46
CHHS16/047 Canberra Hospital and Health Services Clinical Procedure Intercostal Catheter Management (Insertion to Removal- Adults) Contents Contents..................................................... 1 Purpose...................................................... 2 Alerts....................................................... 2 Scope........................................................ 2 Section 1 – Nurse Setup for Insertion of Intercostal Catheter 2 Section 2 – ICC & UWSD Observations..........................6 Section 3 – Clamping an ICC..................................8 Section 4 – Dressing Change..................................9 Section 5 – Changing the drainage chamber...................12 Section 5 – Obtaining a Pleural Fluid Specimen for Laboratory Analysis.................................................... 13 Section 6 – Removal of Intercostal Catheter...............15 Section 7 – Chest Drainage Systems........................18 Section 8 – RACC Community Care Program ICC and Mobile Chest Drainage System Management..................................22 Implementation.............................................. 24 Related Policies, Procedures, Guidelines and Legislation....24 References.................................................. 24 Definition of Terms.........................................26 Search Terms................................................ 26 Attachments................................................. 27 Attachment 1: Management of Chest Drainage System Complications..............................................28 Doc Number Version Issued Review Date Area Responsible Page CHHS16/047 1 31/03/2016 01/04/2021 SOH 1 of 46 Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

Intercostal Catheter Management - ACT Health · Web viewSullivan, B. (2008). Nursing Management of Patients with a Chest Drain. British Journal of Nursing, 17(6), 388-393. Stony Brook

Embed Size (px)

Citation preview

CHHS16/047

Canberra Hospital and Health ServicesClinical ProcedureIntercostal Catheter Management (Insertion to Removal- Adults)Contents

Contents....................................................................................................................................1

Purpose.....................................................................................................................................2

Alerts.........................................................................................................................................2

Scope........................................................................................................................................ 2

Section 1 – Nurse Setup for Insertion of Intercostal Catheter..................................................2

Section 2 – ICC & UWSD Observations......................................................................................6

Section 3 – Clamping an ICC......................................................................................................8

Section 4 – Dressing Change.....................................................................................................9

Section 5 – Changing the drainage chamber...........................................................................12

Section 5 – Obtaining a Pleural Fluid Specimen for Laboratory Analysis................................13

Section 6 – Removal of Intercostal Catheter.........................................................................15

Section 7 – Chest Drainage Systems......................................................................................18

Section 8 – RACC Community Care Program ICC and Mobile Chest Drainage System Management...........................................................................................................................22

Implementation...................................................................................................................... 24

Related Policies, Procedures, Guidelines and Legislation.......................................................24

References.............................................................................................................................. 24

Definition of Terms................................................................................................................. 26

Search Terms.......................................................................................................................... 26

Attachments............................................................................................................................27

Attachment 1: Management of Chest Drainage System Complications..............................28

Attachment 2: Chest Drain Chart Checklist and Nursing Considerations............................29

Attachment 3: Procedures for Education of the Patient and/or Carer................................30

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 1 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Purpose

To provide guidance for the management of intercostal catheters and underwater seal drains including: Insertion Observations Clamping Dressing Change Obtaining a drainage specimen for analysis Removal.

Scope

Alerts

Pleural procedures (including the removal of Intercostal catheters) should be performed during business hours unless in an emergency.

This document pertains to adult patients requiring insertion of or has a single or multiple intercostal catheters insitu at the Canberra Hospital and Health Services.

This document applies to: Medical Officers (MO) who are competent in the procedure Nurses and Midwives who are working within their scope of practice (Refer to Nursing

and Midwifery Continuing Competence Policy) Students under direct supervision.

Section 1 – Nurse Setup for Insertion of Intercostal Catheter

EquipmentFor Pig Tail Alcohol based hand rub (ABHR) Large Dressing trolley Detergent impregnated wipes Suture Set Gauze swabs (4) Intercostal pigtail catheter (ICC) (Medical Officer will advise size) Chest drainage system Under Water Seal Drain (UWSD) Skin preparation e.g. alcohol chlorhexidine or iodine solution 10ml & 50ml Syringe Needles, 19G, 23G, 25G, drawing up needle (1 of each) Suture material- 2/0 silk Adhesive tape

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 2 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

This Standard Operating Procedure (SOP) describes for staff the process to

CHHS16/047

Sterile gown Sterile gloves Clean Gloves Connecting tube Sterile Drapes Fenestrated drape Drain dressing (e.g. fenestrated foam or drain sponge) Occlusive dressing Sterile Specimen containers Local anaesthetic (e.g. Lignocaine or xylocaine 1%) Suction tubing Suction apparatus Padded tube clamps x2 Mask Cap Safety glasses, goggles or shield Clinical waste receptacle General waste receptacle Sharps bin Analgesia as prescribed Hudson mask Oxygen Stethoscope Watch with a second hand Sphygmomanometer (Blood Pressure Cuff) Oxygen Saturation monitor Thermometer

Equipment for Large BoreAs above plus major procedure pack (without suture set), scalpel blade and required ICC sized large bore tube.

Procedure1. Ensure the patients X-Rays are obtained from Medical Imaging (online or hard copy)

prior to insertion2. Attend hand hygiene before touching the patient by either hand washing or using

alcohol based hand rub3. Obtain the patients consent4. Ensure Privacy5. Ask the patient if they have any allergies to dressings or tapes6. Ensure the patient has adequate analgesic cover half an hour prior to the procedure7. Team Time out is performed including; Informed consent has been obtained, the

patient's identity – this is to be checked against the patient identification band and through positive identification e.g. verbal, the procedure side/site is marked if applicable, that all relevant documentation and imaging data are available

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 3 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

8. Attend full set of vital signs including: Respiratory Rate (RR) Oxygen Saturations Temperature Blood Pressure (BP) Pulse (P) Level of Consciousness (LOC) Record Modified Early Warning Score (MEWS)

9. Leave the Oxygen saturation monitor insitu for monitoring throughout procedure10. Administer 6 litres per minute of oxygen via Hudson mask (or as prescribed by the

medical officer)11. Attend hand hygiene by either hand washing or using ABHR12. Clean trolley with detergent impregnated wipes and dry with disposable towel13. Set up equipment on trolley at the patient’s bedside14. Discard packaging in general waste receptacle15. Attend hand hygiene by hand washing or using ABHR16. Don Personal protective equipment (PPE) including, safety goggles or shield and gown

prior to opening sterile equipment17. Open the suture set and Pigtail Catheter set or Major procedure pack and position

equipment using the setting up forceps18. Assist the patient into an upright position. Seated with legs over the side of the bed,

arms resting on the bedside table or as directed by the MO19. Expose insertion site20. Attend hand hygiene by either hand washing or using alcohol based hand rub, 21. Prepare the underwater seal drain

a. Remove outer packaging (discard packaging into general waste receptacle)b. Leave tubing attached to drainage systemc. Remove large sterile water ampoule from back of drainage systemd. Fill water seal with entire contents of ampoule (45mls) via suction port located on

the top of the drain e. Dial up the prescribe amount of suction by turning rotary suction regulator dial to

ordered levelf. Ensure the drainage system is easily assessable for attachment post insertion of ICC

22. Attend hand hygiene by either washing hands or using ABHR23. Don clean gloves24. Assist MO as required25. Observe the patient closely for indications of respiratory distress26. Communicate any concerns to the medical officer

Immediately After ICC Insertion27. Connect the UWSD:

a. Ensure a connector is attached to the ICC (for Pigtail catheter attach connecting tube which connects to UWSD)

b. Detach tubing from back of drainage systemc. Remove protective cap, the end to be attached to the ICC must remain sterile

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 4 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

d. Hand the tubing to the medical officer to attach to the ICC28. Place the UWSD at least 60cm below the patient’s chest height

Rationale: promotes drainage of fluid from the pleural space29. Ensure the drainage tubing does not have any kinks or dragging on the floor

Rationale: A loop can trap fluid and work against the negative pressure

The dressing may be attended by the MO or Nursing staff30. Apply a fenestrated foam and occlusive dressing to drain insertion site31. Ensure the dressing is occlusive and no potential leaks32. Secure connections:

With 1.25cm wide adhesive tape Ensure tape is lengthways up the tubing DO NOT wrap around the connections Optional - Cable tie connection on both sides

33. Ensure visibility of fluid in connection34. Secure the tube to the patient with adhesive tape or anchoring device; ensure this does

not create any kinks35. Attach suction tubing to suction port if ordered 36. Turn suction on until the bellows are at the midline of Vacuum Indicator ()37. Suction will only be achieved when wall suction at a minimum of -80mmHg is applied

and the bellow expands to at least the () indicator

Note: Low wall suction device is not required. The level of suction is controlled by the regulator dial.

38. Check suction is maintained39. Attend Hand hygiene by either washing hands or using ABHR40. Position the patient comfortably41. Ensure that the call bell is within reach42. Perform full set of vital signs and UWSD observations, record on daily Chest Drain

Observations chart 43. Contact the radiology department for a chest x-ray post insertion of an ICC44. Document all observations on the appropriate charts, e.g. Modified Early Warning Score

(MEWS), fluid balance chart, in the patient's clinical record and escalate if required according to MEWS and Medical Emergency Team (MET) criteria

45. MO and Nurse will document in the patient's clinical record.46. MO to review chest x-ray and document in the patient’s clinical record

ALERT 1: Post insertion X-Ray is essential to ensure correct placement of the ICC.ALERT 2: Patient’s with an ICC must be escorted by a Registered Nurse for all off-ward procedures

Required Vital Signs and UWSD Observations Post insertion of an ICC

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 5 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Full set of Vital Signs minimum 4th hourly for the first 24 hours 1 hourly UWSD and drain site check for the first 24 hours and 2nd hourly thereafter until

drain removed (Refer to Procedure 2 for UWSD observations).

Back to Table of Contents

Section 2 – ICC & UWSD Observations

Monitoring of an ICCObserve and record on the ICC daily chest drain observation chart:1. Oscillation/ Swing/ Tidaling2. Air leak3. Suction4. Drainage5. Dressings and Insertion site

Frequency: 1/24 as per daily chest observation chart for the first 24 hours 2/24 if drainage is ≤ 100mls/hr or 4/24 as indicated by MO on daily chest drain

observation chart

All patients with an Intercostal Catheter insitu must have drain attached to an Underwater Seal Chest Drainage unit (CHHS approved UWSD system), Heimlich Valve or Atrium Express Dry Seal Chest Drain Mini 500.

Note: Patients transferred from other Hospitals on other drainage systems are to have them replaced with TCH Approved UWSD Systems.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 6 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Attending ICC Observations 1. Attend hand hygiene before touching the patient by either hand washing or using ABHR2. Explain the procedure and obtain verbal consent3. Ensure Privacy4. Measure and record respiratory rate and oxygen saturations5. Check level of suction prescribed by the medical officer

ALERT: Suction is commenced and/or adjusted ONLY as directed by a medical officer.

6. Temporarily disconnect or turn off the wall suction 7. Underwater seal drainage systems should be assessed for oscillation and air bubbling

through the water seal8. Ask the patient to take a deep breath and cough9. Observe the water seal for oscillation on inspiration (this can be seen by the rise and fall

in the water seal)10. Observe and measure by the increment on the water seal chamber (large swing

indicated the lung has not full expanded and space remains in the pleural cavity)

Note:Oscillation/Swing cannot be observed when suction is in progressA chest drain from the mediastinum will not cause bubbling in the underwater seal chamber.

11. Observe the water seal chamber for bubbling (this will occur on coughing or may be present without coughing if a large leak)

12. Note the level of bubbling (i.e. intermittent, continuous) 13. Reconnect or turn the suction back on to prescribed level14. Turn suction on until the bellows are at the midline of Vacuum Indicator15. Record presence of oscillation and/or swing on observation chart

ALERT 2: If a patient has a large air leak for the UWSD, clamping the tube may rapidly cause a tension pneumothorax if the air leak is originating from the lung. A medical order is required prior to clamping.

ALERT 3: When a chest tube is in the pleural space, excessive continuous bubbling indicates an air leak in the pleural cavity or within the drainage system. Check the patient for signs of respiratory distress and examine the tubing for possible air leak. A thorough check of all connection is essential to ensure there are no loose connections.

ALERT 4: Sudden cessation of bubbling associated with additional clinical signs of respiratory distress may indicate a kink or blockage within the drainage system. This must be rectified immediately and contact the medical officer for patient review.ALERT 5: If blood drainage and/or clots are visible in the tubing, to clear, squeeze alternately hand-over-hand along the drainage tube. This action may generate sufficient pressure to

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 7 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

move fluid along the tube.

16. Observe the drainage chamber for chest drainage including: Volume Colour Type (blood, haemoserous, chyle, pus, serous)

17. Record drainage on observation chart (also record volume on fluid balance chart)18. Contact the MO if concerned or abnormal observations are taken

ALERT 6: Notify the medical officer when: Bloodstained drainage exceeds 200mls hourly after insertion or return to ward (RTW)

from operating rooms (OR) Drainage exceeds 200mls per hour in the first two (2) hours after insertion or RTW from

OR Sustained or copious drainage Return of swing or air leak after periods of no swing or air leak.

19. Ensure excess drainage tubing is positioned along the mattress so that there are no dependant loops of tubing

20. Ensure that no kinking of the tubing occur21. Ensure the patient is comfortable22. Attend hand hygiene by either washing hand or using ABHR23. Document in patient clinical record.

Back to Table of Contents

Section 3 – Clamping an ICC

Equipment Alcohol based hand rub (ABHR) Two padded tube clamps (e.g. Howard Kelly) for each ICC (padding clamps is done by

placing pieces of oxygen tubing over the ends of the clamps)

Clamping should be done whenever the patient is at risk of having air or fluid entering the pleural space.

Clamping may also be used prior to the removal of an intercostal catheter to test that no air leak exists in the lung. A medical officer orders this procedure.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 8 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Two padded tube clamps must be applied to each ICC only: In the event of accidental disconnection or breakage When drainage tube is place <60cm below the patient’s chest As directed by MO to confirm;

o Absolute lung re expansiono For clamp and release drainage.

Procedure1. Confirm medical orders for clamping (or for removal)2. Attend hand hygiene before touching the patient by either hand washing or using ABHR3. Explain the procedure and obtain verbal consent4. Ensure Privacy5. Measure and record respiratory rate and oxygen saturations6. Position the patient7. Clamp the ICC close to the chest wall, approximately 2.5cm apart and in opposite

direction8. Ensure the clamps are not dragging on the ICC9. Maintain clamping for the period prescribed by MO10. Ensure the patient is comfortable11. Attend hand hygiene by either hand washing or using ABHR12. Document clamping on observation chart and in the clinical record.

ALERT 7: Routine clamping is not advised. In a patient with a large air leak, never clamp the tubes as clamping may cause a tension pneumothorax.Clamping should only be performed when documented by the medical officer in the patient’s clinical record.

Back to Table of Contents

Section 4 – Dressing Change

An occlusive dressing around the intercostal catheter must be routinely checked each shift and when UWSD observations are attended.

An occlusive dressing is changed at least every 48 hours and/or when required.

Equipment Alcohol based hand rub (ABHR) Soft pre-moistened cloth (community only) Dressing trolley Detergent impregnated wipes Basic dressing pack Clean gloves Sterile gloves Drain dressing e.g. fenestrated foam

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 9 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Normal saline Chlorhexidine 2%/alcohol 70% swab sticks (5). Tape Transparent occlusive dressings e.g. Film Sterile gauze (to cover the fenestrated dressing and ICC). Securement device (StatLock® Universal Plus in the appropriate size for pigtail drains

inserted in Radiology ) Sterile scissors (to trim the StatLock® to enhance patient comfort if required) Tape measure Clean gown Personal protective equipment (PPE) including, safety goggles or shield Scissors Plastic blue sheet. General waste receptacle Clinical waste receptacle.

Procedure1. Hand hygiene before touching the patient by either hand washing or using ABHR2. Ensure Privacy3. Explain the process and purpose of the dressing change4. Obtain verbal consent5. Confirm allergies to dressings or tapes6. Ensure the patient is placed in a comfortable position7. Place the blue sheet under the Patient.8. Attend hand hygiene by either hand washing or using ABHR9. Clean trolley with detergent impregnated wipes and wipe dry. Clear and/or clean a

suitable space for sterile setup (community only)10. Set up equipment on trolley at the patient’s bedside11. Discard packaging in general waste receptacle12. Don PPE prior to opening sterile equipment13. Open the basic pack and position equipment using the setting up forceps14. Attend hand hygiene by either hand washing or using ABHR15. Don clean gloves16. Expose the wound site17. While ensuring the catheter is secured to the patient’s skin with tape, carefully remove

the old occlusive dressing. Never use scissors to remove the dressing as accidental cutting of the catheter can occur Remove the soiled dressing with setting-up forceps

18. Discard the dressing and forceps and gloves into the clinical waste receptacle

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 10 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

StatLock® Removal Technique:a. Disengage: open the StatLock® device retainer by pressing the tab and lifting the lidb. Carefully lift the catheter from the retainerc. Dissolve: first lift the edge of the anchor pad using 3-4 alcohol swabs. Then continue to

stroke the under surface of the pad with alcohol swabs to dissolve adhesive anchor pad away from skin. Do not force pad to remove

19. At the first dressing / Securement device change and subsequent changes measure and record the length of exposed catheter from the insertion site to the ‘hub’. Compare with initial measurement recorded in clinical record. If the catheter has moved more than 2 cm, contact the MO.

20. Attend hand hygiene by either hand washing or using ABHR21. Don sterile gloves 22. If required, trim the ‘butterfly wings’ of the StatLock® using sterile scissors23. Place sterile towel under the ICC24. Observe the insertion site for infection (Refer to “Basic Wound Technique SOP”)25. Report any concerns of infection to the MO immediately (if wound swab is required

Refer to “Wound Swabs”)26. Using N/Saline soaked gauze cleanse the wound in an ever-increasing circular motion

using normal saline27. Clean the skin around the ICC insertion site with chlorhexidine alcohol swab sticks three

times. Cover an area approximately 15cm in diameter; discard each swab stick after use.

28. Clean the ICC with the 4th and 5th swab sticks from insertion site downwards. Let skin dry completely.

StatLock® Application Technique: (used only for fine bore ICC)a. Apply skin prep wipe for enhanced adherence and skin protection. Allow to dry for 10-

15 secondsb. Wipe the catheter with an alcohol swab (so that it is wet for insertion into the StatLock®

retainer)c. Always secure catheter to the StatLock® retainer before placing pad on the skin d. Bring the StatLock® anchor pad into position. Stabilise the catheter between fingers and

then double tug the catheter to stretch-fit into the retainere. Close the lidf. Peel away the StatLock® paper backing one side at a time. Place on sking. Apply gauze over the catheter insertion site and StatLock® to prevent the occlusive

dressing adhering to catheterh. Place occlusive dressing(s) over the catheter insertion site and StatLock®. Ensure the

catheter is secured by the occlusive dressing and the dressing is waterproofi. Ensure the catheter is secured to the patient’s side with tape

29. Replace the securing tapes if they are loose.30. Examine the catheter from the exit at the chest wall to the drainage system to make

sure there are no kinks or loops that could close off the ICC.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 11 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

31. Apply the fenestrated drain dressing around ICC insertion site.32. Apply gauze over the fenestrated dressing and ICC.33. Apply the occlusive dressing over gauze, fenestrated dressing and ICC.34. Ensure occlusive dressing has adhered to the skin and no leaks are present (multiple

occlusive dressings may be required35. Affix tube to the patient using an anchoring device or tape36. Discard equipment and gloves into clinical waste receptacle37. Clean trolley with detergent impregnated wipes 38. Attend hand hygiene by either hand washing or using ABHR39. Ensure patient is comfortable with new dressing change and understands when the next

dressing change will be attended40. Change dressing as frequently as required and at minimum the dressing must be

changes every 48hours41. Document in patient’s clinical record:

a description of the insertion site type of dressing applied the reason for the change signs of wound infection and actions taken (where noted)

Back to Table of Contents

Section 5 – Changing the drainage chamber

Equipment Alcohol based hand rub (ABHR) Clean Gloves Personal protective equipment (PPE) including, safety goggles or shield Chest drainage system Under Water Seal Drain (UWSD) Padded tube clamps x2

Procedure1. Attend hand hygiene before touching the patient by either hand washing or using ABHR2. Ensure Privacy3. Explain the process and purpose of the chamber change4. Obtain verbal consent5. Confirm allergies to dressings or tapes6. Ensure the patient is placed in a comfortable position 7. Attend hand hygiene by either hand washing or using ABHR8. Prepare the underwater seal drain

a. Remove outer packaging (discard packaging into general waste receptacle)b. Remove attached tubing as existing tubing can be utilisedc. Remove large sterile water ampoule from back of drainage systemd. Fill water seal with entire contents of ampoule (45mls) via suction port located on

the top of the drain

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 12 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

e. Dial up the prescribe amount of suction by turning rotary suction regulator dial to ordered level

f. Ensure the drainage system is easily assessable for attachment 9. Apply gloves and PPE10. Clamp ICC using 2 padded tube clamps above the connector and in opposite directions11. Disconnect chamber from tubing at connector ensuring connector remains clean (no-

touch method) and attach to new system12. Remove padded tube clamps13. Attach suction tubing to suction port if ordered 14. Turn suction on until the bellows are at the midline of Vacuum Indicator ()15. Suction will only be achieved when wall suction at a minimum of -80mmHg is applied and

the bellow expands to at least the indicator

Note: Low wall suction device is not required. The level of suction is controlled by the regulator dial.

16. Check suction is maintained17. Attend Hand hygiene by either washing hands or using ABHR18. Position the patient comfortably19. Ensure that the call bell is within reach 20. Perform full set of vital signs and UWSD observations, record on daily Chest Drain

Observations chart 21. Dispose of UWSD chamber in clinical waste receptacle

Back to Table of Contents

Section 5 – Obtaining a Pleural Fluid Specimen for Laboratory Analysis

Equipment Alcohol based hand rub (ABHR) Kidney dish 20ml syringe Alcohol swabs x3 Clean Gloves Personal protective equipment (PPE) including, safety goggles or shield Sterile specimen jar Pathology label with patients details General waste receptacle Clinical waste receptacle.

Procedure1. Confirm orders for collection of specimen in the patients clinical record2. Collect pathology request form, ensure the MO completed all fields required3. Attend hand hygiene before touching the patient by either hand washing or using ABHR4. Ensure Privacy5. Explain the process and purpose of the specimen collection

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 13 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

6. Confirm Correct patient by cross checking pathology request from, patients identification band and verbal confirmation from patient (Refer to Correct Patient, Correct Site, Correct Procedure Policy)

7. Obtain verbal consent8. Ensure the patient is placed in a comfortable position9. Attend hand hygiene by either hand washing or using ABHR10. Don PPE and clean gloves11. Clean the port with alcohol swab, allow 30 seconds to dry12. Remove the required amount of fluid from the drainage tubing using the 20ml syringe13. Inject the fluid obtained in to the sterile specimen jar, ensure the syringe does not touch

the inside of the jar14. Secured the lid tightly15. Attach patient pathology identification sticker to the specimen jar ( Refer to “Patient

Identification And Pathology Specimen Labelling Policy”)16. Confirm correct details with pathology request form and verbal confirmation from

patient17. Ensure documentation and details on the specimen jar and pathology request form

include: Medical record number Surname Given name Date of birth Date and time of collection Type of specimen and site collected Collecting officers signature

18. Place specimen into biohazard bag and send via the pathology delivery system19. Discard equipment and gloves into clinical waste receptacle20. Attend hand hygiene by either hand washing or using ABHR21. Document the procedure in the patients’ clinical record.

Back to Table of Contents

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 14 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Section 6 – Removal of Intercostal Catheter

Equipment Alcohol based hand rub (ABHR) Dressing trolley Detergent impregnated wipes (to clean trolley) Personal protective equipment (PPE) includes, safety goggles or face shield and gown Clean gloves Sterile gloves (optional) General waste receptacle Clinical waste receptacle Basic dressing pack Normal saline packaged 30mls (at body temperature warmth) Additional gauze swab Stitch cutter or a fine suture removal set Sterile gloves and gown Transparent occlusive dressing Steri-strips Tulle Gras dressing Analgesics as prescribed.

Procedure1. Check patients clinical record for any medical orders2. Attend hand hygiene before touching the patient by either hand washing or using ABHR3. Ensure Privacy4. Explain the process and purpose of the ICC removal5. Obtain verbal consent6. Confirm allergies to dressings or tapes7. Ensure adequate analgesic cover prior to the ICC removal at least half an hour before the

procedure8. Ensure the patient is placed in a comfortable position9. Attend hand hygiene by either hand washing or using ABHR10. Clean trolley with detergent impregnated wipes and wipe dry11. Set up equipment on trolley at the patient’s bedside12. Discard packaging in general waste receptacle13. Don PPE prior to opening sterile equipment14. Open the basic pack and position equipment using the setting up forceps15. Attend hand hygiene by either hand washing or using ABHR, 16. Don clean gloves17. Expose the wound site18. Remove the soiled dressing with setting-up forceps19. Discard the dressing and forceps and gloves into the clinical waste receptacle20. Attend hand hygiene by either hand washing or using ABHR21. Instruct the patient in the method of a valsalva manoeuvre by asking the patient to take

a deep breath and hold it while the ICC is removed

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 15 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Rational: The valsalva manoeuvre will raise the intra-thoracic pressure, decrease venous return and prevent air being drawn into the chest cavity and circulation

22. Practice with the patient to ensure the patient is competent in the manoeuvre23. Attend hand hygiene by either hand washing or using ABHR24. Don sterile gloves25. Prepare an occlusive dressing for the site by folding the tulle gras and placing it on the

gauze swab and the centre of the transparent occlusive dressing. 26. Ask the assistant to turn suction off 27. Using N/Saline soaked gauze cleanse the wound in an ever-increasing circular motion

using normal saline28. Observe the insertion site for infection (Refer to “Basic Wound Technique SOP”)29. Report any concerns of infection to the MO immediately (if wound swab is required

Refer to “Wound Swabs”)30. Ensure site is dry, use dry gauze if needed to dry site31. Remove the anchoring suture (not all ICC have anchoring sutures)32. Support the ICC after the suture is removed to prevent premature dislodgement

ALERT 8: If the ICC is secured with a purse string suture do not remove the suture. This type of suture is used to provide closure to the insertion site post removal of ICC.

33. If a purse string suture is insitu, ensure the ends are untied and ready for removal34. Ask the patient to perform the valsava manoeuvre when ready to clamp the ICC

immediately prior to removal (Refer to procedure 3 for clamping)35. Ensure assistant is ready for removal procedure36. Place index finger and thumb on skin edges around the catheter37. Instruct the patient to perform the valsava manoeuvre38. Pinch skin edges together as catheter is withdrawn 39. Remove the ICC in a steady fluid motion 40. Instruct the assistant to tie purse string if applicable or apply steri-strips for wound

closure immediately after removal41. Instruct the patient to breathe normally42. Apply pre prepared tulle gras, gauze and occlusive dressing over site (must remain insitu

for 24 hours)

ALERT 9: There should be no excessive force required to remove the drain. If any resistance is met, stop the procedure and request senior MO review

ALERT 10: Tulle gras must only be insitu for 24 hours. A dressing change must occur 24 hours post removal and redress with a dry occlusive dressing.43. Ensure full occlusive seal by running finger or hand around the edges of the dressing

with firm pressure44. Additional occlusive dressings may be required 45. Discard equipment and gloves into clinical waste receptacle46. Clean trolley with detergent impregnated wipes 47. Attend hand hygiene by either hand washing or using ABHR

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 16 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

48. Ensure patient is comfortable with new dressing change and understands when the next dressing change will be attended

49. Change dressing as frequently as required and at minimum the dressing must be changed at 24 hours and then every 48hours

50. Document in patient’s clinical record: a description of the insertion site type of dressing applied the reason for the change signs of wound infection and actions taken (where noted)

When More Than One Drain InsituWhen there are two (2) or more drains insitu, a single or multiple ICC can be removed. The MO must clearly mark which drain is to be removed and document in patient’s

clinical records Follow the same procedure for the removal of a single tube Ensure all ICC are clamped prior to removal of any ICC If one ICC is removed, disconnect the “Y” connector and insert a large to large connector

to the remaining ICC Remove the remaining ICC as per “Procedure 6” above On completion of the procedure unclamp the remaining ICC ensuring the tube and

connection are secured as per “Section 1” The remaining ICC may require redressing as per “Section 4” Document the procedure in the patient’s clinical records.

Post RemovalImmediately post removal a full set of vital signs and ICC observation must be performed and documented in the observation charts.

Observe for: Dyspnoea Tachycardia Restlessness Decreased breath sound Increased oscillation and/or air leaks Dressing site oozing or if lifting from skin (may require reinforcing).

Post removal of an ICC an x-ray should be performed within 4 hours of removal or earlier if ordered by the MO.

ALERT 11: For patients who are to be discharged with sutures insitu, ensure the discharge documentation clearly states when the sutures must be removed. Ensure the patient is aware when to make appointments with the GP (or community nursing) for suture removal, and provided with education on ICC site care.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 17 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Back to Table of Contents

Section 7 – Chest Drainage Systems

Heimlich Chest Drain Valve

Care of the ICC and Heimlich Valve Keep the ICC as straight as possible and do not kink the ICC or block the Heimlich valve Ensure the valve is placed with the correct end to the ICC. Instructions are on the

Heimlich valve to ensure correct positioning. It is normal for small amounts of fluid and/or air to come out of the ICC and through the

Heimlich valve. The soft rubber tube will flutter or honking (a duck-like noise) may be heard as air escapes.

Heimlich Valve Drainage Bag Change The drainage bag is changed weekly using a clean non touch technique. Patients with minimal drainage may have a combine dressing loosely applied to the

valve instead of a bag to collect drainage. The bag is emptied when it is ½ to 2/3 full.

Equipment Soft pre-moistened cloths and Alcohol Based Hand Rub (ABHR). Safety eyewear. Clean gloves. Dressing pack. Drainage bag (Product ID: 10408, urine leg bag 500mls includes 4cm connecting tube). Sterile scissors. Plastic blue sheet. Clinical waste receptacle.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 18 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Procedure1. Inform patient of the procedure and obtain consent, ensure patient comfort.2. Attend to hand hygiene using soft pre-moistened cloths and ABHR.3. Set up equipment.4. Position patient sitting upright in a comfortable position.5. Place the blue sheet under the patient.6. Attend to hand hygiene.7. The drainage bag must be vented to allow air to escape otherwise a tension

pneumothorax may occur. Cut a ½ cm hole in the top corner of the bag; ensure the hole is patent to allow air to escape. Insert the 4cm connecting tube into proximal connector of the drainage bag. Ensure the connector tubing does not come in contact with a source of contamination during the procedure.

8. Attend to hand hygiene.9. Don safety eyewear and clean gloves.10. Disconnect the drainage bag from the Heimlich valve carefully without twisting the ICC.11. Connect the prepared drainage bag to the Heimlich valve.12. Examine the ICC from the dressing to the drainage bag to make sure there are no kinks

or loops that could close off the chest drainage system.13. Note colour and volume of drainage bag contents. 14. Discard equipment.15. Remove gloves and safety eyewear.16. Attend to hand hygiene.17. Monitor the patient post procedure for sudden onset of chest pain, dyspnoea or

shortness of breath. Should these signs or symptoms occur, ensure that the ½ cm hole is patent in the top corner of the drainage bag. Examine the ICC from the dressing to the chest drain to make sure there are no kinks that could close off the chest drainage system. Check that the connections are secure. Should the signs or symptoms persist seek urgent medical advice call OOO or 112 from a mobile telephone. While reassuring the patient assess their vital signs. Upon arrival of the Ambulance Officers hand over relevant patient information (Community Care staff)

18. Document in the clinical record and ‘Drain Management Observation Chart’.

Atrium Express™ Mini 500 Mobile Dry Seal Chest DrainPrecautions Do not obstruct positive pressure relief valve located on top of the unit. Do not keep patient tube clamp closed during drainage collection or patient transport. Do not connect any open luer-lock connector to the needleless luer port located on the

front of the drain. Do not use or puncture needleless luer port with a needle.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 19 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

What to Check during Express™ Mini 500 Mobile Dry Seal Chest Drain System Operation

1. Placement of unit – During patient ambulation or when patient is in bed, always place the unit below the patient’s chest in an upright position. Use belt straps as directed for patient ambulation.

2. Suction port (hospital patient’s only) – When suction is required, firmly attach suction source line to suction port located on top of the unit.

3. Suction source (hospital patient’s only) – Suction source should provide a minimum vacuum pressure of -80 mmHg at 20 litres of airflow per minute.

4. Fixed suction regulator - the non-adjustable dry suction regulator is preset at -20cm H20 vacuum setting and will automatically compensate for moderate changes in vacuum source pressure.

5. Dry one-way seal valve – the dry seal valve does not require water for seal protection during patient use. The valve is not position sensitive.

6. Vacuum indicator - a √ mark symbol is visible in the vacuum indicator window when vacuum is present inside the chest drain unit. When no vacuum is present inside chest drain, the √ mark symbol will not appear. When no vacuum is present inside the chest drain unit, such as when the patient has an air leak on gravity drainage, the √ will not appear. The √ may appear intermittently with respiration. If concerned that there is no √ mark symbol visible in the vacuum indicator window check all connections. If still concerned replace the unit. If there is still no vacuum present inside the chest drain contact the MO for advice.

7. Collection chamber - the collection chamber is calibrated in 10ml increments up to a maximum capacity of 500ml.

8. Air leak detection - Fluid must be present in the collection chamber for air leak detection. If fluid is not present, add 20ml of sterile water or saline using a 20 ml luer lock syringe through the needleless access port located on the front of the unit. Temporarily tip the unit to the right until collection fluid appears in the air leak window. Bubbling in the air leak window when the chest drain is positioned on its side, will confirm a patient air leak. Immediately return the unit to upright position.

9. Automatic high negativity release –The high negativity release valve located on the back wall of the unit automatically activates to limit maximum vacuum pressure to approximately -50cmH2O.

10. Positive pressure release valve (PPRV) - Located on top of the unit opens to release positive pressure automatically.

11. Sampling patient drainage – Fluid samples can be taken directly from the needleless luer port located on the front of the unit using a 20 ml luer lock syringe.

12. System disconnection – Close the patient tube blue slide clamp on the patient line and clamp off the ICC with two padded Howard Kelly forceps prior to disconnecting the unit from the patient. Depress the clear button on the inline connector and remove the unit from the patient. Insert the blunt end of the red disposal cap into the unit to close off the unit for disposal.

Emptying the Express Mini via Needless Access Port The Express Mini is emptied when it is ½ to 2/3 full.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 20 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Do not allow the Express Mini to completely fill with fluid or fluid may start to leak out.

Equipment Soft pre-moistened cloths and Alcohol Based Hand Rub (ABHR) Safety eyewear Clean gloves Alcohol swabs Luer lock syringe Clean container Clinical waste receptacle

Procedure1. Inform the patient of the procedure and obtain consent.2. Attend to hand hygiene using soft pre-moistened cloths and ABHR.3. Don safety eyewear and clean gloves.4. Swab the access port with one alcohol swab and allow to air dry for 30 seconds.5. Screw the syringe firmly onto the port located on the bottom of the unit.6. Pull the plunger back on the syringe to empty the fluid.7. When the syringe is full, unscrew the syringe and empty the fluid into the clean

container.8. Repeat as necessary until empty.9. Discard equipment.10. Remove gloves and safety eyewear.11. Attend to hand hygiene.12. Document colour and volume of drainage in the clinical record and ‘Drain Management

Observation Chart’.

Replacement of the Atrium Express™ Mini 500 Mobile Dry Seal Chest Drain UnitThe chest drain unit is generally changed weekly.

Equipment Soft pre-moistened cloths and Alcohol Based Hand Rub (ABHR) Safety eyewear Clean gloves Padded tube clamps x 2 Atrium Express™ Mini 500 Mobile Dry Seal Chest Drain Unit (Product ID: 62221) Luer lock syringe 20mls 20mls of sterile water or normal saline Alcohol swabs Adhesive tape - 1.25cm wide Clinical waste receptacle

Procedure1. Inform patient of the procedure and obtain consent.2. Attend to hand hygiene using soft pre-moistened cloths and ABHR.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 21 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

3. Set up equipment.4. Draw up 20mls of sterile water or normal saline into the 20 ml luer lock syringe.5. Swab the needleless luer port with an alcohol swab and add 20mls of sterile water or

normal saline to the collection chamber. Fluid must be present in the collection chamber for air leak detection.

6. Position patient sitting upright in a comfortable position.7. Attend to hand hygiene.8. Don safety eyewear and clean gloves.9. Close the patient tube blue slide clamp. 10. Clamp off the ICC with two padded tube clamps prior to disconnecting chest drain unit

from the patient.11. Remove red disposal cap from the unit. Depress the clear button on the in-line connector

and remove the unit from the patient. Connect the new unit to the patient tube.12. Remove the 2 padded tube clamps on the ICC.13. Open the patient tube blue slide clamp. The clamp must remain open at all times when

system is connected to the patient. Move the blue slide clamp next to the in-line connector for visual checking.

14. Examine the ICC from the dressing to the unit to make sure there are no kinks or loops that could close off the chest drainage system.

15. Secure the ICC to the patient with adhesive tape; ensure this does not create any kinks.16. Insert the blunt end of the red disposal cap into the unit to close off the unit for disposal.17. Note colour and volume of chest drain contents.18. Discard equipment.19. Remove gloves and safety eyewear.20. Attend to hand hygiene.21. Monitor the patient post procedure for sudden onset of chest pain, dyspnoea or

shortness of breath. Should these signs or symptoms occur, examine the ICC from the dressing to the chest drain to make sure there are no kinks or loops that could close off the chest drainage system. Check that the connections are secure. If the signs or symptoms persist seek urgent medical advice call 000 or 112 from a mobile telephone. While reassuring the patient assess their vital signs. Upon arrival of the Ambulance Officers hand over relevant patient information.

22. Document in the clinical record and ‘Drain Management Observation Chart’, noting the addition of 20mls of fluid to the collection chamber

Back to Table of Contents

Section 8 – RACC Community Care Program ICC and Mobile Chest Drainage System Management

PurposeThe purpose of this section is to provide Community Registered Nurses (RNs) with agreed best practice standards to manage a patient in the community with an ICC and mobile chest drainage system (Heimlich Valve or Atrium Express™ Mini 500 Mobile Dry Seal Chest Drain). The patient and/or carer must be assessed for capacity and suitability to manage the ICC and mobile chest drainage system in the community prior to discharge home. This section

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 22 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

includes procedures for education of the patient and/or carer and equipment for discharge (see Attachment 3).ICC’s are not removed in the community, refer the patient back to the treating MO for assessment.The principles of care of a patient with an ICC in the community are the same as the care in the hospital except for the following variances.

ProcedureICC Dressing Change

NOTE- The ICC dressing is changed every 48 to 72 hours or more often if required see Section 4 – Dressing Change

Patients and/or carers who are assessed as suitable to manage the ICC and chest drainage system in the community are educated prior to discharge home on the key management points as outlined in Attachment 1.

Patient Emergency Treatment Plan The patient and/or carer will be educated in hospital prior to discharge home to: Perform the Valsalva Manoeuvre and if air leak present apply a sterile dressing taped on

three sides only if (to ensure air can escape) or if no air leak apply an occlusive dressing should the ICC accidently dislodge from the chest wall.

Reattach the drainage system or apply two padded Howard Kelly forceps to the ICC close to the chest wall and in opposite, should the drainage system accidently disconnect from the ICC.

Seek medical advice, call 000 or 112 from a mobile phone immediately should any of the above events occur.

Back to Table of Contents

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 23 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Implementation

This procedure will be communicated to relevant staff via team meetings, and will be incorporated into existing education and training programs.

Back to Table of Contents

Related Policies, Procedures, Guidelines and Legislation

PoliciesACT Health Waste Management PolicyCorrect Patient, Correct Site, Correct Procedure PolicyNursing and Midwifery Continuing Competence PolicyPatient Identification and Pathology Specimen Labelling Policy

ProceduresDrain Management Clinical ProcedureCanberra Hospital and Health Services Clinical Procedure Healthcare Associated InfectionsWound Management Procedure

Back to Table of Contents

References

Allibone, L. (2005). Principles for Inserting and Managing Chest Drains. Nursing Times, 101(42), 45-49.Allibone L. Nursing management of chest drains. Nursing Standard. 2003;17(22):45-54.Atrium Medical Corporation. (2006). Express Dry Seal Chest Drain [Brochure]. Mosman, NSW. Atrium Medical Corporation. (2006). Express Dry Seal Chest Drain [Brochure]. Mosman, NSW.Atrium Medical. Express™ Mini 500 Mobile Dry Seal Drain. Retrieved October 21 2015 from:http://www.atriummed.com/EN/default.asphttp://www.atriummed.com/EN/chest_drainage/mini.aspBD Bard-Parker. Heimlich Chest Drain Valve. Retrieved from: http://www.bd.com/medical-surgical/products/heimlich.asp Bibby AC. Pleural procedures: intercostal chest drains and indwelling pleural catheters. British Journal of Hospital Medicine. 2011;72(6):331-336.Briggs D. Nursing care and management of patients with intrapleural drains.Nursing Standard. 2010;24(21):47-55.Carroll P. A guide to mobile chest drains. RNWeb. 2002. Retrieved October 21 2015 from: http://www.rnweb.com/rnweb/article/articleDetail.jsp?id=116004. Carroll P. Mobile chest drainage: coming soon to a home near you. Home Healthcare Nurse. 2002;20(7):434-44. Carroll P. Keeping up with mobile chest drains, RNWeb. 2005. Retrieved October 21 2015 from: http://www.rnweb.com/rnweb/article/articleDetail.jsp?id=182474.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 24 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Coughlin, A., & Parchinsky, C. (2006). Go with the Flow of Chest Tube Therapy. Nursing2006, 36(3), 36-42.Di Ciacca, L., Neal, M., Highcock, M., Bruce, M., Snowden, J., & O’Donnell, A. (2008). Guidelines for the Insertion and Management of Chest Drains. Doncaster and Bassetlaw Hospitals.Durai, R., Hoque, H., & Davies, T. (2010). Managing a Chest Tube and Drainage System. AORN Journal, 91(2), 275-283.Frazer, CA. Managing chest tubes. Academy of Medical-Surgical Nurses. 2012;21(1):1,10-12.Held-Warmkessel, J & Schiech, L. (2008). Caring for a Patient with Malignant Pleural Effusion. Nursing 2008, 43-48.Myatt R. Reducing length of stay through the use of ambulatory chest drains and nurse-led follow-up. British Journal of Cardiac Nursing. 2011;6(11);549-552.Northern Health The Northern Hospital. (2006). Intercostal Catheter Insertion, Management and Removal. Clinical Education Centre.NSW Agency for Clinical Innovation. Pleural Drainage Adults.Retrieved October 21 2015 from: http://www.aci.health.nsw.gov.au/__data/assets/pdf_file/0018/201906/ACI-pleural-drain-web-v1-2.pdfRushing, J. (2007). Clinical Do’s & Don’t’s: Managing a Water-seal Chest Drainage Unit. Nursing2007.Sullivan, B. (2008). Nursing Management of Patients with a Chest Drain. British Journal of Nursing, 17(6), 388-393.Stony Brook Cancer Center. Lung Cancer Evaluation Center. Patient instructions heimlich valve home care. Retrieved October 21 2015 from: http://www.stonybrookmedicalcenter.org/cancer_center

‘World Health Organisation (WHO) Guidelines on Hand Hygiene in Healthcare.

www.nursingmidwiferyboard.gov.au/Codes-and-Guidelines.aspx

Varela G, Jimenez MF & Novoa N. Portable chest drainage systems and outpatient chest tube management. Thoracic Surgical Clinics. 2010;20(3):421-426.

Xue, Y. (2008). Intervention: Chest Drains: Dressing. The Joanna Briggs Institute. Retrieved December 10, 2010, from http://au.jbiconnect.org/infection_control/docs/jbi/cis/connect-gen-user-view.php?IIDXue, Y. (2009). Chest Drains: Bottle and Tubing Changes. The Johanna Briggs Institute.

Back to Table of Contents

Definition of Terms

Pneumothorax: air in the space between the lungs and chest wallPleural Effusion: build up of fluid between the layers of tissue that line the lungs and chest cavity

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 25 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Atrium Express™ Mini 500 Dry Seal Chest Drain: is a disposable, waterless operating system with 500ml collection volume, a non-adjustable dry suction regulatorpreset at -20cm H2O and a dry one-way valve for seal protection.Heimlich Chest Drain Valve: is a one-way flutter valve that is sensitive to pressure changes and used to drain air and fluid from the pleural space without aspirating air or fluid back into the pleural space. It is constructed of soft rubber tubing. The valve is compressed at one end to form leaflets that control unidirectional flow. It pushes open to remove air and fluid from the pleural space and then closes to prevent air and fluid from re-entering the pleural space.Valsalva Manoeuvre: is performed by attempting to forcibly exhale while keeping the mouth and nose closed to increase pressure in the chest, to prevent air entering the pleural space.Tension Pneumothorax: is a life-threatening condition that develops when air is trapped in the pleural cavity under positive pressure.

Back to Table of Contents

Search Terms

Drain, Drainage, Drainage tube care, Wound care: closed drainage, Closed drainage, Suction, Wound drain, Pleural drainage

Back to Table of Contents

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 26 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Attachments

Attachment 1: Management of Chest Drainage System ComplicationsAttachment 2: Chest Drain Chart Checklist and Nursing ConsiderationsAttachment 3: Procedures for Education of the Patient and/or Carer

Disclaimer: This document has been developed by ACT Health, <Name of Division/ Branch/Unit> specifically for its own use. Use of this document and any reliance on the information contained therein by any third party is at his or her own risk and Health Directorate assumes no responsibility whatsoever.

Date Amended Section Amended Approved By

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 27 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Attachment 1: Management of Chest Drainage System Complications

Complication Possible Cause Nursing InterventionsSubstantially increased bloodstained drainage

- Active bleeding- Drainage of old blood

- Monitor vital signs. Observe for increased heart rate and decreased BP. Notify medical officer.- Measure drainage every 15-30 minutes to determine if continuous.- If 300-500mls per hour Call MET

Significant air leak in the water seal chamber

-Air leak from patients’ lung-Large opening around drain-Faulty underwater seal drain-Poor connection to tubing

- Check dressing and ensure that it is secure.- Check the system for leaks.- Check the system for leaks.

If the leak is not found notify the medical officer.

No bubble in water seal chamber

-Sudden cessation:-Tubing is kinked-Obstruction e.g. Clots-Gradual decrease:-Lung has re-expanded

- Ensure that tubing is straight.- Check for tubing kinks.- Notify RMO- Check vital signs and oxygen saturation levels. Inform medical officer.

Air escaping around catheter or catheter vent exposed at entry site

- Large skin opening- Surgical emphysema

- Remove dressing. Inspect insertion site and redress.- Check vital signs. Notify medical officer.

Accidental disconnection /removal of chest tube

- Connections not taped securely

- Disconnection – Clamp tube Place end of chest tube in bottle of sterile water to maintain water seal, unclamp while setting up new system. Tape securely after re connection. Do not clamp > 1 min- Removal of tube – If air leak present-Apply dressing taped on 3 sides – vented, to allow air to escape but prevent air re entering pleural space. No air leak – apply occlusive dressing.- Notify Registrar urgently.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 28 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Attachment 2: Chest Drain Chart Checklist and Nursing Considerations

Protected Chest tube Clamps (ends covered with oxygen tubing) with each ICC with patient at all times (in case of disconnection and for removal)

Emergency equipment check – bedside oxygen and suction functioning Safety requirements – Ensure drain is secure, dressing intact and airtight, connections

securely taped and visible. Check water level in underwater seal chamber to mark indicated

Observe drain sites for any signs of infection, i.e. Inflammation, discharge, oedema or pyrexia

Ensure adequate pain relief for patients with chest drains insitu Keep drainage system below chest level Chest drain observations:

o Record Suction in mmH₂O – suction is only active if connected to wall suctiono Air leak – indicated by presence of bubbles in the water seal chamber – whether

patient has suction on or off – note some patients may not have the strength to expel air from the pleural space without the assistance of suction

o Swing/oscillation – in the water seal chamber indicates negativity of the pleural space will decrease as the lung re expands

o Colour – describe the nature and type of drainage present – serous, haemoserous, chyle, pus, blood

o Drainage totals document from 2400 to 2400 in daily column, document overall total in cumulative column and record on Fluid Balance Chart, ensure weekly fluid balance is also completed

o Observe patient for signs of respiratory distress, i.e. Rapid respiration, pallor, cyanosis, sweating or pressure on the chest

o Check chest drains hourly for any kinks or looping for blockage of tubing with blood clots, fibrin and debris, gently lifting sections of tubing to assist fluid flow into drain. Do not “strip” tubing.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 29 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register

CHHS16/047

Attachment 3: Procedures for Education of the Patient and/or Carer

Equipment for Discharge All Patients with an ICC Padded tube clamps x 2 Occlusive sterile dressings x 3

For Patient’s with a Atrium Express™ Mini 500 Mobile Dry Seal Chest Drain Unit Atrium Express™ Mini 500 Mobile Dry Seal Chest Drain Unit x 1

Complications - when the patient and/or carer are to seek medical advice: The patient reports pain at the ICC insertion site that does not lessen with analgaesia.

The patient /family carer are to contact the nurse or MO. If the ICC dislodges from the chest wall, the patient is to perform the Valsalva

Manoeuvre, if there is no air leak a sterile occlusive dressing is applied to the ICC site, if there is an air leak apply a sterile occlusive dressing secured with tape on three sides only (to ensure air can escape) as instructed. Telephone 000 or 112 from a mobile phone.

If the drainage system dislodges from the ICC, immediately reattach it or apply two Howard Kelly forceps to the ICC close to the chest wall as instructed and seek urgent medical advice. Telephone 000 or 112 from a mobile phone.

The connection between the ICC and the drainage system become loose, resecure the drainage system into the ICC and apply tape. If the patient reports breathing difficulty or sudden unrelieved pain, telephone 000 or 112 from a mobile phone.

Air or fluid is coming from around the ICC insertion site, contact the MO or proceed to the Emergency Department for assessment or telephone 000 or 112 from a mobile phone.

If the patient develops sudden shortness of breath; check the ICC and drainage system are free from kinks. Check air can escape from the drainage bag on the Heimlich valve or the positive pressure relief valve located on top of Express Mini is not obstructed. If these troubleshooting tips do not relieve the sudden shortness of breath, telephone 000 or 112 from a mobile phone.

A large amount of drainage suddenly occurs, contact the MO or proceed to the Emergency Department for assessment or telephone 000 or 112 from a mobile phone.

The Heimlich valve, which was fluttering, has stopped fluttering either the leak has stopped or the ICC is blocked. Contact the MO or proceed to the Emergency Department for assessment or telephone 000 or 112 from a mobile phone.

Doc Number Version Issued Review Date Area Responsible PageCHHS16/047 1 31/03/2016 01/04/2021 SOH 30 of 30

Do not refer to a paper based copy of this policy document. The most current version can be found on the ACT Health Policy Register