7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 1/19
This presentation contains information that is proprietary to ClickSoftware. Any copying, distribution, display, transmission or disseminat
contained in this presentation to third parties without the prior written consent of ClickSoftware is strictly prohibited. No part of this presreproduced, translated or transmitted in any form or by any means, electronic, optic or mechanical, including photocopying, recording, oor retrieval system without written prior permission from the owner of the copyright.
$ntroducing ClickScheduleSage $nformatics%abburu
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 2/19
Agenda
The Scheduling Challenge The Solution& ClickSchedule
The %usiness 'alue
(roven Customer 'alue
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 3/19
The %usiness Challenges
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 4/19
The Service *peration +ilemma
Cost Reduction
Workforce
Retention
CustomerExperience
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 5/19
Contradicting -orces
/easonable
0orking 1ours 23cient /outing /educe (aperwork Compliance
*vertime Travel Costs /esource
4tili5ation
26pectatio Commitme /esponse T -irst Call
/esolution
Workforce
Retention
Cost Reduction
CustomerExperience
Th S h d li Ch ll Ti C
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 6/19
0hen there are 3 Tasks and 3 skilled /esources, thpotential scheduling options
The Scheduling Challenge& Time Cons(rocess
6 scheduling
options
Th S h d li Ch ll Ti C
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 7/19
1ow many scheduling *ptions e6ist for 6 EngineersTasks:
7! "ossi#le $cheduling %ptions&
The Scheduling Challenge& Time Cons(rocess
Th S h d li Ch ll Ti C
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 8/19
The Scheduling Challenge& Time Cons(rocess$n a more realistic scenario when there are )! 2ngine Tasks&
Possible Scheduling Options:
~1,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000
000,000,000,000,000…!
100 Tasks
30 Engineers
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 9/19
Summary& The Scheduling Challenge
Select an optimi5ed
schedule 26amine various scheduling
considerations
2<ective time frame
-le6ibility to ad=ust withdynamic changes
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 10/19
The Scheduling Challenge Who does What, With what, When, Where for Whom?
Who has the skills?
What is the work?
What parts/tools do they have?
When does the work need to start?
Where is the work?
Who is it for?
Reduced customer service
Send the =ob to the mobile device 0hat if the device is not connected:
+uty of care 0hat if the engineer is driving:
2ach =ob to the wrong engineer wastes time
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 11/19
$ntelligent Scheduling
Intelligent Scheduling considers:
The ngineer
Skills
!urrent assignment
The ngineer"s #ocation
#atitude/#ongitude co$ordinates Time stamp
The ngineer"s %&ility to Receive the Work
!onnection status Time stamp
'ehicle telemetry %re they driving?
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 12/19
Scheduling Considerations
Service #evel Agreements >S#A? @ 1ow fast wto react
eography @ Travel time, weather conditionsdistribution Timing @ (ersonal schedules, holidays, sick l Skill matching @ 0ho is able to do the =ob: #ogistics @ Available parts, tools, sta< Customer history @ /epeat visit, complaints
And much moreB..
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 13/19
ClickScheduleClickSoftwares Solution for 9obile 0-9 Scheduling D *ptimi5ation
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 14/19
ClickSchedule *verview
ClickSchedule creates an optimal schedule bthe business speci7c policies&
S#Acompliance
Travel time
*vertime 2ngineer skill
set
Customerlocation
2Euipmen
needed Time to c =ob
0orking hAnd many othersB.
The speci7c policies are de7ned by the organi5ati
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 15/19
ClickSchedule #ogic
ClickSchedule optimi5es the schedule by con
%usiness /ules, *b=ectives and %usiness F($s can be con7gu
di<erently for each customer G business line G geography an
according to the business needs.
%usiness *b=ectives @ /epresent the goascheduling
%usiness F($s @ 2valuate the schedule byperformance indicators
%usiness /ules @ /epresent the schedulin
limitations
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 16/19
ClickSchedule and the Service ConHict
Workforce
Retention
Cost Reduction
CustomerExperience
lickSchedule
aids in
achieing
balance
bet"een these
goals,
according tothe speci#ic
organi$ation
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 17/19
ClickSchedule 4niEue Capabilities Constantly optimi5es the schedule throughout the da
according to realJtime events
(rovides streetJlevel route optimi5ation
*<ers an intelligent appointment booking process, baon real time resource availability
Single solution for multiple business lines and work ty>Supports anything from simple short tasks to multiJdmultiJstaged =obs that reEuire multiple resources?
Ability to schedule and manage any type of resources>inanimate, 1/?
(roven scalability J support small service businesses tlarge enterprise 7eld service organi5ation >!,!!!K 7resources?
2nables easy integration via standard adapters to leaC/9G2/( products and web service A($
!li kS h d l ( fi
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 18/19
!lickSchedule (enefits
Reduce Costs $mprove overall visibility and
control
$ncreasing productivity ande3ciency
9inimi5e travel
/educe overtime
2liminate penalties due to
missed Service #evelagreements
'mprove Cust$atisfaction
et the =ob dothe "st time
(romise reliabappointmentwindows
7/24/2019 Introduction to ClickSchedule
http://slidepdf.com/reader/full/introduction-to-clickschedule 19/19