28
Od AN INTRODUCTION TO OD RESIDENTIAL EXPERIENCE

Intro to od resijune13

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Intro to od resijune13

OdAN INTRODUCTION TO OD

RESIDENTIAL EXPERIENCE

Page 2: Intro to od resijune13

WELCOME Od is London’s leading fi t-out and refurbishment company in commercial, residential and leisure.

We provide the very best specialist construction skills from project initiation to

completion, and we can cope with any scale project including new builds.

We’re experts in organising people and materials within tight timescales.

Jon Kearney has put together a dedicated team with over 50 years’ collective

experience as London and the South East’s leading high-quality contractor

Within this document you will find a selection of our recently completed

commercial office projects

Page 3: Intro to od resijune13
Page 4: Intro to od resijune13

COMPANY HISTORY Founded in 2004 by Jon Kearney (Managing Director). OD Projects has over 50 years collective experience as London and South East’s leading High Quality fitout contractor

and we are keen to demonstrate our team player approach by working closely with all members of professional teams on their projects.

We believe we have the best team of individuals available who have extensive knowledge and experience. These benefits will ensure a smooth delivery that will exceed a

project team’s expectations.

• OD Projects client list includes Arsenal FC,

Scott Brownrigg, AYH, and Price & Myers.

• Recruitment of Commercial Director

(Managing Surveyor of top fit out company)

• Recruitment of Construction Director (BCO

& FX Quality Award Winner)

• AIB framework contractor.

• OD Projects currently employ 25 staff.

• Achieve British Council for offices corporate member status.

• Sign 5 year lease and fit out Moorgate HQ.

• Jon Kearney finalist for G4_ New Generation Awards –

Entrepreneurship Award.

• Rolls Royce Framework contractor

• Green Apple Award for Digitas

Saatchi & Saatchi

• Instutute of Chartered Accountants

Framework contractor

• Awarded Vogue /Condenast HQ fitout

• Education sector expansion with successful

fitout projects for Partnerships For Schools

and North Herts College

• Savills approved contractor

• High end residential team acknowledged as

leading contractor within sector

• Awarded refurbishment for Royal Albert Hall

2004 2005 2006 2007 2008 2009 2010 2011 2012

In January

Jon Kearney

founds OD Projects.

• Client base expanded to include Royal &

Sun Alliance, O2, AIB, Morley Fund, and GIS

Interpublic.

• Consultants include Gensler, Cushman &

Wakefield, Barr Gazetas, and Leslie Clark.

• Royal & Sun Alliance approved

contractor status.

• OD Projects complete £4 million,

107 Leadenhall, fit out.

• OD Projects achieve ISO9001 status.

• Forecast record turnover of circa £20m in with

Business Plan.

• Official launch of aftercare team ‘ZEROdEFECTS’.

• Successful completion of first Irish project for

Marcus Evans HQ in Dublin.

• Notable project wins for clients such as

Finchatton, BMB Property, United Continental

Airlines, Safestay and Royal London Asset

Management.

• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification

achieved for Harris Williams fit out in Mayfair,

SKA silver certificate achieved for Paradigm

Housing in High Wycombe.

• Rebrand of Od which defines our focus and

disciplined approach to achieving quality.

• Od appointed on Savills Estate Agency office

fitout framework

• Repeat business levels at 70% of turnover

and growing

• Notable project wins for Dow Jones, Royal

London Asset Management, Fendi,National

Australia Group and Berkeley Group

Marketing Suites

• Od completes its first hotel refurbishment for

launch of exciting new venture for Safestay in

London

• Od working on over 50000sqft of

Londons super prime residential projects in

Knightsbridge, Kensington & Hampstead

• Od Group formed, divisions focused on

Commercial Fitout, Super prime Residential

and Commercial Design & Build

• OD Expand office space to take another

floor at Sun St HQ

Page 5: Intro to od resijune13

182 8 10 12 14 164 60

(Turnover £m April-April)

2011/2012

20 2422 26

2012/2013

Secured2013/2014 (Projected)

(Turnover £m April-April)

OD Solutions

Secured

Secured OD Interiors

OD Projects

2013/2014 (Projected)

2 8 10 12 144 60

OD GROUP TURNOVER

Secured

Secured2014/2015 (Projected)

TURNOVER

Page 6: Intro to od resijune13

CONFIDENTIALITYIn order for Od to be able to operate effectively we need to ensure that we

maintain the confidence and respect of our clients.

The clients of Od need to have confidence in their dealings with the

Company in the knowledge that any information they provide will not be

passed on to any other person or organisation.

All staff employed by and associates contracted to Od will be expected to

adhere to the company guidelines on confidentiality at all times.

Page 7: Intro to od resijune13
Page 8: Intro to od resijune13

OdPROJECT EXPERIENCE

Page 9: Intro to od resijune13
Page 10: Intro to od resijune13
Page 11: Intro to od resijune13

Knightsbridge• Rutland Gardens

• Montpelier Hall

Kensington• Faroe Road

• De Vere Gardens

• Launceston Place

• Phillimore Gardens

Belgravia• Yeomans Row

• Eaton Square

Mayfair• Shepherd Street

Bayswater• St Petersburgh Place

Central London• Canadian Pacific House

Chelsea• Shawfield Street

• Cheyne Court

St Johns Wood• Blenheim Road

Hampstead• Beaumont Gardens

• Wildwood Road

• West Heath Road

• Kenwood Place

• Winnington Close

• Whitelodge Close

• Pine Grove

Nottinghill• Pembridge Place

Southwark• Bear Pit Apartments

1

2

3

4

6

9

10

7

8

5 11

12

3

45

67

8

9

10

11

RESIDENTIAL EXPERIENCE

Page 12: Intro to od resijune13
Page 13: Intro to od resijune13

Architect: Originate Architects Ltd

Quantity Surveyor: Vincent & Partners

Services Consultant: Chapman Bathurst

Structural Engineer: Michael Alexander

Duration: 63 weeks

Value: £5,000,000

RUTLAND GARDENSKNIGHTSBRIDGE

• Complete demolition & soft strip

• Secant piling to the site boundaries

• A complicated temporary support system &

10m deep basement formation, carried out

as CDP

• High quality stonework

• Whole house ventilation, air-conditioning,

i-Light systems audio visual package

The demolition of an existing two storey property with this prime location in Knightsbridge,

forming a 16m deep basement to the entire site.

Page 14: Intro to od resijune13
Page 15: Intro to od resijune13

Project Manager: AYH

Architect: Hamilton

Quantity Surveyor: AYH

Services Engineer: AWA

Interior Design: Keech Green

Duration: 48 weeks

KENWOOD PLACEHAMPSTEAD

• New mechanical & electrical services

• Audio visual & IT networks

• Specialist joinery

• Extensive stonework

• High quality finishes.

The fit out of a penthouse apartment with 3 bedrooms and bathrooms comprising:

Works included:

Page 16: Intro to od resijune13
Page 17: Intro to od resijune13

Architect: Orbit Architects

Quantity Surveyor: Ridge & Partners LLP

Services Engineer: Hoare Lea

Duration: 20 weeks

CHEYNE COURTCHELSEA

• High spec joinery works

• Underfloor heating

• Electric ceiling heating

• Audio visual installation

Alterations, refurbishment and fitting out works to form a 3 Bedroom Apartment, including:

Page 18: Intro to od resijune13
Page 19: Intro to od resijune13

Project Manager: Cubic

Architect: Stuart Henley & Partners

Structural Engineer: Knapp Hicks & Partners

Interior Design: Gerald Moran

Duration: 55 Weeks

WINNINGTON CLOSEHAMPSTEAD

• Swimming pool, jacuzzi & sauna

• Gym

• Cinema

• Air conditioning

• Lutron lighting

• Underfloor heating

• Full home automation

Detached new build house, comprising 7 bedrooms and bathrooms, contiguous piled caltite

concrete basement and swimming pool. Features of this property include:

Page 20: Intro to od resijune13
Page 21: Intro to od resijune13

Project Manager: Cubic

Architect: Stuart Henley & Partners

Structural Engineer: Knapp Hicks & Partners

Interior Design: Gerald Moran

Duration: 55 Weeks

WHITELODGE CLOSEHAMPSTEAD

• Swimming pool, jacuzzi & sauna

• Gym

• Cinema

• Air conditioning

• Lutron lighting

• Underfloor heating

• Full home automation

Detached new build house, comprising 7 bedrooms and bathrooms, contiguous piled caltite

concrete basement and swimming pool. Features of this property include:

Page 22: Intro to od resijune13

EATON SQUAREBELGRAVIA

Architect: Lifschutz Davidson Sandilands

Quantity Surveyor: Measur

Services Consultant: Tasc

Duration: 56 weeks

The project comprises the design, construction and

fitting out to basement, lower ground and upper ground

levels of approximately 606m² gross internal area.

Works included:

• Basement swimming pool and leisure facility

• Rear mews extension

• High level residential finishes

• Installation of access lift to all floors

• High spec AV installation

• External rooftop inside outside facility

• Staff quarters

Page 23: Intro to od resijune13

BEAUMONT GARDENS LONDON, NW3

Architect: DMFK

Quantity Surveyor: Pierce Hill

Structural Engineer: Michael Alexander

Duration: 70 weeks

The demolition of the existing dwelling and the formation of

a new dwelling with a subterranean basement complete with

swimming pool. Providing five bedrooms and a conservatory

area. The works comprised:

• Demolition & Soft strip;

• Basement formation;

• New superstructure;

• High specification joinery;

• Air conditioning;

• New architectural finishes;

• Hard landscaping.• Staff quarters

Page 24: Intro to od resijune13

SUSTAINABILITYOd is taking positive steps to reduce its own carbon footprint – from the office

environment to the manufacturing process. Wherever possible we control

emissions, recycle, use renewable resources and conserve energy.

We and have received numerous environmental awards and accreditations

including:

• SKA – Silver

• BREEAM – Excellent

• LEED™ – Silver

• Green Apple Award

Page 25: Intro to od resijune13

Just a quick note to thank you for all your hard work on Crawley, In particular I think the BREEAM Excellent is a fantastic result.Well done, great team effort and thank you once again

Philip SuttonDevelopments Project Manager - Property Royal London Asset Management

“ ”

Page 26: Intro to od resijune13

Zero Defects is a commitment Od give to every project.

• Dedicated Aftercare Manager – Paul Kent

• Active involvement in FF&E, Client IT and the migration process

• O & M manuals issued and approved

• Maintenance Contracts in place

• Defect awareness process – simple effective and reactive

ZEROdEFECTS

Page 27: Intro to od resijune13
Page 28: Intro to od resijune13

1 Sun StreetLondonEC2A 2EP

Od