    Interoperability beyond traditional BIM

    Christian RustSales Development Manager AEC Emerging Countries

    Autodesk

  • What does the Bermuda triangle and AEC industry have in common?

    Typical challenges on projects

    Information flow between involved parties

    Time and cost pressure

    Buildings are getting more complex

    Owner

    BuilderPlanner

  • Technologies & Processes available to

    the Industry

    CADComputer Aided

    Drafting

    IPDIntegrated

    Project Delivery

    BIMBuilding

    Information Modeling

    BuildingInformation Model

    Architect

    StructuralEngineer

    MEPEngineer

    Constructor

    Owner

  • BUILDINGINFORMATIONMODELING ARCHITECTS

    STRUCTURALENGINEERS

    MEP SYSTEMSENGINEERS

    BUILDERS

    OWNERS

    The Building Information Model Defined

    Definition

    Building Information Modeling (BIM) The creation and use of coordinated, internally consistent, computable information about a building project in design and construction.

    Image Courtesy of DDB Architectural International Ltd.

  • The benefits of BIM for the AEC industry

    0% 10% 20% 30% 40% 50% 60% 70% 80% 90%

    Construction monitoring

    Phasing and scheduling

    Record models

    Cost estimation

    Shop drawing coordination

    Sustainable design

    Marketing

    Clash detection

    Visualization

    18%

    27%

    27%

    33%

    36%

    39%

    48%

    61%

    88%

    Design Intelligence Technology Survey May/June 2008 www.di.net

  • 2006 Autodesk 6

    Case Study 1

    ADSK office building

    Integrated Project Delivery

  • BIM-enabled approach:

    Integrated Project Delivery (IPD)

    1) Early substantive involvement of key participants

    2) Joint sharing of risk and reward through a profit/incentive pool

    3) Joint project management

    4) Zero Litigation

  • 2006 Autodesk 9

    BIM in practice:

    Design

  • Lighting Design Collaboration

    Design/Electrical Model

    Coordination Model

    BIM Design Deliverables

  • 2006 Autodesk 11

    BIM in practice:

    Digital Fabrication

  • Millwork Design: Contractors Visualization

    Millwork:

    Fabrication Model

  • QTO

  • Construction Process: Coordination

  • Sustainable Design: Lighting

  • Sustainable Design: Construction

  • 8 months from 0% design to Certificate of Occupancy

    0% change orders

    30% owner scope changes delivered in 6.7% less time (compared to baseline project schedule)

    No Claims

    No lost time accidents

    No back charges

    7.4% added design quality

    Results

  • Case Study 2Baltic Arena PolandEurocup 2012

    Structural Engineer:Autorska Pracownia Konstrukcyjna WOJDAK

    Using:Autodesk Robot Structural analysis& Revit Structure & Autocad

    Benefits:Leveraged architects Autocad plansDeveloped structural model in 2 days Able to test multiple design variations and optimize structural setup on the flyEasier communicateon with the client & architect enabled faster decission process

  • Case Study 4CET Budapest

    Planer: ONL

    Using:Revit Architecture & 3DMax

    Challenges:Non Standard architecture with cost limits & embedding existing building

    Advantages:Visualize to understand conceptGet collision free buildingBuilding to factory design

  • creating structural element listings

    [one-to-one relation]

  • Case Study 5Tatweer Towers

    Planer: Burt Hill

    Using:Autodesk BIM approach

    Challenge:Very complex & big building 3.9 Mio SF2 x119 Floors plus 4 (2) Basements

    Benefits: Saving time, money,Gaining understanding

    Following material all provided by:

  • FEASIBILITY

    DESIGN

    DATA

  • GIANT 6 GB FILE SIZE

    REQUIRES SERIOUS STRUCTURING

    COMMERCIAL TOWER ONLY SHOWN,

    RESIDENTIAL HAS SIMILAR STRUCTURE

    EACH USER WORKS

    ON A FILE OF

    MAXIMUM 250 MB

  • IT CANT BE DONE IN REVIT

  • IT MUST BE DONE IN REVIT

  • DESIGN

    MAXMODEL

    REVIT MODEL

    DATABASE

    AUTODESK SOLUTION ENABLES SEAMLESS EFFICIENT

    INTERRELATION BETWEEN

    DESIGNER AND BIM EXPERT MANAGER

  • Dubailand Project, mixed use 4.6 M sf

  • Dubailand Project, mixed use 4.6 M sf

  • PARAMETRIC SURFACE SUBDIVISION

  • PARAMETRIC SURFACE SUBDIVISION

  • STRUCTURAL FRAME GENERATION

  • BEFORE

    2 WEEKS8 STAFF

  • AFTER

    2 HOURS2 STAFF

  • Cities = BIM + IM Project = BIM + IM

  • Big BIM Small BIM MEGABIM

  • BIM consultantsOmnix & Allcad

    Case Study 6looks familiar, or?

    Using:Revit Arch, Structure, MEP, 3D Max, Navisworks, MS Project, Excel, ACAD

    Benefits:BOQ with 2d referencingFast delivery deadline 1st NovemberClash detection Easier communication with the client , architect & engineers enabled faster decision processand much more ..

  • Case Study 6YAS Hotel

    Omnix BIM Services

    1. 3d Views And Section For Constructability Review

    2. Clash Detection Reports

    3. BOQ of all items in BIM model with 2D Drawing cross referencing

    4. Rendered Views & Walk-through for interior and overall building Pre-

    Construction Analysis

    5. Construction Progress Review Sheet

    6. Construction Simulation

    7. As-Built BIM Model

    AllCAD Services

    1. 3d Views And Section For Constructability Review

  • 3d Views And Section For Constructability Review

  • 3d Views And Section For Constructability Review

  • 3d Views And Section For Constructability Review

  • 3d Views And Section For Constructability Review

  • 3d Views And Section For Constructability Review

  • HTML REPORTNWD MODEL

    Clash Detection ReportsClash Detection Reports

    ..\LINK FILES\CLASH REPORT\YAS-GB-AFC-0670-DG-026797 TOWER A LEVEL 01 CANOPY MODEL DRAINAGE - SGN & AGN CLASHES HTML\HTML\DRAINAGE TO SGN & AGN.html..\LINK FILES\CLASH REPORT\NWD\YAS-GB-AFC-0670-DG-026796 TOWER A LEVEL 01 CANOPY MODEL DRAINAGE - SGN & AGN CLASHES.nwd

  • CLASH REPORT OF TOWER-A (YAS ISLAND)Floors MEP to MEP SGN, AGN to MEP

    Basement 51 87

    LGF 307 677

    GF 377 1555

    Mezzanine 78 349

    Level 01 437 837

    Level 02 364 573

    Level 03

    Level 04

    Level 05

    Level 06

    Level 07

    Level 08 - -

    Total 3142 7473

  • CLASH REPORT OF TOWER-B (YAS ISLAND)Floors MEP to MEP SGN, AGN to MEP

    Basement 510 1355

    LGF 187 974

    GF 533 317

    Mezzanine 72 683

    Level 01 51 367

    Level 02 65 169

    Level 03

    Level 04

    Level 05 26 194

    Level 06 - -

    Level 07 - -

    Total 1574 4397

  • Rendered Views & Walk-through for interior and overall building Pre-Construction Analysis

  • Rendered Views & Walk-through for interior and overall building Pre-Construction Analysis

  • Rendered Views & Walk-through for interior and overall building Pre-Construction Analysis

  • (GYPSUM WALL)

    BOQ with 2D Drawing cross

    referencing

  • BOQ with 2D Drawing cross referencing

  • 1 Foundation

    2 RCC Column Schedule

    3 RCC Wall Schedule

    4 RCC Slab Schedule

    5 RCC Beam Schedule

    6 Wall Schedule

    7 Curtain Wall Schedule

    8 Exterior Glazing Schedule

    9 Door Schedule

    10 Window Schedule

    11 Flooring Schedule

    12 Reflected Ceiling Schedule

    13 Staircase Schedule

    14 Balustrade Schedule

    FLOOR WISE QUANTITY LIST FOR FOLLOWING SERVICES.

    1 Electrical Power, Light & Auxiliary

    2 HVAC Works

    3 Fire Protection Works

    4 Water Supply & Drainage

    QUANTITY DELIVERABLES

  • CURTAIN WALLS

    STAIRCASE

    BLOCK WALLS

    SLAB & COLUMNS

    COREWALLS

    Construction Progress Review SheetSEGREGATED BROKEN MODEL

  • As-Built BIM Modelfor preventive maintenance

  • As-Built BIM Modelfor corrective maintenance

  • As-Built BIM Modelfor Facility Management

  • Case Study 6YAS hotel

    Thanks to:Omnix and AllCADALDAR and Al Futtaim

    Cedric CarrRajinder Lall

    7473+4397=11870 Clashes solved