8
OWNED AND PRODUCED BY: PRESENTED BY: SUPPORTED BY: ADVANCING ASIA’S ENERGY FUTURE INVITATION TO ATTEND WWW.POWERGENASIA.COM 2 – 4 October 2013 IMPACT Exhibition & Convention Centre Bangkok, Thailand CO-LOCATED WITH: OFFICIAL SUPPORTER: SUPPORTING ORGANIZATIONS: POWER-GEN ASIA IS THE PREMIER ANNUAL GATHERING OF POWER INDUSTRY PROFESSIONALS AND WE INVITE YOU TO JOIN US IN BANGKOK ON 2 – 4 OCTOBER 2013 Department of Alternative Energy Development and Efficiency Register to attend before 6 September 2013 and save over 10% with the Early Bird rates

INVITATION TO ATTEND - Energy - Products & Services · 10/4/2013 · pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry ... • Leading exhibition with 200 international

Embed Size (px)

Citation preview

Page 1: INVITATION TO ATTEND - Energy - Products & Services · 10/4/2013 · pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry ... • Leading exhibition with 200 international

Owned and prOduced by:

preSenTed by: SuppOrTed by:

AdvAncing AsiA’s energy future

INVITATION TO ATTENDwww.pOwErgENAsIA.cOm

2 – 4 October 2013ImpAcT Exhibition & convention centre Bangkok, Thailand

Co-loCated with:

Official SuppOrTer: SuppOrTing OrganizaTiOnS:

pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry prOfEssIONAls AND wE INVITE yOu TO jOIN us IN BANgkOk ON 2 – 4 OcTOBEr 2013

Department of AlternativeEnergy Development and Ef�ciency

Department of AlternativeEnergy Development and Ef�ciency

register to attend before 6 september 2013 and save over 10% with the Early Bird rates

Page 2: INVITATION TO ATTEND - Energy - Products & Services · 10/4/2013 · pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry ... • Leading exhibition with 200 international

pOwEr-gEN AsIA

POWER-GEN Asia is delighted to be returning to Bangkok, Thailand on 2-4 October 2013, celebrating the 21st year of South-East Asia’s premier power event. POWER-GEN Asia 2013 will once again provide another outstanding exhibition and conference bringing together many of the leading players, both people and organizations, from the power generation industry.

For individuals and companies involved in the manufacture of equipment or the supply of products and services to the power generation industry, POWER-GEN Asia provides the platform and showcase opportunity to reach, meet and demonstrate to the electric power professionals and key industry buyers and influencers of South East Asia.

With a growing exhibition floor, demonstrating the latest and leading technologies and solutions, POWER-GEN Asia and the co-located Renewable Energy World Asia delivers a quality experience and quality audience.

Gain access to the opportunities within the power generation and renewable energy industries of Thailand and wider region, and ensure your presence at POWER-GEN Asia.

Who Should Attend?If you are involved in the power generation and transmission & distribution industries, then POWER-GEN Asia is the MUST attend event of the year.

• State owned / public and private power utilities

• State owned transmission and distribution utilities

• Independent power producers

• Industrial cogenerators / self generators

• Original Equipment Manufacturers (OEMs)

• Government Ministries, Energy Departments and Agencies

• Consulting Engineers, Project developers and Construction Firms

• Environment agencies

• Consultants and Engineers

• Coal, oil and gas operating companies

To register or for further information on the POWER-GEN Asia conference and exhibition visit www.powergenasia.com

Event Highlights:

• Opening keynote session with high level speakers

• Leading exhibition with 200 international exhibitors

• Quality conference programme with over 130 presentations

• A host of networking opportunities

SCAN HERE TO REGISTER

Page 3: INVITATION TO ATTEND - Energy - Products & Services · 10/4/2013 · pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry ... • Leading exhibition with 200 international

TEchNIcAl TOurs

Srinagarind Dam, Kanchanaburi Province

This multi-purpose dam provides a water supply for agriculture all year round, generates 1,250 million kilowatts of electricity annually, serves as a fish breeding source for local residents to earn more income, and prevents saline water from damaging the area at the mouth of the Mae Klong River. Moreover, it helps ease the flooding situation along the Mae Klong River basin, as it can store a large volume of water during the rainy season. Srinagarind Dam has also become one of famous tourist attractions in Kanchanaburi, and it welcomes more than 100 000 visitors each year.

Technical Tour 1: Srinagarind Dam

Owner/Operator: electricity Generating authority of thailand (eGat)

Date: tuesday 1 october 2013

Meeting Time: 08:30

Duration: all day

Cost: $130

Meeting Point: PoweR-GeN asia Registration area, iMPaCt exhibition & Convention Centre

Technical Tour 2: Bang Pakong Thermal Power Plant

Owner/Operator: electricity Generating authority of thailand (eGat)

Date: tuesday 1 october 2013

Meeting Time: 08:30

Duration: all day

Cost: $130

Meeting Point: PoweR-GeN asia Registration area, iMPaCt exhibition & Convention Centre

Bang Pakong Thermal Power Plant

The site of Bang Pakong power plant covers an area of 1,680,000 square metres. It is located on the left side of Bang Pakong River, in Tha kam sub-district, Bang Pakong district, Chachoengsao province. Bang Pakong power plant is comprised of both thermal and combined cycle, with a total generating capacity of 4,384.60 MW.

For further details and to book your tour place on either of these Technical Tours visit www.powergenasia.com

Page 4: INVITATION TO ATTEND - Energy - Products & Services · 10/4/2013 · pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry ... • Leading exhibition with 200 international

cONfErENcE grIDsFor the full conference programme and to register for the POWER-GEN Asia Conference visit:www.powergenasia.com

Wednesday 2 OctOber

09:00 - 10:30 JOint Opening KeynOte sessiOn

tracK 1 tracK 2

Room: Jupiter 7 Room: Jupiter 8

11:00 - 12:30 Session 1

securing a bright Future for solar energy in asia

the impact of bioenergies on asian Fuel

supply

14:00 - 15:30 Session 2

towards a 100% electrified asia

supporting the growth of asia’s Wind energy sector

16:00 - 17:30 Session 3

policy & regulation influ-encing asia’s renewable

energy Future

implementing small scale renewables to benefit the

asia energy Mix

thursday 3 OctOber

09:00 - 10:30 Session 4

panel discussion - utility perspectives on the challenges & Opportunities in the asian renewable sector - Jupiter 7

11:00 - 12:30 Session 5

Money talks - Financing asia’s renewable energy growth

hydro power development in asia

14:00 - 15:30 Session 6

tackling the risks of renewable energy project

development in asia

hydro power Operation & Maintenance

16:00 - 17:30 Session 7

panel discussion - a Look to the Future of renewable energy policy in asia - Jupiter 7

Friday 4 OctOber

09:00 - 10:30 Session 8

innovative and alternative renewable energy

technologies

grid integration & energy storage

11:00 - 12:30 Session 9

Joint conference Feedback & summary session - Jupiter 4 & 5

Wednesday 2 OctOber Wednesday 2 OctOber

09:00 - 10:30 JOint Opening KeynOte sessiOn

tracK 1 tracK 2 tracK 3 tracK 4

trends, Finance and planning

environmental challenges Fuels Options &

distributed generationpower plant technologies

Operation, Optimization & servicing

Room: Jupiter 10 Room: Jupiter 11 Room: Jupiter 12 Room: Jupiter 13

11:00 - 12:30 Session 1

country spotlight i Fuel Options & Flexibility power plant case studies Maintenance strategies

14:00 - 15:30 Session 2

country spotlight iishale and its global

implicationsnuclear & alternative gen-

eration technologiesgenerator issues

16:00 - 17:30 Session 3

china’s power sector: at home & abroad

energy security cogenerationrehabilitation,

Modernization & Life extension

thursday 3 OctOber thursday 3 OctOberindustriaL Water daythursday 3 OctOber

Room: Jupiter 15

09:00 - 10:30 Session 4

Finance & investment emission contol ismall & Mid size gas

turbinespower plant control

systemscountry spotlights

11:00 - 12:30 Session 5

Finance & investment - panel discussion

emission control ii Large gas turbinesplant Operating experi-

ences

intake, cooling`and blowdown

treatment considerations

14:00 - 15:30 Session 6

plenary panel discussion: asian power - 2020 VisionRoom: Jupiter 4-5

plenary panel discussion: asian power - 2020 VisionRoom: Jupiter 4-5

Water system Operation and Maintenance

16:00 - 17:30 Session 7

project development approaches & risk

Mitigationdistributed generation

combined cycle technology

plant OptimizationWastewater Optimization

& reuse

Friday 4 OctOber Friday 4 OctOber

09:00 - 10:30 Session 8

responses to Market needs

dealing with Variable Load

boilers & steam cyclediagnostics & condition

Monitoring

11:00 - 12:30 Session 9

Joint conference Feedback & summary sessionRoom: Jupiter 4-5

circulating Fluidized bed technology

gas turbine upgrades

Page 5: INVITATION TO ATTEND - Energy - Products & Services · 10/4/2013 · pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry ... • Leading exhibition with 200 international

cONfErENcE grIDsFor the full conference programme and to register for the POWER-GEN Asia Conference visit:www.powergenasia.com

View the conference programme by scanning here:

Wednesday 2 OctOber Wednesday 2 OctOber

09:00 - 10:30 JOint Opening KeynOte sessiOn

tracK 1 tracK 2 tracK 3 tracK 4

trends, Finance and planning

environmental challenges Fuels Options &

distributed generationpower plant technologies

Operation, Optimization & servicing

Room: Jupiter 10 Room: Jupiter 11 Room: Jupiter 12 Room: Jupiter 13

11:00 - 12:30 Session 1

country spotlight i Fuel Options & Flexibility power plant case studies Maintenance strategies

14:00 - 15:30 Session 2

country spotlight iishale and its global

implicationsnuclear & alternative gen-

eration technologiesgenerator issues

16:00 - 17:30 Session 3

china’s power sector: at home & abroad

energy security cogenerationrehabilitation,

Modernization & Life extension

thursday 3 OctOber thursday 3 OctOberindustriaL Water daythursday 3 OctOber

Room: Jupiter 15

09:00 - 10:30 Session 4

Finance & investment emission contol ismall & Mid size gas

turbinespower plant control

systemscountry spotlights

11:00 - 12:30 Session 5

Finance & investment - panel discussion

emission control ii Large gas turbinesplant Operating experi-

ences

intake, cooling`and blowdown

treatment considerations

14:00 - 15:30 Session 6

plenary panel discussion: asian power - 2020 VisionRoom: Jupiter 4-5

plenary panel discussion: asian power - 2020 VisionRoom: Jupiter 4-5

Water system Operation and Maintenance

16:00 - 17:30 Session 7

project development approaches & risk

Mitigationdistributed generation

combined cycle technology

plant OptimizationWastewater Optimization

& reuse

Friday 4 OctOber Friday 4 OctOber

09:00 - 10:30 Session 8

responses to Market needs

dealing with Variable Load

boilers & steam cyclediagnostics & condition

Monitoring

11:00 - 12:30 Session 9

Joint conference Feedback & summary sessionRoom: Jupiter 4-5

circulating Fluidized bed technology

gas turbine upgrades

Page 6: INVITATION TO ATTEND - Energy - Products & Services · 10/4/2013 · pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry ... • Leading exhibition with 200 international

ExhIBITOr lIsTFOR A Full list OF ExhibitORs, PROduCts ANd sERviCEs

vist WWW.RENEWAblEENERGyWORld-AsiA.COm*As At 20 JuNE 2013

aaRdiNG theRMal aCoustiCs b.v. G14 abb Pte. ltd. b14abeNGoa e52ad tubi iNossidabili sPa a31alstoM b11aNdRitZ hYdRo GMbh F56aNsaldo eNeRGia d1 aPaC eNeRGY ReNtal J27auMa RiesteR GMbh & Co. KG h47babCoCK & wilCox C20babCoCK PoweR iNC d26baRoN seRviCes F46beuMeR (thailaNd) Co.ltd. b34bFi autoMatioN M8bilFiNGeR babCoCK (thailaNd) Co.,ltd J26bowMaN PoweR GRouP ltd J31bReNtwood asia ltd d33bRush F21buRNs aNd Roe G36CaRboRuNduM uNiveRsal liMited a29CCi (asia PaCiFiC) Pte ltd M2ChiNa exhibitioN woRld e20 & e26ChRoMalloY C26CiRCoR PoweR & PRoCess F34CleaN eNeRGY sYsteMs Co.,ltd d64CleaveR-bRooKs b32CMi thai seRviCes Co. ltd e46 CRestChiC ltd a33daeYouNG C & e Co.,ltd. l55daMPeR teChNoloGY ltd h27deiF a/s K49deKoMte de teMPle KoMPeNsatoRteChNiK GMbh C34dePaRtMeNt oF alteRNative eNeRGY develoPMeNt aNd eFFiCieNCY oF the MiNistRY oF eNeRGY b64diReCtioN PlaN Co ltd a50 doosaN heavY iNdustRies & CoNstRuCtioN b1dP CleaNteCh e56dResseR-RaNd F39dsi laseR-seRviCe GMbh G49duRaG GMbh G26elliott CoMPaNY e27eNeRGY CaPital Pte ltd a22eNeRGY exeMPlaR PtY ltd K66eNeRPRoJeCt sa F45eNviRoNMeNt oNe a17esso (thailaNd) PubliC Co., ltd F30esteRliNe advaNCed seNsoRs C51 Fives PillaRd G45FoCuslab ltd M32FoRbes MaRshall Pvt. ltd. a30FosteR wheeleR d13

Gas tuRbiNe CoNtRols G43GeoRG FisCheR PiPiNG sYsteMes ltd. J56GetabeC d56GReeN woRld PubliCatioN Co., ltd K47Gti-altRoNiC b36haldoR toPsoe e59haMoN e40hilliaRd CoRPoRatioN, the J40hitaChi ltd G2hollaNd PavilioN G14howdeN a2hubeRt stavoReN b.v. G14ibau haMbuRG iNGeNieuRGesellsChaFt iNdustRiebau Mbh C32 ihi CoRPoRatioN K16iMi GRouP oF CoMPaNY a40iNdeCK PoweR a39iNdustRial iNFo east asia K40iNdustRial PoweR teChNoloGY Pte ltd G56iNteRNatioNal PaiNt ltd a55isoPuR Fluid teChNoloGies, iNC. M30KawasaKi Gas tuRbiNe asia K2KeMC (KoRea eleCtRiCal MaNuFaCtuReRs CooPeRative) d40 & C46leCtRodRYeR K45liaNG Chi iNdustRY (thailaNd) Co., ltd. h50MaGotteaux Co.,ltd b29MaseR & QuaRtZeleC seRviCes sdN. bhd. h26Mee iNdustRies iNC M14MeGaFlexoN Co., ltd. b56MeGGitt CoNtRol sYsteMs C33MetaCoR iNteRNatioNal iNC K56Metso PaPeR (thailaNd) Co ltd G50Mitsubishi heavY iNdustRies ltd C2MoRGaN advaNCed MateRials M18MoRGaN sChaFFeR iNC. F39MPP teCh GMbh h40Mtu oNsite eNeRGY (a toGNuM GRouP bRaNd) K14NatioNal eleCtRiC Coil h45NaviGat eNeRGY (thailaNd) ltd. b20NeM eNeRGY b.v G14 NooteR/eRiKseN b33oPRa tuRbiNes b.v G14 oRGaNiCs asia Co. ltd. a66PCC eNeRGY GRouP C40PeNNwell a69PiC asia - PaCiFiC sdN. bhd. G40PiNsuwaN CoMPaNY liMited l20

PMt iNdustRies sdN bhd F60PoweR MaChiNes J36PReCisioN iCeblast CoRPoRatioN M33PRoviNCial eleCtRiCitY authoRitY J20Pw PoweR sYsteMs, iNC. b26Qes (thailaNd) Co ltd b51ReMaZel eNGiNeeRiNG sPa G47ReNteCh boileR sYsteMs iNC. a25RoCheM teChNiCal seRviCes G14Rolls-RoYCe l19sC eNGiNeeRiNG Co.,ltd. C57sChool oF eNviRoNMeNt, ResouRCes aNd develoPMeNt, asiaN iNstitute oF teChNoloGY a44sedae eNeRteCh Co., ltd a34shiN NiPPoN MaChiNeRY Co ltd h56sieMeNs aG eNeRGY seCtoR e2siNtoKoGio, ltd. d32siPos aKtoRiK GMbh G28sMa solaR (thailaNd) Co., ltd h64sPiG sPa h39steJasa G32steuleR-KCh GMbh J50stoRK teChNiCal seRviCes holdiNG b.v. G14sulZeR tuRbo seRviCes veNlo b.v. G14suMitoMo heavY iNdustRies ltd C56teChNoloGY Media Co ltd b48thailaNd GReeNhouse Gas MaNaGeMeNt oRGaNiZatioN (Po) d66theRMal eNGiNeeRiNG iNteRNatioNal (usa) iNC. (tei) d26tNb RePaiR aNd MaiNteNaNCe sdN. bhd F50toshiba CoRPoRatioN a26tRiveNi tuRbiNe ltd. K20tRuwateR CooliNG toweRs sdN bhd G64tuRbiNe bladiNG aNd PaRts F44tÜv RheiNlaNd K34uNisoN eteCh h28vbR tuRbiNe PaRtNeRs G14veolia wateR solutioNs & teChNoloGies C64voGt PoweR iNteRNatioNal iNC d26voKes aiR GMbh d64waRtsila FiNlaNd oY F2west saleM MaChiNeRY F64wood GRouP Gts a12woRld loGistiCs seRviCes CoRP h36ZoK C31

PoweR-GeN asia Renewable energy world asia

NAME BOOTH NAME BOOTH NAME BOOTH

Page 7: INVITATION TO ATTEND - Energy - Products & Services · 10/4/2013 · pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry ... • Leading exhibition with 200 international

pOwEr-gEN AsIA

ExHiBiTiON OPENiNg HOurS

wedNesdaY 2 oCtobeR 10:30 – 18:00thuRsdaY 3 oCtobeR 10:00 – 18:00FRidaY 4 oCtobeR 10:00 – 16:00

ON-SiTE rEgiSTrATiON OPENiNg HOurS

tuesdaY 1 oCtobeR 13:00 – 17:00wedNesdaY 2 oCtobeR 08:00 – 18:00thuRsdaY 3 oCtobeR 08:00 – 18:00FRidaY 4 oCtobeR 08:00 – 16:00

OPENiNg CErEMONy – WEDNESDAy 2 OCTOBEr 10:15am

OPENiNg rECEPTiON – WEDNESDAy 2 OCTOBEr 17:00pm – 18:30pm

ClOSiNg rECEPTiON & BEST PAPEr AWArDS – FriDAy 4 OCTOBEr 15:00pm – 16:00pm

tRAvEl ANd ACCOmmOdAtiON

CONFERENCE hiGhliGhts

FlIGHTS:Qatar Airways are the Official Airline of POWER-GEN Asia and are offering a Special Net Fare for delegates and visitors travelling to attend the event in Bangkok. To gain the discounted offer you must first register to attend POWER-GEN Asia.

HOTElSEvents in Focus is a market leader in accommodation, travel and on-site management for worldwide events. Offering competitive rates at a wide range of hotels including transfers, meet and greet, organising private functions and dinners during this event.

Visit the POWER-GEN Asia Travel Information page for further details on flights and hotels at: www.powergenasia.com

Don’t miss the great opportunities offered at POWER-GEN Asia:• See new developments / technology• Keep up to date with industry developments• Source new products and suppliers

We look forward to welcoming you to POWEr-gEN Asia 2013

Joint Opening Keynote Sessionwednesday 2nd october, 09:00 – 10:30Session Chair: Nigel Blackaby, Conference Director, PennWell, United Kingdom

invited Speakers:• Dr. Twarath Sutabutr, deputy director-General , department of alternative energy development and efficiency, thailand

• Mr. Sutat Patmasiriwat, Governor of electricity Generating authority of thailand, thailand

•Dr. Piyasvasti Amranand, Chairman, energy for environment Foundation, thailand• Mr. Markus Lorenzini, head of energy sector, aseaN-Pacific Cluster, siemens, indonesia

Page 8: INVITATION TO ATTEND - Energy - Products & Services · 10/4/2013 · pOwEr-gEN AsIA Is ThE prEmIEr ANNuAl gAThErINg Of pOwEr INDusTry ... • Leading exhibition with 200 international

PlEASE COMPlETE THE FOllOWiNg SECTiONS: TOTAl PAyMENT DuE:1. TyPE OF COMPANy Or OrgANiZATiON(Please tick oNe only)q 05 electric utility or Power Generation Companyq 09 iPP/industrial/Combined heat & Powerq 43 Government energy departmentq 89 Consulting engineer or Constructor Firmq 18 original equipment Manufacturer specifierq 01 equipment supplierq 98 other (please describe)

2. SECTOrS OF iNTErEST(Please tick oNe only)q 01 thermal Plantsq 02 hydro Plantsq 03 Renewable energyq 04 Nuclearq 05 waste to energyq 06 information technologyq 12 transmission & distributionq 08 other (please describe

3. PriMAry JOB FuNCTiON(Please tick oNe only)q 02 President, vP, Ceoq 02 Managing director/General Managerq 03 Manager/supervisor q 04 engineer (design, Planning & specify, Consulting)q 06 operations & Maintenance q 08 Purchasingq 98 other (please describe)

4. PurCHASiNg AuTHOriTy(Please wtick oNe only)q 01 Final authorityq 05 Recommendq 09 influenceq 10 None

5. HOW DiD yOu FiND OuT ABOuT THE EVENT ?(Please check those that apply)q website (if so which one)

q advertising (if so which publication)q Call for Paperq Pre show Guideq e-mailq word of mouthq other (please state)

PoweR-GeN asia is a Pennwell Corporation event. Please tick the relevant box if you do not wish to receive information about:q Future PoweR-GeN asia eventsq other Pennwell Corporation Productsq Carefully selected third parties I understand that my signature authorizes PennWell to charge the above amount to my credit card

Payment must be received by the published date to receive any early registration discounts. Cancellations must be received in writing before 6 september 2013 in order to receive a refund, minus a $100 administrative charge. after 6 september 2013 refunds on any PoweR-GeN asia 2013 activities/conference sessions are not available under any circumstances. substitutions of personnel may be made at any time by contacting the registration office in writing.

Method of Payment:Credit card, wire transfer or make cheques payable to PoweR-GeN asia 2013 (us dollars only).Payment must be received prior admittance to the conference. all billing will be made in $.

Total Payment Due: $

✓ Cheque enclosed ($) ✓ wire transfer (wiring infomation provided on invoice)

Credit Card:

✓ amex ✓ MasterCard ✓ visa

Card number: Exp date: month /year

Name of Card:

Signature:

CONFErENCE FEES:individual Full Conference – includes entrance to the exhibition and all PoweR-GeN asia and Renewable energy world asia conference sessions, two lunches and conference proceedings:Paid before 6 september 2013 ✓ $ 1,160 individualPaid on or after 6 september 2013 ✓ $ 1,335 individual

government Agency ✓ $ 905 individual

Student Fee (i.D. required) ✓ $ 290 individual

One-day Conference – includes entrance to the exhibition and PoweR-GeN asia and Renewable energy world asia conference sessions and lunch for one day. does Not include the conference proceedings:wednesday 2 october 2013 ✓ $ 700 thursday 3 october 2013 ✓ $ 700 Friday 4 october 2013 ✓ $ 700

Exhibitor Full Conference – includes entrance to the exhibition and all PoweR-GeN asia and Renewable energy world asia conference sessions, two lunches and conference proceedings (must be an exhibiting company):Paid before 6 september 2013 ✓ $ 585Paid on or after 6 september 2013 ✓ $ 685

Supporting Associations Full ConferencePlease indicate the association you are registering under ✓ $ 1070q ait q PiPPa q wade q eRdi q CeeRd q ies q Ceat q iPPF q Fti q tGo q teba q Ptit q tei

Free (lunches, conference proceedings and conference sessions Not included)

rEgiSTrATiON FOrM

Conference and Exhibition2-4 October 2013iMPACT Exhibition & Convention Centre,Bangkok, Thailand

Choose from 4 easy ways to register for POWEr-gEN Asia:

Fax: +1 918 831 9161Post: PennWell registration/PgA13 PO Box 973059 Dallas, Tx 75397-3059 uSAWeb: www.powergenasia.comEmail: [email protected]

For queries only call: +1 918 831 9160

ExHiBiTiON FlOOr ONly:

Co-located with

PlEASE PriNT ClEArlyFirst Name

Family Name

Job title / Position

organization/Company

Complete Mailing address

City

telephone

e-mail

Postal Code: Country:

(+ ) Fax (+ )

Confirmations will be emailed if a unique e-mail is provided.

FAx BACK TO: +1 918 831 9161 Or EMAil TO: [email protected]

PlEASE uSE THiS PrOMOTiONAl CODE WHEN rEgiSTEriNg

i would like to receive/continue to receive a complimentary digital subscription to Power engineering international q Yes q No

email address is required for digital magazine delivery _____________________________________ signature _______________________________ date_____/_____/_____

if submitting this form electronically, please provide the first letter of the city or town of your birth ________________

Corporate Delegate Plan5 EmployeesPaid before 6 september 2013 ✓ $ 5,280Paid on or after 6 september 2013 ✓ $ 5,78510 EmployeesPaid before 6 september 2013 ✓ $ 9,655Paid on or after 6 september 2013 ✓ $ 10,91015 EmployeesPaid before 6 september 2013 ✓ $ 14,035Paid on or after 6 september 2013 ✓ $ 15,38020 EmployeesPaid before 6 september 2013 ✓ $ 16,120Paid on or after 6 september 2013 ✓ $ 19,230

Additional lunch Tickets ✓ $ 85 wed 2 october 2013 ✓ $ 85 thu 3 october 2013Conference ProceedingsPoweR-GeN asia / Renewable energy world asia combined Conference Proceedings ✓ $ 425Technical Tour (including lunch and transport)tour 1 srinagarind dam tuesday 1 october 2013 ✓ $ 130tour 2 bang Pakong thermal Power Plant tuesday 1 october 2013 ✓ $ 130

Registration for these technical tours must be made before 30 august 2013 Passport Number (for security purposes only)