Internship Report Abdul Mateen Khan MBA – (Management) (MC070403976) – Fall 2009. 2. 1. 4. 8. 7. 6. 3. 5. Contents. Brief Introduction of the Organization. Organization Hierarchy Chart. Internship / Training Plan. Management Functions. Critical Analysis. SWOT Analysis. Conclusion. - PowerPoint PPT Presentation
Citation preview
Contents
Organization Hierarchy Chart
1
Internship / Training Plan
SWOT Analysis
3
4
5
6
Conclusion
Management Functions
Brief Introduction of the Organization
Critical Analysis
7
8 Recommendation
2
Overview (1/10) History
Service Providing Telecommunication Compony Known as TIER4 Pvt Ltd Registered in 2007 Started with 16 employees Starting Project NSN Telenor Project. Now more then 150 employees Working in North, South and Centeral Region of Pakistan Recent is reputed subcon of HUAWEI Telecom Establishing Two new Offices in Multan & Karachi
Vision Overview (2/10)
TIER4 intend to lead in Telecom Implementation, Data Communication, Microwave and All types of Transmission and Connectivity.
Mission Overview (3/10)
TIER4 committed to achieve its goals and always concern to the optimum benefits of clients.
To develop its professional skills and techniques and teams, its managerial strength & resources will be strengthened.
TIER4 is capable of managing, all the companies and sub-contractors involved in the deployment process.
Types of Services Overview (4/10)
Telecom Installation
Testing & Commissioning
Power & DG Installation
Logistic Movement of material
Business Volume Overview (5/10)
The portfolio of mega-projects in which TIER4 has participated since its beginning are.
NSN – TELENOR Rollout Site Survey TSSR Logistic Support HUAWEI Ufone (Rollout + Expension) Zong (Rollout + Expension + Swap) Warid (Rollout) PTCL(MW Links + CDMA) Local Site Survey LOS
How it works Overview (6/10)
DN Processing and Collection Follow up transportation Hardware receiving, Verification and RFI Team Movements Follow up Complete workflow chart SOP implementation Quality checklist Media Patching and call test Pre-ATP and DT support ATP Snags Verification Commercial Launch
TIER4 Work Flow: Overview (7/10) Process Nok ok
Project Coordinator
DN
Receiving
Huawei Coordination
TE Implementation
M.O
Quality Work
Media + Test Call
Pre-ATP + DT Support
D.M.O
Q.M
D.M.O
Commercial Launch
Site Documentation
RFI
ATP + Snags Verification
Achievement Overview (9/10)
Place in “A” grade for the 3rd quarter in Ufone Project all region 2008.
Competitors Overview (10/10)Sr No
Names Sr No
Names
1 ELTEK Karachi Pakistan
8 IKAN Engineering Judicial Colony Raiwand Road Lahore
2. RELACOM Pakistan (Pvt) Ltd
Karachi
9 Wajda International Lahore
3. Haris & Co Faisal Town Lahore
10 Watanserve Rwp
4. Enter SES 11 MYSON Engineering System Islamabad
5. NETCOM Solutions (Pvt) Ltd
12 High Rise Pvt Ltd E-8 Islamabad
6. ATL 13 Technocrate Pakistan Karachi
7. Global Technology Islamabad
14 Sifco Engineering Service Multan
Organization Hierarchy Chart
Chief Executive Officer
Manager Operation Director Admin
Dy Mgr Operation
RPM Center
Eng
Instalation Team
RPM South RPM North
Eng
Instalation Team
Eng
Instalation Team
Coord HR Finance ExecutAccount Execut
Internship Plan/Training Plan
DepartmentsDuration Training
Date Schedule
Activity
Administration(HR/Store)
4 Week01 – 31
Mar 2009
• Include study of HR Activities and Store . Recruiting the candidates
• Selecting the appropriate candidates.• Training & Development of the employees.• Methods use for job analysis.• Career Development program.• Orientation program policy• Performance appraisal.• Hiring and Firing
Accounts(Finance/
Salary/TA/DA)2 Week
01 – 15 Apr 2009
• File Management Preparation of invoices of Payments & Receipts: Preparing of Salaries
Engineering (Tech/QC)
2 Week01 – 30
Apr 2009• How operations are carried out in line with safety and quality policies.
Orientation – Task Asigned
Departments Task Asigned
Administration(HR/Store)
Engineers and Technical and Admin and staff files management of the attendance records, official correspondence through mails, prepare and issue the appraisal and experience letters documents separately for each network deployment projects equipments/store issuance or receiving record is managed.
Accounts(Finance/Salary/TA/DA)
How transaction are electronically made.
How invoices are made and claim of payment is made in line with progress made on the project. 70% of payment is made if half of any HUAWEI Corporation China any assignment of project is complete and remaining is made at the end of project.
How to prepare salaries and TA/DA of the employees.
Engineering (Tech/QC)
how to workflow of TIER4 occurs
how quality of services are ensured.
Similarly what are the safety and quality instruction regarding TIER4 activities.
Management Functions: Planning
Planning is setting standards and goals and making strategies to achieve those goals.
Decision-making ProcessAt TIER4, there is mixed of centralization and some context of decentralization type of decisions.
Organizations Current Strategies• Sincerity towards responsibilities • No Compromise on “Quality”• Customer relationship• Quick response , Willingness for Post Services
demands• Co-ordination between Management and Field
Engineers • Dedicated services, Positive attitude
Management Functions: Organizing
Organizing is assembling and coordinating the human, financial, physical, informational, and other resources needed to achieve goals. Main Office; organize all TIER4 administrative and technical activities. Number of Employee: 150 employees Organizational Design
1) Departmentalization: Admin& Engineering,2) Span of Control: Chief Executive Officer & Teams Head3) Chain of Command Chief Executive Officer to Teams Head
4) Centralization & Decentralization: Both Exists5) Formalization: Formal and informal6) Work Specialization Specified job engineers and staff
Managing Change; Due to IT, Telecom and very nature of services along with dedication of staff easily manages change
Management Functions:
LeadingLeading is stimulating people to be high performers. It is directing, motivating, and communicating with employees, individually and in groups.
Leadership Style• Chrismatic• Instrumental • Participative
Above leadership style is followed by the top management of TIER4 (Pvt) Limited.
Management Functions:
ControllingControlling involves monitoring progress and implementing necessary changes. Controlling Operation
TIER4 is also controlling its operations by adopting different control methods, which assess how efficiently and effectively an organization's transformation processes create goods and services. These methods are
• SOPs• Quality test of installation and commissioning of sites• Quality audit and evaluation criteria of different vendors
Controlling Performance• Performance Appraisal System
At TIER4, the performance appraisal system, which is followed by the management, is based upon results, which the employees are given on daily basis.
SWOT Analysis (1/4)Strengths1. Highly qualified young work force2. .Completion of Projects in Required time.3. .Competitive Prices for Installation services.4. Quality control services Professional Expertise & Proper
Engineering services5. Reliable cooperation with Vendors.6. Parallel Telecom Installation operations.7. Installation through properly trained staff.8. Competitive TI rates & No additional rates for Quality services
and Services through out Pakistan. 9. TI installation service coverage in all sort of environment and
climate10.Congenial atmosphere for working.11.Chrismatic & Instrumental leadership of CEO which leads staff
to create dedication, interest trust among working force.making them as a single unit with cooperation and appropriate conduct.
Strengths1. Highly qualified young work force2. .Completion of Projects in Required time.3. .Competitive Prices for Installation services.4. Quality control services Professional Expertise & Proper
Engineering services5. Reliable cooperation with Vendors.6. Parallel Telecom Installation operations.7. Installation through properly trained staff.8. Competitive TI rates & No additional rates for Quality services
and Services through out Pakistan. 9. TI installation service coverage in all sort of environment and
climate10.Congenial atmosphere for working.11.Chrismatic & Instrumental leadership of CEO which leads staff
to create dedication, interest trust among working force.making them as a single unit with cooperation and appropriate conduct.
SWOT Analysis (2/4) Weaknesses TIER4 has space constraints as for as the land at which it
is situated. High amount of expenditure due to the reason that TIER4
has to pay the high rent of the office building/store and hostels for work force.
Improper allocation of financial funds by the management.
Highly centralized decision-making as key decision revolves about CEO.
Organization form is sole proprietorship. High turnover of faculty and staff. Comparatively newcomer and Smaller in addressing
market
SWOT Analysis (3/4)
Opportunities TIER4 is located in industrial area; industrial linkage can be
established for R & D purpose. New Engineering departments and industrial management
department are being opened because of industry demand such as opening of new offices and Multan and Karachi cities..
TIER4 can provide consultation to local industry. Employees can get internship/training in local industry. TIER4 can enhance its manpower as it is easily available due
to high education rate in Islamabad.
SWOT Analysis (4/4)
Threats New institutes are opening in the locality, which
may become threat for TIER4 in future. TIER4 is emerging organization, an entrant to
industry where already working big organization may tackle its market with adopting better strategies.
Critical Analysis Key role in planning revolves around the CEO Ownership be separate from business entity Amalgamated HR & Store, Account and Finance
separation is required. Planning in order to have own building,
transportation and labor.. Alternative of CEO for handling organizing matters Management of medical and health coverage matter Performance evaluation criteria also need to
improve
Conclusion Core strength of TIER4 is its all workforce
working like a single unit Involvement of CEO interest and dedication Willingness of every individual to go to far flung
areas for erecting of towers and preparation of sites
TIER4 always prefers individual task outcomes, and evaluates the performance of its employees to identify the training and development needs, performance rewards and employee’s correction
Fast pace working system and self discipline team.
Recommendations (1/4) Chief Executive Officer must prepare an official for
doing activities like him. There must be a separate building for distinction
between different levels of individuals Proper Management functions need to practice such
as accounting system and finance system should be separated..
To look store matter proper person with experience of handling store should be appointed
TIER4 is form of sole proprietorship. It should make endeavor to partnership organization,. Partnership should be made with the indl who possess telecom knowledge. In TIER4 partnership has some form but other partner is only familiar with administration not with telecom sites installation and commissioning.
Recommendations (2/4) It must have spacious building as TIER4 is only
having its infrastructure in two or three rooms on rent. It has not own its own transportation. To facilitate the
procedure it must have its own transportation and work force to derive them.
Similarly it has to hire labor from SAM Tours. So it should have its own labor along with transportation facility to run its business activities in all over Pakistan.
.Recruitment process may be strengthened. There is a strong need for training at each level.
Recommendations (3/4) There should be involvement of manager operation or
Dy manager operation in meeting with other vendors gaining work for TIER4 so that alternative might be there for CEO
The evaluation process should be strengthened by adopting training measure to officer responsible for evolution of employees.
Although TIER4 is focusing on employee development, however there is a need for employee training especially with respect to the Engineer as some of them are new to the field and don not know the effective way to deliver their services.
Recommendations (4/4) Opportunities for growth of the employees
should be created and those striving to avail such opportunities may be entertained rather than denying and loosing potential individuals.
An internal search for recruiting the employees may be highly beneficial for the institution. Such type of activity gives a spirit and increases morale of the employees.