8
INTERREG IV C-Project on Water Scarcity and Drought

INTERREG IV C-Project on Water Scarcity and Drought

  • Upload
    dixie

  • View
    42

  • Download
    3

Embed Size (px)

DESCRIPTION

INTERREG IV C-Project on Water Scarcity and Drought. INTERREG IV C-Project on Water Scarcity and Drought. INTERREG IV C-Project on Water Scarcity and Drought. Southern-Great Plain region Endanger by aridity and drought Endanger by inland waters. Water resources decreased - PowerPoint PPT Presentation

Citation preview

Page 1: INTERREG IV C-Project on Water Scarcity and Drought

INTERREG IV C-Project on Water Scarcity and Drought

Page 2: INTERREG IV C-Project on Water Scarcity and Drought

INTERREG IV C-Project on Water Scarcity and Drought

Page 3: INTERREG IV C-Project on Water Scarcity and Drought

INTERREG IV C-Project on Water Scarcity and Drought

Southern-Great Plain region • Endanger by aridity and drought

• Endanger by inland waters Water resources decreased• underground water-levels

• surface outflow

traditionally high-

quality agriculture decreased

Page 4: INTERREG IV C-Project on Water Scarcity and Drought

INTERREG IV C-Project on Water Scarcity and Drought

Environmental elements degradation• (Solodized) lakes and water-courses• Flora and fauna

Nagyszéksós-lake (125 hectare) • endangered (climate change)• multifunctional tasks (environmental and water storage)

Complex development program• EU regional OP (ERDF 75%)• National cofinancing (25%)

   

Page 5: INTERREG IV C-Project on Water Scarcity and Drought

INTERREG IV C-Project on Water Scarcity and Drought

Pump station

2

3

Main elements of the project (Water Saving-Water Reuse)

• Building the water replacement system of Nagyszéksós-lake (grey water use, wet-land)

1

Pressure pipe

Wet-land

Page 6: INTERREG IV C-Project on Water Scarcity and Drought

INTERREG IV C-Project on Water Scarcity and Drought

Channel dredging

4

Main elements of the project (Water Saving-Water Reuse)

• Rebuilding drainage routes (increasing capacity of the drainage system towards Serbia)

4

Channel dredging

4 Channel dredging

●● ● ●Water retention sluices

●●Water retention sluices5

5

Page 7: INTERREG IV C-Project on Water Scarcity and Drought

INTERREG IV C-Project on Water Scarcity and Drought

12 hectare

Periodical reservoir

4 hectare

Main elements of the project (Water Saving-Water Reuse)

• Reconstructing the internal area of the

reservoir (1.2 billion m3 water storage capacity)

Sluice

Constatnt water surface

Sluice

Constatnt water surface

Total budget ~620.000 €