INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:
Page 2: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

INTEGRATED HEALTH MODEL

Page 3: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

HOSPITALS & OUTPATIENT CLINICS

A DISTINCT ECOSYSTEMINTEGRATED HEALTH MODELA DISTINCT ECOSYSTEM

A DISTINCT ECOSYSTEM

Page 4: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PLANNING & DESIGN

MEDICAL EQUIPMENT PLANNING &

PROCUREMENT

INTEGRATION OF HOSPITAL OPERATION

KNOW-HOW

INTEGRATION OF INFORMATION

TECHNOLOGIES

CONSTRUCTION WITH MODULER SYSTEMS

PROJECT MANAGEMENT

ACIBADEM PROJECT MANAGEMENT SERVICES

Page 5: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

2

1 TURNKEY PROJECTS

RENOVATIONPROJECTS

GLOBAL VISION

4

6DESIGN & PROJECT MANAGEMENT

INTERNATIONALDESIGN

3

MODULAR SYSTEMS5

Page 6: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

11TURNKEY PROJECTS

ACIBADEM MASLAK PHASE 2

ACIBADEM ALTUNIZADE

ACIBADEM INTERNATIONAL

AMSTERDAM

ACIBADEM TAKSIM HOSPITAL

ACIBADEM ANKARA HOSPITAL

ACIBADEM FULYA HOSPITAL

ACIBADEM ATAKENT HOSPITAL

ACIBADEM UNIVERSITY

Page 7: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

WORKING STRUCTURE

CLIENT REPRESENTATIVE

1 TURNKEY PROJECTS

MEP ENGINEERS

EPC CONTRACTOR

DESIGNER/ MEDICAL PLANNER

INTERIOR DESIGNER

INTEGRATED PROJECT DELIVERY

PROJECT MANAGEMENT COMPANY

MEDICAL EQ. PLANNING & PROCUREMENT

CLIENT

LOCAL AUTHORITIES

Page 8: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PROJECT AREA: 65.000 sqmNUMBER OF BEDS: 160PROJECT DURATION: INC PRE-CONSTRUCTION 25 MONTHS (SEPTEMBER 2016 - OCTOBER 2018)GROUNDBREAKING 20 MONTHS (FEBRUARY 2017- OCTOBER 2018)CONTRACT VALUE: 88.400.000 USD (CONSTRUCTION +MED EQ)

: 1.100 USD/m2 (CONSTRUCTION)

ACIBADEM MASLAK PHASE 2 1 TURNKEY PROJECTS

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

PROJECT INFORMATION SCOPE OF WORKS

Page 9: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM MASLAK PHASE 2 1 TURNKEY PROJECTS

Page 10: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM MASLAK PHASE 2 1 TURNKEY PROJECTS

Page 11: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM ALTUNIZADE 1 TURNKEY PROJECTS

PROJECT AREA: 98.000 sqmNUMBER OF BEDS: 315PROJECT DURATION: INC PRE-CONSTRUCTION 36 MONTHS (APRIL 2014 – APRIL 2017)GROUNDBREAKING 24 MONTHS (APRIL 2015- APRIL 2017)CONTRACT VALUE: 172.300.000 USD (CONSTRUCTION+MED EQ)

: 1.200 USD/m2 TOTAL CONSTRUCTION

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION WITH MODULAR SYSTEMSCONSTRUCTION MANAGEMENTMEDICAL EQUIPMENT PROCUREMENT

Page 12: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM ALTUNIZADE 1 TURNKEY PROJECTS

Page 13: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM AMSTERDAM 1 TURNKEY PROJECTS

PROJECT AREA: 5.500 sqmPROJECT DURATION PHASE 1: 5 MONTHS (JULY 2018 – NOVEMBER 2018)PROJECT DURATION PHASE 2: 10 MONTHS (MARCH 2018 – JANUARY 2019)CONTRACT VALUE: PHASE 1: 7.400.000 EUR (CONSTRUCTION+MED EQ)PHASE 2: 4.300.000 EUR (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

Page 14: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM AMSTERDAM 1 TURNKEY PROJECTS

Page 15: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM TAKSIM HOSPITAL 1 TURNKEY PROJECTS

PROJECT AREA: 25.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 28 MONTHS (AUGUST 2013 – DECEMBER 2015)CONTRACT VALUE: 40.500.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

Page 16: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM TAKSIM HOSPITAL 1 TURNKEY PROJECTS

Page 17: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM ANKARA HOSPITAL 1 TURNKEY PROJECTS

PROJECT AREA: 10.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 30 MONTHS (MAY 2010 – DECEMBER 2012)CONTRACT VALUE: 23.000.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

Page 18: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM ANKARA HOSPITAL 1 TURNKEY PROJECTS

Page 19: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM FULYA HOSPITAL 1 TURNKEY PROJECTS

X

PROJECT AREA: 23.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 10 MONTHS (DECEMBER 2009 – OCTOBER 2010)CONTRACT VALUE: 16.400.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PROCUREMENT

Page 20: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM FULYA HOSPITAL 1 TURNKEY PROJECTS

Page 21: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM ADANA HOSPITAL 1 TURNKEY PROJECTS

PROJECT AREA: 21.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 13 MONTHS (JUNE 2009 – JULY 2010)CONTRACT VALUE: 37.000.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATIONARCHITECTURAL DESIGNMEDICAL PLANNINGPROJECT MANAGEMENT CONSTRUCTION MANAGEMENTCONSTRUCTION WITH MODULAR SYSTEMSMEDICAL EQUIPMENT PLANNING & ROCUREMENT

Page 22: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM ATAKENT HOSPITAL 1 TURNKEY PROJECTS

PROJECT AREA: 60.000 sqmNUMBER OF BEDS: 265PROJECT DURATION: 20 MONTHS (AUGUST 2012 – MARCH 2014)CONTRACT VALUE: 86.000.000 USD (CONSTRUCTION+MED EQ)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNPROJECT MANAGEMENT CONSTRUCTION MANAGEMENT

Page 23: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM ATAKENT HOSPITAL 1 TURNKEY PROJECTS

Page 24: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM MEHMET ALI AYDINLAR UNIVERSITY 1 TURNKEY PROJECTS

PROJECT AREA: 90.000 sqmPROJECT DURATION: 27 MONTHS (JULY 2011 – OCTOBER 2013) CONTRACT VALUE: 85.300.000 USD (CONSTRUCTION+MED EQ)

860 USD/m2 (CONSTRUCTION)

SCOPE OF WORKSPROJECT INFORMATION

ARCHITECTURAL DESIGNPROJECT MANAGEMENT CONSTRUCTION

Page 25: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM MEHMET ALI AYDINLAR UNIVERSITY 1 TURNKEY PROJECTS

Page 26: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

2 RENOVATION PROJECTS

INTERNATIONAL HOSPITAL

ACIBADEM MASLAK 1

Page 27: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

Project Management

(Coordination with Operational team)

2 RENOVATION PROJECTSWORKING STRUCTURE

Facility Management Team

Operational team(Medical & Administrative)

Client

Direct Link

Indirect Link

• Phasing

• Scheduling

Page 28: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

INTERNATIONAL HOSPITAL 2 RENOVATION PROJECTS

PROJECT AREA: 19.000 sqmNUMBER OF BEDS: 113PROJECT DURATION: 25 MONTHS ( JUNE 2006-JULY 2008)CONTRACT VALUE: 10.500.000 USD

ARCHITECTURAL DESIGNFUNCTIONAL STACKINGMEDICAL PLANNINGCONSTRUCTION SCENERIO PLANNINGMEP INFRASTRUCTURE CONSTRUCTION MANAGEMENT

SCOPE OF WORKSPROJECT INFORMATION

Page 29: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

INTERNATIONAL HOSPITAL 2 RENOVATION PROJECTS

PREVIOUS VIEW

NEW DESIGN

PREVIOUS VIEW

NEW DESIGN

Page 30: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM MASLAK RENOVATION 2 RENOVATION PROJECTS

PROJECT AREA: 40.000 sqmNUMBER OF BEDS: 150PROJECT DURATION: EST 23 MONTHS (JANUARY 2019-DECEMBER 2020 )

ARCHITECTURAL DESIGNMEDICAL PLANNINGCONSTRUCTION SCENERIO PLANNINGMEP INFRASTRUCTURE CONSTRUCTION MANAGEMENT

SCOPE OF WORKSPROJECT INFORMATION

Page 31: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

DESIGN & PROJECT MANAGEMENT FOR RENOVATIONS

3

TOKUDA HOSPITAL

PANTAI AYER KEROH

AMSTERDAM SLOOTERVART

ACIBADEM KADIKÖY

Page 32: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

Design & Project Management

Technical Office Duty on Site

Head Office Site visits by Group Managers

Local Architects & Engineers / Contractors

Direct Link

Indirect Link

Client

Operational team (Medical & Administrative)

Project Coordinatoron Site duty

Design CoordinationTeam on Site

3 DESIGN AND PROJECT MANAGEMENTWORKING STRUCTURE

Local Authorities

Medical EquipmentProcurement

Test & Validation

Page 33: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

PROJECT AREA: 57.500 sqmNUMBER OF BEDS: 775PROJECT DURATION:

CONCEPT REVIEWMASTER PLANNINGARCHITECTURAL DESIGNMEDICAL PLANNINGCONSTRUCTION SCENERIO PLANNINGPROJECT MANAGEMENTMEDICAL EQUIPMENT PROCUREMENT

SCOPE OF WORKSPROJECT INFORMATION

MASTER RENOVATION PLAN 5 YEARS 2018- 2023 5TH. FLOOR PLAN 5 SEPTEMBER 2019 – MARCH 2020

Page 34: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

SINGLE PATIENT ROOM – ALTERNATIVE 2SINGLE PATIENT ROOM - ALTERNATIVE I

Page 35: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

DOUBLE PATIENT ROOM

Page 36: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

SINGLE PATIENT ROOM – MOCK UP

Page 37: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

DOUBLE PATIENT ROOM- MOCK UP

Page 38: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

AS BUILT PHOTOS

Page 39: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

TOKUDA HOSPITAL 3 DESIGN AND PROJECT MANAGEMENT

AS BUILT PHOTOS

Page 40: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

PROJECT AREA: 20.500 sqmNUMBER OF BEDS: 221EXPANSIONALTERNATIVE 1: 351 beds - 28 830 sqmALTERNATIVE 2: 621 beds - 40 000 sqmPROJECT DURATION: 5 MONTHS (APRIL 2013-OCTOBER 2013)

ARCHITECTURAL DESIGNFUNCTIONAL STACKINGMEDICAL PLANNINGPHASING FOR DESIGN WORKSCONSTRUCTION SCENERIO PLANNINGMEP INFRASTRUCTURE CONSTRUCTION MANAGEMENT

SCOPE OF WORKSPROJECT INFORMATION

Page 41: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

351 BEDS

ALTERNATIVE 1 SITE PLAN

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

Page 42: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ALTERNATIVE DESIGN 1 (351 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

Page 43: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ALTERNATIVE DESIGN 1 (351 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

Page 44: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

621 BEDS

ALTERNATIVE 2 SITE PLAN

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

Page 45: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ALTERNATIVE DESIGN 2 (621 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

Page 46: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ALTERNATIVE DESIGN 2 (621 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

Page 47: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ALTERNATIVE DESIGN 2 (621 BEDS)

ALTERNATIVE DESIGN 1 (351 BEDS)

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

Page 48: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

RENDER

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

Page 49: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PH AYER KEROH - EXPANSION 3 DESIGN AND PROJECT MANAGEMENT

Page 50: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PH AYER KEROH - RENOVATION 3 DESIGN AND PROJECT MANAGEMENT

EXISTING WARD PHOTOS

Page 51: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

w w w . a r c h i s t a n b u l . c o m

PH AYER KEROH - RENOVATION 3 DESIGN AND PROJECT MANAGEMENT

APM DESIGN RENDERS

Page 52: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PANTAI HOSPITAL AYER KEROH/DOUBLE PATIENT ROOM-831/MOCK UP

DESK/CORIAN

CORIAN/CLAY

LAMINATED

LAMICOLOR/1027W

ARPA/0028BIANCO NUBE/ERRE

ARPA/4539 OLMO MERCURIO VG/ALEVEBARRISOL LIGHTING

w w w . a r c h i s t a n b u l . c o m

MOCK UP

PH AYER KEROH - RENOVATION 3 DESIGN AND PROJECT MANAGEMENT

Page 53: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

AMSTERDAM MC SLOOTERVART 3 DESIGN AND PROJECT MANAGEMENT

PROJECT AREA: 800 sqmNUMBER OF BEDS: 12PROJECT DURATION: 8 WEEKS

ARCHITECTURAL DESIGNFUNCTIONAL STACKINGMEDICAL PLANNING

SCOPE OF WORKSPROJECT INFORMATION

Page 54: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

AMSTERDAM MC SLOOTERVART 3 DESIGN AND PROJECT MANAGEMENT

Page 55: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

CONCEPT REVIEWMASTER PLANNINGARCHITECTURAL DESIGNMEDICAL PLANNINGPHASING FOR DESIGN WORKS

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

PREVIOUSPROJECT AREA: 17.500 sqmNUMBER OF BEDS: 112EXPANSIONPROJECT AREA: 46.000 sqm.NUMBER OF BEDS: 250

SCOPE OF WORKSPROJECT INFORMATION

Page 56: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PHASE 1

PHASE 1

PHASE 1

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

Page 57: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PHASE 1

PHASE 1PHASE 2

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

PHASE 2

Page 58: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PHASE 1

PHASE 1PHASE 2PHASE 3

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

PHASE 3

Page 59: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

GROUND FLOOR

PHASE 1

PHASE 2

PHASE 1

PHASE 3

SERVICE

ENTRANCE

PARKING

ENTRANCEOP ENTRANCE

IP ENTRANCE

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

Page 60: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

SKETCHES

Page 61: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

EXISTING HOSPITAL PLANNED HOSPITAL

Page 62: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ACIBADEM KADIKOY 3 DESIGN & PROJECT MANAGEMENT

Page 63: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

4 INTERNATIONAL DESIGN

PARKWAY YANGON

MYANMAR

MEDPARK INTERNATIONAL

MOLDOVA

MOSCOW CHILDREN

SHARJAH PRIVATE HOSPITAL

MILLENIUM HOSPITAL KAZAN

ABU DHABI TRANSPLANTATION

KIRKUK GENERAL HOSPITAL

MOSCOW CITY HOSPITAL No 71

Page 64: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

Designer

Head Office Site visits

by Group Managers

Local Architects & Engineers / Contractors

Direct Link

Indirect Link

Client

Consultants

4 INTERNATIONAL DESIGN

Project Coordinator

On site duty

Design Coordination

Team

WORKING STRUCTURE

Local Authorities

Page 65: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNINGPHASING FOR DESIGN WORKS

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PROJECT AREA:PHASE 1- 26.000 sqmPHASE 2- 12.000 sqm

NUMBER OF BEDS:PROJECT DURATION: 3 WEEKS

SCOPE OF WORKSPROJECT INFORMATION

Page 66: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE PLAN

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 67: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

P H A S ES & P L A N S P H A S E - 1

CONSTRUCTIONAL AREA-PHASE 1

Level

Phase

Created Area

B1 Phase 1 3,623

F1 Phase 1 4,525

F2 Phase 1 4,065

F3 Phase 1 4,511

F4 Phase 1 4,440

F5 Phase 1 1,195

F6 Phase 1 1,195

F7 Phase 1 1,195

F8 Phase 1 1,187

TOTAL AREA 25,936

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 68: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

P H A S ES & P L A N S P H A S E - 2

CONSTRUCTIONAL AREA-PHASE 2

Level

Phase

Created Area

B1 Phase 2 1,020

F1 Phase 2 1,063

F2 Phase 2 1,094

F3 Phase 2 1,078

F4 Phase 2 1,005

F5 Phase 2 1,002

F6 Phase 2 1,004

F7 Phase 2 1,004

F8 Phase 2 1,004

F9 Phase 2 1,005

F10 Phase 2 1,004

TOTAL AREA 12,287

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 69: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

DEPARTMENTSCHEDULE-

F1-PHASE 01

DEPARTMENT Area

ADMISSION 390 m²

CAFETERIA 387 m²

CIRCULATION 1763 m²

DIAGNOSTIC&IMAGING 698 m²

EMERGENCY 476 m²

HEALTH SCREENING 163 m²

LABORATORIES 185 m²

PHARMACY 58 m²

WET AREA 120 m²

Grand total 4240 m²

F 1 – P H A S E - 1

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 70: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

B - B S EC T I O N

PATIENT WARD

ICU

CONSULT ROOMS

EMERGENCY DIAGNOSTIC &

IMAGING

D&L

OPERATING UNITS

CONSULT ROOMS

DIAGNOSTIC &

IMAGING

NICU

OPERATING UNITS

CONSULT ROOMS

NUCLEAR MEDECINE

DIALYSIS

CCU

CONSULT ROOMS

PATIENT WARD

PATIENT WARD

PATIENT WARD

CHEMO &DIALYSIS

PATIENT WARD

PATIENT WARD

PATIENT WARD

PATIENT WARD

PATIENT WARD

PATIENT WARD

BB

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 71: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 72: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MYANMAR PARKWAY YANGON 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 73: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MEDPARK MOLDOVA INTERNATIONAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PROJECT AREA: 8. 000 sqmNUMBER OF BEDS: 60 PROJECT DURATION: 1 MONTHS

SCOPE OF WORKSPROJECT INFORMATION

CONCEPT REVIEW AND MASTER PLANNING ARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

Page 74: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MEDPARK MOLDOVA INTERNATIONAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 75: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MEDPARK MOLDOVA INTERNATIONAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 76: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PROJECT AREA: 80.000 sqmNUMBER OF BEDS: 400PROJECT DURATION: 1 MONTH

SCOPE OF WORKSPROJECT INFORMATION

MOSCOW CHILDREN 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MASTER PLANNING ARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

Page 77: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PROJECT AREA: 60.000 sqmNUMBER OF BEDS: 125PROJECT DURATION: SEPTEMBER –NOVEMBER 2018 (3 MONTHS)

SCOPE OF WORKSPROJECT INFORMATION

SHARJAH PRIVATE HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

FEASBILITY STUDIESARCHITECTURAL CONCEPT & PRELIMINARY DESIGNINTERIOR CONCEPT DESIGN

Page 78: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

DESIGN CONSULTANCY MEDICAL EQUIPMENT PLANNING

PROJECT AREA: 33.000 sqmNUMBER OF BEDS: 100PROJECT DURATION: 3 MONTHS

SCOPE OF WORKSPROJECT INFORMATION

MILLENIUM KAZAN 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 79: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MILLENIUM KAZAN 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 80: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PROJECT AREA: 32.000 sqmNUMBER OF BEDS: 20 BMTPROJECT DURATION: MAY – JUNE 2018 (2 MONTHS)

SCOPE OF WORKSPROJECT INFORMATION

ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

Page 81: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PHASE - 1

Page 82: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PHASE - 2

Page 83: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ABU DHABI TRANSPLANTATION 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PHASE - 3

Page 84: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PROJECT AREA: 72.000 sqmNUMBER OF BEDS: 400PROJECT DURATION: 10 MONTHS (FEBRUARY 2012 – DECEMBER 2012)

KIRKUK GENERAL HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SCOPE OF WORKSPROJECT INFORMATION

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

Page 85: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PROJECT AREA: 60.000 sqmNUMBER OF BEDS: 300PROJECT DURATION: 10 MONTHS (FEBRUARY 2012 – DECEMBER 2012)

KERBELA GENERAL HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SCOPE OF WORKSPROJECT INFORMATION

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

Page 86: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

PROJECT AREA: 30.000 sqmNUMBER OF BEDS: 150PROJECT DURATION: 10 MONTHS (JANUARY 2012 – JUNE 2012)

MOSUL GENERAL HOSPITAL 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SCOPE OF WORKSPROJECT INFORMATION

MASTER PLANNINGARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

Page 87: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

PROJECT AREA: 125.000 sqmNUMBER OF BEDS: 400PROJECT DURATION: 8 MONTHS (FEBRUARY 2014 – OCTOBER 2014)

SCOPE OF WORKSPROJECT INFORMATIONMASTER PLANNING ARCHITECTURAL CONCEPT & PRELIMINARY DESIGNMEDICAL PLANNING

Page 88: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 89: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN SITE - 1

Page 90: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN SITE - 1

Page 91: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN SITE - 1

Page 92: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 93: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 94: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 95: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE PLAN PHASE I

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 96: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

SITE PLAN PHASE II

Page 97: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

1 ST FLOOR

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 98: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

5-6-7 TH FLOOR

SITE - 1 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 99: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 100: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 101: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 102: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 103: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 104: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

SITE PLAN

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 105: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

1 ST FLOOR

SITE - 2 MOSCOW CITY HOSPITAL No 71 4 INTERNATIONAL DESIGN 4 INTERNATIONAL DESIGN

Page 106: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

5 MODULAR SYSTEMS

ACIBADEM MASLAK 1 & 2

ACIBADEM ALTUNIZADE

ACIBADEM INTERNATIONAL

AMSTERDAM

ACIBADEM TAKSIM

ACIBADEM UNIVERSITY

ACIBADEM ATAKENT

UNIVERSAL H – BANJA

LUKA

Page 107: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

Designer

Local Architects & Engineers / Contractors

Direct Link

Indirect Link

Client

Consultants

WORKING STRUCTURE

Local Authorities

5 MODULAR SYSTEMS

Modular SystemsSolution Partner

Page 108: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

Design

Production

Installation

DurabilityModularity

Flexibility

Aesthetics

Hygienic

Fast and Easy Installation

Upgradeability

SOLUTIONS 5 MODULAR SYSTEMS

Page 109: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

OPERATING ROOM (HYBRIT) 5 MODULAR SYSTEMS

Page 110: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

OPERATING ROOM (HALL) 5 MODULAR SYSTEMS

Page 111: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

OPERATING ROOM (HALL) 5 MODULAR SYSTEMS

Page 112: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

OPERATING UNİT 5 MODULAR SYSTEMS

Page 113: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

OPERATING ROOM 5 MODULAR SYSTEMS

Page 114: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

DELIVERY ROOM 5 MODULAR SYSTEMS

Page 115: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

DELIVERY ROOM 5 MODULAR SYSTEMS

Page 116: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

GMP LABORATORY 5 MODULAR SYSTEMS

Page 117: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

GMP LABORATORY 5 MODULAR SYSTEMS

Page 118: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

GLOBAL VISION6

ST.PETERSBURG MMC

Page 119: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

Medical Solution Partner

Designer, Local Architects & Engineers / Contractors

Consultants

Direct Link

Indirect Link

Client

6 GLOBAL VISIONWORKING STRUCTURE

Technological Solution Partners

Operational team (Medical & Administrative)

Page 120: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MASTER PLANNINGARCHITECTURAL DESIGNMEDICAL PLANNINGINTERIOR CONCEPT DESIGNMEDICAL EQUIPMENT PLANNINGMEP PROJECTSDESIGN CONSULTANCY

ST.PETERSBURG MMC 6 GLOBAL VISION

PROJECT AREA: 200.000 sqmNUMBER OF BEDS: 485PROJECT DURATION: NOVEMBER 2018- EST 2019

SCOPE OF WORKS

ONCOLOGY

CENTER

SPORTS MEDICINE

& REHABILITATION

CENTER

TECHNICAL

AREA

BOARDING

HOUSE

TRAINING

CENTER ADMINISTRATIVE

OFFICESMAIN HOSPITAL CYCLOTRON

PLANT

NUCLEAR

MEDICINE

SCOPE OF WORKSPROJECT INFORMATION

Page 121: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MAIN HOSPITAL VIEW - 1

ST.PETERSBURG MMC 6 GLOBAL VISION

Page 122: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MAIN HOSPITAL VIEW - 2

ST.PETERSBURG MMC 6 GLOBAL VISION

Page 123: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

ONCOLOGY CENTER

ST.PETERSBURG MMC 6 GLOBAL VISION

Page 124: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

TRAINING CENTER, SPORTS MEDICINE & REHABILITATION CENTER

ST.PETERSBURG MMC 6 GLOBAL VISION

Page 125: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

MEDICATION & SUPPLY MANAGEMENT SYSTEM LABORATORY SERVICES

LAUNDRY MANAGEMENT

FOOD MANAGEMENTMODULAR WALL SYSTEMS

WASTE MANAGEMENT

CONSULTANCY ON TECHNOLOGICAL SOLUTIONS ST.PETERSBURG MMC 6 GLOBAL VISION

Page 126: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

AGV (AUTOMATED GUIDED VEHICLE) - ROBOT IT BASED PROJECT SOLUTIONS

ST.PETERSBURG MMC 6 GLOBAL VISIONCONSULTANCY FOR TECHNOLOGICAL SOLUTIONS

Page 127: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

3D MAQUETTE ST.PETERSBURG MMC 6 GLOBAL VISION

Page 128: INTEGRATED HEALTH MODEL · acibadem amsterdam 1 turnkey projects project area: 5.500 sqm project duration phase 1: 5 months (july 2018 –november 2018) project duration phase 2:

THANK YOU