Federal and any other local jurisdiction. OCII will make  the  final  determination  on  the  consistency  of  the  certification  standards  and acceptance or denial of certifications listed above.  

Provide your Certification letter with your bid and list the involvement of any SBE Suppliers or Sub‐subcontractors that may be included in your bid. 

For information on LBE certification with the City and County of San Francisco, please visit the following site: http://sfgov.org/cmd/lbe‐certification  

Please contact Maria Pecot, OCII Contract Compliance Specialist for additional information at [email protected] 

Page 6: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

 B. Construction Work Force Goals: 

Pursuant  to  the  Office  of  Community  Investment  and  Infrastructure’s  Construction Workforce Policy and Bayview Hunters Point Employment and Contracting Policy  (“BVHP ECP”),  this project has a 50%  local workforce hiring goal with  first consideration to BVHP residents  (persons  domiciled  in  94124,94134 and 94107), followed by San Francisco residents. This goal applies to all hires and is expressed as a percentage of each Contractor’s total hours of employment and training by trade on the project.   Eligible employees and their work hours may be counted, toward meeting more than one of these programmatic goals. 

San Francisco residents in each trade:  50% of the total hours worked. 

First consideration to residents domiciled in 94124,94134 and 94107. 

The Department of Economic and Workforce Development: City Build will provide Contractors with Assistance in placing qualified individuals. Contractors must cooperate with OCII and City Build and demonstrate a good faith effort towards meeting workforce goals and curing deficiencies.  

C. Prevailing Wage Provisions: 

This project  is subject to federal and state prevailing wage requirements.   Subcontractors must  pay  all  trades  in  their  employ  the  higher  of  the  state  or  federal  prevailing  wage determination.    Please  see  the  California  Department  of  Industrial  Relations  website (www.dir.ca.gov) or go to the links below for more info.   If you do not understand which wage to include in your pricing, please contact Cahill/Hercules.  

State of California 

Journeyman: http://www.dir.ca.gov/dlsr/PWD/Northern.html  

Apprentice: http://www.dir.ca.gov/DAS/PWAppWage/PWAppWageList.asp  

Federal 

http://www.gpo.gov/davisbacon/CA.html    

D. Payroll Requirements  Subcontractors will be required to submit certified payrolls(“CPR”) every week to OCII, through the Elations System and to the California Department of Industrial Relations (“DIR”).  The City and County of San Francisco offers monthly Elations trainings every second Tuesday of the month, training information can be found at: http://sfgov.org/olse/educational‐presentations‐materials    

E. Preconstruction Meeting Selected subcontractors shall be required to attend a preconstruction meeting with Cahill/Hercules, the OCII and City Build.  This meeting must be held prior to the commencement of any subcontractor’s work onsite. 

Page 7: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

F. Registration with the California Dept. of Industrial Relations (DIR) As of 3/01/2015, subcontractors submitting bids on all public works projects MUST be registered with the California DIR.  If you are not registered you can get registered using the link below. 

https://efiling.dir.ca.gov/PWCR/ActionServlet?action=displayPWCRegistrationForm 

To complete the application you will need the following items: a. Proof of current Worker’s Compensation Insurance b. Contractor License Number (CSLB), if applicable c. No delinquent liabilities for back wages d. A certification that the contractor is not debarred e. $300 Registration fee 

 A complete list of OCII policies relevant to this development, including but not limited to the Small Business Enterprise Policy, the Construction Workforce Policy, the Bayview Hunters Point Employment and Contracting Policy, and the Prevailing Wage Policy can be found online at http://sfocii.org/policies‐and‐procedures  

  

End Exhibit C ‐ Contracting & Workforce Hiring Goals  

Page 8: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

EXHIBIT E Contract Terms & Labor Relations 

February 14, 2018  

Subcontracts will  be awarded on  the  standard Cahill/Hercules  Subcontract Agreement  form with exhibits.    Copies will  be  provided  if  you  are  not  familiar with  this  document.    In  addition  to  the standard clauses, all subcontracts will include the following terms: 

1. Retention ‐ Retention will be ten (10%) percent. 

2. Change Order Markups ‐ Maximum allowable mark‐up for overhead and profit on Change Orders will be fifteen (15%) percent for subcontractor work and five (5%) percent for 2nd and 3rd tier subcontractors or vendors. 

3. Liquidated Damages ‐ A Liquidated Damages clause will be included in all subcontracts.  The exact amount will be established at a later date. 

4. Payroll Requirements Subcontractors will be required to submit certified payrolls every week, through the Elations System, and to the California Department of Industrial Relations (“DIR”). 

5. Cahill/Hercules Superintendent is authorized to order premium time work to expedite the schedule.  The premium time so ordered will not be "extra work" but will be directed only to expedite  completion  of  the  work  contracted  for.    Cahill/Hercules  Superintendent  will authorize  the  work  and must  sign  daily  tags  as  acknowledgment  of  hours  worked.    For premium  time  work  authorized  by  Cahill/Hercules,  Cahill/Hercules  will  pay  the  actual premium costs only.   No additional overhead and profit will be allowed.    (Subcontractors should include the straight time and premium time rates on their bids, for all trades in their employ.) 

6. The following paragraph will be added to all subcontracts as a standard requirement: “Subcontractor  shall  indemnify  Contractor  from  and  against  any  liability,  damages, losses  and  expenses  incurred  by  reason  of  claims  by  third  parties,  including  Owner, arising out of or related to the presence or existence of toxic or non‐toxic mold, at, upon or in the Project Site, to the extent caused by Subcontractor.”  

7. Upon  project  award  Cahill/Hercules will  not  provide  additional  plans  or  specifications  to subcontractors unless prior arrangements have been made in writing.  Subcontractors and suppliers are responsible for obtaining all necessary construction documents at their cost. 

8. Subcontractors  are  required  to  submit  any  deviation  (IB,  Addendum,  RFI,  Bulletin,  etc.) pricing within ten (10) working days of receipt of the change in construction documents.  Any pricing  submitted after  (10) working days will not be accepted and costs associated with implementing the change in work will be borne by the subcontractor. 

9. Subcontractor  shall  furnish  shop  drawings,  free  of  charge,  for  approval  and  use  by  the 

Page 9: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 2 

General Contractor.  The number of drawings required shall be reasonably determined by the General Contractor.  Shop drawings to be provided in hardcopy and in electronic format.  Subcontractor is to verify all reference measurements or other dimensions designated to be field measured before ordering materials or proceeding with the work. 

10. Subcontractor has closely inspected existing job site conditions that affect their work, and has included in his contract price all work, adjustments, or revisions necessary to provide a complete job as shown or called for in the Contract Documents.  Change Orders will not be allowed for conditions that were clearly apparent at bid time.  

11. The Subcontractor agrees to defend, indemnify and hold Cahill/Hercules harmless from or against  any  claim,  damage,  liability  or  expense,  including  reasonable  attorney's  fees,  the Owner, Subcontractor or Cahill/Hercules may sustain arising out of, or during, or as a result of the Subcontractor's use of any scaffolding, regardless of who has rented or erected this scaffolding, notwithstanding the fact that the claim, loss, damage, liability or expense may arise wholly or in part out of the negligence of Cahill/Hercules,  its officers, or employees.  The Subcontractor agrees to indemnify Cahill/Hercules as listed above, regardless of the fact that the Subcontractor's personnel or material men may have utilized any scaffolding with or without Cahill/Hercules permission. 

12. Critical trades will be required to work in more than one area at any given time to maintain schedule and job progress.  The General Contractor shall determine which trades are critical.  Subcontractors shall work overtime at their own expense to meet the schedule if they are unable to provide materials, equipment or labor to maintain the schedule 

13. Subcontractors shall have a valid business  license  for work  in  the City and County of San Francisco. 

14. The  subcontractor  shall  notify  Cahill/Hercules  immediately  if  they  discover  that  work performed by another trade is not installed per the contract documents.  The subcontractor shall not continue to install their work if they are aware that this work will not allow another trade to correct their deficiencies, if any. 

15. Bidders  not  eligible  to  be  part  of  Cahill/Hercules  subcontractor  default  insurance  (SDI) program due to their financial capacity / work experience will be required to carry their own 

bond and associated costs.  SDI eligibility will be at Cahill/Hercules discretion.  

   

Page 10: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 3 

LABOR REQUIREMENTS & RELATIONS  

1. All labor is to be Prevailing Wage. 

2. Subcontractors are advised that Cahill/Hercules is a union contractor signatory to the carpenters, laborers and operating engineers unions.  As such, we require that all Subcontractors utilizing these crafts or falling under the jurisdiction of these unions also be signatory to the applicable unions.  For bidders who are not signatory at the time of bid you must sign up with these unions or agree to a onetime project agreement with the applicable union(s) prior to starting work. 

3. Bidders who do not perform work claimed by the carpenters, laborers or operating engineers do not have to be signatory to the union. 

4. Subcontractor acknowledges that Contractor has entered into labor agreements covering work at its construction jobsites with the Laborers, Carpenters & Operating Engineers.  

5. Subcontractor agrees to comply with all of the terms and conditions of those labor agreements including signatory status if required.  Subcontractor further agrees to make trust fund payments into  the  respective  labor  trust  funds set  forth  in  the  respective  labor agreements  referenced above, insofar as Subcontractor may lawfully do so.  Subcontractor agrees to comply with the terms and provisions of said agreements setting forth the jurisdiction and scope of work therein for  resolution  of  jurisdictional  disputes.    In  the  absence  of  any  such  procedure  or  if  such procedure fails to promptly resolve the jurisdictional dispute, Subcontractor agrees, at its own cost and expense and upon request by Contractor, to take any and all lawful steps to secure a binding and  final determination of  said  jurisdictional dispute by  the National  Labor Relations Board.  

6. Subcontractor acknowledges that terms and conditions of the labor agreements with the unions listed  above  may  require  that  Subcontractor  comply  with  additional  labor  agreements  with unions affiliated with the AFL‐CIO but not listed therein.  When the terms and conditions of the referenced labor agreements so require, Subcontractor shall perform its jobsite work pursuant to all terms and conditions of an appropriate labor agreement with a union affiliated with the AFL‐CIO.  

7. Should there be picketing on Contractor’s jobsite and the Contractor establishes a reserved gate for Subcontractor’s purpose, it shall be the obligation of Subcontractor to continue the proper performance of its work without interruption or delay.  

8. Subcontractor further promises and agrees that it will bind and require all of its subcontractors and  their  subcontractors  performing  jobsite  work  of  the  type  covered  by  any  of  the  labor agreements specified above to agree to all of the foregoing promises and undertakings, to the same effect as herein provided with respect to Subcontractors. 

 9. Subcontractor  shall  comply  with  all  equal  employment  opportunity  and  affirmative  action 

requirements  promulgated  by  any  governmental  authority,  including, without  limitation,  the requirements of the Civil Rights Act of 1964.  Presidential Executive Orders No. 10925, 11114 and 11246, the California Fair Employment Practices Act and the American with Disabilities Act 1991.  

Page 11: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 4 

Subcontractor shall comply with an agrees to be bound by all applicable Federal, State and local laws and regulations, including, but not limited to, all Fair Labor Standards Act provisions and California  Labor  Code  provisions  covering  the work.    Upon  request,  Subcontractor  agrees  to submit certified payroll report to Contractor no later than three (3) working days after labor has been paid. 

  

 

End Exhibit E ‐ Contract Terms & Labor Relations 

Page 12: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 1 

EXHIBIT F Insurance Requirements 

February 14, 2018  

Certificates of  Insurance will  be  required  for  the  construction work.    There  is no wrap  insurance program on this project.  You will be required to supply evidence of insurance for the following: 

A. Comprehensive General Liability (CGL) that includes both ongoing and completed operations coverage which can be made up of a combination of both primary and excess umbrella policies. The minimum per project insurance limits are denoted in the chart below (section IV.E.2.g). 

a. The Subcontractor’s CGL insurance must NOT contain a residential construction exclusion. 

b. A waiver of subrogation, by way of a policy endorsement in favor of Cahill/Hercules and the Owner for CGL. 

c. Cahill/Hercules must be either a named insured or listed as an additional insured as evidenced by a copy of the additional insured endorsement to your policy using additional insured endorsement form CG 2010 11/85 or equivalent.  04/13 form revision dates are not considered equivalent and are not acceptable.  In addition to naming Cahill/Hercules as an additional insured the following list of other additional insured needs to be included: 

i. Office of Community Investment and Infrastructure (OCII) – The Office of Community Investment and Infrastructure/Successor Agency to the Redevelopment Agency of the City and County of San Francisco, the City and County of San Francisco and their respective commissioners, members, officers, agents and employees  

ii. LMS Architects and their consultants iii. Mercy California and their agents and consultants iv. SFHDC and their agents and consultants 

 B. Professional Liability insurance that covers errors and omissions in the amount of 

$2,000,000 including contractual liability will be required for all design build subcontractors.   

C. Auto Liability insurance for “All Autos” with a minimum combined single limit of $1,000,000.  

a. If your auto policies include “scheduled autos” we will need a schedule of all autos that are to be on site and/or used in the performance of your work. 

 D. Workers Compensation insurance with the statutory minimum limit of $1,000,000 along 

with a waiver of subrogation, by policy endorsement, in favor of Cahill/Hercules and the Owner. 

Page 13: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

 E. Comprehensive Pollution Liability (CPL) ‐ minimum insurance limit of $2,000,000 may be 

required for subcontractors that work in the soil or with hazardous materials.  

F. Required insurance chart: 

    

End of Exhibit F – Insurance Requirements  

Insurance Type  Limits Required Coverage Required Within Policy

Commercial General Liability 

Contract Value: $0 ‐ $100,000:

$1,000,000 Per Occurrence 

$1,000,000 General Aggregate  

$1,000,000 Products and Completed Operations Aggregate 

 Contract Value: $100,001 ‐ $2,500,000: 

$1,000,000 Per Occurrence 

$3,000,000 General Aggregate  

$3,000,000 Products and Completed Operations Aggregate 

 Contract Value: $2,500,001 ‐ $5,000,000: 

$2,000,000 Per Occurrence 

$5,000,000 General Aggregate  

$5,000,000 Products and Completed Operations Aggregate 

Coverage must be on an Occurrence Form, per project, including: 

Waiver of Subrogation in favor of each entity identified in the Additional Insured Listing 

Additional Insured endorsements required in form CG 20 10 11 85 or equivalent applicable to entity identified in the Additional Insured Listing 

Explosion, Collapse and Underground Hazards 

Broad Form Property Damage  

Coverage must not exclude the following: 

Residential/Habitational exposure 

Subsidence  Coverage Limits may be achieved through primary and Umbrella/Excess Liability limits 

Automobile Liability 

$1,000,000 Combined Single Limit Symbol 1, “Any Auto” preferred 

Workers Compensation 

Statutory Limits as required by State of California 

Waiver of Subrogation required in favor of each entity identified in the Additional Insured Listing 

Contractor’s Pollution Liability 

$2,000,000 Per Occurrence$2,000,000 Policy Aggregate 

Selected subcontractors only based on scope of work. 

Professional Liability 

$2,000,000 Per Claim$2,000,000 Policy Aggregate 

Selected subcontractors only based on scope of work. 

Page 14: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

    Candlestick Point Block 11A ‐ #464 

EXHIBIT G 

CONTRACT DOCUMENT LIST February 14, 2018 

 Project Manual, prepared by LMS Architects, dated November 3, 2017. (See attached Table of Contents.)   Note: Additional MEP design‐build performance criteria and specifications will be issued by February 23, 2018.  Drawings  OCII Schematic Design Submittal (See Attached Index) 1. Architectural Drawings prepared by LMS Architects, dated November 3, 2017 

2. Landscape Drawings prepared by GLS, dated November 3, 2017 

100% Schematic Design Pricing Set (See Attached Index) 

1. Architectural Drawings prepared by LMS Architects, dated November 6, 2017 

2. Civil drawings, prepared by Luk and Associates, dated November 1, 2017 

3. Structural drawings, prepared by KPFF, dated November 6, 2017 

4. Mechanical drawings, prepared by Tommy Siu and Associates, dated October 30, 2017 

5. Electrical drawings, prepared by Engineering Design Collaborative, dated November 3, 2017 

 

 End of Document List 

 

Page 15: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Candlestick Points South: Block 11A, San Francisco Leddy Maytum Stacy Architects

November 3, 2017 100% SD Specifications

TABLE OF CONTENTS

PROJECT DIRECTORY PRELIMINARY SPECIFICATIONS: November 3, 2017 APPENDIX: 1. GEOTECHNICAL INVESTIGATION, ENGEO; DATED: NOVEMBER 2, 2017

2. ENVIRONMENTAL NOISE STUDY; DATED SEPTEMBER 29, 2017

3. INTERIOR ACOUSTICS NARRATIVE, CHARLES SALTER ASSOCIATES

4. MECHANICAL SYSTEMS DESCRIPTION, TOMMY SIU ASSOCIATES

5. MECHANICAL SPACE REQUIREMENTS, TOMMY SIU ASSOCIATES

6. RETAIL SPACE REQUIREMENTS, MERCY CALIFORNIA

7. ELECTRICAL AND LOW VOLTAGE BASIS OF DESIGN; EDESIGN C

8. GPR BLUEPRINT SCORESHEET; BRIGHT GREEN STRATEGIES

9. GPR PLANNING SCORESHEET; BRIGHT GREEN STRATEGIES

10. RETAIL GRID; MERCY CALIFORNIA

11. OAC SCHEMATIC DESIGN MEETING NOTES

12. MECHANICAL FIRE FLOW CALCULATIONS, TOMMY SIU ASSOCIATES

13. DESIGN PROGRAM; MERCY CALIFORNIA

Page 16: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Candlestick Point 11ANOVEMBER 3, 2017SAN FRANCISCO, CA

DRDAP CHECKLIST / SHEET INDEX / PROJECT INFO

DESIGN TEAM

DEVELOPER

SAN FRANCISCO HOUSING DEVELOPMENT CORPORATIONTOM KOSTOSKY, PROJECT MANAGER 4439 THIRD STREETSAN FRANCISCO, CA 94124415-822-1022

MERCY HOUSING SHARON CHRISTEN, PROJECT MANAGER 1360 MISSION STREET, SUITE 300SAN FRANCISCO, CA 94103415-355-7100

ARCHITECT

LEDDY MAYTUM STACY ARCHITECTS BILL LEDDY, PROJECT PRINCIPAL GREGG NOVICOFF, PROJECT MANAGER 677 HARRISON STREET SAN FRANCISCO, CA [email protected]

ASSOCIATE ARCHITECT

SAIDA + SULLIVAN DESIGN PARTNERSKOJI SAIDA, AIA, PROJECT MANAGER 44 GOUGH ST., SUITE 202SAN FRANCISCO, CA 94103415-777-0991 EXT [email protected]

LANDSCAPE ARCHITECT

GLSDEAN WILLIAMS, PROJECT MANAGER2677 MISSION STREET, NO. 200SAN FRANCISCO, CA [email protected]

SHEET INDEX

A0.0 COVER SHEET A0.1 DRDAP CHECKLIST, SHEET INDEX & PROJECT INFO A0.2 D4D CONFORMANCE CHECKLIST A0.3 D4D CONFORMANCE CHECKLIST A0.4 D4D CONFORMANCE CHECKLIST A0.5 DESIGN NARRATIVEA0.6 DESIGN NARRATIVEA0.7 PROJECT DATA A0.8 SF GREEN BUILDING CODE CHECKLIST A0.9 SF GREEN BUILDING CODE CHECKLIST A0.10 SF GREEN BUILDING CODE CHECKLIST A0.11 SITE CONTEXT A0.12 SITE CONTEXT – PEDESTRIAN / BIKE / TRANSIT NETWORKS A0.13 SITE CONTEXT – STREET TYPOLOGIES / VIEW CORRIDORS A0.14 SITE CONTEXT – BUILDING HEIGHTS & STREET PARKING A0.15 DESIGN APPROACH – URBAN CONTEXT – BLOCK PATTERNA0. 16 DESIGN APPROACH – BUILDING MODULATION A0. 17 DESIGN APPROACH – BUILDING MASSING A1.1 PROJECT PERSPECTIVE A1.2 PROJECT PERSPECTIVE A1.3 NOT USEDA1.4 D4D CONFORMANCE – MASSING & STREET WALL DIAGRAMS A1.5 D4D CONFORMANCE – MASSING & STREET WALL DIAGRAMS A1.6 D4D CONFORMANCE – MASSING & STREET WALL DIAGRAMS A1.7 D4D CONFORMANCE – BUILD-TO LINE DIAGRAMS A1.8 D4D CONFORMANCE – BUILD-TO LINE DIAGRAMSA1.9 D4D CONFORMANCE – BUILD-TO LINE DIAGRAMS A1.10 D4D CONFORMANCE – LOT AREA & STEP BACKS A1.11 D4D CONFORMANCE – BLOCK COVERAGE A1.12 D4D CONFORMANCE – OPEN SPACE A1.13 SITE PLAN – CONTEXT A1.14 SITE PLAN – CIRCULATION A1.15 SITE PLAN – UTILITIESA2.1 GROUND FLOOR PLAN A2.2 SECOND FLOOR PLAN A2.3 THIRD FLOOR PLAN A2.4 FOURTH FLOOR PLAN A2.5 FIFTH FLOOR PLAN A2.6 SIXTH FLOOR PLAN A2.7 SEVENTH FLOOR PLAN A2.8 ROOF PLAN A3.1 BUILDING ELEVATIONS A3.2 BUILDING ELEVATIONSA3.3 COURTYARD ELEVATIONS A3.4 COURTYARD ELEVATIONS

DRDAP CHECKLIST, S.D. APPLICATION

REQUIREMENTS SUBMITTAL SHEET

1 WRITTEN STATEMENT DESIGN STRATEGY A0.5-A0.6 SIZE & USE OF FACILITIES PROVIDED A0.5-A0.6 CONFORMANCE WITH D4D A0.5-A0.6 SUSTAINABILITY MEASURES A0.5-A0.6 STRUCTURAL SYSTEM A0.5-A0.6 PRINCIPLE BUILDING MATERIALS A0.5-A0.6 FLOOR AREA CALCULATIONS A0.7

2 DATA CHART

2A LOCATION & SQ. FOOTAGE OF LAND USES A0.72B PROJECT DATA TABLE (HOUSING) A0.7 2C AUTOMOBILE & BICYCLE PARKING A0.72D BUILDING DIMENSIONS & A2.1; A1.4-A1.12 CONFORMANCE WITH D4D

3 SCHEMATIC DRAWINGS

3A SITE PLAN A1.13-A1.153B SITE SECTIONS A3.103C BUILDING PLANS A21-A2.83D AXONOMETRIC DRAWINGS A0.173E STUDY MATERIALS A0.15-A0.163F MID-BLOCK BREAK DESIGN A2.1; A3.2; L2.23G ADDITIONAL MATERIALS A3.7; A3.11

4 MODEL TO FOLLOW

5 SUSTAINABLE DESIGN MEASURES A0.5-A0.6; A0.8-A0.10

6 PERSPECTIVES, SKETCHES & RENDERINGS A0.17; A1.1-A1.2

7 FACADE MATERIALS BOARD TO FOLLOW

A0.1

A3.5 COURTYARD ELEVATIONSA3.6 ENLARGED BUILDING ELEVATIONS A3.7 METAL SUNSHADE SCREEN DESIGN A3.8 ENLARGED BUILDING ELEVATIONS A3.9 ENLARGED BUILDING ELEVATIONSA3.10 SITE & BUILDING SECTIONS A3.11 ENTRY DETAILS A4.1 ENLARGED UNIT PLANS - 1 BEDROOM & STUDIO TYPA4.2 ENLARGED UNIT PLANS - 1 BEDROOM TYPA4.3 ENLARGED UNIT PLANS - 1 BEDROOM TYPA4.4 ENLARGED UNIT PLANS - 1 BEDROOM TYPA4.5 ENLARGED UNIT PLANS - 2 BEDROOM TYPA4.6 ENLARGED UNIT PLANS - 2 BEDROOM TYPA4.7 ENLARGED UNIT PLANS - 2 BEDROOM TYPA4.8 ENLARGED UNIT PLANS - 2 BEDROOM TYPA4.9 ENLARGED UNIT PLANS - 2 BEDROOM TYPA4.10 ENLARGED UNIT PLANS - 3 BEDROOM TYPA4.11 ENLARGED UNIT PLANS - 3 BEDROOM TYPA4.12 ENLARGED UNIT PLANS - 3 BEDROOM TYPA4.13 ENLARGED UNIT PLANS - 3 BEDROOM TYPA4.14 ENLARGED UNIT PLANS - 3 BEDROOM TYPA4.15 ENLARGED UNIT PLANS - 3 BEDROOM TYPA4.16 ENLARGED UNIT PLANS - 4 BEDROOM TYPA4.17 ENLARGED UNIT PLANS - 5 BEDROOM TYPL2.1 LANDSCAPE SITE PLANL2.2 GROUND FLOOR LANDSCAPE PLAN L 2.3 PODIUM LEVEL LANDSCAPE PLANL 2.4 ROOF LEVEL LANDSCAPE PLANL3.1 PLANTING PLANL4.1 LANDSCAPE PERSPECTIVES

Page 17: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this
Page 18: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

  

  

    Please             Initial        

EXHIBIT H 

ENVIRONMENTAL, HEALTH & SAFETY (EHS) REQUIREMENTS February 14, 2018 

1. General  a) Subcontractor agrees to comply with: 

i) All applicable Environmental, Health & Safety (EHS) rules, regulations, policies, procedures and guidelines when performing work in facility or site.  EHS Laws in the United States of America (US) include, but are not limited to:  The Occupational Safety and Health Act (OSHA); Title 8, California Code  of  Regulations  (CAL‐OSHA);  the  Resource  Conservation  and  Recovery  Act  (RCRA);  the International  Fire  Code  (IFC)  and  International  Building  Code  (UBC)  as  adopted  by  the  local jurisdiction; and, the Hazardous Materials and Transportation Act (HMTA). 

ii) Contractor’s Injury and Illness Prevention Program (Safety Program) or Subcontractor’s Injury and Illness Prevent Program (Safety Program), whichever is more stringent.  Refer to California Code of Regulations, Title 8, Section 1509. 

 

2. Subcontractor agrees to submit to Contractor’s Project Manager copies of all appropriate safety related documents  to  include  but  not  limited  to  Subcontractor  Injury  and  Illness  Prevention  Program  (Safety Program), safety meetings minutes, accident investigation reports, Material Safety Data Sheets (MSDS), and  workers  compensation  insurance  claims.    Subcontractor  will  notify  Contractor  within  thirty  (30) minutes of any accident(s) requiring medical care, workers compensation claims, first‐aid administered near misses or any EHS or potential liability issues and assist in the necessary accident investigation. Copies of  all  accident  reports  shall  be  submitted  to  the  Contractor  within  8  hours  of  the  incident.  If  the investigation  is “on‐going,”  the Subcontractor shall provide updated  information on a weekly  (or more frequent) basis until  the  investigation  is completed.   The accident  investigation will document all  facts related  to  the  incident  for  future  reference  and  establish  a  corrective  action  to  prevent  future major accidents.  Subcontractor will identify the competent person responsible for monitoring EHS requirements on site.  The competent person shall be knowledgeable in EHS rules, regulations, policies, procedures and guidelines and have the authority to mitigate hazards relative to subcontractor’s operations. 

 

3. Subcontractor agrees that it is responsible for ensuring that its employees, agents, suppliers and/or sub‐subcontractors  (Subcontractor’s  Employees)  performing  Work  on  Facility  do  so  in  accordance  with Subcontractor’s EHS Program, all applicable EHS Laws, and Specific Requirements.   

 a) Subcontractor agrees to attend all required job site safety meetings and to respond promptly to all 

safety‐related issues that affect subcontractor’s work and other trades’ work which may be derivative of subcontractor’s work.  Subcontractor agrees to have at least one (1) employee or agent at the job site at all times who speaks and understands English with ease when safety meetings are held and who  will  disseminate  the  safety  information  to  said  subcontractor’s  employees  and  agents.  Subcontractor also agrees to have an English‐speaking and understanding employee or agent readily‐accessible when safety issues are discussed, which may arise at any time during the work day.  

4. Subcontractor  agrees  to  allow Contractor,  to monitor,  audit  and  inspect  Subcontractor  operations  for compliance with all the terms of this Addendum. 

 a) Agrees to notify Contractor of any observed noncompliance with any requirement of this Addendum 

that is within the responsibility or control of the Subcontractor. 

Page 19: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

  

     

    Please             Initial        

b) Subcontractor  agrees  that  work  may  stop  if  Contractor,  in  its  sole  judgment,  determines  that noncompliance may present a risk of an incident, accident, injury, illness or a violation of EHS Laws. 

c) Subcontractor agrees to take immediate action to correct any noncompliance that may present a risk of an incident, accident, injury, illness or a violation of EHS Laws. 

d) Should Subcontractor discover an unsafe condition on facility, Subcontractor shall immediately notify the Contractor and take immediate action to correct any such condition that is under or within the responsibility or control of the Subcontractor. 

e) Subcontractor agrees that should Subcontractor’s Employee(s) fail to take immediate action to correct any  noncompliance,  Subcontractor  shall,  at  request  of  Contractor,  exclude  the  noncompliant Subcontractor’s  Employee(s)  from  facilities  until  such  time  as  Subcontractor  provides  evidence  of compliance that in Contractor’s sole judgment, is determined to be sufficient. 

f) Should Contractor find Subcontractor areas of work or individuals being or acting in noncompliance with Cal/OSHA, the Project Safety Plan and the Contractor’s Site Specific Safety Plan, the Contractor shall have authority to order immediate correction of the non‐compliant occurrence. 

g) All costs of correction shall be borne by the Subcontractor deemed responsible. h) If more than one Subcontractor is deemed responsible, the Contractor’s division of responsibility shall 

be final. i) Nothing contained herein, however, shall serve to relieve the Subcontractor of their liabilities and/or 

obligations under Cal/OSHA as well as other applicable Federal, State and local requirements as well as the Project Safety Plan. 

j) Contractor  may  withhold  payment  of  any  sums  due  to  the  Subcontractor  for  failure  to  follow Cal/OSHA,  the  Project  Safety  Plan  and  the  Contractor’s  Site  Specific  Safety  Plan  policies  and procedures. 

k) Contractor will issue a written, 24‐hour notice in this regard. The notice requires immediate action to eliminate the hazard or violation followed by a written response from the Subcontractor within 24 hours. 

l) Repeated violations or lack of cooperation with regard to the Project Safety Plan and the Contractor’s Site Specific Safety Plan by employees of a Subcontractor will indicate non‐compliance with provisions included in the contract and may be reason for the employee being barred from the project site and/or for termination of the Subcontractor’s contract. 

 

5. Subcontractor and all associated suppliers, office personnel, delivery personnel or anyone visiting the site shall wear American National Standards Institute (ANSI) approved Personal Protective Equipment (PPE) i.e., eye, face, and head protection.  PPE shall be of the latest ANSI version: 

 a) Anyone not complying with the PPE requirement will be removed from the site. b) At the sole discretion of the Contractor site Superintendent, the PPE requirement may be modified 

when  conditions  permit.    For  example,  when  overhead  work  is  complete,  employees  working  in protected areas may not be required to wear hardhats.   When workers have entered unprotected areas  on  site,  the  hard  hat  program  will  once  again  be  enforced.    The  use  of  PPE  and  the identification/determination/designation  of  protected  areas  are  at  the  sole  discretion  of  the  site superintendent. 

c) Subcontractor will supply his own ANSI approved PPE.  If Contractor supplies safety glasses, goggles or hardhats for the use of Subcontractor’s Employees, the safety glasses or goggles will be charged to Subcontractor at a rate of five dollars ($5.00) per pair and hardhats will be charged back at a rate of fifteen dollars ($15.00). 

d) Appropriate eye protection and hard hats meeting the requirements of ANSI (most recent version) with hard side shields are required to be worn in a manner to protect the eyes while in construction areas at all times. No dark safety glasses are to be worn inside any building or outside  in  low‐light conditions. 

Page 20: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

  

     

    Please             Initial        

e) Bright orange, strong yellow‐green or fluorescent versions of these colored warning garments such as vests or jackets shall be worn by all job site personnel. 

 

6. In addition, approved eye and face protection is required as follows:  

a) Goggles, welding hoods and shields, or face shields will be required to be properly worn at all times when in the area of operations, such as when welding, burning, grinding, chipping, chemical handling, corrosive liquids or molten materials, drilling, sawing, driving nails, powder actuated tools, concrete pouring, tampers and gasoline fueled hand operated equipment (i.e. blowers). This section will also apply to those employees of Subcontractors who are assisting any worker as an apprentice or helper. 

b) Prescription glasses shall meet the requirements of ANSI Z (most recent version), or be covered with over‐the‐glass safety glasses. 

c) Goggles are to be worn when grinding or cutting at shoulder height or above with full face shield. d) Face shields shall be worn when cutting or grinding metal. 

 

7. Subcontractor agrees that failure to follow EHS requirements as stated in this Exhibit to the subcontract agreement will result in the following action by the Contractor: 

 a) The first incident will result in a verbal warning by the Contractor’s Superintendent on site or Safety 

and Health Manager. b) The second incident will result in a letter sent to the Subcontractor by Contractor’s Project Manager 

or Safety and Health Manager.  This letter will refer to the lack of response to verbal warning given by Contractor site superintendent and describe the EHS requirements. 

c) The third incident will result in a second letter sent to Subcontractor by Contractor’s Project Manager. This  second  letter  will  result  in  a  deductive  change  order  in  the  amount  of  five  hundred  dollars ($500.00) and /or termination of contract. 

 

8. “Immediate removal from a project” will result when:  

a) Any employee, supervisor or manager exposes themselves or other employees to i) Imminent loss of life. 

b) Any employee, supervisor or manager openly exhibits disregard, defiance or disrespect for    i) The safety plan.  

c) Any employee, supervisor or manager knowingly falsifies any investigative document or i) Testimony involved in an investigation. 

d) A violent physical encounter (fighting) occurs. All individuals involved in the incident are i) Subject to removal. 

e) Threats are made against any safety personnel performing their duties. f) Theft or destruction of property occurs. g) Any employee, supervisor or manager consumes, possesses, distributes or is under the 

i) Influence of alcohol/drugs. 

Page 21: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

 

   

   

EXHIBIT I DESIGN BUILD REQUIREMENTS 

February 14, 2018  I. THE FOLLOWING WILL BE REQUIRED OF ALL DESIGN BUILD SUBCONTRACTORS ON THE PROJECT 

 A. Design Expectations (FOR DESIGN BUILD TRADES):  

1. All Design Build Subcontractors will be responsible to design and build a complete operating system for their trade meeting all code requirements. 

2. Subcontractor’s Engineer of Record (EOR) will provide signed and stamped calculations, construction/permit drawings and specifications, meeting the requirements of the Authority Having Jurisdiction. EOR is to be a competent California State Registered Professional Engineer.  

3. Selected firms are expected to cooperate & coordinate fully with the Architectural and Engineering team during the design phases of the project in order to assist in developing a full set of coordinated drawings. 

4. Firms should plan for a minimum of (8) coordination meeting with the Architectural and Engineering team during the design phase. 

5. Firms are expected to plan and attend at least (1) pre‐application meeting with the San Francisco Department of Building Inspection and the San Francisco Fire Department to confirm design requirements and address code issues prior to the permit application.  Minutes from these meetings are to be copied to the Architect. 

6. Firms must also be aware of, and include in the design, the criteria as outlined on the design team’s Green Point Rated and Green Communities Criteria checklists. 

7. The following language will be included in the letter of intent and subcontract for the successful design build subcontractors: 

“Subcontractor  agrees  on  behalf  of  Cahill/Hercules  and  the  Project  Owner  [Owner]  that  the [Trade]  performance  standards  and  budgets  are  established  per  the  above.    If  awarded  a subcontract  for  such  work  by  the  Project  general  contractor,  as  long  as  the  performance standards are not changed, the design‐build subcontractor will be responsible for assuring that this budget  is not exceeded.   This will  include participation in design review meetings and the review of the drawings and specifications to insure that the established budget is maintained. If the Architect or Owner introduces requirements that will increase the cost, then [Subcontractor] must notify Cahill/Hercules and Owner at once and participate in redesign/value engineering or obtain Cahill/Hercules and Owner approval to increase the approved budget. ” 

”In  the meantime, pending execution of  a  subcontract  agreement,  this  letter will  serve as  an interim  agreement  between  Cahill/Hercules  and  Subcontractor  for  certain  design  services  as specified herein.    Subcontractor  acknowledges  that  the proposed budget  includes design and engineering services relating to performance of the subject work.  If a subcontract is executed by 

Page 22: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

 

   

  Page 2  

 

Subcontractor, any payments provided pursuant to this letter agreement will be deducted from the  bid  amount  specified  above.    If  Subcontractor  does  not  enter  into  a  subcontract  for performance of  the subject work, Subcontractor will be paid  for  their design and engineering services monthly in proportion to the services performed not to exceed the maximum amount of [$AMOUNT].    The Owner  shall  in any event  retain all  rights  to  the design work and drawings produced  by  the  Subcontractor  (e.g.  for  bidding  purposes),  but  shall  not  use  them  for construction documents without further agreement with the engineer of record.” 

“In  the  event  of  any  dispute  regarding  any  design  (by  plan  or  specification  prepared  by [Subcontractor]), Owner agrees  to  look exclusively  to  said  subcontractor as  regards  to design issues.” 

8. Errors and Omissions Insurance in the amount of $2,000,000 including contractual liability will be required for all design build subcontractors. See Exhibit F Insurance Requirements, section 2.E. Professional Liability Insurance (Errors and Omissions) for further details. 

 

 

End of EXHIBIT I – Design Build Requirements 

 

Page 23: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

 

    

   

 Exhibit J Page 1 of 2  

  

EXHIBIT J BID REQUIREMENTS 

 February 14, 2018 

 

BID REQUIREMENTS  

1. Subcontractor bids are to be firm for the duration of the project. Escalation will not be allowed.  This applies to all tiers of subcontractors and suppliers. 

2. Cahill/Hercules reserves the right to reject any bidder due to issues that we consider will affect the bidder’s ability to perform the work satisfactorily (such as financial capability, labor compliance, office and/or field manpower, having performed similar‐sized projects successfully and technical expertise). 

3. Bidders not eligible to be part of Cahill/Hercules Subcontractor Default Insurance (SDI) program due to their financial capacity / work experience will be required to carry their own bond and associated costs.  SDI eligibility will be at Cahill/Hercules discretion. 

4. Substitutions.  Please include the specified materials in your bid.  If you cannot include the specified materials or if you’d like to propose an alternate material as a Value Engineering suggestion, please qualify exactly what’s included in your proposal and include the following statement in your proposal: “Our proposal includes [description of proposed material] in lieu of the specified material.  We’re confident that this is an equal substitution.” 

5. Subcontractors should include the straight time and premium time rates for all trades in their employ. Provide rate sheet per bid form. 

6. Bidders must note any & all exceptions that are being taken to the plans & specs, particularly any exclusions which would be assumed as being included with the bidder’s trade.  Bidders shall also note any detail or specification deficiencies which are impossible to construct or are outside of industry norms. 

7. Subcontractor has closely inspected existing job site conditions that affect their work, and has included in his contract price all work, adjustments, or revisions necessary to provide a complete job as shown or called for in the Contract Documents.  Change Orders will not be allowed for conditions that were clearly apparent at bid time. 

8. The Contract Documents are presented as complete and with the intention to provide a complete project.  Any errors, discrepancies or omissions shall be brought to Cahill/Hercules attention prior to bid.  Any bid qualifications must relate to a document conflict and/or omission and must be specifically spelled out in the Subcontractor’s Bid Proposal. 

9. It is the intent of Cahill/Hercules to provide a complete and operational building.  We will not accept change orders for conflicts in/or between the plans and/or specifications, manufacturer’s installation requirements, or applicable codes.  All subcontractors and 

Page 24: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

 

   

   

Exhibit J Page 2 of 2  

    

suppliers are required to call our attention any potential conflicts or items included in the specifications that are not intended to be provided. 

10. Bids received with no qualifications/exclusions will be assumed to be in strict accordance with both the plans and specifications.  Bidders are required to list all specification sections included in the applicable bid proposal.  Bids will be assumed to include the entire specification sections referenced unless there are corresponding exclusions. 

11. Bidders are assumed to be knowledgeable of this type of work and shall include all normal requirements to produce a complete project ready for its intended use as described by these documents. 

 

 

End of EXHIBIT J – Bid Requirements 

 

Page 25: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 1 of 12

EXHIBIT K BIM AGREEMENT & PROCEDURES 

February 14, 2018   

1. Building Information Modeling (BIM) Agreement:  

a. Subcontractor agrees to participate in three‐dimensional (3D) modeling, referred to herein as BIM, for the benefit of facilitating coordination, sequencing, scheduling and/or production of as‐built drawings.   The costs of this participation are included in the Subcontractor’s price, unless explicitly outlined herein.  

b. Subcontractor shall provide digital submissions of shop drawings describing its respective work in a form and manner that Cahill/Hercules may require and that can be loaded into BIM assembled by Cahill/Hercules. The digital format of BIM submissions is described herein (specifying the necessary digital formats, software requirements, etc.), which will be provided to subcontractor after execution of Agreement and prior to the start of coordination.   

 c. Subcontractor's submissions shall be of sufficient detail to enable accurate and complete 

clash detection, and shall be provided by Subcontractor at a point in time that is reasonably in advance of Subcontractor’s shop drawing submittals and the subsequent on site construction of the Subcontractor’s Work. BIM submissions shall contain details and follow procedures as Cahill/Hercules may require.    

 d. Subcontractor shall participate in BIM coordination and review meetings as 

Cahill/Hercules may require and agrees that, as a result of the information exchanged at meetings, both the digital submission and the Work depicted in the Subcontractor’s digital submission may be required to be changed by Subcontractor to achieve coordination with other elements of the Project being provided by others.  Changes shall be accomplished at no increase in the Price or Time of Completion.  Subcontractor acknowledges that meetings will require attendance of personnel that are familiar with both the data entry and software aspects of the BIM, as well as an understanding of the Work to be performed and its relation to other elements of the Project, and subcontractor therefore agrees that personnel conversant in both shall attend all meetings. 

 e. Subcontractor agrees that neither the BIM nor the use of BIM is neither lieu of nor 

intended to relieve the Subcontractor of its responsibilities under the Subcontract, 

Page 26: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 2 of 12

including to (i) coordinate its Work with the work of others involved in the Project and (ii) strictly comply with the other requirements of the Subcontract Agreement and the Contract Documents.  It is expressly understood and agreed that, notwithstanding the requirement for submittals in connection with the BIM process, traditional shop drawings and other submissions shall be required of Subcontractor as required by the Contract Documents. No party shall be liable to the other for any claim, dispute, controversy, cost, or expense arising solely out of the use of the BIM.    

 f. Subcontractor acknowledges and agrees that Cahill/Hercules shall incur no responsibility 

or liability with respect to the BIM or the use thereof, including that resulting from errors, omissions, or deficiencies in the BIM.  In the event that Subcontractor provides deficient information or data that does not represent the Work it will be ultimately providing, that is corrupted, that contains a virus and/or that otherwise damages the BIM, Subcontractor shall bear all costs associated with reconstructing the BIM and to otherwise remediate deficiencies or their effects. 

 g. In the event the Subcontractor discovers any error, inconsistency, or omission in its 

information or submissions, the information or submissions provided by others or any BIM, it shall promptly report the same to Cahill/Hercules via written notice, which shall contain all relevant specifics.   

 h. Subcontractor acknowledges that the BIM may require updating throughout the life of 

the Project to addresses any changes to the Work.  Subcontractor agrees to promptly update and provide revised submissions to Cahill/Hercules throughout the course of the Project so that the BIM at the conclusion of the Project accurately depicts the Work as actually performed and installed. 

 i. The foregoing process is in addition to the Subcontractor’s obligations to make the 

traditional submissions and shall not relieve or lessen in any way the Subcontractor’s obligations contained throughout this Agreement and the other Contract Documents. 

 2. Roles and Responsibilities of Cahill/Hercules 

 a. Cahill/Hercules may provide at their sole discretion utilize a three‐dimensional model 

representation of project scope for use as a background during coordination.  The model shall include, where applicable, elements such as floor slabs, structural elements, ceilings / soffits, interior partition thicknesses, roof thicknesses, openings, and miscellaneous elements.  Cahill/Hercules makes no guarantees, implied or otherwise, as to the accuracy of this modeled information.  Each subcontractor is solely responsible for coordinating 

Page 27: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 3 of 12

the trade’s scope of work to the information represented in the two‐dimensional contract documents.   

 b. Cahill/Hercules shall designate at their sole discretion, a person or persons to act as BIM 

Coordinator for the duration of project coordination.  This person may be a Cahill/Hercules employee, a direct employee of a subcontractor participating in BIM coordination, or other third party independent of all other subcontracted entities, as specified by Cahill/Hercules.   This person shall act as a representative of Cahill/Hercules throughout the coordination process.  This person shall be responsible for managing the coordination process, with responsibilities including, but not limited to: 

 i. Setting and issuing the schedule of coordination, including milestones, 

submission deadlines, and target completion dates.    

ii. Determining the specific modeling conditions unique to the project.  

iii. Assembling the composite model representing all trades and disciplines participating in the coordination process.  

iv. Performing clash detections per the coordination schedule.  

v. Assigning subcontractor responsibility and annotating procedures for clash resolution.    

vi. Administering clash‐resolution meetings per the coordination schedule.  

vii. Specifying the location and method of shop drawing and as‐built documentation delivery.  

3. Roles and Responsibilities of Subcontractors   

a. All Subcontractors shall generate and provide, in a timely manner, a three‐dimensional model of their scope of work in addition to the contractually‐required two‐dimensional documentation.  The 3D Model will represent an “as‐fabricated” fully‐detailed level of information.  Elements included in the model may vary by trade and are enumerated below.  Any element not enumerated in the Trade‐Specific paragraphs below may be modeled if required to resolve a particular coordination issue determined as the sole discretion of the BIM Coordinator.  

Page 28: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 4 of 12

b. For Each Subcontractor’s model, all elements described in this section should be modeled to the correct width, height, length, slope, and location as specified by the designer, to a tolerance of no greater than 1/8”.  For objects where construction tolerances are in excess of the model tolerance, the model shall denote the Construction Tolerance as a parameter or a 3D object. 

 c. Each Subcontractor shall be required to maintain and update their 3D Model to reflect 

changes in the work as a result of design, coordination or installation, and issued to Cahill/Hercules on a weekly basis during the BIM process.  The weekly as‐built updates shall be the basis of an as‐built record model of the system in its entirety, delivered to Cahill/Hercules at project closeout.   

 d. Each Subcontractor shall be responsible for modeling elements as outlined below. 

 i. The HVAC‐Dry Contractor’s model shall include, but are not limited to, ducts, air 

handling equipment, flanges, insulation, fire smoke dampers, variable air systems, and duct fittings.  Means and methods such as hangers, supports, supplemental steel, and falsework need not be modeled unless required to resolve a specific coordination issue as determined at the sole discretion of the BIM Coordinator.  In addition, all access and installation clearances associated with the successful and code‐compliant installation, operation, and maintenance of the subcontractor’s scope of work should be depicted as solids within the 3D model.    

ii. The HVAC‐Wet Contractor’s model elements shall include, but are not limited to, all piping and conduit ¾” and larger in diameter, any grouping of two or more pipes or conduits regardless of size, insulation (modeled as a separate element), fittings, connections, pumps, valves, and all equipment required for system functionality.  Means and methods such as hangers, supports, supplemental steel, and falsework need not be modeled unless required to resolve a specific coordination issue as determined at the sole discretion of the BIM Coordinator.  In addition, all access and installation clearances associated with the successful and code‐compliant installation, operation, and maintenance of the subcontractor’s scope of work should be depicted as solids within the 3D model.    

iii. The Plumbing Contractor’s model elements shall include, but are not limited to, all piping and conduit ¾” and larger in diameter, any grouping of two or more pipes or conduits regardless of size, insulation (modeled as separate elements), fittings, connections, pumps, valves, and all equipment required for system functionality.  Means and methods such as hangers, supports, supplemental 

Page 29: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 5 of 12

steel, and falsework need not be modeled unless required to resolve a specific coordination issue as determined at the sole discretion of the BIM Coordinator.  In addition, all access and installation clearances associated with the successful and code‐compliant installation, operation, and maintenance of the subcontractor’s scope of work should be depicted as solids within the 3D model.    

iv. The Electrical Contractor’s model elements shall include, but are not limited to, all conduit ¾” and larger in diameter, any grouping of two or more conduits regardless of size, transformers, VFDs, panel boards, large disconnects, gutter boxes, pull boxes, control panels, annunciator panels, switchgear, transfer stations, cable trays, conduits, light fixtures, and elements where coordination with other trades’ specific equipment is required (such as outlets and jacks embedded in casework).  Means and methods such as hangers, supports, seismic bracing, and vibration isolation need not be modeled unless required to resolve a specific coordination issue as determined at the sole discretion of the BIM Coordinator.  In addition, all access and installation clearances associated with the successful and code‐compliant installation, operation, and maintenance of the subcontractor’s scope of work should be depicted as solids within the 3D model.    

v. The Fire Sprinkler’s model elements shall include, but are not limited to, main and branch piping, valves, fittings, drains, pumps, tanks, sensors, control panels, sprinkler heads, and seismic bracing.  Means and methods such as hangers, supports, and vibration isolation need not be modeled unless required to resolve a specific coordination issue as determined at the sole discretion of the BIM Coordinator.  In addition, all access and installation clearances associated with the successful and code‐compliant installation, operation, and maintenance of the subcontractor’s scope of work should be depicted as solids within the 3D model.   

 e. Each Subcontractor shall show in a separate layer all structural penetrations, block outs, 

cans or cores required for their own work. Cahill/Hercules shall combine these drawings for review by the design team.  All penetrations shall be dimensioned from gridline.  

 4. Coordination and Clash Resolution Procedure  

 a. Cahill/Hercules shall provide to each subcontractor a Schedule for Coordination.  This 

schedule shall specify dates for events including, but not limited to, coordination meetings, QC/QA of the model, model delivery deadlines, and project milestones.    

Page 30: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 6 of 12

b. Each Subcontractor is required to participate in all scheduled BIM coordination meetings. These meetings will be held at a time, location, and frequency to be determined by the BIM Coordinator.  Subcontractors may be excused from meeting attendance at the sole discretion of the BIM Coordinator or Cahill/Hercules Project Manager.  Meetings will be held in person or via GoToMeeting.  Failure to attend, or inadequately prepare for a given meeting will result in the modeling provided for the given meeting by the absent or negligent contractor to be declared “Improperly Coordinated”, requiring the contractor to relocate work as dictated by Cahill/Hercules.  No extra compensation will be paid to any contractor for relocating any duct, pipe, conduit, or other material that has been installed without proper coordination between all the contractors and the trades involved.  If any improperly coordinated work, or work installed that is not in accordance with the approved coordination composites, necessitates additional work by other contractors, the cost of such additional work shall be assessed to the subcontractor responsible as determined by Cahill/Hercules.  Errors in coordination will be resolved by the subcontractor at their own expense.  Where agreements cannot be reached, Cahill/Hercules will furnish a resolution.  The contractor will bear the expense of said resolution.   

c. Cahill/Hercules will assemble the composite model and make available 3D backgrounds of the Architectural and Structural systems as well as any other materials specifically set forth in Section 3 of this document.  Subcontractors will be given 2D structural/architectural *.dwg backgrounds in addition to a 3D Navisworks *.nwd files, broken into coordination areas, to develop their models.   

 d. Each Subcontractor is required to be familiar with the use of and own a copy of 

Navisworks Manage 2009 or later. The subcontractor models can be based on any 3D cad platform they prefer as long as the final model output is compatible with Navisworks and also can be exported in a *.dwg format. In addition the model must be made of Solid Objects such as (ACIS Solid Objects) and not as wireframe or surface models. 

 e. Each Subcontractor is required to submit a complete model of their scope of work per 

the preceding section in accordance with the Schedule of Coordination set forth by the BIM Coordinator. Scope models shall be posed to Box.com.  

 f. Models shall only contain relevant 3D modeling data to that of the subcontractor’s scope 

of work. All non‐clash essential data such as 2D line work, X‐refs, Image Backgrounds, Traced Objects, shall be removed from the file in entirety. If there are any annotations available, they shall be put on a single separate layer for reference. Any unused layers shall be purged from the file.   

 

Page 31: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 7 of 12

g. Models to reference the 0,0,0 insertion point established by the insertion point file (.dwg) available on the Box.com site: this will ensure all files are inserted at the right location in plan views and elevation views. 

 h. Upon publication of the consolidated model and prior to the coordination meeting, each 

Subcontractor shall, to the best of his ability, independently resolve coordination issues identified during clash detection for which they are primarily responsible. If conditions exist where adjacent trades may be affected by a subcontractor’s coordination changes, the revising subcontractor must contact the adjacent trade’s subcontractor to develop a resolution for all affected trades. If a condition cannot be resolved between Subcontracts, such condition shall be bought to the BIM Coordinators attention, immediately, for resolution (e.g. RFI).     

i. Cahill/Hercules will run clash detection within Navisworks and send out reports via email to all of the Subcontractors for further resolution. The same will be followed when new file are posted to Box.com   

j. Each Subcontractor is required to follow the Hierarchy of Systems Coordination as set forth below in order to resolve coordination issues.  This hierarchy may be modified at the sole discretion of the BIM Coordinator.  Additionally, please note that ceiling heights may not be modified without the prior consent of the Owner and the Design Team. 

 i. Structure 

 ii. Architecture, including Trade elements that impact visual condition of occupiable 

spaces (e.g.  diffusers, grilles, or lighting)  

iii. Equipment Location and Access  

iv. Sloped and Elevation‐Sensitive HVAC, Plumbing, and Fire Protection Piping  

v. High and Medium Pressure Ductwork and Associated Devices  

vi. Large Diameter (>2” OD) Pressurized Pipe Mains, Valves, and Devices  

vii. Medium and High Voltage Concrete‐Encased Conduit  

viii. All other Plumbing Elements  

ix. All other HVAC Piping Elements 

Page 32: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 8 of 12

 x. Non‐Encased Large Conduit (>2” OD), Power Feeds, and Switchgear 

 xi. Electrical Distribution 

 xii. Fire Protection Distribution 

 xiii. Fire Alarm 

 xiv. Sleeves through Rated Partitions 

 xv. Access Panels 

 k. Each Subcontractor shall revise and resubmit their 3D model to reflect changes to system 

design and functionality represented in any supplemental documentation including, but not limited to, RFIs, ASIs, Bulletins, Addenda, and Owner’s Directives. Such revisions shall be made in accordance with the following sequence: 

 i. All subcontractors shall evaluate the design change documentation for the 

impact upon their systems and report their findings in writing to the BIM Coordinator or Cahill/Hercules Project Manager.  

ii. Upon Architect or Owner approval of the design change documentation, the BIM Coordinator or Cahill/Hercules Project Manager shall release subcontractors to revise their scope models.    

 iii. Any subcontractor with work directly affected by the design change 

documentation will draft a revised 3D model while coordinating with adjacent trades.   

 iv. Coordination of areas affected by the design change shall proceed in accordance 

with the Hierarchy of Systems Coordination.    

v. Once revision and coordination of the areas reflected in the design change documentation is complete, each involved subcontractor may submit a change request pursuant to the change of scope, additions or deletions, and coordination labor. 

 l. For any clash between an Object and Construction Tolerance where the clash cannot be 

resolved via coordination, the Subcontractor whose Construction Tolerance is in 

Page 33: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 9 of 12

question must provide field measurement in a timely manner once the scope in question is installed.  

m. All revisions to model scope or layout not specifically described in the contract documents or supplemental information from the Architect or Owner shall be deemed to be Coordination Changes and shall not be eligible for any change request.  

n. Each Subcontractor shall, upon completion of the coordination process for a given area and in consultation with the Owner, Architect, and Cahill/Hercules, attend a coordination sign‐off meeting, where each subcontractor will sign a “super‐plot” showing all trades.  Any  stated conditions, at the time of sign off, such as unanswered RFI’s, known design changes that are forthcoming, or additional coordination that is known that will need to take place at a later date, will also be signed by each of the subcontractors. This document does not relieve any signee of the roles, responsibilities, or obligations outlined or implied elsewhere in this contract. 

 5. Model File, Naming, and Color Conventions  

 a. Each Subcontractor shall follow the file, naming, and color conventions set forth herein.  

These default conventions may be modified at the sole discretion of the BIM Coordinator in order to accommodate specific project conditions or additional BIM‐participating subcontractors.  

b. Each Subcontractor shall adhere to the following Filing Management System:  

i. Naming  convention:  Discipline‐Level‐  yyyy‐mm‐dd.  Example:  M‐B‐2011‐04‐03.dwg.   

1. MASTER – Combined Coordination Model  

2. A – Architectural Base Model  

3. S – Structural (Steel & Decking or Concrete) Base Model  

4. E – Electrical System Model  

5. FP – Fire Protection System Model  

6. M – Mechanical (Dry Side) System Model  

Page 34: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 10 of 12

7. MP – Mechanical Pipe (Wet Side) System Model  

8. P – Plumbing System Model  

9. T – Telecom System Model  

ii. File folders will be structured in the following format: 3D Coordination/Level/Date of Coordination Meeting. Files shall be loaded to Box.com  

c. Each  subcontractor must  post  their  files  to  the  Box.com  site  using  the  following  color codes:   

i. HVAC dry side will be assigned the color Magenta (#6)  

ii. HVAC PIPING will be assigned the color Orange (#30)  

iii. PLUMBING (Graded) will be assigned the color Dark Blue (#170)  

iv. PLUMBING (Pressurized) will be assigned the color Light Blue (#140)  

v. PLUMBING (Gas) will be assigned the color Purple (#200)  

vi. SPRINKLERS will‐be assigned the color Red (#1)  

vii. ELECTRICAL will be assigned the color Green (#3)  

viii. TELEDATA will be assigned the color Cyan (#4)  

ix. ACCESS and CODE CLEARANCES will be assigned the color Amber (#40)  

6. Shop Drawing Submittal Procedure   

a. Once coordination has been determined to be complete signed off for each floor or area of the project, each subcontractor is required to submit for approval such two‐dimensional, annotated, as‐fabricated drawings as are required to make a complete representation of their entire system scope.  These drawings must be fully‐dimensioned projections including, but not limited to, plans, sections, and elevations.  Unless otherwise stipulated by the BIM Coordinator, the drawing scale shall be 1/4” = 1’‐0”. Printed copies must be delivered to Cahill/Hercules as stipulated by the BIM Coordinator. 

Page 35: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 11 of 12

 b. Each Subcontractor shall submit separately all structural penetrations, block outs, cans 

or cores required for their own work. Cahill/Hercules shall combine these drawings for review by the design team.  All penetrations shall be dimensioned from gridline.   

c. Each Subcontractor shall be responsible for incorporating Design or Field Revisions initiated after the sign‐off of a given floor or zone into the Consolidated Model at the sole discretion of the BIM Coordinator and according to the sequence set forth herein.   

7. Closeout and As‐Built Model Procedure   

a. Each Subcontractor shall be responsible for the accurate maintenance and revision of their three‐dimensional scope model to reflect the As‐Built condition of their system.  These updates should be made in a timely manner throughout the subcontractor’s installation process.  

b. Upon project completion, each subcontractor is required to submit such two‐dimensional, annotated, as‐built drawings as are required to make a complete representation of their system scope.  These drawings must be fully‐dimensioned projections including, but not limited to, plans, sections, elevations, and axonometric diagrams.  Unless otherwise stipulated by the BIM Coordinator, the drawing scale shall be 1/4” = 1’‐0”.  The number, format, and medium of these drawings shall be determined elsewhere in the subcontractor’s contract.  Printed copies must be delivered to Cahill/Hercules as stipulated by the BIM Coordinator. 

 8. Miscellaneous Requirements  

a. Each Subcontractor shall provide coordination drawings (including 3D models) executed by competent draftsmen in a clear and legible manner utilizing standard industry conventions.   

b. Each Subcontractor shall be responsible for providing sufficient labor to complete their coordination drawing files according to the established coordination schedule.   

c. All Subcontractors shall not be relieved of any obligations stipulated in the project specifications, and are distinctly separate from the requirements to provide final “As‐Built” drawings.   

d. Cahill/Hercules shall supply files in DWG, NWC, RVT, or IFC format which shall be readable by other trades’ CAD system and Navisworks.  Being ‘readable’ means the ability to open a file without any errors (such as proxy, xref resolution, geometry error, etc) and with objects, layers, and other file properties remaining intact. 

Page 36: INVITATION TO BID - San Franciscomission.sfgov.org/OCA_BID_ATTACHMENTS/FA52221.pdf · 2018. 2. 15. · 15. BIM ‐ Building Information Modeling (BIM) software will be used on this

Page 12 of 12

e. Each Subcontractor shall be responsible for providing three‐dimensional solid or surface models (not line & wireframe models) that represents the actual dimensions of the trade system elements and equipment that will be installed. 

f. Subcontractors who are underperforming, not meeting scheduled deadlines, or incapable of providing a 3D model will be performed by the BIM coordinate at Subcontractor’s expense.