6/15/2012 1 WEF Government Affairs Webcast “Clean Water Act Integrated Planning Framework: Next Steps” June 14, 2012 2 Carl Myers Assistant Director Government Affairs Water Environment Federation [email protected] WELCOMING REMARKS

Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

1

WEF Government Affairs Webcast

“Clean Water Act Integrated Planning Framework: Next Steps”

June 14, 2012

2

Carl Myers

Assistant Director

Government Affairs Water Environment Federation

[email protected]

WELCOMING REMARKS

Page 2: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

2

Revised Framework: EPA update and perspectives

A View from the States

An Integrated Water Quality Affordability Strategy

Local utility considerations: Lima, Ohio

Questions/Answers

4

Deborah Nagle

Director, Water Permits Division, Office of [email protected]

Mark Pollins

Director, Water EnforcementDivision, Office of Enforcement and Compliance [email protected]

US Environmental Protection AgencyWashington, DC

TODAY’S SPEAKERS

Page 3: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

3

Clean Water Act Integrated Planning Framework: Next StepsWEF WebinarJune 14, 2012

Under an integrated approach, EPA and States would use the flexibility of EPA’s existing regulations and policies and encourage municipalities to evaluate how best to meet all of their CWA requirements and within their financial capability to better allow—

sequencing wastewater and stormwater projects in a way that allows the highest priority environmental projects to come first, and

innovative solutions, such as green infrastructure 

6

Page 4: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

4

Addresses most serious water quality problems sooner

More cost‐effective, may lower overall cost of compliance

Fosters innovative approaches, such as green infrastructure, that are more sustainable

7

Encourages Regions to work with States and communities on implementing comprehensive, integrated planning approaches CWA and implementing regulations and guidance provide necessary flexibility 

Existing regulatory standards will be maintained EPA is developing integrated planning framework Will obtain feedback from States, local governments, utilities and environmental groups

Looking to identify municipal leaders to serve as models

8

Page 5: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

5

Atlanta, GA ‐ January 31, 2012

New York City, NY ‐ February 6

Seattle, WA ‐ February 13, 2012

Kansas City, KS ‐ February 15, 2012

Chicago, IL ‐ February 17, 2012

NACWA workshop –Washington, DC – December 17, 2011

Conference of Mayors workshop ‐Monrovia, CA –February 27, 2012  

9

42 comments received

8 NPDES State Agencies

10 Municipal NGOs

11 Municipalities

4 Environmental NGOs

9 Consultants/ Attorneys

10

Page 6: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

6

Burdens on States Consistency between HQ and Regions Financial Capability Adaptability  Use of Permits Detail SDWA

11

Transmits final Integrated Planning Framework to EPA Regions

Encourages Regions to work with States to identify opportunities to implement the integrated planning approach

12

Page 7: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

7

Background Principles

Overarching Principles

Guiding Principles

Elements of an Integrated Plan Implementation

Permits

Enforcement 

13

Integrated planning will maintain existing regulatory standards that protect public health and water quality

Integrated planning will allow a municipality to balance various CWA requirements in a manner that addresses the most pressing public health and environmental protection issues first

The responsibility to develop an integrated plan rests with municipalities

14

Page 8: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

8

Integrated Plans should:

Reflect State requirements and planning efforts and incorporate State input on key issues

Provide for meeting water quality standards using existing flexibilities in the CWA and its implementing regulations

15

Maximize the effectiveness of infrastructure dollars through analysis of alternatives and the selection and sequencing of actions needed to address water quality challenges and non‐compliance

Incorporate effective innovative technologies, approaches and practices (including green infrastructure)

16

Page 9: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

9

Evaluate and address community impacts and consider disproportionate burdens resulting from a municipality’s implementation of its plan

Implementation of technology‐based and core requirements are not delayed

17

Financial strategy is in place, including appropriate fee structures

Opportunity for meaningful stakeholder input throughout the development of the plan

18

Page 10: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

10

Description of the water quality, human health and regulatory issues to be addressed in the plan, including

An assessment of existing CWA challenges ‐ current and projected future regulatory requirements

Identification and characterization of  human health threats Identification and characterization of water quality 

impairment and threats ‐TMDLs or an equivalent analysis Identification of sensitive areas and environmental justice 

concerns Metrics for evaluating human health and water quality 

objectives

19

Description of existing wastewater and stormwater systems under consideration and summary information describing systems performance, including:

Identification of municipalities and utilities that are participating in the planning effort 

Characterization of wastewater and stormwater systems

Characterization of flows in the wastewater and stormwater systems under consideration

Identification of deficiencies associated with existing assets

20

Page 11: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

11

Process for involving relevant community stakeholders in the planning and selection process

Opportunities for meaningful input during development and selection of alternatives;

Making new information available during plan implementation and providing meaningful input into developing proposed modifications; and

Public involvement in evaluating the effectiveness of green infrastructure approaches

21

Process for evaluating and selecting alternatives and proposed implementation schedules

Use of sustainability planning elements to assist in providing information for prioritizing investments Includes asset management principles

A systematic approach to considering green infrastructure and other innovative measures

Identification of criteria to be used for comparing alternative projects Identification of  alternatives, including cost estimates,  projected 

pollutant reductions and other benefits associated with each alternative Analysis of alternatives that documents the criteria used, the projects 

selected, and why they were selected. Proposed implementation schedules For each entity participating in the plan, a financial strategy and 

capability analysis

22

Page 12: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

12

Measuring success Proposed performance criteria and measures of success

Monitoring program to address the effectiveness of controls, compliance monitoring and ambient monitoring.

23

A process for identifying, evaluating and selecting proposed new projects or modifications to ongoing or planned projects and implementation schedules based on changing circumstances; and  

Where the municipality is seeking a modification, they must collect the appropriate information to support the modification.

24

Page 13: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

13

Incorporate all or part of an integrated plan into NPDES permit where legally permissible

Considerations for incorporating integrated plans into permits  Compliance schedules for meeting WQBELs need to be consistent with the requirements in 40 CFR 122.47 

Green infrastructure approaches and related innovative practices

Appropriate water quality trading 

25

All or part of an integrated plan may be able to be incorporated into the remedy of an enforcement action  

Considerations for incorporating integrated plans into enforcement actions  All parties needed to effectuate a remedy are involved History of compliance Where extended time is necessary to achieve compliance Using permitting and enforcement action in conjunction  Enforcement orders should allow for adaptive management Green infrastructure approaches and related innovative 

practices Environmentally beneficial projects in plan that municipality is 

not otherwise legally required to perform may be included consistent with Supplemental Environmental Protects Policy

26

Page 14: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

14

Work with interested municipalities Share information about lessons learned  Management of Process

Ongoing discussions with Regions

27

Water Environment Federation

June 14, 2012

A View from the States: 

Integrated Planning

Alexandra Dunn

Executive Director & General Counsel 

Association of Clean Water Administrators

Page 15: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

15

ACWA 12/14/11 Hill Testimony

ACWA President Walt Baker (UT)

“Moving from the appealing concepts in the memorandum, to a Framework, to actual implementation will require commitment by all parties.  Integrated planning is one thing – the implementation of this planning through the CWA’s rigorous permitting process may be quite another.”  

Page 16: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

16

• “…the final framework needs to define the roles of the states and the Agency clearly and explicitly.  Through the workshops, we learned that EPA contemplates a prominent role for state permitting authorities – which we appreciate.   EPA intends for state permitting authorities to approve the integrated plans developed by municipalities.” 

2/12 ACWA Comments on Draft Framework

“Given the interplay between permitting and enforcement, we are also concerned that a few years after a municipal plan is developed and underway in partnership with the state permitting authority, EPA could come back and order more stringent or different controls or approaches  … 

The role of EPA and the states needs to be clearly defined so that the integrated approach agreed upon can be relied on by all parties and stakeholders.”  

2/12 ACWA Comments on Draft Framework

Page 17: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

17

6/12 Final Framework Answers Some Questions

• Prioritization (#4)

• Cost & affordability  (#4)

• Balance between permitting and enforcement (IV)

• Measuring success (#5)

• Incorporating adaptive management (#6)

The Role of Innovation…“Innovations … are critical to our future success for maintaining and improving water quality.  States need to be open and willing to look at things differently. But given state resource limitations and workload demands, it’s critical that entities do the homework to ensure that an innovation is well founded.”

Page 18: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

18

• “Talk to your regulators early in the process – not after spending a lot of time and money”

• “Be upfront … ‘I don't know’ is an acceptable answer especially in the early part of the discussions”

• “Be willing to make minor changes to the project to get most of what you want” 

• “When there is a problem or concern ‐ pick up the phone”

Page 19: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

19

37

Brandon C. Vatter, P.E.

Senior Project Manager

Hatch Mott MacDonald

Cincinnati, Ohio

[email protected]

TODAY’S SPEAKERS

The Need for An Integrated Water Quality Affordability Strategy

Brandon Vatter, PERobert A. Weimar, PE, BCEE

New York Water Environment AssociationJune 14, 2012

Page 20: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

20

Affordability: Historically Disconnected from Water Quality Improvement!

Affordability: Historically Disconnected from Water Quality Improvement!

Current: Affordability = Infrastructure That Public Can Afford To Build To Reduce CSO/SSO

Current: Affordability = Infrastructure That Public Can Afford To Build To Reduce CSO/SSO

Alternative: Affordability =

The optimum public investment to Improve

Water QualityThe Integrated Water Quality Affordability Program

$0 

$500 

$1,000 

$1,500 

Full Attainment0

Estimated Construction Cost ($M)

Water Quality Standards Compliance

Solutions to address CSOs & SSOs only

Solutions to address overflows & storm water

Integrated Solutions to address overflows, storm water, & other pollution sources (Ag, septics, illicits, dry weather sources, etc.)

Cost increases

Water quality gets better

For the same $500M investment, greater WQ improvement can be achieved with the integrated approach

Integrated Water Quality Affordability ProgramCost‐Benefit Measured by Cost per Day of Increased 

Compliance with Water Quality Standards

Multiple pollutants are addressed; Bacteria, Nutrients, TSS, etc. – the pollutants impairing the stream

Page 21: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

21

1% 

2% 

3%

Full Attainment0

% of Median Household In

come (%

MHI)

Water Quality Standards Compliance

Solutions to address CSOs & SSOs only

Solutions to address overflows & storm water

Integrated Solutions to address overflows, storm water, & other pollution sources (Ag, septics, illicits, dry weather sources, etc.)

% MHI increases

Water quality gets better

Defines the “knee of the curve” for MHI & optimum spending rate for maximum WQ improvement for the dollar spent

Integrated Water Quality Affordability ProgramCost‐Benefit  Measured by Increase in % of MHI per Day of Increased 

Compliance with Water Quality Standards

EPA Guidance Supports the Integrated WQ Affordability Approach

EPA Guidance Supports the Integrated WQ Affordability Approach

EPA regulatory guidance - Interim Economic Guidance for Water Quality Standards Workbook April 27, 1995 If substantial and widespread economic and social impacts

have been demonstrated, then the discharger will not have to meet the water quality standards.

The discharger will, however, be expected to undertake some additional pollution control.

Criteria outlined in Guidance - used to determine the most protective pollution control technique that would not impose a substantial impact on the entity.

Evaluate how the Integrated Controls Program will affect the socioeconomic well-being of the community.

EPA regulatory guidance - Interim Economic Guidance for Water Quality Standards Workbook April 27, 1995 If substantial and widespread economic and social impacts

have been demonstrated, then the discharger will not have to meet the water quality standards.

The discharger will, however, be expected to undertake some additional pollution control.

Criteria outlined in Guidance - used to determine the most protective pollution control technique that would not impose a substantial impact on the entity.

Evaluate how the Integrated Controls Program will affect the socioeconomic well-being of the community.

H1

Page 22: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

Slide 42

H1 This was how SD1 selected their CSO LOC. If you cite them as the example you are ok. If you want to use the ideas then I suggest rewording the slide some.HMM, 4/30/2012

Page 23: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

22

EPA Guidance Supports the Integrated WQ Affordability Approach

EPA Guidance Supports the Integrated WQ Affordability Approach

Substantial & Widespread Impacts include changes to the socioeconomic indicators listed below: Median Household Income; Community Unemployment Rate; Losses to the local economy; Percent of Households Below Poverty Line; Increases in unemployment, Impact on Community Development Potential; Impact on Property Values. Decreases in tax revenues,

Substantial & Widespread Impacts include changes to the socioeconomic indicators listed below: Median Household Income; Community Unemployment Rate; Losses to the local economy; Percent of Households Below Poverty Line; Increases in unemployment, Impact on Community Development Potential; Impact on Property Values. Decreases in tax revenues,

H2

EPA Guidance Supports the Integrated WQ Affordability Approach

EPA Guidance Supports the Integrated WQ Affordability Approach

Additional socioeconomic indicators cont’d: Potential for the loss of future jobs and personal

income if businesses choose not to locate in affected community,

Depressed economic activity resulting from loss of purchasing power by persons losing their jobs due to increased user fees.

“Applicants should feel free to consider additional measures not mentioned here if they judge them to be relevant.”

Additional socioeconomic indicators cont’d: Potential for the loss of future jobs and personal

income if businesses choose not to locate in affected community,

Depressed economic activity resulting from loss of purchasing power by persons losing their jobs due to increased user fees.

“Applicants should feel free to consider additional measures not mentioned here if they judge them to be relevant.”

• Combined Water & Sewer Rates Impacts

• Total Costs - Costs of Doing Business in addition to Controls Program

H3

Page 24: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

Slide 43

H2 This was how SD1 selected their CSO LOC. If you cite them as the example you are ok. If you want to use the ideas then I suggest rewording the slide some.HMM, 4/30/2012

Slide 44

H3 This was how SD1 selected their CSO LOC. If you cite them as the example you are ok. If you want to use the ideas then I suggest rewording the slide some.HMM, 4/30/2012

Page 25: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

23

Once Substantial & Widespread Economic & Social Impacts Demonstrated

Once Substantial & Widespread Economic & Social Impacts Demonstrated

Guidance - Utility can modify its Program Costs to fall within the “” boxes listed in the Financial Capability Matrix table.

“EPA will interpret a " " rating to mean that the community is not expected to incur substantial impacts as a result of the pollution control project.”

Guidance - Utility can modify its Program Costs to fall within the “” boxes listed in the Financial Capability Matrix table.

“EPA will interpret a " " rating to mean that the community is not expected to incur substantial impacts as a result of the pollution control project.”

Secondary Score

Municipal Preliminary Screener

(Cost Per Household as a % of MHI)1

(Socioeconomic, Debt and Financial Indicators)1

Less than 1% Between 1.0 and

2.0% Greater than 2.0%

Less than 1.5 ? X X

Between 1.5 and 2.5 ? X

Greater than 2.5 ?

H4

$0 

$10 

$50

$100 

Full Attainment0

Project Estim

ated Construction Cost ($M)

Water Quality Standards Compliance by Project

Projects that make up the Integrated  Controls Program “purple” curve

Cost increases

Construct the Projects that provide the Greatest WQ Improvement for the         

$ Spent

Water quality gets better

Integrated Water Quality Affordability Program

Page 26: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

Slide 45

H4 This was how SD1 selected their CSO LOC. If you cite them as the example you are ok. If you want to use the ideas then I suggest rewording the slide some.HMM, 4/30/2012

Page 27: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

24

1% 

2% 

3%

Full Attainment0

% of Median Household In

come (%

MHI)

Water Quality Standards Compliance

Solutions to address CSOs & SSOs only

Solutions to address overflows & storm water

Integrated Solutions to address overflows, storm water, & other pollution sources (Ag, septics, illicits, dry weather sources, etc.)

% MHI increases

Water quality gets better

Defines the “knee of the curve” for MHI & optimum spending rate for maximum WQ improvement for the dollar spent

Integrated Water Quality Affordability ProgramCost‐Benefit  Measured by Increase in % of MHI per Day of Increased 

Compliance with Water Quality Standards

The MHI spending rate from MatrixTable compared to the “knee of thecurve”.If Yes, Utility proceeds with MHIspending rate as shown in the “knee ofthe curve”.If No, Utility adjusts their IntegratedControls Program to match the rangedetermined from the Matrix Table.

Result: An Integrated Controls Program that is Affordable and maximizes WQ Improvement – Meets WQS

Pollutants impairing the stream addressed; Bacteria, Nutrients, TSS, temperature, etc.

No more silos of regulations

Integrated WQ Affordability Program Benefits

Integrated WQ Affordability Program Benefits

Integrates management of WW, SW, & other source pollution abatement directly with nominally affordable spending plans -optimize in-stream WQ improvement & WQS compliance

Ultimate water quality goals expected by CWA would be met, but at a rate which recognizes the nominal short term values & costs to the local community

Affordability discussions focused on optimum spending rate of MHI based on overall receiving WQ benefits

Integrates management of WW, SW, & other source pollution abatement directly with nominally affordable spending plans -optimize in-stream WQ improvement & WQS compliance

Ultimate water quality goals expected by CWA would be met, but at a rate which recognizes the nominal short term values & costs to the local community

Affordability discussions focused on optimum spending rate of MHI based on overall receiving WQ benefits

Page 28: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

25

Integrated WQ Affordability Program Benefits

Integrated WQ Affordability Program Benefits

Prioritize investment on the net benefits to overall in-stream WQ improvement on a watershed by watershed basis

Rate of expenditures and the ultimate value to the community thru direct value of WQ improvements easily understood

Readily evaluate and compare the rates of water quality improvements. Example - First $10 million spent yields five additional days of WQS

compliance, Will take an additional $100 million to achieve the next five additional

days of WQS compliance. Or, $100 million dollars spent achieves zero additional days of WQS

compliance.

Prioritize investment on the net benefits to overall in-stream WQ improvement on a watershed by watershed basis

Rate of expenditures and the ultimate value to the community thru direct value of WQ improvements easily understood

Readily evaluate and compare the rates of water quality improvements. Example - First $10 million spent yields five additional days of WQS

compliance, Will take an additional $100 million to achieve the next five additional

days of WQS compliance. Or, $100 million dollars spent achieves zero additional days of WQS

compliance.

Integrated WQ Affordability Program Benefits

Integrated WQ Affordability Program Benefits

No more Regulatory Silos, No Need for a SW Rule - All in-stream WQ regulatory goals assessed as one metric, not individual, often overlapping requirements

Non-urban WQ sources considered - ensure that urban strategies offer a cost-effective basis for WQ improvement, -not an undue burden on urban ratepayers without a commensurate benefit

All decisions based upon long term receiving WQ benefits, & rate achieved, rather than the rate of infrastructure expenditures

No more Regulatory Silos, No Need for a SW Rule - All in-stream WQ regulatory goals assessed as one metric, not individual, often overlapping requirements

Non-urban WQ sources considered - ensure that urban strategies offer a cost-effective basis for WQ improvement, -not an undue burden on urban ratepayers without a commensurate benefit

All decisions based upon long term receiving WQ benefits, & rate achieved, rather than the rate of infrastructure expenditures

Page 29: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

26

Integrated WQ Affordability Program Summary

Integrated WQ Affordability Program Summary

Integrated Water Quality Affordability Program founded on: Primary goal of continuous WQ improvement at an affordable

rate to protect public health & achieve the water body uses and functions

Time is now to bring these historically separate concepts together under one program

Move away from the traditional approach of “Spend money and the WQ may get better”

Integrated Water Quality Affordability Program founded on: Primary goal of continuous WQ improvement at an affordable

rate to protect public health & achieve the water body uses and functions

Time is now to bring these historically separate concepts together under one program

Move away from the traditional approach of “Spend money and the WQ may get better”

We know what we need to spend at an affordable rate in order to Maximize Improvements to in-stream Water Quality.

52

Gary A. Sheely

Director of Utilities

Lima, Ohio

[email protected]

TODAY’S SPEAKERS

Page 30: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

27

“Integrated planning will assist municipalities on their critical paths to achieving the human health and water quality objectives of the Clean Water Act (CWA) by identifying efficiencies in implementing the sometimes overlapping and competing requirements that arise from distinct wastewater and stormwater programs, including how best to make capital investments.”

“balance the CWA requirements in a manner that addresses most pressing public health and environmental protection issues first”

“…recognizes flexibilities in the CWA for the appropriate sequencing of work.”

“Maximize the effectiveness of funds through analysis of alternatives and the selection and sequencing of actions needed to address human health and water quality related challenges and non-compliance”

Page 31: Integrated Planning June 14 2012 Webcast slides Planning June 14 2012... · Integrated Solutionsto address overflows, storm water, & other pollution sources (Ag, septics, illicits,

6/15/2012

28

“Clean Water Act Integrated Planning Framework: Next Steps”

Q & A Session