INTEGRATED HEALTH MODEL
HOSPITALS & OUTPATIENT CLINICS
A DISTINCT ECOSYSTEMINTEGRATED HEALTH MODELA DISTINCT ECOSYSTEM
A DISTINCT ECOSYSTEM
PLANNING & DESIGN
MEDICAL EQUIPMENT PLANNING &
PROCUREMENT
INTEGRATION OF HOSPITAL OPERATION
KNOW-HOW
INTEGRATION OF INFORMATION
TECHNOLOGIES
CONSTRUCTION WITH MODULER SYSTEMS
PROJECT MANAGEMENT
ACIBADEM PROJECT MANAGEMENT SERVICES
2
1 TURNKEY PROJECTS
RENOVATIONPROJECTS
GLOBAL VISION
4
6DESIGN & PROJECT MANAGEMENT
INTERNATIONALDESIGN
3
MODULAR SYSTEMS5
11TURNKEY PROJECTS
ACIBADEM MASLAK PHASE 2
ACIBADEM ALTUNIZADE
ACIBADEM INTERNATIONAL
AMSTERDAM
ACIBADEM TAKSIM HOSPITAL
ACIBADEM ANKARA HOSPITAL
ACIBADEM FULYA HOSPITAL
ACIBADEM ATAKENT HOSPITAL
ACIBADEM UNIVERSITY
WORKING STRUCTURE
CLIENT REPRESENTATIVE
1 TURNKEY PROJECTS
MEP ENGINEERS
EPC CONTRACTOR
DESIGNER/ MEDICAL PLANNER
INTERIOR DESIGNER
INTEGRATED PROJECT DELIVERY
PROJECT MANAGEMENT COMPANY
MEDICAL EQ. PLANNING & PROCUREMENT
CLIENT
LOCAL AUTHORITIES
PROJECT AREA: 65.000 sqmNUMBER OF BEDS: 160PROJECT DURATION: INC PRE-CONSTRUCTION 25 MONTHS (SEPTEMBER 2016 - OCTOBER 2018)GROUNDBREAKING 20 MONTHS (FEBRUARY 2017- OCTOBER 2018)CONTRACT VALUE: 88.400.000 USD (CONSTRUCTION +MED EQ)
: 1.100 USD/m2 (CONSTRUCTION)
ACIBADEM MASLAK PHASE 2 1 TURNKEY PROJECTS
ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT
PROJECT INFORMATION SCOPE OF WORKS
ACIBADEM MASLAK PHASE 2 1 TURNKEY PROJECTS
ACIBADEM MASLAK PHASE 2 1 TURNKEY PROJECTS
ACIBADEM ALTUNIZADE 1 TURNKEY PROJECTS
PROJECT AREA: 98.000 sqmNUMBER OF BEDS: 315PROJECT DURATION: INC PRE-CONSTRUCTION 36 MONTHS (APRIL 2014 – APRIL 2017)GROUNDBREAKING 24 MONTHS (APRIL 2015- APRIL 2017)CONTRACT VALUE: 172.300.000 USD (CONSTRUCTION+MED EQ)
: 1.200 USD/m2 TOTAL CONSTRUCTION
SCOPE OF WORKSPROJECT INFORMATION
ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION WITH MODULAR SYSTEMSCONSTRUCTION MANAGEMENTMEDICAL EQUIPMENT PROCUREMENT
ACIBADEM ALTUNIZADE 1 TURNKEY PROJECTS
ACIBADEM AMSTERDAM 1 TURNKEY PROJECTS
PROJECT AREA: 5.500 sqmPROJECT DURATION PHASE 1: 5 MONTHS (JULY 2018 – NOVEMBER 2018)PROJECT DURATION PHASE 2: 10 MONTHS (MARCH 2018 – JANUARY 2019)CONTRACT VALUE: PHASE 1: 7.400.000 EUR (CONSTRUCTION+MED EQ)PHASE 2: 4.300.000 EUR (CONSTRUCTION+MED EQ)
SCOPE OF WORKSPROJECT INFORMATION
ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT
ACIBADEM AMSTERDAM 1 TURNKEY PROJECTS
ACIBADEM TAKSIM HOSPITAL 1 TURNKEY PROJECTS
PROJECT AREA: 25.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 28 MONTHS (AUGUST 2013 – DECEMBER 2015)CONTRACT VALUE: 40.500.000 USD (CONSTRUCTION+MED EQ)
SCOPE OF WORKSPROJECT INFORMATION
ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT
ACIBADEM TAKSIM HOSPITAL 1 TURNKEY PROJECTS
ACIBADEM ANKARA HOSPITAL 1 TURNKEY PROJECTS
PROJECT AREA: 10.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 30 MONTHS (MAY 2010 – DECEMBER 2012)CONTRACT VALUE: 23.000.000 USD (CONSTRUCTION+MED EQ)
SCOPE OF WORKSPROJECT INFORMATION
ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT
ACIBADEM ANKARA HOSPITAL 1 TURNKEY PROJECTS
ACIBADEM FULYA HOSPITAL 1 TURNKEY PROJECTS
X
PROJECT AREA: 23.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 10 MONTHS (DECEMBER 2009 – OCTOBER 2010)CONTRACT VALUE: 16.400.000 USD (CONSTRUCTION+MED EQ)
SCOPE OF WORKSPROJECT INFORMATION
ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT
ACIBADEM FULYA HOSPITAL 1 TURNKEY PROJECTS
ACIBADEM ADANA HOSPITAL 1 TURNKEY PROJECTS
PROJECT AREA: 21.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 13 MONTHS (JUNE 2009 – JULY 2010)CONTRACT VALUE: 37.000.000 USD (CONSTRUCTION+MED EQ)
SCOPE OF WORKSPROJECT INFORMATIONARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PLANNING & ROCUREMENT
ACIBADEM ATAKENT HOSPITAL 1 TURNKEY PROJECTS
PROJECT AREA: 60.000 sqmNUMBER OF BEDS: 265PROJECT DURATION: 20 MONTHS (AUGUST 2012 – MARCH 2014)CONTRACT VALUE: 86.000.000 USD (CONSTRUCTION+MED EQ)
SCOPE OF WORKSPROJECT INFORMATION
ARCHITECTURAL DESIGNPROJECT MANAGEMENT CONSTRUCTION MANAGEMENT
ACIBADEM ATAKENT HOSPITAL 1 TURNKEY PROJECTS
ACIBADEM MEHMET ALI AYDINLAR UNIVERSITY 1 TURNKEY PROJECTS
PROJECT AREA: 90.000 sqmPROJECT DURATION: 27 MONTHS (JULY 2011 – OCTOBER 2013) CONTRACT VALUE: 85.300.000 USD (CONSTRUCTION+MED EQ)
860 USD/m2 (CONSTRUCTION)
SCOPE OF WORKSPROJECT INFORMATION
ARCHITECTURAL DESIGNPROJECT MANAGEMENT CONSTRUCTION
ACIBADEM MEHMET ALI AYDINLAR UNIVERSITY 1 TURNKEY PROJECTS
2 RENOVATION PROJECTS
INTERNATIONAL HOSPITAL
ACIBADEM MASLAK 1
Project Management
(Coordination with Operational team)
2 RENOVATION PROJECTSWORKING STRUCTURE
Facility Management Team
Operational team(Medical & Administrative)
Client
Direct Link
Indirect Link
• Phasing
• Scheduling
INTERNATIONAL HOSPITAL 2 RENOVATION PROJECTS
PROJECT AREA: 19.000 sqmNUMBER OF BEDS: 113PROJECT DURATION: 25 MONTHS ( JUNE 2006-JULY 2008)CONTRACT VALUE: 10.500.000 USD
ARCHITECTURAL DESIGNFUNCTIONAL STACKINGMEDICAL PLANNINGCONSTRUCTION SCENERIO PLANNINGMEP INFRASTRUCTURE CONSTRUCTION MANAGEMENT
SCOPE OF WORKSPROJECT INFORMATION
INTERNATIONAL HOSPITAL 2 RENOVATION PROJECTS
PREVIOUS VIEW
NEW DESIGN
PREVIOUS VIEW
NEW DESIGN
ACIBADEM MASLAK RENOVATION 2 RENOVATION PROJECTS
PROJECT AREA: 40.000 sqmNUMBER OF BEDS: 150PROJECT DURATION: EST 23 MONTHS (JANUARY 2019-DECEMBER 2020 )
ARCHITECTURAL DESIGNMEDICAL PLANNINGCONSTRUCTION SCENERIO PLANNINGMEP INFRASTRUCTURE CONSTRUCTION MANAGEMENT
SCOPE OF WORKSPROJECT INFORMATION
DESIGN & PROJECT MANAGEMENT FOR RENOVATIONS
3
TOKUDA HOSPITAL
PANTAI AYER KEROH
AMSTERDAM SLOOTERVART
ACIBADEM KADIKÖY
Design & Project Management
Technical Office Duty on Site
Head Office Site visits by Group Managers
Local Architects & Engineers / Contractors
Direct Link
Indirect Link
Client
Operational team (Medical & Administrative)
Project Coordinatoron Site duty
Design CoordinationTeam on Site
3 DESIGN AND PROJECT MANAGEMENTWORKING STRUCTURE
Local Authorities
Medical EquipmentProcurement
Test & Validation
TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT
PROJECT AREA: 57.500 sqmNUMBER OF BEDS: 775PROJECT DURATION:
CONCEPT REVIEWMASTER PLANNINGARCHITECTURAL DESIGNMEDICAL PLANNINGCONSTRUCTION SCENERIO PLANNINGPROJECT MANAGEMENTMEDICAL EQUIPMENT PROCUREMENT
SCOPE OF WORKSPROJECT INFORMATION
MASTER RENOVATION PLAN 5 YEARS 2018- 2023 5TH. FLOOR PLAN 5 SEPTEMBER 2019 – MARCH 2020
TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT
SINGLE PATIENT ROOM – ALTERNATIVE 2SINGLE PATIENT ROOM - ALTERNATIVE I
TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT
DOUBLE PATIENT ROOM
TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT
SINGLE PATIENT ROOM – MOCK UP
TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT
DOUBLE PATIENT ROOM- MOCK UP
TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT
AS BUILT PHOTOS
TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT
AS BUILT PHOTOS
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
PROJECT AREA: 20.500 sqmNUMBER OF BEDS: 221EXPANSIONALTERNATIVE 1: 351 beds - 28 830 sqmALTERNATIVE 2: 621 beds - 40 000 sqmPROJECT DURATION: 5 MONTHS (APRIL 2013-OCTOBER 2013)
ARCHITECTURAL DESIGNFUNCTIONAL STACKINGMEDICAL PLANNINGPHASING FOR DESIGN WORKSCONSTRUCTION SCENERIO PLANNINGMEP INFRASTRUCTURE CONSTRUCTION MANAGEMENT
SCOPE OF WORKSPROJECT INFORMATION
351 BEDS
ALTERNATIVE 1 SITE PLAN
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
ALTERNATIVE DESIGN 1 (351 BEDS)
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
ALTERNATIVE DESIGN 1 (351 BEDS)
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
621 BEDS
ALTERNATIVE 2 SITE PLAN
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
ALTERNATIVE DESIGN 2 (621 BEDS)
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
ALTERNATIVE DESIGN 2 (621 BEDS)
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
ALTERNATIVE DESIGN 2 (621 BEDS)
ALTERNATIVE DESIGN 1 (351 BEDS)
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
RENDER
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT
PH AYER KEROH - RENOVATION 3 DESIGN AND PROJECT MANAGEMENT
EXISTING WARD PHOTOS
w w w . a r c h i s t a n b u l . c o m
PH AYER KEROH - RENOVATION 3 DESIGN AND PROJECT MANAGEMENT
APM DESIGN RENDERS
PANTAI HOSPITAL AYER KEROH/DOUBLE PATIENT ROOM-831/MOCK UP
DESK/CORIAN
CORIAN/CLAY
LAMINATED
LAMICOLOR/1027W
ARPA/0028BIANCO NUBE/ERRE
ARPA/4539 OLMO MERCURIO VG/ALEVEBARRISOL LIGHTING
w w w . a r c h i s t a n b u l . c o m
MOCK UP
PH AYER KEROH - RENOVATION 3 DESIGN AND PROJECT MANAGEMENT
AMSTERDAM MC SLOOTERVART 3 DESIGN AND PROJECT MANAGEMENT
PROJECT AREA: 800 sqmNUMBER OF BEDS: 12PROJECT DURATION: 8 WEEKS
ARCHITECTURAL DESIGNFUNCTIONAL STACKINGMEDICAL PLANNING
SCOPE OF WORKSPROJECT INFORMATION
AMSTERDAM MC SLOOTERVART 3 DESIGN AND PROJECT MANAGEMENT
CONCEPT REVIEWMASTER PLANNINGARCHITECTURAL DESIGNMEDICAL PLANNINGPHASING FOR DESIGN WORKS
ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT
PREVIOUSPROJECT AREA: 17.500 sqmNUMBER OF BEDS: 112EXPANSIONPROJECT AREA: 46.000 sqm.NUMBER OF BEDS: 250
SCOPE OF WORKSPROJECT INFORMATION
PHASE 1
PHASE 1
PHASE 1
ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT
PHASE 1
PHASE 1PHASE 2
ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT
PHASE 2
PHASE 1
PHASE 1PHASE 2PHASE 3
ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT
PHASE 3
GROUND FLOOR
PHASE 1
PHASE 2
PHASE 1
PHASE 3
SERVICE
ENTRANCE
PARKING
ENTRANCEOP ENTRANCE
IP ENTRANCE
ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT
ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT
SKETCHES
ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT
EXISTING HOSPITAL PLANNED HOSPITAL
ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT
4 INTERNATIONAL DESIGN
PARKWAY YANGON
MYANMAR
MEDPARK INTERNATIONAL
MOLDOVA
MOSCOW CHILDREN
SHARJAH PRIVATE HOSPITAL
MILLENIUM HOSPITAL KAZAN
ABU DHABI TRANSPLANTATION
KIRKUK GENERAL HOSPITAL
MOSCOW CITY HOSPITAL No 71
Designer
Head Office Site visits
by Group Managers
Local Architects & Engineers / Contractors
Direct Link
Indirect Link
Client
Consultants
4 INTERNATIONAL DESIGN
Project Coordinator
On site duty
Design Coordination
Team
WORKING STRUCTURE
Local Authorities
MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNINGPHASING FOR DESIGN WORKS
MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
PROJECT AREA:PHASE 1- 26.000 sqmPHASE 2- 12.000 sqm
NUMBER OF BEDS:PROJECT DURATION: 3 WEEKS
SCOPE OF WORKSPROJECT INFORMATION
SITE PLAN
MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
P H A S ES & P L A N S P H A S E - 1
CONSTRUCTIONAL AREA-PHASE 1
Level
Phase
Created Area
B1 Phase 1 3,623
F1 Phase 1 4,525
F2 Phase 1 4,065
F3 Phase 1 4,511
F4 Phase 1 4,440
F5 Phase 1 1,195
F6 Phase 1 1,195
F7 Phase 1 1,195
F8 Phase 1 1,187
TOTAL AREA 25,936
MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
P H A S ES & P L A N S P H A S E - 2
CONSTRUCTIONAL AREA-PHASE 2
Level
Phase
Created Area
B1 Phase 2 1,020
F1 Phase 2 1,063
F2 Phase 2 1,094
F3 Phase 2 1,078
F4 Phase 2 1,005
F5 Phase 2 1,002
F6 Phase 2 1,004
F7 Phase 2 1,004
F8 Phase 2 1,004
F9 Phase 2 1,005
F10 Phase 2 1,004
TOTAL AREA 12,287
MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
DEPARTMENTSCHEDULE-
F1-PHASE 01
DEPARTMENT Area
ADMISSION 390 m²
CAFETERIA 387 m²
CIRCULATION 1763 m²
DIAGNOSTIC&IMAGING 698 m²
EMERGENCY 476 m²
HEALTH SCREENING 163 m²
LABORATORIES 185 m²
PHARMACY 58 m²
WET AREA 120 m²
Grand total 4240 m²
F 1 – P H A S E - 1
MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
B - B S EC T I O N
PATIENT WARD
ICU
CONSULT ROOMS
EMERGENCY DIAGNOSTIC &
IMAGING
D&L
OPERATING UNITS
CONSULT ROOMS
DIAGNOSTIC &
IMAGING
NICU
OPERATING UNITS
CONSULT ROOMS
NUCLEAR MEDECINE
DIALYSIS
CCU
CONSULT ROOMS
PATIENT WARD
PATIENT WARD
PATIENT WARD
CHEMO &DIALYSIS
PATIENT WARD
PATIENT WARD
PATIENT WARD
PATIENT WARD
PATIENT WARD
PATIENT WARD
BB
MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
MEDPARK MOLDOVA INTERNATIONAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
PROJECT AREA: 8. 000 sqmNUMBER OF BEDS: 60 PROJECT DURATION: 1 MONTHS
SCOPE OF WORKSPROJECT INFORMATION
CONCEPT REVIEW AND MASTER PLANNING ARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING
MEDPARK MOLDOVA INTERNATIONAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
MEDPARK MOLDOVA INTERNATIONAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
PROJECT AREA: 80.000 sqmNUMBER OF BEDS: 400PROJECT DURATION: 1 MONTH
SCOPE OF WORKSPROJECT INFORMATION
MOSCOW CHILDREN 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
MASTER PLANNING ARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING
PROJECT AREA: 60.000 sqmNUMBER OF BEDS: 125PROJECT DURATION: SEPTEMBER –NOVEMBER 2018 (3 MONTHS)
SCOPE OF WORKSPROJECT INFORMATION
SHARJAH PRIVATE HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
FEASBILITY STUDIESARCHITECTURAL CONCEPT & PRELIMINARY DESIGNINTERIOR CONCEPT DESIGN
DESIGN CONSULTANCY MEDICAL EQUIPMENT PLANNING
PROJECT AREA: 33.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 3 MONTHS
SCOPE OF WORKSPROJECT INFORMATION
MILLENIUM KAZAN 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
MILLENIUM KAZAN 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
PROJECT AREA: 32.000 sqmNUMBER OF BEDS: 20 BMTPROJECT DURATION: MAY – JUNE 2018 (2 MONTHS)
SCOPE OF WORKSPROJECT INFORMATION
ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING
ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
PHASE - 1
ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
PHASE - 2
ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
PHASE - 3
PROJECT AREA: 72.000 sqmNUMBER OF BEDS: 400PROJECT DURATION: 10 MONTHS (FEBRUARY 2012 – DECEMBER 2012)
KIRKUK GENERAL HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SCOPE OF WORKSPROJECT INFORMATION
MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING
PROJECT AREA: 60.000 sqmNUMBER OF BEDS: 300PROJECT DURATION: 10 MONTHS (FEBRUARY 2012 – DECEMBER 2012)
KERBELA GENERAL HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SCOPE OF WORKSPROJECT INFORMATION
MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING
PROJECT AREA: 30.000 sqmNUMBER OF BEDS: 150PROJECT DURATION: 10 MONTHS (JANUARY 2012 – JUNE 2012)
MOSUL GENERAL HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SCOPE OF WORKSPROJECT INFORMATION
MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING
MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
PROJECT AREA: 125.000 sqmNUMBER OF BEDS: 400PROJECT DURATION: 8 MONTHS (FEBRUARY 2014 – OCTOBER 2014)
SCOPE OF WORKSPROJECT INFORMATIONMASTER PLANNING ARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING
MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN SITE - 1
MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN SITE - 1
MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN SITE - 1
SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE PLAN PHASE I
SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE PLAN PHASE II
1 ST FLOOR
SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
5-6-7 TH FLOOR
SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
SITE PLAN
SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
1 ST FLOOR
SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN
5 MODULAR SYSTEMS
ACIBADEM MASLAK 1 & 2
ACIBADEM ALTUNIZADE
ACIBADEM INTERNATIONAL
AMSTERDAM
ACIBADEM TAKSIM
ACIBADEM UNIVERSITY
ACIBADEM ATAKENT
UNIVERSAL H – BANJA
LUKA
Designer
Local Architects & Engineers / Contractors
Direct Link
Indirect Link
Client
Consultants
WORKING STRUCTURE
Local Authorities
5 MODULAR SYSTEMS
Modular SystemsSolution Partner
Design
Production
Installation
DurabilityModularity
Flexibility
Aesthetics
Hygienic
Fast and Easy Installation
Upgradeability
SOLUTIONS 5 MODULAR SYSTEMS
OPERATING ROOM (HYBRIT) 5 MODULAR SYSTEMS
OPERATING ROOM (HALL) 5 MODULAR SYSTEMS
OPERATING ROOM (HALL) 5 MODULAR SYSTEMS
OPERATING UNİT 5 MODULAR SYSTEMS
OPERATING ROOM 5 MODULAR SYSTEMS
DELIVERY ROOM 5 MODULAR SYSTEMS
DELIVERY ROOM 5 MODULAR SYSTEMS
GMP LABORATORY 5 MODULAR SYSTEMS
GMP LABORATORY 5 MODULAR SYSTEMS
GLOBAL VISION6
ST.PETERSBURG MMC
Medical Solution Partner
Designer, Local Architects & Engineers / Contractors
Consultants
Direct Link
Indirect Link
Client
6 GLOBAL VISIONWORKING STRUCTURE
Technological Solution Partners
Operational team (Medical & Administrative)
MASTER PLANNINGARCHITECTURAL DESIGNMEDICAL PLANNINGINTERIOR CONCEPT DESIGNMEDICAL EQUIPMENT PLANNINGMEP PROJECTSDESIGN CONSULTANCY
ST.PETERSBURG MMC 6 GLOBAL VISION
PROJECT AREA: 200.000 sqmNUMBER OF BEDS: 485PROJECT DURATION: NOVEMBER 2018- EST 2019
SCOPE OF WORKS
ONCOLOGY
CENTER
SPORTS MEDICINE
& REHABILITATION
CENTER
TECHNICAL
AREA
BOARDING
HOUSE
TRAINING
CENTER ADMINISTRATIVE
OFFICESMAIN HOSPITAL CYCLOTRON
PLANT
NUCLEAR
MEDICINE
SCOPE OF WORKSPROJECT INFORMATION
MAIN HOSPITAL VIEW - 1
ST.PETERSBURG MMC 6 GLOBAL VISION
MAIN HOSPITAL VIEW - 2
ST.PETERSBURG MMC 6 GLOBAL VISION
ONCOLOGY CENTER
ST.PETERSBURG MMC 6 GLOBAL VISION
TRAINING CENTER, SPORTS MEDICINE & REHABILITATION CENTER
ST.PETERSBURG MMC 6 GLOBAL VISION
MEDICATION & SUPPLY MANAGEMENT SYSTEM LABORATORY SERVICES
LAUNDRY MANAGEMENT
FOOD MANAGEMENTMODULAR WALL SYSTEMS
WASTE MANAGEMENT
CONSULTANCY ON TECHNOLOGICAL SOLUTIONS ST.PETERSBURG MMC 6 GLOBAL VISION
AGV (AUTOMATED GUIDED VEHICLE) - ROBOT IT BASED PROJECT SOLUTIONS
ST.PETERSBURG MMC 6 GLOBAL VISIONCONSULTANCY FOR TECHNOLOGICAL SOLUTIONS
3D MAQUETTE ST.PETERSBURG MMC 6 GLOBAL VISION
THANK YOU