13
International design build service

International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

International

design build service

Page 2: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

32 GOLDBECK International GOLDBECK International

G3 Manufacturing, Voderady | 17.300 m2 gross floor area

GOLDBECK is an international contractor who:

l Builds throughout Europe

l Has local offices, local knowledge and experience

l Could deliver design, build and service

l Provides systemised components, individual and flexible solutions

l Has significant off-site fabrication, high quality components and short construction periods

l Is cost effective, value for money solutions

Building in Europe

Economical, fast and reliable

Page 3: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

International

GOLDBECK

Construction Ltd.

GOLDBECK Sp. z o. o.

GOLDBECK-RHOMBERG AG

GOLDBECK- RHOMBERG GmbH

GOLDBECK s. r. o.

GOLDBECK Bau s. r. o.

GOLDBECK International GmbH

GOLDBECK Nederland B.V.

5

01 Planning and building Turnkey construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Production of building elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Logistics and assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

02 Products Product overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Logistics warehouses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Production buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Office buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Multi-storey Car parks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

03 Expertise GOLDBECK – The Company . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

Contents

GOLDBECK International

Europe is our home. The headquarters of GOLDBECK International GmbH are in Bielefeld, Germany.

4 GOLDBECK International GOLDBECK International

SKK Zoeller Tech, Rekowo | 18.800 m2 gross floor area

At home in Europe

ArnhemGOLDBECK Nederland B. V.Meander 901NL-6825 MH ArnhemTel. +31 26 8001211

LinzGOLDBECK RHOMBERG GmbHFriedrich-Schunk-Straße 2A-4511 AllhamingTel. +43 7227 50 800-10

BirminghamGOLDBECK Construction Ltd.Eagle 2Hatchford Brook | Coventry RoadGB-Birmingham | B26 3RZTel. +44 121 743-0928

PosenGOLDBECK Sp. z o.o.Ul. Towarowa 20PL-62-052 KomornikiTel. +48 61 83 42 900

BratislavaGOLDBECK s. r. o.Dvojkrížna 9SK-82107 Bratislava 2Tel. +421 245 64 20-84

SalzburgGOLDBECK RHOMBERG GmbHVilniusstraße 13A-5020 SalzburgTel. +43 662 45 18 83-0

BregenzGOLDBECK RHOMBERG GmbHKonrad-Dopplmayr-Str. 17A-6922 WolfurtTel. +43 55 74 5 43 73-1

St. GallenGOLDBECK RHOMBERG AGBionstrasse 4CH-9015 St. GallenTel. +41 71 314 26 26

KrakauGOLDBECK Sp. z o.o.Ul. Sucha 2APL-30-601 KrakówTel. +48 12 663 16 20

TovačovTopos Prefa Tovačov a.s.Tovačov II, Annín 53CZ-75101 TovačovTel. +420 581 781212

Kutná HoraGOLDBECK Bau s.r.o.Chrudimská 42CZ-28571 VrdyTel. +420 32 73 01-234

WienGOLDBECK RHOMBERG GmbHLeonard-Bernstein-Straße 10A-1220 WienTel. +43 1 890 0918-10

More detailed information about GOLDBECK is provided at: www.goldbeck.de

We have subsidiaries in:

l Poland

l Czech Republic

l Slovakia

l Austria

l Switzerland

l United Kingdom

As a result we:

l Are close to customers

l Providing local knowledge

l Have experience of implementation throughout Europe

Page 4: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

76 GOLDBECK International | 01 Planning and building 01 Planning and building | GOLDBECK International

Planning and building

One-stop turnkey projects

Creating an entire building is a complex task. GOLDBECK could be your partner that takes care of all your needs and concerns.

Quality

Short construction times

Extension planning

High cost-effectiveness

Concept

Servicing and maintenance

Building construction

Real estate

Design Efficiency

ITM, Swadzim | 77.900 m2 gross floor area

Our services for your project could be:

l Option of assistance with site selection

l Planning and design to suit your specific requirements

l Fast turnkey building construction

l Option of long term servicing and maintenance support

We provide:

l Inception to completion service with dedicated project manager

l In-house design teams, all disciplines including M + E

l In-house manufacture of major components

l High proportion of off-site fabrication

l Tried and tested construction systems

l Fixed completion dates, fixed costs, fast construction periods

l High quality construction

Page 5: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

Manufacturing

Individuality and systemized production

8 9

Structural steel elements plant, Bielefeld

Structural steel elements plant, Bielefeld Precast concrete elements plant, Kutna Hora

GOLDBECK International | 01 Planning and building 01 Planning and building | GOLDBECK International

We build with a system which is characterized through:

l Systemised construction using tried and tested components

l Components manufactured to a high quality in our modern, purpose built, highly automated production facilities

l Production facilities located throughout Europe

l Component production coordinated with construction requirements

l “Just in time” delivery of components to site

l Off-site manufacture reduces risk to on-site activities from adverse weather conditions

We manufacture:

l Precast concrete structural components

l Steel structural components

l Metal cladding systems

l Metal windows and curtain walling

Page 6: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

10 11

Assembly

3, 2, 1 – Finished!

ITM, Swadzim | 77.900 m2 gross floor area

GOLDBECK International | 01 Planning and building 01 Planning and building | GOLDBECK International

Our systemised approach, in-house design and manufacture and control of the whole construction process results in:

l Short construction periods

l Significant off-site fabrication

l “Just in time” delivery of components

l Reduced dependence on weather conditions

l High quality

l Tried, tested and safe erection methods

l Minimal amounts of waste

Page 7: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

12 13

GOLDBECK Buildings

AdministrationSpecialised stores

Parking

Offices

LogisticsRetail

IndustryProduction

Distribution

Sector specialists and all-rounders

GOLDBECK International | 02 Products 02 Products | GOLDBECK International

l Logistics warehouses

l Production buildings

l Office buildings

l Multi-storey Car parks

Tomra, Senec | 12.900 m2 gross floor area

Arvato, Stochov | 14.500 m2 gross floor area

Volkswagen, Komorniki | 32.000 m2 gross floor area Scania, Oskarshamn | 33.600 m2 gross floor area

Müller, Letenye | 19.400 m2 gross floor area

Sustainability certificates make energy efficiency and the use of ecologically-safe building materials visible and comparable. If required, we will be pleased to assist you during the certification process.

Rohner, Wollfurt | 3.300 m2 gross floor area

Miele, Abingdon | 1.700 m2 gross floor area

Hoffmann La Roche, Kaiseraugst | 615 Car park spaces

In a summary our key products are:

l GOLDBECK creates logistics and production buildings as one of its key products within the shortest period of time. We can deliver logistics parks, single logis-tics buildings or buildings developed for small business units. It only depends on your requirements.

l GOLDBECK constructs flexible office buildings whose room partitions can be easily changed.

l GOLDBECK constructs Multi-storey Car parks which are functional, clearly laid out and allow an easy parking for the users.

The basis is always our GOLDBECK system. This enables us to tailor your property to your needs – individually, quickly and cost-effectively.

Page 8: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

1514

Logistics warehouses

Free space for fast processes

Speed is of the essence for logistics – and for us as well! Thanks to modular construction components, we can plan and build very quickly. We have taken the characteristics of a good logistics specialist on board, which means you receive solutions which are economical, flexible and reliable. Our logistics warehouses only need a few supporting structures and allow you to have a lot of free space for transportation, order picking and storage. We will also meet your requirements with regard to building automation and tailor our buildings precisely to your goods handling. Irrespective of whether it concerns automatic storage and transport chains or the loading technology as a building / vehicle interface, we will create the right con-ditions, so that your goods streams can flow smoothly and efficiently.

GOLDBECK International | 02 Products 02 Products | GOLDBECK International

The GOLDBECK product broschure for Industrial buildings provides more detailed information

asics, Krefeld | 60.000 m2 gross floor area

DC5, Jirny | 32.100 m2 gross floor area

DPD, Komorniki | 9.300 m2 gross floor area IL Development, Jenec | 1.900 m2 gross floor area

Page 9: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

1716

Production buildings

Precision-fit and tailor-made

Our GOLDBECK production buildings provide you with the framework for a successful business. We construct indivi-dualistic buildings which are tailor-made and therefore also have enough scope for extensions and changes of use.Your production processes and the flow of goods determine the form. Your requirements regarding efficiency, comfort and longevity decide what the inner qualities will be. The lattice supporting structure and a well-designed lighting system create a bright, open atmosphere. In addition, the GOLDBECK factory floor is so stable that it can easily and reliably carry heavy loads. We are also supporting you when it comes to modifica-tions and extensions. Our GOLDBECK system enables us to optimise the existing structure and provide space for your growth – cost-effectively and quickly.

GOLDBECK International | 02 Products 02 Products | GOLDBECK International

Cargotec, Stargard | 25.100 m2 gross floor area

SKK Zoeller Tech, Rekowo | 18.800 m2 gross floor area

Inalfa roof systems, Bialezyce | 9.600 m2 gross floor area IEE Sensing, Velka Ida | 9.300 m2 gross floor area

The GOLDBECK product broschure for Industrial buildings provides more detailed information

Page 10: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

18 19

Office buildings

A miracle of space with a guaranteed feeling of well-being

GOLDBECK builds offices providing a feeling of well-being, both for employers and employees. With short distances, practical structures, well thought-out technology, and lots of atmosphere, we create offices which are best suited to your working culture. This includes the facility for future developments. The GOLDBECK building system enables you to react to future new challenges and requirements for your office. Irrespective of whether it concerns single, double, group, combination or open space offices – they can easily be created now and in the future. Just choose the structural shell, the floor plan, the facades and the office concept! Select light, heating, ventilation and communication systems and the final form and mate-rials of your building! We will make sure with our design and construction teams that your space and comfort requi-rements become a reality.

GOLDBECK International | 02 Products 02 Products | GOLDBECK International

Volkswagen, Komorniki | 1.900 m2 gross floor area

Miele, Abingdon | 1.700 m2 gross floor area

Calvia, Gorzow | 550 m2 gross floor area ITM, Swadzim | 7.950 m2 gross floor area

The GOLDBECK product broschures for Office buildings provides more detailed information

Page 11: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

20 21

Multi-storey Car parks

More than just parking!

Every motorist wants to get safely and quickly to the car park, into the parking space and then quickly back on the road. We know all about the needs of motorists at GOLDBECK, in addition to the different requirements of customers and locations. GOLDBECK designs and builds Multi-storey Car parks for clinics, businesses, retailers, airports and publicly used buildings. Our aim is to construct functional and aesthetic car parks which are welcoming to people and give them a sense of security but are still economical with every comfort. One of the key advantages of our Multi-storey Car parks is that the GOLDBECK system provides column-free parking spaces allowing an easy parking comfort for the motorists. Building with the GOLDBECK system means a one-stop solu-tion for all your needs, from engineering services to manu-facturing and parking space management.

GOLDBECK International | 02 Products 02 Products | GOLDBECK International

BAA, Aberdeen | 504 Car park spaces

Airport, Vienna | 859 Car park spaces

Sainsburys, Coventry | 553 Car park spaces

National Grid, Warwick | 457 Car park spaces

The GOLDBECK product broschure for Multi-storey Car parks provides more detailed information

Page 12: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

2322 GOLDBECK International | 03 Competence 03 Expertise | GOLDBECK International

GOLDBECK – The Company

design build service

Structural steel elements plant, Bielefeld

Structural steel elements plant, Treuen Precast concrete elements plant, Hamm Precast concrete elements plant, Kutna Hora

Local expertise – always close at hand It’s always good if your contact is nearby. Our branches in Europe will provide you with expert and personal support during the entire project.

Hamburg

Kiel

Bremen

Hanover

Magdeburg

BerlinMünster

Bielefeld

Düsseldorf

BochumHamm

Cologne

Cassel

Erfurt

Leipzig

Dresden

Coblenz

Giessen

SuhlPlauen

Frankfurt

Nuremberg

Stuttgart

Regensburg

Ulm

Munich

Rosenheim

Rostock

Bodensee

Kutná Hora

Tovačov

Cracow

Posen

St. GallenBregenz

SalzburgBratislava

Vienna

Linz

PragueMannheim

Arnhem

Birmingham

Karlsruhebranch office/subsidiary

exhibitions “SystemZentren”

production plants

Head office, Bielefeld

Page 13: International · 2 GOLDBECK International GOLDBECK International 3 G3 Manufacturing, Voderady | 17.300m2 gross floor area GOLDBECK is an international contractor who: l Builds throughout

GOLDBECK International GmbH

Ummelner Straße 4–6

33649 Bielefeld

Germany

Tel. +49 521 9488-1061

Fax +49 521 9488-1069

www.goldbeck.de

Subj

ect

to t

echn

ical

cha

nges

| P

rint

ed o

n pa

per

from

sus

tain

able

for

estr

y.

10/2

017

0736

6