9
Integrating Construction Integrating Construction Processes Processes Achievements of the German IAI Achievements of the German IAI Domain Groups Domain Groups Dr. Thomas Liebich Dr. Thomas Liebich AEC3 Deutschland AEC3 Deutschland Technical Coordinator, IAI e.V. Technical Coordinator, IAI e.V.

Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

Embed Size (px)

Citation preview

Page 1: Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

Integrating Construction ProcessesIntegrating Construction ProcessesAchievements of the German IAI Achievements of the German IAI

Domain GroupsDomain Groups

Dr. Thomas LiebichDr. Thomas LiebichAEC3 DeutschlandAEC3 Deutschland

Technical Coordinator, IAI e.V.Technical Coordinator, IAI e.V.

Page 2: Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

05.04.2006 buildingSMART Conference

2

Design Construction

Process IntegrationProcess Integration

FacilityManagement

Inception

Life cycle

Influ

ence

on

Life

cyc

le c

osts

Page 3: Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

05.04.2006 buildingSMART Conference

3

Building ServicesBuilding Services

User guidelines to apply BIM/IFC methodology Advantages of BIM/IFC What everyone has to do Opportunities for use Minimum information sets concrete instructions for using

particular BIM/IFC enabled software

Page 4: Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

05.04.2006 buildingSMART Conference

4

Structural EngineeringStructural Engineering

Optimizing the interface between architecture and structural engineering Consistent working Time savings for analysis Change management Collaboration for hybrid

constructions (concrete, steel,

timber)

Architecturalmodel

Structuralmodel

Page 5: Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

05.04.2006 buildingSMART Conference

5

Quantity TakeoffQuantity Takeoff

Reliable quantities fromthe building model fast, cost effective, and

comprehensive

Development steps configurable IFC Catalog free choice of CAD/BIM IFC Quantities for calculation

Page 6: Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

05.04.2006 buildingSMART Conference

6

Facility ManagementFacility Management

IFC Model – Starting point for facility management short ramp-up time little post-acquisition of data consistent set of data … influencing life-cycle costs

during design phase

CAFM Structure IFC Structure

Page 7: Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

05.04.2006 buildingSMART Conference

7

Research / DevelopmentResearch / Development

Product data models from component to town level Consistency Level of Details Interoperable with other

product data formats Connection to model server

IFCIFC

VDI3805

IFC

IFC

cityGML

AP214

KML

Forschungszentrum Karlsruhein der Helmholtz-Gemeinschaft

Page 8: Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

05.04.2006 buildingSMART Conference

8

Application in PracticeApplication in Practice

Real construction projects using 3D BIM and IFC Reconstruction- Office Bldg Construction- Factory Design- Central Train Station Design- Airport Construction- Housing Construction- Metro Station …

Page 9: Integrating Construction Processes Achievements of the German IAI Domain Groups Dr. Thomas Liebich AEC3 Deutschland Technical Coordinator, IAI e.V

05.04.2006 buildingSMART Conference

9

More at the forumMore at the forum

Booth of the IAI e.V.