Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear Installations Immediate or deferred dismantling … Shut down End state Patrick O’SULLIVAN Decommissioning & Environmental Remediation Section | Division of Nuclear Fuel Cycle and Waste Technology | Department of Nuclear Energy Florida International University, Miami, 9-13 September 2019

Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Interregional Workshop on Technology Selection for

Decommissioning of Large and Small Nuclear Installations

Immediate or deferred

dismantling …Shut down End state

Patrick O’SULLIVAN

Decommissioning & Environmental Remediation Section | Division of Nuclear Fuel Cycle

and Waste Technology | Department of Nuclear Energy

Florida International University, Miami, 9-13 September 2019

Page 2: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Challenges and issues in

decommissioning

Enablers

Organization and implementation

Particular technical and non-technical

issues

• Policy and strategy

• Costing and funding regimes

• Skills and knowledge transfer

• Infrastructure (waste routes, transport, stakeholder engagement processes)

• Management of changes

• Transition period

• Risk assessment and mitigation

• Contracting and supply chain management

• End-state definition, instrumentation and controls

• Problematic waste (e.g. i-graphite)

• SMRs

• Post-accident facilities

2Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear Installations, Miami, 9 -13 September 2019

Page 3: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Our goals and activities

Information

and

knowledge

transfer

Peer

review

Promote

good

practice

Facilitate

cooperation

Publications

Practitioners

networks

Expert

missions

Training

workshop

and

courses Meetings

and conferences

E-toolsBuild

capacity

3Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear Installations, Miami, 9 -13 September 2019

Page 4: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Reasons for NPP Shutdowns [Source: IAEA PRIS Database]

4

176 reactors in Decommissioning

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear Installations, Miami, 9 -13 September 2019© IAEA

151Reasons published for Reactors

31%

25%

20%

3%

21%

Based on Economy Based on Ageing Based on Approval

Incident Others

Future - Reactors types currently in operation

66%PWR 3%GCR

16%BWR 3%LWGR

11%PHWR 1%FBR

Past and currently in decommissioning

31%PWR 26%GCR

24%BWR 6%LWGR

6%PHWR 5%FBR

0

5

10

15

20

25

30

35

Ages of reactors at shut downNb

up to 40 years life time16%

Page 5: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

0

100

200

300

400

500

600

700

2000 2010 2020 2030 2040 2050 2060

Power reator Shut down - different perspectives with life time between 40 & 60 years

fixed 40 yrs fixed 50 yrs fixed 60 yrs fixed 50yrs Variation

NPP Decommissioning SCENARIO : Future Prognosis

© IAEA

50-years operation basis

5

Developing a realistic ILLUSTRATIVE scenario

1) 50 years life time operation is considered when nothing have been already established - 70% of the cases

2) Consider multi reactors sites dismantling organization

451 Reactors in operation spread on 200 sites should stop in the coming years

70% of the Nuclear Sites have more than one reactor in operation

47% of the reactors located on a same site have been started on a range of 3 years after a predecessor

40-year operation basis

60-year operation basis

0

10

20

30

2020

Shut dow ned estimates based on illustrative scenario 50V

PWR BWR OTHER

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear Installations, Miami, 9 -13 September 2019

Page 6: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

NPP Decommissioning SCENARIO : Future Prognosis

© IAEA 6

Determine the decommissioning

scenario is paramount- Date of shutdown

- Small variation have consequence on HR

management

- Assumption for Implementation timing by design (if no existing Def Decom Plan)

- Duration of decommissioning steps can change according to the country and NPP specifics

0

20

40

60

80

100

120

140

160

180

200

50 50V1 50V2

SCENARIO SENSITIVITY ON D&D -VARIATION AROUND 50 YEARS BASED SCENARIO -10%

-21%

DESIGN

CANDU PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANS6 TRANS7 TRANS8 TRANS9 TRANSoutSAFin 30 years (canada) SAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&Dout SR SR

PWR PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANSoutSAFin SAF 50 years or Adapted SAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&Dout SR SR

BWR PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANSoutSAFin SAF 50 years or Adapted SAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&Dout SR SR

FBR PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANS6 TRANS7 TRANS8 TRANS9 TRANS10TRANS TRANS TRANSoutSAFin SAF 50 years or AdaptedSAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&D10 D&D11 D&D D&D D&D D&Dout SR SR

GCR PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANS6 TRANS7 TRANS8 TRANS9 TRANS10TRANS TRANS TRANSoutSAFin SAF 50 years or AdaptedSAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&D10 D&D11 D&D D&D D&D D&Dout SR SR

RBMK PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANS6 TRANS7 TRANS8 TRANS9 TRANS10TRANS TRANS TRANSoutSAFin SAF 50 years or AdaptedSAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&D10 D&D11 D&D D&D D&D D&Dout SR SR

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear Installations, Miami, 9 -13 September 2019

Page 7: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

20

52

20

54

20

56

20

58

20

60

20

62

20

64

20

66

20

68

20

70

20

72

20

74

20

76

20

78

20

80

20

82

20

84

20

86

20

88

20

90

20

92

20

94

20

96

20

98

21

00

21

02

21

04

21

06

21

08

21

10

21

12

21

14

21

16

Subcontractors staffing estimates

total External

0

100

200

300

400

500

600

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

DECOMMISSIONING STAFFING

Engineering internal OPS internal Project mgm external external

Skilled Trades external Waste Ops external Maintenance internal

Security / ER internal RP/Chemistry internal Proj. mgm/admin internal

Total

Planning Transition Safestore Site releaseActive Dismantling

Immediat

Deferred

Global Resource Needs estimate for Decommissioning

© IAEA 7

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

100000

20

20

20

23

20

26

20

29

20

32

20

35

20

38

20

41

20

44

20

47

20

50

20

53

20

56

20

59

20

62

20

65

20

68

20

71

20

74

20

77

20

80

20

83

20

86

20

89

20

92

20

95

20

98

21

01

21

04

21

07

21

10

21

13

Staffing for decommissioning - skills distribution Worlwide estimates based on illustrative scenario

1 -Engineering internal 2 - OPS internal 3 - Project mgm external external

4 - Skilled Trades external 5 - Waste Ops external 6- Maintenance internal

7 - Security / ER internal 8 - RP/Chemistry internal 9 - Proj. mgm/admin internal

1

3

5

8

2

4

67

9

0

5000

10000

15000

20000

25000

30000

35000

Staffing for decommissioning - skills distribution Western Europe estimates based on illustrative scenario

Engineering internal OPS internal Project mgm external external

Skilled Trades external Waste Ops external Maintenance internal

Security / ER internal RP/Chemistry internal Proj. mgm/admin internal

1

3

5

8

2

4

6

7

9

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

20

52

20

54

20

56

20

58

20

60

20

62

20

64

20

66

20

68

20

70

20

72

20

74

20

76

20

78

20

80

20

82

20

84

20

86

20

88

20

90

20

92

20

94

20

96

20

98

21

00

21

02

21

04

21

06

21

08

21

10

21

12

21

14

21

16

SUBCONTRACTORS STAFFING ESTIMATES

France United kingdom Germany Belgium

Sweden Spain Netherland Finland

Switzerland Italy Turkey EUROPE WESTERN

0

1000

2000

3000

4000

5000

6000

7000

8000

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

20

52

20

54

20

56

20

58

20

60

20

62

20

64

20

66

20

68

20

70

20

72

20

74

20

76

20

78

20

80

20

82

20

84

20

86

20

88

20

90

20

92

20

94

20

96

20

98

21

00

21

02

21

04

21

06

21

08

21

10

21

12

21

14

21

16

SUBCONTRACTORS STAFFING ESTIMATES

China Korea republic of Taiwan, China Japan Asia - Far East

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear Installations, Miami, 9 -13 September 2019

Page 8: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

8

Interregional Workshop on Optimization of Technology

Selection for Decommissioning of Large and Small

Nuclear Installations

Purpose - to discuss technology options for different decommissioning activities andthe process of selecting optimal approaches in light of relevant environmental andother boundary conditions

Topics:• Lessons Learnt from the DOE’s Decommissioning Programme

• Digitalization and Robotics for Nuclear Decommissioning

• Nuclear Education and Training

• D&D Knowledge Management Information Tool (KM-IT)

• Competence Mapping and Workforce Planning for Decommissioning

• Advanced Information Management Systems / Tours of GIS Modelling Lab / Cyber Lab

• Radiation Protection Planning / Simulation / 3D Radiological Modelling

• Artificial Intelligence / Big Data applications for NPP and other Nuclear Facilities / Autonomous Mapping using UGV (Unmanned Ground Vehicles)

• Robotics Technologies for Decommissioning

• Lab Tours – Robotics Platforms and Rad Labs

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear Installations, Miami, 9 -13 September 2019

Page 9: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Thank you!

Page 10: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Extra Slides

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019 10

Page 11: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Relevant IAEA Activities on

Decommissioning

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019 11

Page 12: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

12

Collaborative Project: Human Resource Development for

Decommissioning - 1

President’s Report (Extracts)

…Decommissioning and environmentalremediation presents a work environmentthat is changing frequently, and so may notbe fully dependent upon standardization ofprocedures and work plans. …it shouldnonetheless be recognized that transitionfrom operators to decommissioning workerswill require retraining and a differentmotivational approach.

The number of ongoing decommissioningand environmental remediation projects islarge, and current estimates indicate furthersubstantial increases in the coming years.The Conference emphasises the need topromote actions and programmes aimed atensuring the availability of personnel forfuture activities. In this regard the need toincrease ongoing activities to attract youngprofessionals to make these activitiessustainable over time was stronglyemphasized.

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

Page 13: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

13

Collaborative Project: Human Resource Development for

Decommissioning - 1

Objective

o Highlight current good practice on training and human resource

management / human performance improvement for decommissioning

Timeframe

o 2018-2019

o Technical Meeting – 1-5 July, VIC [EVT1804578]

Deliverable

o NE Series Report “Training and Human Resource Considerations for Nuclear Facility Dismantling” [Early 2020]

Main topics Addressed

o Human resource considerations in preparation for decommissioning

o Transitioning from operations to decommissioning

o Knowledge management requirements for decommissioning

o Roles and responsibilities

o Training requirements and application of the systematic approach to

training (SAT)

o Training facilities, instructors and training programmes

o Case studies

Overview of the SAT process

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

Page 14: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

14

Collaborative Project: Human Resource Development for

Decommissioning - 2

Case study: Rocky Flats

0

100

200

300

400

500

600

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Figure 1 - DECOMMISSIONING STAFFING

Engineering internal OPS internal Project mgm external external

Skilled Trades external Waste Ops external Maintenance internal

Security / ER internal RP/Chemistry internal Proj. mgm/admin internal

Total

Planning Transition Safestore Site releaseActive Dismantling

Immediat

Deferred

Typical staffing profile for decommissioning of light water reactors (PWR/BWR)

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

Page 15: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

NPP Organization’s Primary Knowledge Assets

Information Management (Information

Technology Tools and Systems)

Processes

PeopleNuclear Sci. &

Technology

“Alignment”

Physical Plant &Design Basis

Organizational Culture

4

Page 16: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Plant Information Model (PIM)

A Knowledge-centric Plant Information Model is asemantically organized set of interlinked facility information, relationships, rules andknowledge frameworks that collectivelyform digital representations of theplant throughout its life cycle

5

Page 17: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Plant Information Model (PIM) for the Plant Lifecycle

Design Construction CommissioningOperations and

MaintenanceLong term Operation

Decommissioning

- Design specifications

- Design requirements

- Design changes

- As built drawings and specifications

- Design changes to Structures, Systems and Components

- Construction experience

- Testing and validation

- Design changes based on commissioning feedback

- Commissioning experience

- Design changes from operation feedback

- Operation experience

- Operation and Maintenance policies/procedures

- Major design changes to plant Structures, Systems and Components to improve performance and safety

- Data and experiences

Plant Information Model Captures the Information as the Plant Moves Through Lifecycles ( ~ 100 Years)

6

Page 18: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Plant information model for decision making

7

Page 19: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Integration of PIM systems and sensors

Image courtesy of István Szõke (IFE, Norway)

Page 20: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Holistic Digital Support

Image courtesy of István Szõke (IFE, Norway)

Page 21: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Capacity Building for

Decommissioning

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019 21

Page 22: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Capacity Building

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

o Reports

o Expert missions & peer reviews

o Training courses/workshops

o Scientific visits & fellowships

o Conferences and technical

meetings

Training Event Host/Location

Workshop on safety assessment of sites for

decommissioning and remediation [INT/9/183]Argonne, US

Regional workshop processes for end state

selection and site release criteria for NPPs

[RER/9/150]

Slavutych, UA

Regional Workshop on decommissioning

planning and cost estimation for

decommissioning [RER/9/150]

Bratislava, SK

Regional Workshop on role of IT in knowledge

management for decommissioning [INT/9/183]Halden, NO

Regional Workshop on safety aspects of near

surface disposal of radioactive waste

[RER/9/150]

Kozloduy, BG

Regional Workshop on technologies for waste

characterization and processing [RER/9/150]

Visaginas,

Lithuania

22

Page 23: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

IAEA Collaborating Centres on Decommissioning

Objectives:

• To promote innovation in decommissioning

• To facilitate knowledge sharing on current good practice

• To assist in long-term developing a qualified workforce through supporting a

number of fellowships (i.e. secondments of several months’ duration).

Courtesy of IFE, Norway

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

23

Page 24: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Encouraging Innovation Through

Collaboration• Roadmap for R&D for Decommissioning [SHARE Project Proposal]

• Encouraging Use of Digitalization [3D3P Project Proposal -> PLEIADES]

• ELINDER network of training organizations

[Photo courtesy of IFE, Norway]

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 201924

Page 25: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

IAEA Support: E-learning

for stakeholders and

newcomers to the fieldhttps://nucleus.iaea.org/sites/connect-members/LMS/Pages/Welcome-to-

the-learning-materials-section.aspx

25

IAEA Supported Tools

International Predisposal Networkforum for the sharing of practical experience

Networking Nuclear Education Community of Practice

Regulatory Supervision of Legacy sites International Working Forum

and international developments on radioactive waste management activities before disposal.

© IAEAInterregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

Launched in 2016 : WIKI

IAEA Data Bases

PRIS Power Reactor Information

System2 modules for NP Reactors; in Operation - in Decommissioninghttp://prisweb.iaea.org/Home/Pris.asp

RRDB Research Reactors Data Basehttp://nucleus.iaea.org/RRDB

INFCIS Nuclear Fuel Cycle Information

Systemhttps://infcis.iaea.org/NFCIS/Facilities

Specifics

IAEA Support

14 Networks - Web Based Tools

to support information sharinghttps://nucleus.iaea.org/sites/connect/Pages/default.aspx

Page 26: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

E-learning / Briefing Material

For Stakeholders and Professionals

More

languages

than

English

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

CLP4Net - Agency wide Learning Management System

26

Page 27: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Peer Reviews – ARTEMIS

• Main objectives: to provide independent expert opinion and advice to MS

– IAEA forms a team of international experts

• Intended for facility operators and other implementing organizations,

regulators, government agencies, policy makers

• Scope can include facilities and activities related to:

– Spent nuclear fuel and RW management

– Decommissioning

– Environmental remediation

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019 27

Page 28: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

Recent Technical and Policy Publications

http://www-pub.iaea.org/MTCD/publications/publications.asp

28

Page 29: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Future Outlook

• Finalize current report by the

end of 2019

• HRD for Decommissioning

remains an ongoing key topic of interest for IAEA

• Ideas on further relevant

activities to promote

collaboration and sharing of experience and knowledge is

this field are very welcome

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

29

Page 30: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Thank you!

Page 31: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Decommissioning scenarios Analysis

Worldwide NPP decommissioning

program – analysis and prognosis

Immediate or differed

decommissioningShut Down End state

Mr Christian GLORENNEC

Decommissioning and Environment Remediation Section | Division of Nuclear Fuel Cycle and Waste Technology| Department of Nucl ear Energy

Page 32: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

DECOMMISSIONING CHALLENGES AND CHARACTERISTICS

COST AND FUNDINGS

Schedule

Best Technique Available

Commercial strategy

WASTE MANAGEMENT

Type

Volume

Waste route

STAFFING MANAGEMENT

SCHEDULE

And

CHRONIC

X

X

X

STRATEGIES

X

X

x

REACTOR

TYPE POWER and

HISTORY

X

X

x

ORGANIZATION

x

X

X

(multi)

© IAEA

STATUS

Decommissioning Plan Transition Safe store D&DSite

release

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

32

Page 33: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Reasons for NPP Shutdowns [Source: IAEA PRIS Database]

33

176 reactors in Decommissioning

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

© IAEA

151Reasons published for Reactors

Ageing is the only reason which can

be measuredAnd also the 2nd reason pointed for definitive shut down in

America Northern and in Western Europe

31%

25%

20%

3%

21%

Based on Economy Based on Ageing Based on Approval

Incident Others

Future - Reactors types currently in operation

66%PWR 3%GCR

16%BWR 3%LWGR

11%PHWR 1%FBR

Past and currently in decommissioning

31%PWR 26%GCR

24%BWR 6%LWGR

6%PHWR 5%FBR

0

5

10

15

20

25

30

35

Ages of reactors at shut downNb

up to 40 years life time16%

Page 34: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

0

100

200

300

400

500

600

700

2000 2010 2020 2030 2040 2050 2060

Power reator Shut down - different perspectives with life time between 40 & 60 years

fixed 40 yrs fixed 50 yrs fixed 60 yrs fixed 50yrs Variation

NPP Decommissioning SCENARIO : Future Prognosis

© IAEA

50-years operation basis

34

Developing a realistic ILLUSTRATIVE scenario

1) 50 years life time operation is considered when nothing have been already established - 70% of the cases

2) Consider multi reactors sites dismantling organization

451 Reactors in operation spread on 200 sites should stop in the coming years

70% of the Nuclear Sites have more than one reactor in operation

47% of the reactors located on a same site have been started on a range of 3 years after a predecessor

40-year operation basis

60-year operation basis

0

10

20

30

2020

Shut dow ned estimates based on illustrative scenario 50V

PWR BWR OTHER

Decommissioning scenarios analysis handover– 2019-08-14Interregional Workshop

on Technology Selection

for Decommissioning of

Page 35: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

NPP Decommissioning SCENARIO : Future Prognosis

© IAEA 35

Determine the decommissioning

scenario is paramount- Date of shutdown

- Small variation have consequence on HR

management

- Assumption for Implementation timing by design (if no existing Def Decom Plan)

- Duration of decommissioning steps can change according to the country and NPP specifics

0

20

40

60

80

100

120

140

160

180

200

50 50V1 50V2

SCENARIO SENSITIVITY ON D&D -VARIATION AROUND 50 YEARS BASED SCENARIO -10%

-21%

DESIGN

CANDU PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANS6 TRANS7 TRANS8 TRANS9 TRANSoutSAFin 30 years (canada) SAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&Dout SR SR

PWR PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANSoutSAFin SAF 50 years or Adapted SAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&Dout SR SR

BWR PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANSoutSAFin SAF 50 years or Adapted SAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&Dout SR SR

FBR PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANS6 TRANS7 TRANS8 TRANS9 TRANS10TRANS TRANS TRANSoutSAFin SAF 50 years or AdaptedSAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&D10 D&D11 D&D D&D D&D D&Dout SR SR

GCR PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANS6 TRANS7 TRANS8 TRANS9 TRANS10TRANS TRANS TRANSoutSAFin SAF 50 years or AdaptedSAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&D10 D&D11 D&D D&D D&D D&Dout SR SR

RBMK PLANin PLAN2 PLAN3 PLANoutSD DF TRANSinTRANS2 TRANS3 TRANS4 TRANS5 TRANS6 TRANS7 TRANS8 TRANS9 TRANS10TRANS TRANS TRANSoutSAFin SAF 50 years or AdaptedSAFout STUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSSTUDY RE-ASSESSD&Din D&D2 D&D3 D&D4 D&D5 D&D6 D&D7 D&D8 D&D9 D&D10 D&D11 D&D D&D D&D D&Dout SR SR

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

Page 36: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

0

20

40

60

80

100

Estimate number of Reactor into PLANNING

Europe - Western Europe - Central and Eastern

America - Northern Asia - Far East

PLANNING

NPP Decommissioning: Status Prognosis

© IAEA 36

Period for

Dismantling

Activities

Period for HR transition

and Detailed Characterization

Period for planning

0

20

40

60

80

100

120

140

160

Estimate number of Reactor into TRANSITION

Europe - Western Europe - Central and Eastern

America - Northern Asia - Far East

"TRANSITION"

0

20

40

60

80

100

120

140

160

180

Estimate number of Reactor into Active Dismanling

Europe - Western Europe - Central and Eastern

America - Northern Asia - Far East

D&D

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

Page 37: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

20

52

20

54

20

56

20

58

20

60

20

62

20

64

20

66

20

68

20

70

20

72

20

74

20

76

20

78

20

80

20

82

20

84

20

86

20

88

20

90

20

92

20

94

20

96

20

98

21

00

21

02

21

04

21

06

21

08

21

10

21

12

21

14

21

16

Subcontractors staffing estimates

total External

0

100

200

300

400

500

600

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

DECOMMISSIONING STAFFING

Engineering internal OPS internal Project mgm external external

Skilled Trades external Waste Ops external Maintenance internal

Security / ER internal RP/Chemistry internal Proj. mgm/admin internal

Total

Planning Transition Safestore Site releaseActive Dismantling

Immediat

Deferred

Global Resource Needs estimate for Decommissioning

© IAEA 37

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

100000

20

20

20

23

20

26

20

29

20

32

20

35

20

38

20

41

20

44

20

47

20

50

20

53

20

56

20

59

20

62

20

65

20

68

20

71

20

74

20

77

20

80

20

83

20

86

20

89

20

92

20

95

20

98

21

01

21

04

21

07

21

10

21

13

Staffing for decommissioning - skills distribution Worlwide estimates based on illustrative scenario

1 -Engineering internal 2 - OPS internal 3 - Project mgm external external

4 - Skilled Trades external 5 - Waste Ops external 6- Maintenance internal

7 - Security / ER internal 8 - RP/Chemistry internal 9 - Proj. mgm/admin internal

1

3

5

8

2

4

67

9

0

5000

10000

15000

20000

25000

30000

35000

Staffing for decommissioning - skills distribution Western Europe estimates based on illustrative scenario

Engineering internal OPS internal Project mgm external external

Skilled Trades external Waste Ops external Maintenance internal

Security / ER internal RP/Chemistry internal Proj. mgm/admin internal

1

3

5

8

2

4

6

7

9

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

20

52

20

54

20

56

20

58

20

60

20

62

20

64

20

66

20

68

20

70

20

72

20

74

20

76

20

78

20

80

20

82

20

84

20

86

20

88

20

90

20

92

20

94

20

96

20

98

21

00

21

02

21

04

21

06

21

08

21

10

21

12

21

14

21

16

SUBCONTRACTORS STAFFING ESTIMATES

France United kingdom Germany Belgium

Sweden Spain Netherland Finland

Switzerland Italy Turkey EUROPE WESTERN

0

1000

2000

3000

4000

5000

6000

7000

8000

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

20

52

20

54

20

56

20

58

20

60

20

62

20

64

20

66

20

68

20

70

20

72

20

74

20

76

20

78

20

80

20

82

20

84

20

86

20

88

20

90

20

92

20

94

20

96

20

98

21

00

21

02

21

04

21

06

21

08

21

10

21

12

21

14

21

16

SUBCONTRACTORS STAFFING ESTIMATES

China Korea republic of Taiwan, China Japan Asia - Far East

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

Page 38: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Decommissioning Funds estimate for Decommissioning

© IAEA 38

0

500

1000

1500

2000

2500

2020

2023

2026

2029

2032

2035

2038

2041

2044

2047

2050

2053

2056

2059

2062

2065

2068

2071

2074

2077

2080

2083

2086

2089

2092

2095

2098

2101

2104

2107

2110

2113

2116

ESTIMATE OF DECOMMISSIONING MARKET SIZE IN EUROPEAN UNION scenario 50y

10.2 10.6 12.18.7

15.3 15.918.1

13.0

0.0

5.0

10.0

15.0

20.0

2019 -2029

2030 -2039

2040 -2049

2050 -2060

EU EU

0

5

10

15

20

25

2019 - 2029 2030 - 2039 2040 - 2049 2050 - 2060

ESTIMATE OF DECOMMISSIONING MARKET SIZE by time period

Europe - Western America - Northern Asia - Far East

Europe - Central and Eastern America - Latin Asia - Middle East and South

Mini Maxi

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

Page 39: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

303

367

505

376

242276

158

48

149192

246196

12.96 8.70 7.66 7.320

100

200

300

400

500

600

2019 - 2029 2030 - 2039 2040 - 2049 2050 - 2060

Europe - Western - DECOMMISSIONING WASTE ESTIMATE

VLLW RELEASE LLW ILW

1000's Tons

WASTES PRODUCTION PROGNOSIS

© IAEA

PLAN TRANSITION D&D

DEMOLITION &SITE

RELEASE

WLLV - 20% 80% Equally distributed

LLW - 10% 90% Equally distributed

ILW - 100% Equally distributed

FUEL 100% 3 first years of transition

TOTAL VOLUME

1000 Mwe VLLW LLW ILW

PWR 10 000.00 5 000.00 50.00

VVER

BWR 15 000.00 6 000.00 150.00

GCR 300 000.00 77 000.00 10 000.00

LWGR 300 000.00 70 000.00 9 000.00

PHWR 10 000.00 5 000.00 100.00

FBR 50 000.00 10 000.00 9 000.00

fuel/Tons

100

100

100

100

100

100 To b

e ad

apte

d

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

3039

91

106

6575

161

186

3444

108

136

1.78 1.96 3.07 2.310

20

40

60

80

100

120

140

160

180

200

2019 - 2029 2030 - 2039 2040 - 2049 2050 - 2060

Asia - Far East - DECOMMISSIONING WASTES ESTIMATE

VLLW RELEASE LLW ILW

1000's Tons

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1000.00

2000.00

3000.00

4000.00

5000.00

6000.00

7000.00

2020

2023

2026

2029

2032

2035

2038

2041

2044

2047

2050

2053

2056

2059

2062

2065

2068

2071

2074

2077

2080

2083

2086

2089

2092

2095

2098

2101

2104

2107

2110

2113

2116

Decommissioning GDF waste production estimates inside the EUropean Community

FUEL ILW To GDF39

Page 40: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Decommissioning scenarios Analysis

PRIS data improvement

© IAEA

- Country (analyze by country region)

- Reactor design (design effect)

- Date of grid connection (age)

- Power (size effect)

- Date of shutdown (start decommissioning)

- Decommissioning Strategy (start D&D)

- Decommissioning milestone (decommissioning status)

Next steps for analysis – Forecasts and prognosis

For staffing For cost and annual expenses For waste

production

and

distribution

TO PROVIDE STANDARD ANALYSIS

TO THE MS Country/region/time scale

- Number of NPP within a dedicated

status

- Estimates of expenses

- Estimates of staffing/skills

- Estimates of wastes produced

Develop Modeling Results

Interregional Workshop on Technology Selection for Decommissioning of Large and Small Nuclear

Installations, Miami, 9-13 September 2019

BA

SED

ON

AS

SU

MP

TIO

N A

ND

MO

DEL

BA

SED

ON

REA

L A

ND

ES

TIM

AT

ES

40

Page 41: Interregional Workshop on Technology Selection for ... › wp-content › uploads › 2019 › 09 › ... · Interregional Workshop on Technology Selection for Decommissioning of

Thank you!