Upload
trinhkien
View
267
Download
6
Embed Size (px)
Citation preview
CTCIOur Vision
To become a leading global provider of engineering services and innovative technologies
Corporate Presentation
JAN 2008
-- 2 --
Safety Map
-- 3 --
Emergency Phone Numbers Police Station 110
Fire/ Ambulance 119
Building Management ext. 1458
Supervisor in charge ext. 7511/ ext. 1365
Security Guard ext. 1458
Evacuation Plan
Evacuation assembly area is designated at the pedestrian island on Sec. 2, Tun Hwa South Road, opposite CTCI Tower.
-- 4 --
A Leading Global EPC Service Provider
Commitment to Customer Value
Net Sales of US$ 3 B by 2010
Our Goals
-- 5 --
Full Knowledge of Major Licensors and EPC Firms.
Strategic Alliance with Selected Technology Providers.
An International EPC Contractor with Local Facilities and Resources.
Own sufficient subsidiaries around the world to support project execution.
CTCI’S Strengths
-- 6 --
CTCI confirms its full commitment to the Client with the highest standards of quality, safety and protection of the environment.
CTCI confirms its performance to fulfill the Client’s requirement for all customers, and responsibility to society.
Value to the Client
-- 7 --
History1959 – China Technical Consultants, Inc. (C.T.C.I.) established1979 – CTCI Corporation founded by C.T.C.I. and two
financial organizations (C.T.C.I. now renamed as CTCI Foundation)
1993 – A public listed company in TSE
Paid-in Capital ……………NT$6,167M (approx. US$189M)
Shareholder’s Total Equity…………….……US$271M
FY 2006 New Orders………………………..US$1,910M
CTCI Group Consolidated………US$2,166M
FY 2006 Turnover……………………………..US$717M
CTCI Group Consolidated………US$1,031M
Corporate Overview (1/2)
US$:NT$=1:32.57
-- 8 --
Number of EmployeesCTCI Corporation 2,700 +CTCI Worldwide 4,400 +
CTCI OfficesTaipei Headquarters
Kaohsiung Regional Operation Center
Affiliated CompaniesDomestic 15Overseas 20
Corporate Overview (2/2)
-- 9 --
( Year ended December 31)
500
1500
2000
2500
Million US$
1000
0202 02
523723 809
03
541
03
1554
03
1,844
Turnover New Orders Backlog
04
676 956
04 04
2,109
05
972
491
05 05
1762
06
1031
2166
06 06
2821
Performance (2002-2006)
-- 10 --
Hydrocarbon
Gas Processing
Petroleum Refining
Petrochemical
Chemical
Terminal
Infra., Environ.&Power
Infrastructure
Transportation
Communication
Environment
Metal Mills
Brewery & Winery
Power Plants
Waste To Energy
Environmental & Resources
O&M and Management of Waste to Energy Plants
O&M and Management of Power Plants
Waste Management
Waste & Energy Recycling
Project Development of Waste & Energy
Business Areas
-- 11 --
Feasibility Study & PlanningProject ManagementEngineering DesignProcurementFabricationConstructionCommissioningMaintenance
Activities and Services
-- 12 --
Organization Chart (1/4)
continued on next page……
Management & Strategy Committee
PresidentChairman
Executive Management Office
(EMO)
Hydrocarbon Business Operations
(HBO)
• Marketing & Sales Division• Project Division Ⅰ• Project Division Ⅱ• Project Division Ⅲ• Project Division Ⅳ• Project Service Dept. • Technology Center
• M&S Dept. (Taiwan)Ⅰ• M&S Dept. (China)Ⅱ• M&S Dept. (S.E.A./ India)Ⅲ• M&S Dept. (M.E.)Ⅳ
• Project Control Dept.
• Estimating
• Contract Management
• Project Quality & HSE
Management
• Corporate Admin. Dept.• Chief Financial Officer (CFO)
- Accounting Dept.- Finance Dept.- Investment Relationship Dept.
• H. R. Dept.• Admin. & General Services
Dept.• Planning Dept.• Legal Affairs Dept.
-- 13 --
Organization Chart (2/4)
continued on next page……
Infrastructure, Environment
& Power Business
Operations(IEPBO)
• Marketing & Sales Division
• Power Projects Division• Infrastructure &
Environment Projects Division
• Project Service Div. • Technology Center
• M&S Dept. (Taiwan)Ⅰ• M&S Dept. (China) Ⅱ• M&S Dept. Ⅲ (S.E.A./ India)• M&S Dept. (M.E.)Ⅳ
• Power Dept.• Waste-to-Energy Dept.• Air Pollution Control Dept.
• Infrastructure Dept.• General Industrial Dept.• Environment Dept.
• Project Control Dept.• Estimating• Contract Management• Project Quality & HSE
Management
Management & Strategy Committee
PresidentChairman
-- 14 --
Organization Chart (3/4)
• Information Technology Center
• Research & Development Center
• Engineering Division
• Procurement Division
• Construction Division • Procurement Logistics• Project Procurement
Managers
• Process Engineering Dept.
• Piping Engineering Dept.
• Mechanical & Equipment Engineering Dept.
• Instrumentation & Control System Engineering Dept.
• Electrical Engineering Dept.
• Civil & Building Engineering Dept.
• Project Engineering Managers
• Planning & Proposal• Project Construction
Managers• Construction HSE
EPC & Technical Service
(EPCTS)
continued on next page……
Management & Strategy Committee
PresidentChairman
-- 15 --
Organization Chart (4/4)
• Chief Technical Officer (CTO)• Chief Information Officer (CIO)• China Regional Representative• Auditing Dept.• Q.A. & Safety Dept. • Overseas Subsidiaries• Domestic Subsidiaries
Environment & Resources Business Operations (ERBO)
• HD Resources Management Corp.
• Sino Environmental Service Corp.
• Leading Energy Corp.• Fortune Energy Corp.• KD Holding Corp.• Administration Center
Management & Strategy Committee
PresidentChairman
-- 16 --
(as of DEC.2007)
Department ManpowerExecutive Management 12
Project Group 607
Engineering 1,112
Procurement 101
Construction 656
IT Center 44
Budget & Operation Administration 9
QA/QC 9
Finance & Accounting 50
Human Resource 6
Administration & General Service 75
Other Supporting 20
Total 2701
Manpower
-- 17 --
CTCI Arabia, KSA
CTCI, Thailand
Jingding, China
CTCI Kaohsiung
CIMAS, VietnamCTCI, Malaysia
CIPEC, Philippines
Shang Ding, China
CTCI, Qatar
CTCI, Abu Dhabi
CTCI Taipei HQ
CTCI Worldwide Network
-- 18 --
DOMESTIC
E & C Engineering Corp.
Advanced Control & Systems Inc.
Resources Engineering Services Inc.
CTCI Chemicals Corp.
CTCI Machinery Corp.
Sino Environmental Services Corp.
KD Holding Corp.
Leading Energy Corp.
HD Resources Management Corp.
Fortune Energy Corp.
OVERSEAS
Jingding Engineering &Construction Co. Ltd. Beijing, China
Shang Ding Engineering &Construction Co. Ltd. Shanghai, China
CTCI (Thailand) Co., Ltd. Thailand
CIMAS Engineering Co., Ltd. Vietnam
CTCI Engineering & Construction Sdn. Bhd. Malaysia
CIPEC Construction, Inc., Philippine
CTCI Arabia Ltd. Saudi Arabia
CTCI Overseas Corporation Ltd.,Hong KongCTAS Corporation, USA
CTAS Corporation, USA
Major Subsidiaries & Affiliates
-- 19 --
(US$M)
A. rating Moody’s A3/S&P A- or above
International Banks (13) 481
Taiwan Banks (15) 417Sub-Total 898
B. rating below Moody’s A3/S&P A-Taiwan Banks (22) 331
Grand Total 1,229
Financial Capability (1/2)Total Bank Credit (DEC 2007)
-- 20 --
(US$M)
Grand Total Bank Credit
1,229
Utilized Bank Credit
400
Available Bank Credit
829
Financial Capability (2/2)Available Bank Credit (DEC 2007)
-- 21 --
ISO 9001
-- 22 --
ISO 14001 & OHSAS 18001
-- 23 --
CTCIEngineering
EngineeringEngineeringEngineering
-- 24 --
Process Design Piping Design Civil and Building Design Instrumentation & Control System Electrical Design Mechanical and Equipment Design Project Engineering Management
Engineering Design
-- 25 --
Office Allocation
Engineering HubTaipei 908Kaohsiung 170
Global Engineering SatellitesBeijing 252Bangkok 99Hanoi 147
Total 1,579
Kaohsiung
Taipei
Engineering Manpower (1/3)(Resources)
Beijing
Hanoi
(as of Aug. 31, 2007)
Bangkok
-- 26 --
Department Manpower
Process 107
Piping 543
Civil & Building 320
Instrumentation & Control System 178
Electrical 170
Mechanical & Equipment 201
Project Engineering Mgr 60
Total 1,579
Engineering Manpower (2/3)(Discipline Allocation)
(as of Aug. 31, 2007)
-- 27 --
Total Engineering Man-hour Spent
(Fiscal Year)
MillionMH
2002
4.0
3.5
3.0
0
3.3
2003
3.81
2004
4.24.5
2005
3.87
2006
4.31
Engineering Manpower (3/3)(Capacity)
-- 28 --
Process Flow Diagram
MechanicalDesign/Rating
Plot Plan
Foundation Design
Structural Modeling
Structural Analysisand Design
Piping Stress Analysis
Piping ArrangementProduction
Isometric ProductionInterference Detection
Model (Design)Review
2DSchematic Database
ProcessSimulation
IntelligentP&ID
InstrumentDesign
ElectricalDesign
Instrument Layout
Electrical Layout
QTO
MTO
3DDesign
Database
Piping Design/Piping Modeling
Process Equipment Design
EquipmentModeling
Multi-Discipline Engineering Design Work Flow
-- 29 --
EMS: Engineering Management SystemEDMS: Engineering Document Management SystemCAD/CAE: Computer Aided Design/EngineeringPMS: Procurement Management System
ContractedScope of Work
EDMS
QTO
CMS
QT O
MTO
Database
Doc
PMS
MMS
Vendor DocOutsideENG. Doc Dwg
EMS
Req
CAD/CAE
MMS: Material Management SystemCMS: Construction Management SystemMTO: Material Take OffQTO: Construction Quantity Take Off
CAD/CAE Linked to Project MIS
-- 30 --
Material Management System
Inventory Management System
Proj
ect
Proc
urem
ent
Team
Engi
neer
ing
Con
stru
ctio
n
EngineeringDepartment
ProcurementDepartment
RequisitionPlan
EngineeringDesign M.T.O./SUM
Establish MTO Database Generate Material Reports
Check
StockAvailability
MaterialRequisitioning
Generate BulkMaterials
Equipment Requisitions
Requisition Approval
Budgeting and Cost Control
Material Coding System
Material CodesChecking/Adding
Material Purchasing
Inquiry 、 Bid Evaluation 、P.O. 、 Delivery
MaterialReceiving
Site MaterialDispatching/ Returning
Material Management
and Warehousing
Material Management
-- 31 --
Enterprise Network
Dedicated CircuitRouterVideo Conference
VoIP Telephony
Data CommunicationInternet Connection
JDEC / Beijing
SDECShanghai
Eng. / Kaohsiung
E&C / Taipei
SESC / Taipei
ACS / Taipei
RES / Taipei
Sites / Taipei
CTCI Machinery Corp. / Kaohsiung
Sites / Taiwan
HQ / Taipei
CTCI-TBangkok
-- 32 --
CTCIProcurement
ProcurementProcurementProcurement
-- 33 --
Market Survey Inquiry and Purchasing Inspection and Expediting Shipping, Delivery and Claim Permits Banking Affairs Customs Clearance Insurance Tariffs Subcontracting
Procurement Activities & Services
-- 34 --
Total Procurement Amount
A Continuous Large Procurement Amount makes CTCI a “Powerful” Purchaser
Direct Access to Vendor’s Top Management
CTCI can Procure Equipment & Materials at very Competitive Prices
(Fiscal Year)
500
400
300
(US$M)
368
02 03
337
04
682
600
05
652
700
06
763800
Procurement Power of CTCI Group
-- 35 --
CTCICTCI Machinery Corporation
CTCI Machinery CorporationCTCI Machinery CorporationCTCI Machinery Corporation
-- 36 --
American Mechanical Society of EngineersU (certified since 1982) U2 (certified since 1982)S (certified since 1992)PP (certified since 1992)
The National Board of Boiler and Pressure Vessel InspectorsNB (certified since 1992)R (certified since 1992)
China State Bureau of Quality and Technical SupervisionSafety Quality License (certified since 1999)
CTCI Machinery Corporation Certification
-- 37 --
Towers & Drums 300 Tons/Month
Heat Exchangers 200 Tons/Month
Steel Structures 600 Tons/Month
Piping Prefabrication 30000 Dia.-in/Month
CTCI Machinery Corporation Capacity
-- 38 --
Zirconium & Zirconium-based AlloysAluminium & Aluminium-based AlloysTitanium & Titanium-based AlloysDuplex Stainless SteelCopper & Copper-based AlloysCopper-NickelNickelMonelInconel & IncoloyHastelloy
CTCI Machinery Corporation Excellence
-- 39 --
CTCIConstruction
ConstructionConstructionConstruction
-- 40 --
Equipment Installation & Rigging
Piping Fabrication & Erection
Steel Structure Fabrication & Erection
Electrical Installation & Wiring
Instrument Installation, Piping & Wiring
Civil & Architectural
Painting & Insulation
Construction Management
Pre-commissioning
Construction Activities & Services
-- 41 --
06
37.5
Total Construction Man-hour
Construction Management
All Disciplines
South Asia in Proven Experience in Management of International Workers – Chinese, Thai, Filipino, Vietnamese
(Fiscal Year)
30.0
20.0
10.0
MillionMH
002
15.7
03
21.7
04
24
40.0
05
38.1
Construction Capability of CTCI Group
-- 42 --
Site OrganizationManpower Mobilization & ControlTemporary Facilities & UtilitiesConstruction Schedule ControlConstruction EquipmentConstruction Procedure PlanningProcurement & Subcontracting
Quality Control & AssuranceSafety & SecurityMaterial Control & Warehousing Cost ControlComputer ApplicationDocument ControlWelding ControlOffice AdministrationPre-commissioning
Construction Management
-- 43 --
CTCIGlobal General Contractor
Global General ContractorGlobal General ContractorGlobal General Contractor
-- 44 --
Product/Process Process Licensor Oil & Gas……1
Crude Distillation (Topping) ABB Lummus
Vacuum Distillation (VDU) ABB Lummus, ExxonMobil
Catalytic Reforming ABB Lummus, Engelhard, IFP, UOP
HDS IFP, Union Oil, Haldor Topsoe
RDS Chevron, Gulf, Union Oil, UOP
Delayed Coking ABB Lummus
Visbreaker ABB Lummus
FCC / RFCC S&W, Exxon, KBR, UOP
continued on next page……
Reference w/Process Licensors (1/6)
-- 45 --
Product/Process Process Licensor
Oil & Gas……2
Hydrocracking UOP, Union Oil
Alkylation Exxon, Phillips, Stratco
Isomerization UOP
Lube Oil Badger, Chevron, Gulf, ExxonMobil
SRU Comprimo, Pritchard, Parsons, Amoco
, Technip KTI
Gasification Texaco
TAME IFP
Sweetening Merichem, UOP
Synthesis Gas Haldor Topsoe, Texaco
continued on next page……
Reference w/Process Licensors (2/6)
-- 46 --
Product/Process Process Licensor
Petrochemicals……1
Acetaldehyde Aldehyde
Acrylonitrile BP
Aromatics UOP
Bis-Phenol A Chiyoda, Idemitsu
Butadiene Extraction Nippon Zeon, ABB Lummus
Caprolactam (CPL) Stamicarbon
Cumeme CD Tech, UOP
EB / SM Mobil / Badger, ABB Lummus / UOP
EDC / VCM Solvay, Geon
EO / EG Shell, UCC, SD, Atochemcontinued on next page……
Reference w/Process Licensors (3/6)
-- 47 --
Product/Process Process Licensor Petrochemicals……2
FA (Formic Acid) BASFMEK (Methyl Ethyl Ketone) ArcoMMA (Methyl Mathacrylic) Comprimo, ICI, MRC MTBE Arco, IFP, UOPOlefins S&W, KBR, ABB LummusPropylene (OCT) ABB LummusPDH UOPPhenol KBR, UOP, GEPA (Phthalic Anhydride) BASFPTA BP, Invista, Tecnimont, HitachiSBR B.F. GoodrichVinyl Acetate Bayer
continued on next page……
Reference w/Process Licensors (4/6)
-- 48 --
Product/Process Process Licensor Polymers
LLDPE / HDPE Borealis, Mitsui Chemicals, Nissan, Quantum, UCC
LDPE BASF, GulfPP Basell, BASF, HerculesPS KHI, NovaPVC Oxychem, FPC, WestlakeABS Monsanto, JSR, Toray, KumhoSAN Monsanto, Mitsui Chemicals
continued on next page……
Reference w/Process Licensors (5/6)
-- 49 --
Product/Process Process Licensor
Others
Acetic Acid BP
AG Chemicals Rohm & Haas
Chlor-Alkali Asahi Glass, Asahi Kasei, Ineos
Ion Exchange Resin Rohm & Haas, Mitsubishi Chemical
Polyol Dow Chemical
Wax Unocal
Municipal IncineratoR Martin
Reference w/Process Licensors (6/6)
-- 50 --
ABB Lummus Badger TechnologiesBechtel FluorFoster Wheeler Halliburton KBRMcDermort ParsonsSNC-Lavalin Stone & WebsterAker Kvaerner LindeLurgi Sembcorp Simon-CarvesTechnip Tecnicas ReunidasTecnimont UhdeChiyoda JGCMitsubishi Heavy Ind. Toyo Engineering
Reference w/Major E&C Firms - Hydrocarbon Related
-- 51 --
Air Products Air LiquideArco Asahi KaselBASF Basell (Montell)Bayer BOCBPChevronPhillipsCiba Specialty Dow ChemicalDuPont ExxonMobilHuntsman (ICI PU Business) Ineos (ICI Chlor Business)Lucite (ICI MMA business) MonsantoOccidental Chemical PPGRhone-Poulenc Rohm & HaasShell SolvayUbe Industries
Reference w/Major Int’l Clients - Hydrocarbon Related
-- 52 --
Alstom
Electrowatt
Parsons Brinkerhoff
Pacific Consultant International
Systra
Sofretu
TYLin International
Reference w/Major E&C Firms - Infra., Environ. & Power Related
-- 53 --
Alstom Jet TechABB MHIADI MBELB&W VolundCH2M HILL TSKChube Electric ToshibaHitachi SiemensIHIGE
Reference w/Major Int’l Clients - Infra., Environ. & Power Related
-- 54 --
CTCIMajor Project Reference
Major Project ReferenceMajor Project ReferenceMajor Project Reference
-- 55 --
No. of ProjectCrude Distillation (Topping) 12 Vacuum Distillation 6Reformer/CCR 6FCC/RFCC 7Hydrocracker 5HDS/RDS 28SRU/SRU Tail Gas Treating 29Alkylation/Isomerization 8MTBE/TAME 5Visbreaking/Delayed Coking 4 Lube Oil/Condensate processing 6 Synthesis Gas 14
TOTAL 130
Experience Summary - Refinery
-- 56 --
No. of Project Olefins 17 Aromatics 8 Butadiene Extraction 5 Acetaldehyde 1 Carbon Black 5 EDC/VCM 2 EO/EG 8 Methyl Methacrylate (MMA) 7 Acrylonitrile (AN) 1 EB/SM 5 Cumene/Phenol/Bis-Phenol A 9 CPL 2 PTA 20 Other 50
Total 140
Experience Summary - Petrochemical
-- 57 --
Polyethylene (LLDPE/LDPE/HDPE) 11
Polyvinyl Chloride (PVC) 5
Polypropylene (PP) 11
Polystyrene (PS) 2
ABS/SAN 11
SBR/BR/TPE 6
Spandex/PTMG 3
Acryllc Fiber Polyester 2
Total 51
Experience Summary - Polymer
No. of Project
-- 58 --
No. of Project
Co-generation 15
Combined Cycle 23
Fossil 11
Nuclear 15
Power Transmission & Distribution 17
Total 81
Experience Summary - Power
-- 59 --
No. of Project Glass Industry 2 Air Separation Unit (ASU) 15 Pulp & Paper 2 Electronics Business 30 Iron Making 9 Steel Making 7 Hot Rolling Mill 5 Cold Rolling Mill 8 Non-Ferrous 3 Utility 10 Storage and Terminal 25 Pipeline 11
Total 127
Experience Summary - General Industry
-- 60 --
No. of
Project
High Speed Railway 28
Massive Rapid Transit (MRT) 37
Freeway, Tunnel and Road Work 19
Others 11
Total 95
Experience Summary - Transportation
-- 61 --
No. of Project
SCR De Nox 83
Flue Gas Desulfurization (FGD) 8
Electrostatic Precipitator (EP) 8
Water and Waste Water Treatment 17
Solid/Liquid Waste Treatment (Incinerator) 34
Environment Impact Assessment 19
Air Quality Management / Planning 5
Noise Abatement and Vibration Control l5
Soil and Ground Water Remediation 15
Industrial & Environmental Safety Monitoring 16
Total 220
Experience Summary - Environmental
-- 62 --
CTCICTCI OperationIn Taiwan
CTCI’s Experience in Taiwan(From Jan.2000 to Jun.2007)
CPC Tao-Yuan Refinery
FPG Complex
CPC Kao-Hsiung Refinery
Ta-Lin Petrochemical Complex
Ta-Sheh, Jen-Wu Petrochemical ComplexLin-Yuan Petrochemical Complex
▲
▲
▲
▲▲
▲
▲GGPC Complex
FCFC, Aroma 3 ProjectFPCC, Lube Base Oil (LBO) Project
▲Tai-Chung Harbor
CPC,LNG Receiving Terminal Project
CPC, Diesel HDS ProjectCPC, Jet Fuel Treating ProjectCPC, N-Paraffins ProjectCPDC, Caprolactam III Project
CPC, Alkylation Project
TSMC, EB-1 EBMax ProjectOUCC, EC ProjectOUCC, EA ProjectOUCC, EO/EG ProjectTPCC, AMS Recovery Project
FPCC, Olefin 3 ProjectFPCC, Refinery Complex ProjectFPCC, RCC ProjectFPCC, Diesel HDS ProjectFPC, MMA Project GGPC EIS Service Project
CAPCO, No.6 PTA Project
-- 64 --
continued on next page……
Client Location Project Scope CompletionChinese Petroleum Tai-Chung Northern LNG EPC ProgressingCorporation Receiving TerminalFormosa Petrochemical Mai-Liao, KHU Fired Heaters EPC ProgressingCorporation Yun-Lin 29.67 MMKcal/HrFormosa Petrochemical Mai-Liao, Lube Base Oil C ProgressingCorporation Yun-Lin 9,000 BPSDFormosa Chemicals Lon-Der, IPA Plant E Progressing& Fibre Corporation Yi-Lan 300,000 MTAFormosa Petrochemical Mai-Liao, LNS/SLP-3/LPF-2 E 2007Corporation Yun-LinFormosa Petrochemical Mai-Liao, PRU-2/OCT E 2007Corporation Yun-Lin
JGC Formosa Chemicals Mai-Liao, ARO-3 Plant E+C 2007 & Fibre Corporation Yun-Lin 1,271,000 MTA
Major Reference – Taiwan (1/4)
-- 65 --
continued on next page……
Client Location Project Scope CompletionFormosa Chemicals Mai-Liao, ARO-3 Fired Heaters EPC 2007& Fibre Corporation Yun-Lin 480.68 MMKCal/HrFormosa Chemicals Mai-Liao, SM-3 Fired Heaters EPC 2007& Fibre Corporation Yun-Lin 66.4 MMKcal/HrFormosa Petrochemical Mai-Liao, Olefin 3 Plant E+C 2007Corporation Yun-Lin 1,200,000 MTA
Taiwan Styrene Lin-Yuan, EB-1 EBMax Project EPC 2006
Monomer Corporation Kao-Hsiung
Formosa Chemicals Mai-Liao, Phenol Revamping E+C 2005
& Fibre Corporation Yun-Lin 400,000 MTA
Formosa BP Chemicals Mai-Liao, Acetic Acid E 2005
Corporation Yun-Lin 300,000 MTA
JGC Corporation CPC Tao-Yuan Alkylation EPC 2003Refinery 8,600 BPSD
Major Reference – Taiwan (2/4)
-- 66 --
continued on next page……
Client Location Project Scope Completion
Chinese Petroleum Kao-Hsiung Diesel HDS EPC 2003 Corporation 20,000 BPSD
Chinese Petroleum Ta-Lin, Jet Fuel Treating EPC 2003Corporation Kao-Hsiung 18,000 BPSDChinese Petroleum Ta-Lin, N-Paraffins EPC 2003Corporation Kao-Hsiung 130,000 MTAChina American Tai-Chung No.6 PTA Project EPC 2003Petrochemical Co., Ltd 700,000 MTAChang Chun Kao-Hsiung Phenol Project E 2002Petrochemical Co., Ltd 200,000 MTAFormosa Petrochemical Mia-Liao, Olefin-1 Revamping C 2002Corporation Yun-Lin 700,000 MTAFormosa Asahi Mai-Liao, PTMG II Expansion C 2002Spandex Co., Ltd Yun-Lin 14,000 MTA
Major Reference – Taiwan (3/4)
-- 67 --
Client Location Project Scope CompletionNan-Ya Plastics Mai-Liao, BPA II Project C 2001Corporation Yun-Lin 100,000 MTA
Oriental Union Lin-Yuan, EC Project EPC 2001Chemical Corporation Kao-Hsiung 40,000 MTAOriental Union Lin-Yuan, EA Project EPC 2000Chemical Corporation Kao-Hsiung 40,000 MTAOriental Union Lin-Yuan, EO/EG Project EPC 2000Chemical Corporation Kao-Hsiung 180,000 MTAChina Petrochemical Kao-Hsiung Caprolactam Project EPC 2000Development Corporation 120,000 MTATaiwan Prosperity Lin-Yuan, AMS Recovery EPC 2000Chemical Corporation Kao-Hsiung 130,000 MTA
Major Reference – Taiwan (4/4)
-- 68 --
CTCICTCI OperationIn China
-- 69 --
Jingding Engrg. & Const. Co., Ltd. - Corporate OverviewEstablished in 1993Capital RMB 14MTurnover (2006) USD 6MShare Holders
CTCI Overseas, HK 100%Offices
Beijing Head Offices Number of Employees 410New Orders (2006) RMB 82MTurnover (2006) RMB 47MCurrent Backlog (2006) RMB 64M
-- 70 --
Local Expatriate
Jingding Engrg. & Const. Co., Ltd. - Manpower ResourcesManagement 14 2
Project Group 24 3
Engineering 348 1- Process 15- Piping 140 - Equipment 37- Civil & Structure 80- Instrument 35- Electrical 35- IT center 6Procurement 8 Construction 16 1
TOTAL 410 7
-- 71 --
Jingding Engrg. & Const. Co., Ltd. - CertificatesThe First Class Design Institute for Petrochemical and Chemical Industries (No. 0109011)
Pressure Vessel Design (No. RSP ZSH( 三 ) – 050)
-- 72 --
-- 73 --
-- 74 --
Jingding Engrg. & Const. Co., Ltd. - Business License (No.000335)
-- 75 --
Shang Ding Engrg. & Const. Co., Ltd. - Corporate OverviewEstablished in 2003
Capital RMB 52M
Share HoldersCTCI Overseas, HK 52%
E&C Engineering Corp. 48%
Offices Shanghai
Number of Employees 172
New Orders (2005) RMB 119M
Turnover (2005) RMB 109M
Current Backlog (2005) RMB 367M
-- 76 --
Shang Ding Engrg. & Const. Co., Ltd. - Certificates
Class A EPC General Contractor for Mechanical & Electrical Construction
Class A EPC General Contractor for Environmental Engineering
Class B EPC General Contractor for Building Construction
Class B EPC General Contractor for Petrochemical Industries
Class B EPC General Contractor for Infrastructure
Class B General Contractor for Electrical Construction
Class B General Contractor for Municipal Engineering
-- 77 --
-- 78 --
Shang Ding Engrg. & Const. Co., Ltd. - Business License (No.034332)
-- 79 --
Shang Ding Engrg. & Const. Co., Ltd. - Business Areas Infrastructure
Water / Wastewater TreatmentAir Pollution ControlWaste-To-EnergyPower Plants
High TechHigh Tech IndustriesBiotechMEP for Hospital
Information Technology & AutomationIntegration of Computer, Communication and ControlEnvironmental MonitoringTransportation ControlHigh Tech Products AgentSoftware Engineering
CTCI’s Experience in ChinaO2 Generation System - Jilin
SAN II Project - Zhenjiang
Ag Plant - Nantong
PVC Plant - Suzhou
IER Project - ShanghaiPU System House - ShanghaiLPG Terminal - QuanzhouCP-1 Power Plant DeNox System -ZhangzhouDry Film Resin Plant - ZhongshanPTA Plant - ZhuhaiPPAM Plant - Hong KongPTA Plant -Xiamen, FujianABS II Plant – ZhenjiangWest-East Natural Gas Pipeline – NanjingLDPE Project – NanjingC1 Project – NanjingEO/EG Project – HuizhouAF Project – NingboMMA Project – ShanghaiSAR Project – ShanghaiLiquid Waste Incinerator –HuizhouPVDC Project – NantongLNG Project - Shanghai
4445
464847
Carbon Black Plant - Zhangjiagang
Chromium Sulfate Project - Suzhou
Multi - Product Resins - ShanghaiEpoxy Plant – Panyu, Guangdong
24
27
25PMMA Project - ZhenjiangPFA Plant - ZhenjiangSBR Project - NantongEthylene Plant Expansion – ShanghaiPVC Plant – NingboPTA Plant - NingboABS Plant - NingboPTA Plant - Xiamen, Fujian
Relocation of O2 Plant – Guangdong
MMA Project – ShanghaiPVC Plant – ZiboIIP Project – ShanghaiPTA Plant – ShanghaiPTA Plant Revamping – Xiamen, FujianABS III Plant – Zhenjiang EB/ SM Plant – Dushanzi, XinjiangTiO2 Plant – ShangdongBR Plant – NantongSEBS Plant – NantongFCC Plant – Qinzhou, Guangxi
2829
26
3130
32Beijing
Kaohsiung
JDEC
CTCI H.Q.
CTCI Overseas Liaison Office
SDEC
1
Nanjing Shanghai
Hong Kong
Taipei
44
272
263
4528
8
9
11
654
7
3147
2610
12Xiamen
Guangzhou
1346
48
29
14 15
24
33
2
3
4567
8
9
1
101112
13
14
15
16
17
33
3416
17
34
1819202122
35
18 3025
35
32
19 20
21
2236
37
35
36
38
40
3940
41 42
23
4123
38
EPC LSTK
ENG’GCOST ESTIMATE
CONSTR. MGT
Additive Project - Shanghai
4243
43
-- 81 --
Client Location Project Scope Completion
ZGPC Chemical Zhanjiang, ABS III Plant ED Ongoing
Jiangsu 100,000 MTA
Stone & Webster Dushanzi EB/SM Plant EB Ongoing
Xinjiang 320,000 MTA
E.I. du Pont (DuPont) Dongying, TiO2 Plant EPsCM Ongoing
Shangdong 200,000 MTA
TSRC (Nantong) Nantong, BR Plant EB Ongoing
Jiangsu 72,000 MTA
TSRC (Nantong) Nantong, SEBS Plant EB & ED Ongoing
Jiangsu 20,000 MTA
Shanghai LNG Company Shanghai Shanghai LNG EPC Ongoing
3,000,000 MTA
continued on next page……
Major Reference – China (1/8)
-- 82 --
__Client Location Project Scope Completion
PetroChina Qiangzhou, FCC Plant FEED Ongoing Guangxi Guangxi 3,500,000 MTAPetrochemicalCompanyOriental Pudong, PTA Plant EPsCM 2006
Petrochemical Shanghai 600,000 MTAFormosa Petrochemical Ningbo, PP Plant ED 2006
Corp. Zhejiang 300,000 MTA Formosa Chemicals Ningbo, ABSII Plant ED 2006
& Fibers Crop. Zhejiang 125,000 MTA BASF/Huntsman Caojing, Integrated EPsCM 20063 JVs Shanghai Isocyanates
Project
Major Reference – China (2/8)
continued on next page……
-- 83 --
Client Location Project Scope Completion
BASF-YPC Nanjing, C1 Units EPC 2005Jiangsu - FA:50,000 MTA
- PA:30,000 MTA- MA:30,000 MTA- DMF:30,000 MTA
Ningbo Rayon Ningbo, Acrylic Fiber EPC 2005 Acrylic Fiber Zhejiang Project 50,000 MTA
Lucite Caojing, MMA Plant EPC 2005Shanghai 90,000 MTA
Shanghai Secco Caojing, SAR Plant EPC 2005 Petrochemical Shanghai 278,000 MTA
CNOOC and Shell Huizhou, Liquid Waste EPC 2005 Petrochemicals Guangdong Incinerator
Formosa Chemicals Ningbo, IPA Plant ED 2005 & Fibers Zhejiang 600,000 MTA
continued on next page……
Major Reference – China (3/8)
-- 84 --
continued on next page……
Client Location Project Scope CompletionFormosa Zhangzhou, CP-1 Power EPC 2005Petrochemical Fujian Plant DeNox SystemPetrochemical Fujian Revamp to E 2005
1,200,000 MTANantong SKT New Nantong, PVDC Project EPC 2005Materials Jiangsu 10,000 MTA
BASF-YPC Nanjing, LDPE Plant EPC 2005Jiangsu 400,000 MTA
CNOOC and Shell Huizhou, EO/EG Plant EPC 2005 Petrochemicals Guangdong 320,000 MTA
Formosa Plastics Ningbo, PVC Plant E 2004
Xiang Lu Xiamen, PTA Plant EB 2004
Major Reference – China (4/8)
-- 85 --
continued on next page……
Major Reference – China (5/8)
___Client Location Project Scope Completion
China Petroleum Nanjing, West-East EPC 2003Pipeline Engineering Jiangsu Natural Gas
Pipeline TunnelCrossing River Project
Lucite Caojing, MMA Plant E 2003Shanghai 90,000 MTA Phase I
SAR Plant278,000 MTA
Qilu Petrochemical Zibo, S-PVC Plant EB 2003Shangdong 400,000 MTA
Formosa Chemicals Ningbo, ABS Plant E 2003 & Fibers Zhejiang 120,000 MTA
ZGPC Chemical Zhengjiang, ABS II Plant EPC 2002Jiangsu 30,000 MTA
-- 86 --
continued on next page……
Major Reference – China (6/8)
___Client Location Project Scope Completion
Xiang Lu Xiamen, PTA Plant EPC 2002Petrochemical Fujian 900,000 MTARohm & Haas Nantong, Ag Chemical EPC 2001
Nantong Chemical Jiangsu Plant 8,000 MTA (incl’d EB for OSBL)
Shanghai Shanghai Ethylene Plant EB 2001 Petrochemical Revamping &
Expansion to700,000 MTA
LCY Chemical Zhengjiang, PFA Plant E 2001Jiangsu 15,000 MTA
ZGPC Chemical Zhenjiang, SAN-II Plant EPC 2000Jiangsu 30,000 MTA
Rohm & Haas Shanghai IER Plant EPC 1999 Shanghai Chemical 13,710 MTA
(incl’d EB for OSBL)
-- 87 --
continued on next page……
Major Reference – China (7/8)
Client Location Project Scope CompletionSuzhou Huasu Suzhou, PVC Plant E-C 1999
Plastics Jiangsu 100,000 MTALCY Chemical Zhenjiang, PMMA Plant EB 1999
Jiangsu 25,000 MTAMontell-TPP China Hong Kong PPAM Plant EPC 1999Advanced Polymer 6,000 MTAFujian Huaxing Quanzhou, LPG Terminal EPC 1998Petrochemical Fujian 2 x 25,000 M3Shanghai CIBA Gao Shanghai Additive Project CM 1997Qiao ChemicalICI Polyurethane Shanghai PU System EPC 1996
HouseJihua Petrochemical Jilin Oxygen EPC 1995
Generation System
-- 88 --
Major Reference – China (8/8)
Client Location Project Scope CompletionTaiwan Synthetic Nantong SBR Plant EB 1995Rubber Chemical Jiangsu 100,000 MTAAir Products Shekou Relocation of E 1992
Guangdong Oxygen Plan
Legend: EB – Basic Engineering ED – Detailed Engineering P – Supply Ps - Procurement Service C – Construction CM - Construction Management
-- 89 --
CTCICTCI OperationIn Thailand
-- 90 --
Established in 1987Capital Baht 100 MillionRevenues (2006) Baht 1,396 MillionRevenues (up to March 2007) Baht 476 MillionNumber of Employees 400+Shareholders
Thais 51%CTCI Corporation 49%
OfficesBangkok Head Office and Engineering OfficeRayong Eastern Province Operation Center (EPOC) - Construction and Fabrication Base
CTCI(Thailand)Co., Ltd. Corporate Overview
-- 91 --
BanpanKong
Nakhon Sawan
Lampang
Sriracha
Khon Kaen
Nakong Pathong
TOC C2 Cold Train and C3 Train
Vinythai VCM Plant
MPKC (“Bayer”) ABS/SAN Plant
Amata 170 MW CCPP Piping Work
Bayer BPA & PC II Expansion Mechanical Work
TPC-OXY PVC Paste Resin Plant
HMC PP-I Upgrading; PP-II; Year 2001 & 2002 Debottleneck
TIG ASU 400 TPD
Tuntex PTA Plant ISBL; Waste Gas Venturi Scrubber; RVF
Maxxis Rubber Tire Plant
Bangchak Gas Oil HDS
PPG Coatings Plant
CTCIT Bangkok OfficeCTCIT Bangkok Office
CTCIT EPOC Work ShopCTCIT EPOC Work Shop
Rayong Purifier Topping Unit
Diapolyacrylic PMMA Plant
HMC PDH Plant
Thai MMA TBA #2 and New MMA Tank
Rohm & Haas PAA Plant
Rayong
Thai Oil New Gas Turbine
PTTUT CUP 1
Bangchak Product Quality Improvement Project
Bangkok
PPCL Phenol Project
Major Reference in Thailand
-- 92 --
continued on next page……
Client Project Scope Completion
HMC - PDH Project EPC Ongoing
Bangckak Petroleum - Product Quality Improvement EPC Ongoing
PPCL - PTT Phenol Project EPC Ongoing
PTT Chem Co. - Cluster Flare Project EPC Ongoing
Thai Oil Co. - GTG/HRSG Project EPC Ongoing
PTT Utility Co. - CUP 1 Phase 4 EPC Ongoing
PTT Utility Co. - CUP 1 Phase 3 EPC Ongoing
PTT Utility Co. - CUP 1 Phase 1&2 EPC 2006
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
Major Reference – Thailand (1/7)
-- 93 --
continued on next page……
Client Project Scope Completion
Mitsubishi Corp. - BLCP Power Plant Visitor Center EPC 2006
MAXXIS - Rubber Tire Phase I Stage 2 C 2006
TSL - TSL Expansion EPC 2005
Thai Olefins Co., - New Parallel C3 EPC 2005
SIEMENS - Piping Work for IPT Power EPC 2004
Plant for CT#2
Thai Caprolactam - Oxime Dehydration Unit EPC 2004
Thai Olefins Co., - Air Oxidation Unit EPC 2004
Bangkok Industrial - BIGIII Liquifier Upgrade EPC 2004 Gases Project
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
Major Reference – Thailand (2/7)
-- 94 --
continued on next page……
Client Project Scope Completion
SIEMENS - Piping Work for IPT Power EPC 2004
Plant
Thai Olefins Co., - New Parallel Cold Train EPC 2004
Tuntex - CTA-RVF Project EPC 2004
MAXXIS International - Rubber Tire Plant C 2004
Thai Caprolactum Co., - New Train of NH3 Oxidizer EPC 2003
HMC - Deduster Project EPC 2003
Cementhai / SMPC - P-Xylene Tank Project EPC 2003
Thai Industrial Gas - Steel Structure and Pipe Line C 2003
Thai Polyethylene Co., - R-1 Expansion Project EPC 2002
Thai Polyethylene Co., - Low Polymer Transfer Line EPC 2002
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
Major Reference – Thailand (3/7)
-- 95 --
Legend: E – Engineering P – Procurement Ps - Procurement Service C – Construction CM - Construction Management
Client Project Scope CompletionPeroxythai - Distillation Upgrade EPC 2002
Tuntex - Feasibility Study for Plant E 2002
Expansion
Thai Polyethylene Co., - LLDPE Modification Project EPC 2002
Thai Olefins Co., - New Ethylene Recovery EPC 2001
Compressor Installation
HMC Polymers - Year 2002 Debottleneck EPC 2001 - Year 2001 Debottleneck EPC 2001
Bayer Polymer - BPA and PC II Expansion
- PC II Mechanical Work C2001
Major Reference – Thailand (4/7)
-- 96 --
Client Project Scope Completion
Thai MMA New MMA Tank EPC 2001
Thai MMA TBA #2 EPC 2001
Diapolyacrylic PMMA Plant Modification EPC 2001
PPG Coatings Coating Plant Modification EPC 2001
Tuntex PTA Plant Waste Gas EPC 2000
Petrochemicals Venturi Scrubber
Siam Styrene SM Furnace Modification C 2000
Monomer
The Aromatics Admin. Bldg. Extension EPC 2000
Thailand
Rohm & Haas Poly Acrylic Acid Plant EPC 1999
Chemical 22,000 MTA
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
Major Reference – Thailand (5/7)
-- 97 --
Client Projec Scope CompletiRayong Purifier Fired Heater for Purifier Unit EPC 1998
17,000 BPSDSiemens Power Gen/ 170 MW CCPP Piping Work EPC 1998
Amata-EGCO Power
Thai Industrial Gases ASU 400 TPD EPC 1997Rayong Purifier Purifier Unit 17,000 BPSD E 1997Siam Styrene SM Fire Heater C 1996
MonomerTPC-OXY PVC Paste Resin Plant EPC 1996
25,000 MTA Thai Oil HCU-2 Piping Work C 1996HMC Polymers PP-II Plant 170,000 MTA EPC 1996
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
Major Reference – Thailand (6/7)
-- 98 --
Client Project Scope Completion Grand Pacific ABS/SAN Plant Expansion EPC 1995
Chemical 18,000 MTA HMC Polymers PP-I Plant Upgrading EPC 1995 Vinythai VCM/Chlorine Plant 140,000 EPs 1995
MTABayer Polymer ABS/SAN Plant 46,000 MTA EPs 1995
(was “MPKC”)Tuntex Petrochemicals PTA Plant 350,000 MTA ISBL EPC 1995Thai Oil Various Construction Work C 1994Bangchak Petroleum Gas Oil HDS 18,000 BPSD EPC 1993Bangchak Petroleum Plant No. 2 Modification E 1992Thai Oil Sriracha Refinery Expansion C 1989
(TOC II)
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
Major Reference – Thailand (7/7)
-- 99 --
CTCICTCI OperationIn Vietnam
-- 100 --
Established in July 2001Registered Capital USD 5MShare Holders- CTCI Overseas, HK 50%- LILAMA, Vietnam 33%- Sincerity Eng’g., Taiwan 17%
Office HanoiNumber of Employees 157New Orders (2006) USD 6.6MTurnover (2006) USD 2.5MCurrent Backlog USD 7.0M
CIMAS Engineering Co., Ltd. Corporate Overview
-- 101 --
Phu My 3 Power PlantPiping Design & Field Engineer
7km Phu My-Go Dau pipelineInstrument Design
Na Duong Power Plant (2x50MW)Electrical Design
Dung Quat Refinery Package 2&3Detail Design
Van Tri Waste WaterTreatment PlantPiping Design
Dung Quat Refinery-BuildingWorksDesign
Condensate Processing PlantPiping, Civil Design
& Field Engineer
Kim Lien & Truc Bach Waste Water TreatmentPiping Design
Ca Mau 1 & 2 Power PlantPiping
Design,Procure,Construction
Da Nhim RehabilitationField Engineer
Major Reference in Vietnam
-- 102 --
__Client Project Scope Completio
n
MHI Da Nhim Rehabilitation E Ongoing
TPGM Dung Quat Refinery Project E Ongoing
(Building Work for P1, P2 & P3)
MHI/MC Omon 1A Thermal Power Plant E Ongoing
Siemens Ca Mau I&II CCPP Piping Work EPC Ongoing
Petro-Vietnam Condensate Process Plant EPC 2006
Petroleum
Development Co.
EBARA Kim Lien & Truc Bach E 2005
Waste Water Treatment
Major Reference – Vietnam (1/3)
-- 103 --
Client Project Scope Completion
ECC 45-1 7 Km Pipeline-Phu My Go Dau E 2004
(Low Pressure Pipeline)
Siemens Phu My 3 CCPP Piping Work EPC 2004
EBARA Van Tri Waste Water E 2003
Treatment Plant
LILAMA Na Duong 2x50MW Power Plant E 2003
ZNSM Dzung Quat Refinery E Put on holdPackage 2 & 3
Major Reference – Vietnam (2/3)
Legend: E – Engineering P – Supply Ps - Procurement Service C – Construction CM - Construction Management
-- 104 --
CTCICTCI ReferenceIn Singapore, Malaysia, Indonesia & The Philippines
-- 105 --
Titan Butadiene/Propylene Plant
Kuala Lumpur
Johor Bahru
Melaka
Titan OSBL Pipelines Project
Titan PP Plant
Malaysian Refining Co.PSR-II Melaka Refinery
Teluk Gong Panglima PowerCCGT Piping Project
Major Reference in Malaysia
-- 106 --
San Lorenzo 500 MW Piping
Petron / Gas Oil Hydrotreater #3 and Isomerization Unit
Batangas
Manila
Bataan
Major Reference in the Philippines
-- 107 --
Jurong
Seletar
Singapore
Esso / Power System Expansion
Esso / Propane Recovery fro
m CVS
PUB / Senoko Power Station Fuel Oil Tank Facility
PUB / Senoko Power StationElectrochlorination System
SRC /Visbreaker Project &
Catalytic
PUB / Jurong Power Station 2x100MW Gas Turbine Construction Work
SRC / HCU-2 Project Piping Work
SRC / RCC Project Piping Work
Chevron / Lube Oil Additive Engineering Work
Major Reference in Singapore
-- 108 --
continued on next page……
Client Project Scope Completion
Singapore……1
Chevron Chemical Lube Oil Additive E 1997
Singapore Refinery RCC Project Piping Work C 1995
Singapore Refinery HCU-2 Project Piping Work C 1986
PUB Jurong Power Station 2x100MW C 1986Gas Turbine Construction Work
Reference – Singapore, Malaysia,Indonesia & the Philippines (1/4)
-- 109 --
Client Project Scope Completion
Singapore……2
PUB Senoko Power Station EPC 1985Electrochlorination System
Esso Refinery Propane Recovery from CVS EPC 1985
PUB Senoko Power Station Fuel Oil EPC 1984Tank Facility
Esso Refinery Power System Expansion EPC 1983
Singapore Refinery Visbreaker Project & Catalytic E-C 1983Reformer Piping Work
continued on next page……
Reference – Singapore, Malaysia,Indonesia & the Philippines (2/4)
-- 110 --
Client Project Scope Completion
Malaysia
Titan Petchem (M) Butadiene/Propylene Project, EPC Ongoing Pasir Gudang
Teluk Gong Panglima Panglima CCGT Piping Work, EPC 2002 Power Co. Melaka
Titan Petchem (M) OSBL Pipelines, Pasir Gudang EPC 2000
Titan Petchem (M) PP Plant 100,000 MTA, E 1991Pasir Gudang
Malaysian Refining PSR-II Melaka Refinery E 1996
continued on next page……
Reference – Singapore, Malaysia,Indonesia & the Philippines (3/4)
-- 111 --
Client Project Scope Completion Philippine
Petron Gas Oil Hydrotreater #3 EPC 200522,000 BPSD and IsomerizationUnit 11,000 BPSD
Petron Gas Oil Hydrotreater #3 F.S. 200222,000 BPSD Basic Engrg.
First Gas Power San Lorenzo 500 MW Piping EPC 2002 Work, Batangas
Legend: E – Engineering P – Procurement Ps - Procurement Service C – Construction CM - Construction Management
Reference – Singapore, Malaysia,Indonesia & the Philippines (4/4)
-- 112 --
CTCICTCI OperationIn The Mid East
-- 113 --
2
3
45
6
7
8
9
1
101112
13
14
15
Riyadh Refinery Plant Expansion-KSA
Yanbu Domestic Refinery-KSAYanbu Export Fuel Refinery-KSA
Yanbu Lube Oil Refining (Luberef II)-KSAEG & Polymer Plant-KSA
Ethylene Plant-KSAEG & LLDPE Plant-KSALNG Plant-QatarMethanol & MTBE Plant-QatarFertilizer Plant Urea Quality Improvement-KSAABS/SAN Plant - IranEthylene Plant Expansion- Qatar
Hydro-Chlorination Generation Unit-KSA
Riyadh Water Transmission System Pumping Station -KSA
1
4 57
8
91013
11 12 15
3
14
2
6
Aqaba Fertilizer Plant- Jordan
UAEUAE
QATARQATAR
16 Saudi Kayan EO/EG Project- KSA
16
Major Reference in Middle East
-- 114 --
Client Location Project Scope Completion
Saudi Kayan Jubail, Saudi Kayan EO/EG EPC OngoingPetrochemical KSA Project Company
Qatar Petrochemical Mesaieed, Ethylene Plant EPC OngoingCo., (QAPCO) Qatar Expansion
525,000 MTA to 720,000 MTA S&W Process
Ghaed Bassir Golpayegan, Iran ABS/SAN Plant EPCM 2004Petrochemical Co., Ltd ABS: 35,000 MTA
SAN: 22,000 MTA Kumho Process
Al Jubail Fertilizer Co. Jubail, Fertilizer Plant Urea EPsCa 2002(SAMAD) KSA Quality Improvement
630,000 MTAStamicarbon Process
continued on next page……
Major Reference- Middle EastPetrochemical Field (1/3)
-- 115 --
Client Location Project Scope Completion
Qatar Fuel Additives Mesaieed, Methanol & MTBE E 1998
Co., Ltd. Qatar Plant
(QAFAC) MeOH: 830,000 MTA
MTBE: 600,000 MTAMeOH:ICI ProcessMTBE: UOP Process
Qatar Liquefied Gas Ras Laffan LNG Plant E 1996Co., Ltd. Qatar(QATARGAS),
continued on next page……
Major Reference- Middle EastPetrochemical Field (2/3)
-- 116 --
Client Location Project Scope Completion
• Arabian Petrochemical Co. Jubail, Ethylene Plant C 1985(Petrokemya) KSA 500,000 MTA.
• Eastern Petrochemical Co Jubail, EG & LLDPE Plant EC 1985(SHARQ) KSA EG: 450,000 MTA
Shell ProcessLLDPE: 300,000 MTAUCC Process
• Saudi Yanbu Yanbu, EG & Polymer Plant C 1984Petrochemical Co. KSA EG: 220,000 MTA (YANPET) SD Process
HDPE/LLDPE: 300,000 MTAUCC Process
• Jordan Fertilizer Jordan Aqaba Fertilizer Plant C 1982Industry Co., Ltd.
Major Reference- Middle EastPetrochemical Field (3/3)
-- 117 --
Client Location Project Scope Completion• Petromin Lubricating Yanbu, Yanbu Lube Oil E 1996
Oil Co. KSA Refining (Luberef II)25,400 BPSDMobil Process
• Petromin Mobil Yanbu Yanbu, Yanbu Export Fuel EC 1982Refinery Co. Ltd. KSA Refinery 1984
• General Petroleum & Yanbu, Yanbu Domestic C 1982Mineral Organization KSA Refinery(Petromin)
• General Petroleum & Riyadh, Riyadh Refinery C 1980Mineral Organization KSA Plant Expansion(Petromin) UOP Process
Major Reference – Middle EastRefinery Field
-- 118 --
Client Location Project ScopeCompletion
• Jeddah Oil Refinery Jeddah, Hydro-Chlorination EPC 1984 Co. KSA Generation Unit
• Saline Water Riyadh, Riyadh Water E 1984Conversion Corp. KSA Transmission
System PumpingStation
Major Reference – Middle EastOthers
Legend: E – Engineering P – SupplyPs - Procurement Service C - ConstructionCa – Construction Advisor CM - Construction Management
-- 119 --
CTCICTCI OperationIn Other Areas
-- 120 --
Client Location Project Scope Completion
Formosa Plastics USA USA OL-2 OSBL E 1999
Westlake Group USA IEM Revamping E 1999
Formosa Plastics USA USA Gasoline HDS E 1997
Karnaphuli Fertilizer Bangladesh Fertilizer Plant E 1992
Formosa Plastics USA USA OL-1 OSBL E 1991Guam Oil & Refinery Guam Jet Fuel E 1977
Modification
continued on next page……
Reference – Other Areas (1/2)
-- 121 --
Client Location Project Scope Completion
B&W USA De-NOx SCR E+P for Power Plant - Campbell, Michigan 2004- Lewis Creek, TX 2003- Karn, Michigan 2002- Huntington Beach 2001
Westlake Group USA IEM Plant EPC 2002
Formosa Plastics USA VCM Plant E 1999 USA Debottlenecking
Legend: E - Engineering P - Procurement Ps - Procurement ServiceC - Construction CM - Construction Management