Upload
shaw
View
66
Download
0
Embed Size (px)
DESCRIPTION
Introduction to Drill Objective AFMan 36-2203, 3.1-3.3. Execute POA & Parade REST. Position of Attention (POA). 45 degree. Parade REST. 12 “ apart FYI: On command of “Flight” assume parade rest. At Ease, Rest, Fall Out. - PowerPoint PPT Presentation
Citation preview
Introduction to Drill Objective
AFMan 36-2203, 3.1-3.3
–Execute POA & Parade REST
Position of Attention (POA)
45 degree
Parade REST
12 “ apart
FYI: On command of “Flight” assume parade rest
At Ease, Rest, Fall Out