Page 1: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT

INTO YOUR CLASSROOM PILOTOctober 2019

Page 2: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

INTRODUCTIONS

Jeff Hoag, AIA, LEED AP BD + CArchitect / K-12 Practice Leader, GMB Architecture + Engineering

Sara EasterPresident,

Communications by Design Consulting

Nicole Smith, IIDA, LEED AP ID+CInterior Designer

GMB Architecture + Engineering

Page 3: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

What problem are you trying to solve?

START HERE

• “Fix” old furniture or outdated technology

Select & purchase

• Change teaching model• Make a wide range of changes• Plan for a phased approach to change• Develop rationale for future change

Develop and implement a pilot program

Page 4: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

WHAT IS A PILOT PROGRAM?

Page 5: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

WHY WORK WITH A DESIGN TEAM?

Furniture & technology are systems that need to be designed and integrated into a space in a multi-disciplinary way

Page 6: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

HOW TO START

Let the concept drive decision- making, not a specific product• Develop the “why”• What are the activities that furniture & technology need to support?• “Tell me about your day”

Page 7: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

9-16 monthsTake the time to get it right!

EXAMPLE TIMELINE

ESTABLISH THE PILOT1 month

DEVELOPING THE PILOT1-2 months

MEASURING / NEXT STEPS2+ weeks

TRAINING IN THE SPACE2-4 months

ENGAGEMENT / IDEATION2-3 months

EXECUTING THE PILOT2-4 months

TESTING THE SPACE6+ weeks

IMPLEMENTATION

Page 8: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

ESTABLISH THE PILOT~1 month• Understand what you want to achieve• Assemble a team of ambassadors to see process through;

Identify others that might participate• Identify scope & reach• Establish schedule and ideal design framework

ESTABLISH THE PILOT1 month

DEVELOPING THE PILOT1-2 months

MEASURING / NEXT STEPS2+ weeks

TRAINING IN THE SPACE2-4 months

ENGAGEMENT / IDEATION2-3 months

EXECUTING THE PILOT2-4 months

TESTING THE SPACE6+ weeks

IMPLEMENTATION

Page 9: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

2-3 months• Approach conceptually• Surveys / observations

• Tours• Workshops

• Program - Learn, think, listen• Intructional exploration

ENGAGEMENT / IDEATION

ESTABLISH THE PILOT1 month

DEVELOPING THE PILOT1-2 months

MEASURING / NEXT STEPS2+ weeks

TRAINING IN THE SPACE2-4 months

ENGAGEMENT / IDEATION2-3 months

EXECUTING THE PILOT2-4 months

TESTING THE SPACE6+ weeks

IMPLEMENTATION

Page 10: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

CLARKSTON JR. HIGH

PILOT 5 - TRIANGLE DESK CLASROOM LAYOUT

P5-STC• CASTERS• 5 STAR BASE • FOOT RING • POLYSHELL BACK/SEAT

P5-SC• GLIDES• 4-LEGGED• POLYSHELL BACK/SEAT• OPTIONAL BOOK STORAGE

P5-ST• 2 GLIDES 1 CASTER • LARGE SIZE 50 x 35 x 35

P5-GT• STANDING HEIGHT • BOOK SHELF • GLIDES

P5-TL• CASTERS• METAL BASE• LAMINATE TOP

P5-S• 18 1/2” H

P5-LS• LINEAR AND CURVED • SOFT SEATING

P5-T• CASTERS• 5 STAR BASE

( EX

ISTI

NG

CA

SE

WO

RK

TO

BE

VE

RIF

IED

)

CLASSROOM E105

Learning Technologies

Laptop

Chromebook

Microsoft Surface Pro

Apple iPad

Desktop Computer

Instructional Technology Possibilities

Short-Throw Projector

Wall Mounted Display

Document Camera

Classroom Speaker & Microphone

Interactive Projector and WhiteboardStandard-Throw Ceiling

Mounted Projector

1-2 months• Designers bring options for

validation and review

DEVELOPING THE PILOT

ESTABLISH THE PILOT1 month

DEVELOPING THE PILOT1-2 months

MEASURING / NEXT STEPS2+ weeks

TRAINING IN THE SPACE2-4 months

ENGAGEMENT / IDEATION2-3 months

EXECUTING THE PILOT2-4 months

TESTING THE SPACE6+ weeks

IMPLEMENTATION

Page 11: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

2-4 months• Make specific product & finish selections

• Quoting / place order• Furniture production time: 8-12 weeks• Complete any necessary infrastructure

updates (casework, electrical, etc.)• Pre-pilot survey

EXECUTING THE PILOT

ESTABLISH THE PILOT1 month

DEVELOPING THE PILOT1-2 months

MEASURING / NEXT STEPS2+ weeks

TRAINING IN THE SPACE2-4 months

ENGAGEMENT / IDEATION2-3 months

EXECUTING THE PILOT2-4 months

TESTING THE SPACE6+ weeks

IMPLEMENTATION

Page 12: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

2-4 weeks• Installation of pilot products• Reconfiguring the space, adjusting

product / furniture• Base-level professional development;

classroom management; toolbox training; instructional coaching

TRAINING IN THE SPACE

ESTABLISH THE PILOT1 month

DEVELOPING THE PILOT1-2 months

MEASURING / NEXT STEPS2+ weeks

TRAINING IN THE SPACE2-4 months

ENGAGEMENT / IDEATION2-3 months

EXECUTING THE PILOT2-4 months

TESTING THE SPACE6+ weeks

IMPLEMENTATION

Page 13: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

6+ weeks• Time using the space - minimum of a

few weeks per class / teacher• Rotate teachers into pilot classrooms

• Test and make adjustments

TESTING THE SPACE

ESTABLISH THE PILOT1 month

DEVELOPING THE PILOT1-2 months

MEASURING / NEXT STEPS2+ weeks

TRAINING IN THE SPACE2-4 months

ENGAGEMENT / IDEATION2-3 months

EXECUTING THE PILOT2-4 months

TESTING THE SPACE6+ weeks

IMPLEMENTATION

Page 14: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

2+ weeks• Repeat survey post-pilot• Evaluate surveys & feedback• Share data with key stakeholders to

make decisions about next steps• Make any changes, as needed• Make plans for engagement &

adoption

MEASURING / NEXT STEPS

ESTABLISH THE PILOT1 month

DEVELOPING THE PILOT1-2 months

MEASURING / NEXT STEPS2+ weeks

TRAINING IN THE SPACE2-4 months

ENGAGEMENT / IDEATION2-3 months

EXECUTING THE PILOT2-4 months

TESTING THE SPACE6+ weeks

IMPLEMENTATION

Page 15: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

ESTABLISH THE PILOT1 month

DEVELOPING THE PILOT1-2 months

MEASURING / NEXT STEPS2+ weeks

TRAINING IN THE SPACE2-4 months

ENGAGEMENT / IDEATION2-3 months

EXECUTING THE PILOT2-4 months

TESTING THE SPACE6+ weeks

IMPLEMENTATION

• Implications to design characteristics

• Evaluate changes needed for larger-scale rollout

• Go tell people what you did!

IMPLEMENTATION

Page 16: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED

UNEXPECTED FINDINGS • Students get to class early to select their favorite seat

• Parents pushing for district to expand on an initial pilot

• Teachers are mentally prepared for change ahead

• Be prepared to be surprised!

Page 17: INTEGRATING FURNITURE, TECHNOLOGY, AND …INTEGRATING FURNITURE, TECHNOLOGY, AND PROFESSIONAL DEVELOPMENT INTO YOUR CLASSROOM PILOT October 2019. INTRODUCTIONS Jeff Hoag, AIA, LEED