  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Howard Ashcraft, Partner at Hanson Bridgett and Adjunct Professor, Stanford University

    Integrated Project Delivery: Executing Your First Project

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference 1May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    The Pitch

    • $500 Million revenue over 4 years

    • 12 Divisions– Each with executive with differing bonus goals

    • No CEO

    • No CFO

    • No Executive Committee

    • No Board of Directors

    • And we have never worked together

    2May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Remember Design Build?

    • With Great Responsibility Comes Great Power

    • If you aren’t responsible for outcome, you are not a player.

    • IPD is a second chance for designers to be relevant and have a seat at the table.

    3May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Are You Right for IPD?

    • Collaborative?

    • Project Leadership?– Facilitator– Cost Controls– Schedule Controls– Pulled Workflows

    • Addicted to utilization?

    • Unwilling to co-locate?

    4May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Workflow• Lean

    – Work to pull- Not what you want to do, what they need

    – Flow before utilization- Small batches, continuous flow

    – Colocation- Doing real work, together- Not charrette on steroids

    – Culture- Reliability- No studio

    5May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Is the Team Right for IPD?

    • Engaged

    • Collaborative

    • Competent

    • Committed • Collaborative

    • Competent

    • Transparent

    • Respectful

    6May 20, 2019

    Owner

    Builders

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Is the Project Right for IPD?

    • Ambition– High Performance Project

    • Challenges– Cost, Schedule, Technical

    • Clarity– Affects Target Cost Timing

    • Probability of change

    • Interdependencies– Systems– Organizations

    7May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Project Types

    • Healthcare

    • Universities

    • Laboratories

    • Manufacturing

    • Commercial

    • Non-critical Nuclear

    • Biopharmaceutical

    • Software

    • K-12 Educational

    • Net Zero Energy

    • Mixed Use

    • Hospitality

    • Amusement Parks

    • Semiconductor Mfg.

    • First Responder

    • Financial Services

    • Transportation/Heavy Civil/Water/Wastewater (International)

    8

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    IPD is a Cocktail

    9May 20, 2019

    • Structure• Environment• Operating System• Technology

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    High Performance Project

    • Buildable– Can be efficiently constructed within budget

    • Usable– Meets the needs of sponsors and stakeholders

    • Operable– Can be easily maintained and operated

    • Sustainable– Spares Resources, Preserves Environment

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    HighPerformance

    Project

    IntegratedBuildingSystems

    IntegratedProcesses

    IntegratedOrganization

    IntegratedInformation

    PerformanceMetrics

    ProductionManagement

    Integrated ConcurrentEngineering

    SimulationVisualization

    Integration Agreement

    Integrated Project DeliveryA Simple Framework

    Fischer, Ashcraft, Reed & Khanzode 2017

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Fischer, Ashcraft, Reed & Khanzode (2017)

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Owner

    Consultant

    Team

    Variable

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Negotiation Keys

    • What is included in “Chargeable Costs?”– Direct Costs– Overhead

    • What is the Risk/Reward Program?

    • How is Target Cost validated?

    • How is cashflow managed?

    • What risks are waived?

    • What risks are reserved?

    • What is the insurance plan?

    14May 20, 2019

    Finance Liability

    Governance• How are decisions made?

    • How are decisions contested?

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Simple Risk/Reward

    15May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Value/Cost Risk Reward Model

    16May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Neutral Zone

    17May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Project Structure

    18May 20, 2019

    Multiparty (3 Parties) Polyparty

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Governance

    19May 20, 2019

    • Tiered– Senior Management Team– Project Management Team– Cross-Functional Teams

    - ”Clusters” ”Project Implementation Teams”

    • Voting– Owner 1/3 of votes– Owner’s Override that can

    trigger a change order

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Insurance• Traditional

    – Normal for all parties

    • Hybrid– OCIP/CCIP– Traditional Professional Liability

    • Integrated (Single or Multiple Policies)– Project Specific Professional Liability

    - Rectification/Mitigation?- Insured v. Insured Exclusion- Project Policy Exclusion

    – OCIP/CCIP

    20May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Traditional and Relational…and some implications

    Attribute Traditional Relational

    Enforcement of Promises External Adjudication Internal Adjustment

    Definition of Success Compliance Satisfaction

    Project Organization Segregated/Sequential Integrated/Concurrent

    Decision Authority Hierarchical Distributed

    Contract Provisions Prescriptive Enabling

    Communication System Channeled Networked

    Risk Allocation Assigned Shared

    Accountability Audit Transparency

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference 22May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    And Remember…

    23May 20, 2019

  • Victor O. Schinnerer & Company, Inc. │Large Firm Conference

    Resources

    • Integrating Project Delivery, Fischer, et al., (Wiley 2017)

    • Integrated Project Delivery: An Updated Working Definition (AIACC 2014)

    • Integrated Project Delivery: An Action Guide for Leaders (Pankow, CIDCI, IPDA 2018)

    • Target Value Design (LCI)

    • Target Value Delivery (LCI)

    • This is Lean, Modig & Åhlstrom (Thisislean.com)

    24May 20, 2019