52

Integrated Planning Final - HUGmnhugmn.org/Downloads/techday2010/Integrated Planning Final.pdf · Customer of Hyperion Planning ... Integrated Planning What is Integrated Planning?

Embed Size (px)

Citation preview

INTEGRATED PLANNING

INCLUDED IN THIS SEMINAR

1WHAT

2INTEGRATED

PLANNING

3NEXT STEPS

AGENDATODAY’S

SOLUTIONS

1. Planning

2. Strategic Planning

3. Integrated Planning

1. Strategic Planning

2. Full Income Statement

3. Detailed Planning

4. Scenario Based

5. Next Steps (Internal vs

External)

1. Solutions

2. Methodology

3. Questions

CORPORATE BACKGROUND7

WHEN YOUR LOOKING FOR THE BEST…

LINIUM IS A

LEADER IN…

IS A MEMBER

OF THE…

HAS EXPERIENCE

THROUGH…

LEARN ABOUT LINIUM’S

7

-EPM Solutions Focused

Around Oracle Hyperion

Solutions

- Oracle Practice, 1st Original

Customer of Hyperion

Planning

-Oracle Customer Advisory

Board

- Hyperion SIG-Domain Lead

- Oracle Beta Development

& User Experience Team

-Hundred’s Of Customer

Implementations

- Leading Product & Industry

Experts/Analyst

-More Than A Decade Of

Execution Experience

8

CUSTOM SOLUTIONS TAILORED TO INDUSTRIES SUCH AS

COMMERCIAL EDUCATION &

RESEARCH

FEDERAL

GOVERNMENT

STATE & LOCAL

INDUSTRY EXPERIENCELEARN ABOUT LINIUM’S

-Healthcare & Life Sciences

- Manufacturing

- Retail/Merchandising

- Utilities/Energy/Gas

- Financial Services

- Aerospace & Automotive

- Electronics

- Entertainment & Media

- Public Health

- Business

- Education

- Family

- Law & Order

- Environment

- Housing

- Transportation

- Defense & Intelligence

- Armed Forces/Veterans

- Public Safety

- Health & Nutrition

- Environment & Agriculture

- Family, Home & Community

- Benefits & Grants

- Science & Technology

- Public Education

- Private Education

- E-Learning

- Colleges

- Research

- Scientific

- Environmental

Hyperion Practice Background9

� Leader in EPM Solutions focused around Oracle Hyperion Solutions

� Leaders of Oracle Practice were 1st Original Customer of Hyperion Planning

� 1st Customer Migration of OFA to Hyperion� 1st Customer Migration of OFA to Hyperion

� Member of Oracle Customer Advisory Board

� Member of Hyperion SIG

� Member of Oracle Beta Development Team

� Experienced Consultants (100’s of Implementation)

� Dozens of Certified Hyperion Consultants

9

Services Offerings10

� Hyperion Design & Architecture Recommendations

� Hyperion Technical Implementation

� Project Management

� Infrastructure Installation, Disaster Recovery

Functional Requirements Analysis and Roadmaps� Functional Requirements Analysis and Roadmaps

� Re-engineering Budgeting and Forecast Process

� Hyperion Administration and Support

� OFA Conversion Specialists

� Systems Assessments, Tuning & Troubleshooting

10

Planning

� What is Planning?

In general usage, a financial plan can be a budget, a plan for spending and saving future income. This plan allocates future income to various types of

expenses, such as rent or utilities, and also expenses, such as rent or utilities, and also reserves some income for short-term and long-term savings. A financial plan can also be an investmentplan, which allocates savings to various assets or projects expected to produce future income, such as a new business or product line, shares in an

existing business, or real estate.

Strategic Planning

� What is Strategic Planning?

Strategic planning is an organization's process of defining its strategy, or direction, and making

decisions on allocating its resources to pursue this strategy, including its capital and people.strategy, including its capital and people.

Integrated Planning

What is Integrated Planning?

IBP refers to the technologies, applications and processes of

connecting the planning function across the enterprise to

improve organizational alignment and financial performance.

IBP accurately represents a holistic model of the company in IBP accurately represents a holistic model of the company in

order to link strategic planning and operational planning with

financial planning.

By deploying a single model across the enterprise and

leveraging the organization’s information assets, corporate

executives, business unit heads and planning managers use

IBP to evaluate plans and activities based on the true

economic impact of each consideration.

Integrated Enterprise Planning

LONG RANGE LONG RANGE

PLANNINGPLANNINGLONG RANGE LONG RANGE

PLANNINGPLANNING

14

FINANCIAL FINANCIAL

PLANNINGPLANNING

CORPORATE CORPORATE

DEVELOPMENT DEVELOPMENT

ACTIVITIESACTIVITIES

OPERATIONALOPERATIONAL

PLANNINGPLANNING

TREASURYTREASURY

STRATEGIESSTRATEGIES

FINANCIALFINANCIAL

PLANNINGPLANNING

OPERATIONALOPERATIONAL

PLANNINGPLANNING

WHAT IFWHAT IF--MODELINGMODELING

DEMAND PLANNINGDEMAND PLANNING

Defining Integrated Planning

INTEGRATED

STRATEGIC PLANNING/LONG RANGE PLANNING

Long-Range

Plan

Balance

Sheet/Cash

Flow

Scenario

Modeling

Integration of

Summarized

Data

15

INTEGRATED

PLANNING

OPERATIONAL PLANNING

Annual PlanDepartmental

BudgetsForecasting

Workforce,

Capital and

Projects etc.

Strategic Planning

INTEGRATED

STRATEGIC PLANNING/LONG RANGE PLANNING

Long-Range

Plan

Balance

Sheet/Cash

Flow

Scenario

Modeling

Integration of

Summarized

Data

16

INTEGRATED

PLANNING

OPERATIONAL PLANNING

Annual PlanDepartmental

BudgetsForecasting

Workforce,

Capital and

Projects etc.

Strategic Planning Process –

� Powerful Scenario Modeling

� Driver based forecasting

� Cash flow/Balance Sheet

� Capital Investments

17

� Capital Investments

� Ratio Analysis

� Growth Strategies

Integrated Planning Process

Financial Planning

Long-Term

Financial Planning

TreasuryManagement

Financial

Planning & Budgeting

Working

CapitalPlanning

ProfitabilityManagement

PerformanceScorecards

18

ERP System

Functional Operational Planning

DemandManagement

CustomerManagement

Human Resources Planning

SupplyPlanning

ProductPerformanceManagement

LogisticsPlanning

Integrated Business Planning

Financial Planning

Long-Term

Financial Planning

Treasury

Management

Financial

Planning & Budgeting

Working

CapitalPlanning

Profitability

Management

Performance

Scorecards

19

ERP System

Functional Operational Planning

DemandManagement

CustomerManagement

Human Resources Planning

SupplyPlanning

ProductPerformanceManagement

LogisticsPlanning

IntegratedPlanning/Analysis

FinancialModeling

StrategicOperationalModeling

Integrated Business Planning

Integrated Process

Planning and Managing Financial Performance

Income StatementRevenue Product Mix & Prices

Growth & Region Mix

Cost of Sales Direct Costs

Shared Costs

Business Entities

Business Data

Chart of Accounts, GL Entity,

Products, Customers, Regions,

Projects, Employees, Assets

Key Drivers(Examples)

Planning Solution

Needs

Financial

Measures

IP Focus

22

Balance Sheet

Cash Flow

Statement

Shared Costs

Payroll Expenses Headcount

Salary Increases

Capital Expenses New Projects

Purchase Prices

Accounts Receivable A/R Aging

Collection Rates

Relationships

Rules

Financial data, Operational Data,

Market Data

Entity Hierarchies, Product Bills of

Material, Distribution Networks

Budget Allocation Rules,

Aggregation Rules, Variance

Thresholds

Constraints

Capital Budget, Operating Budget,

Capacity, Materials, ResourcesWorkforce Plg.

Integrated Planning Key Points

� Business Drivers

� Process

� Level of Detail

� What-If� What-If

� Metrics Based Planning

� Visibility of the Business

� Technology

Business Drivers

� Revenue

� Operating Costs

� Employee

� Gross Margin� Gross Margin

� Capital Investments

� External Factors

� Currency

Process

� Data Loads from Source Systems

� Dependencies from Resources

� Inputs from User

� Business Logic Clarification/Validation� Business Logic Clarification/Validation

� Key Stakeholders/Responsibility

� Management Reporting

� Variance Explanations

Level of Detail/Integration

� # of Products

� # of Employees

� # of Projects

� # of Departments� # of Departments

� # of Customers

� # of Assets

What-If

� Scenario based modeling using key drivers and assumptions

� Revenue-Price, Discounts

� Employee-Salary, Merit, Benefits� Employee-Salary, Merit, Benefits

� Cost Reductions-Cogs Factors

� Margin-Goal Seek

� Allocations-Business Unit P&L

� Currency

Metrics Based Planning

� Variances

� Ratio

� Exceptions

� Thresholds� Thresholds

� Target Setting

� Industry Benchmarks

� Actualized Trends

Visibility of the Business

� Clear understanding of business drivers

� Inputs vs. Source Data

� Business Logic

� Ownership of Plan� Ownership of Plan

� Allocations

� Consolidation Rules

� Overrides/Challenges/Risks

Technology

� Data Integrity

� Seamless Process

� Access to Data in one Place

� Integration with Office Products� Integration with Office Products

� Hierarchy Management

� Task Lists/Role Based Process

� Business Intelligence

� Dashboards

Integrated Planning Processes

Solution

Oracle Hyperion Planning

Develop an Integrated Planning application using business level planning, strategic using business level planning, strategic

planning, reporting, and what-if modeling with multiple applications

Application Design Example

Solution-Planning

� Benefits

� Web Interface

� Office Integration

� Collaborative Tool� Collaborative Tool

� Workflow

� Security

Oracle Hyperion Planning

Webform Financial ReportingDashboards MS OfficeExcel

Workspace

35

Hyperion Planning

Linium’s Methodology and

Approach

Our Methodology37

Project Phase Milestones

InceptionM1 - Requirements and Solution Design Approval

M2 - Project Team Training

Construction

M3 - Application Setup & Dimension Review

M4 - Application Build Cycle 1 into CRP #1Construction

M4 - Application Build Cycle 1 into CRP #1

M5 - Application Build Cycle 2 into CRP #2

M6 - Final Build delivery to User Acceptance Testing

Transition

M7 - End-User Training Program

M8 - Go-Live preparation and Go-Live

M9 - Documentation & Knowledge Transfer

M10 - Post Go-Live Support

10 Milestones to EPM Success

Requirements / Design Process

� Key Areas of focus:

� Dimensions & Attributes

� Hierarchies & Alternate Hierarchies

� Business Logic for Calculations

38

� Business Logic for Calculations

� Input template Layouts

� Report Layouts

� Security

� Integration & Extract Layouts

� Testing Approach

� Training Approach

Requirements/Solution Design39

Requirements / Design Approach

� Review Business Requirements Doc

� Conduct validation sessions

� Refine any necessary areas

� Identify any outstanding items and schedule

40

� Identify any outstanding items and schedule follow-up

� Design in small groups with key SME’s

� Document design & project plan

Design/Architecture Challenges

� Unique requirements from a SME that could affect overall design

� Business rule/logic that is not clearly defined

� Hardware support designed to support the

41

� Hardware support designed to support the demands of the system

� Clear understanding of business logic

� Amount of data that needs to be loaded into model

Application Build/CRP Cycle42

Build Dimension

Model

Load Dimension

Layout

Create Initial

Integration for

Metadata

Load Initial Data

Review Dimension Prototype

Conference Room Pilot iterations

Create

Calculations/

Business Rules

Create Input

Form Templates

Create Report

Templates

Create Data

Integration

Mapping

Create Security

Matrix

Develop

Automated

Integration(s)

Process

Management/

Task Lists

(to UAT)

Prototypes & Acceptance Testing43

Conduct CRP

Dimension

Prototype Review

Modifications to

Dimensionality

from Prototype

Review

Develop CRP

Test Scripts

Migrate

Development to

Test

Conference

Room Pilots

(n iterations)

Modifications

from CRP

Extend/Update

CRP Test Scripts

Migrate Next CRP

Build to Test

Develop UAT

Test Scripts

Develop

Integration Test

Scripts

Migrate

Development to

UAT/QA

Conduct UAT,

Integration Test Final Changes

Approval for

UAT

Operational

Readiness

Construction Phase Challenges

� Dependency on SME’s to test system during CRP’s and UAT

� Availability of resources to validate business logic developed in application

44

logic developed in application

� Data mapping and data reconciliation have a clear and defined process

� Integration Testing/Performance

� SME’s reliance on consultants to complete specific deliverables/tasks

Training & Transition Processes45

Training: A strategy and schedule will be needed for the users

based upon user type.

Planning for Go-Live: An implementation plan is prepared to

ensure a smooth transition from QA to the Production environment.

The application is successfully migrated.

Documentation and Knowledge Transfer: Publish a document

detailing the system processes and procedures for the functional

administrator to maintain the application.

Transition Challenges

� Ability of both Functional and IT Administrator to fully support the system once knowledge transfer - handoff is completed

� Time between go-live and training

46

� Time between go-live and training

� New requirements communicated after go-live (prepare short term and long term fixes)

Transition

� Incorporate approved test plans and defined user acceptance tests

� Manage end user, power user and administrator training

47

administrator training

� Manage rollout and post-production support

� Coordinate project/phase shutdown and lessons learned

� Sign off on project completion

Questions

Our Methodology49

Project Phase Milestones

InceptionM1 - Requirements and Solution Design Approval

M2 - Project Team Training

Construction

M3 - Application Setup & Dimension Review

M4 - Application Build Cycle 1 into CRP #1Construction

M4 - Application Build Cycle 1 into CRP #1

M5 - Application Build Cycle 2 into CRP #2

M6 - Final Build delivery to User Acceptance Testing

Transition

M7 - End-User Training Program

M8 - Go-Live preparation and Go-Live

M9 - Documentation & Knowledge Transfer

M10 - Post Go-Live Support

10 Milestones to EPM Success

Requirements / Design Process

� Key Areas of focus:

� Dimensions & Attributes

� Hierarchies & Alternate Hierarchies

� Business Logic for Calculations

50

� Business Logic for Calculations

� Input template Layouts

� Report Layouts

� Security

� Integration & Extract Layouts

� Testing Approach

� Training Approach

Training & Transition Processes51

Training: A strategy and schedule will be needed for the users

based upon user type.

Planning for Go-Live: An implementation plan is prepared to

ensure a smooth transition from QA to the Production environment.

The application is successfully migrated.

Documentation and Knowledge Transfer: Publish a document

detailing the system processes and procedures for the functional

administrator to maintain the application.

Contact Information

Sean Bernhoit

Vice President, Oracle Practice &

CFO Advisory Services

[email protected]@linium.com

949-235-4285