Integrated ESIA GreeceAnnex 8.2 - Noise Control Study GCS00

Page 2 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

TABLE OF CONTENTS

1  INTRODUCTION 3 

1.1  General 3 1.2  Scope of study 3 1.3  Noise Immission limits 4 1.3.1  World Bank 4 1.3.2  World Health Organisation 5 1.3.3  Greek national noise limits 5 1.3.4  Project Specification 6 1.3.5  Summary 6 

2  DOCUMENTATION USED 7 

3  STANDARDS AND GUIDELINES USED 7 

4  SITE DESCRIPTION 8 

4.1  Local Situation, Sensitive Receptor Points 8 4.2  Proposed Gas Compressor Station 9 

5  NOISE MODELLING 11 

5.1  Methodology 11 5.2  Meteorological conditions considered 11 

6  NOISE CONTROL SPECIFICATIONS AND ASSOCITATED NOISE CONTROL MEASURES (NCM) 12 

7  PREDICTED NOISE LEVELS 18 

8  CONCLUSION 20 

GLOSSARY OF TERMS 21 

ATTACHMENTS 22 

Page 3 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

1 INTRODUCTION

1.1 General

The TAP AG proposes to develop the Trans Adriatic Pipeline to transport natural gas from the

Middle East Area via Greece, Albania and across the Adriatic Sea to southern Italy.

The pipeline transport capacity will be initially approx. 10 billion cubic meters / year. In order to

provide this gas capacity a gas compressor facility in north-eastern Greece near the Greek-

Turkish-Border is needed among other stations. It is planned to develop the initial transport

capacity at a later stage up to an ultimate transport capacity of 20 billion cubic meters / year.

Genest und Partner Ingenieurgesellschaft mbH was commissioned by E.ON New Build & Tech-

nology GmbH to undertake a noise modelling study of the proposed gas compressor station

GCS00 at the regional unit Evros, Greek, near the border to Turkey. The study will form part of

an Environmental Impact Assessment for the site and is therefore based on the first development

phase of 10 BCM/Y and the future enhancement phase to the ultimate gas transport capacity of

20 BCM/Y.

In this report, all necessary noise control measures for the proposed gas compressor station

GCS00 will be specified to comply with various noise limits, which are discussed later in this

report under section 1.3.

1.2 Scope of study

The task of this study is to identify noise mitigation options in plant selection and design in order

to achieve compliance with the governmental noise level requirements. As a first step a

preliminary estimate for the noise emission and the necessary mitigation measures should be

prepared.

The following list outlines the major activities undertaken during the course of the noise impact

assessment.

Page 4 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Review of documentation provided by E.ON New Build & Technology GmbH including

Data Site & Utility Data, site plans and topographical data.

Estimation of noise emission levels (sound power levels) for equipment associated with

the proposed operation.

Development of an acoustic model for the proposed compressor station and the

surrounding area for each construction phase.

Calculation of noise levels at sensitive receptors using the noise prediction method

described in ISO 9613 ‘Acoustics – Attenuation of sound during propagation outdoors –

Part 2: General method of calculation’ for the meteorological conditions provided by ENT.

The acoustic model shall only consider continuous and discontinuous noise sources during

normal operation of the plant.

The following noise sources are to be excluded from the modelling and determination of the

predicted sound pressure level:

Construction, pre-commissioning and commissioning noise emissions

Maintenance activity like vehicle road noise, crane movements etc.

1.3 Noise Immission limits

Currently there are no statutory regulations governing environmental noise immissions in the

surrounding area of the proposed compressor station. Several criteria are therefore discussed

below to provide information of international standards.

1.3.1 World Bank

In the ‘Pollution Prevention and Abatement Handbook’ issued by the World Bank Group in April

1999 (Permanent URL: http://go.worldbank.org/E6G093QFZ1), noise limits for new installations

financed by the World Bank are set out, which are summarized below in Table 1.

Additionally, it is stated in the handbook that an increase of up to 3 dB above the existing

background noise levels at receptors outside the property boundary is considered acceptable.

Page 5 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Table 1: World Bank noise limits, maximum LAeq in dB(A)

Receptor Day

(07:00 – 22:00) Night

(22:00 – 07:00)

Residential, institutional, educational 55 45

Industrial, commercial 70 70

1.3.2 World Health Organisation

In the WHO document „Guidelines for Community Noise‘, guideline limit values for community

noise in various specific environments are provided. Noise levels below the limits are considered

necessary to minimize any temporary or long term deterioration in physical, psychological or

social functioning associated with noise exposure. The values form the basis of many

international environmental noise policy limits and are summarized in Table 2 below.

Table 2: WHO Guideline values

Specific Environment Critical Health Effects LAeq

dB(A)

LAmax

dB(A)

Outdoor living area Serious annoyance, daytime and evening

Moderate annoyance, daytime and evening

55

50

Inside bedrooms Sleep disturbance, night-time 30 45

Outside bedrooms Sleep disturbance, window open (outdoor values) 45 60

School, playground outdoor Annoyance (external source) 55

Industrial, commercial, shopping and traffic

areas, indoors and Outdoors Hearing impairment 70 110

1.3.3 Greek national noise limits

The main legal framework is provided under art. 14 of the Environmental Protection Act 1985,

Presidential Decree 1180/1981. The herein mentioned noise limits apply at the borderline of a

plot area, according to its land use (urban, semi-urban, industrial, mixed). The part of the

borderline oriented to the emission source is relevant. The noise limits in this instruction are listed

in the table below and correspond with the noise limits set out by the WHO:

Page 6 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Table 3: Immission noise limits according to Greek legislation (Presidential Decree 1180/1981, Table 1)

Line Description Noise limits LAeq in dB(A)

1 Established industrial areas 70

2 Areas with predominantly industrial

characteristics 65

3 Areas with equivalent industrial and urban

characteristics 55

4 Areas with predominantly urban

characteristics 50

In cases where the noise emitting site borders are on a home property, the noise limit is 45

dB(A), measured in front of an open door or window.

1.3.4 Project Specification

Until further notice, the noise limits within this project will be set to LAeq ≤ 65 dB(A) at the station

fence measured as hourly averaged noise level.

1.3.5 Summary

The ‘3 dB(A) Criterion’ demanded by the World Bank Group is the most strict requirement

concerning noise, (please see also Section 1.3.1). Consequently the maximum noise impacts

emitted from the proposed compressor station should not increase the background noise level of

3 dB(A) at the nearest receptor location off-site. As the further development from 10 to 20 BCM/y

transport capacity will be done at a later stage, the ‘3 dB(A) Criterion’ is applied to each of the 2

construction phases respectively.

Page 7 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

2 DOCUMENTATION USED

Specification Noise Survey

Document No.: CAL00-ENT-000-A-TSA-0001, Rev.: 01

Project Manual – Part 12 – Document Control

Document No.: CAL00 – ENT-000-B-TPA-0012, Rev.: 0D

Project Manual – Part 16 – Engineering Manual

Document No.: CAL00-ENT-000-B-TPA-0016, Rev.: 0C

Station Layout GCS00 – Gas Compressor Station Kipoi

GCS00-ENT-000-Q-DQA-0007 Rev. 0G

3 STANDARDS AND GUIDELINES USED

DIN EN 12354-4 „Building acoustics – Estimation of acoustic performance of

buildings from the performance of products

Part 4: Transmission of indoor sound to the outside“,

Issue date: 2001-04

VDI 3733 „Noise at pipes“

Issue date: 1996-07

VDI 3734 Part 1

„Characteristic noise emission values of technical sound

sources; air coolers“

Issue date: 1981-02

DIN ISO 9613 Part 2

Acoustics - „Attenuation of sound during propagation

outdoors,

Part 2: General method of calculation“

Issue date: 1999-10

Page 8 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

4 SITE DESCRIPTION

4.1 Local Situation, Sensitive Receptor Points

The Gas Compressor Station is proposed for a site within the district Evros, Greece. The local

situation can be seen from the aerial image below.

The area is a primarily rural area. The closest residences to the site are the settlements in the

north-east of Peplos.

The shortest distance between the proposed compressor station and community areas is to

‘Peplos’, with a distance of approx. 1650 m to the geometrical center of the station.

Picture 1: Aerial image of the proposed compressor station GCS00 and nearby communities

Page 9 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Table 4: Noise sensitive receptors

Sensitive receptor point Distance / Direction

1 Thymaria

nearest outskirt of village

approx. 2650 m

west-north-west

2 Tavri

nearest outskirt of village

approx. 2900 m

west

3 Peplos

nearest outskirt of village approx. 1650 m

south-south-west

4 Kipoi

nearest outskirt of village approx. 2250 m

south-sputh-east

5 Station fence

West of the station approx. 200 m

north-west

6 Station fence

South of the station approx. 200 m

south-west

7 Station fence

East of the station approx. 200 m

south-east

4.2 Proposed Gas Compressor Station

For the ultimate transport capacity of 20 billion cubic meters / year six gas turbines, each with a

power of 15 MW, will be installed of which five units will be in operation simultaneously at full

load. One compressor unit is reserved for standby. Each gas compressor unit comprises one

natural gas compressor with a gas turbine driver and will be located within its own compressor

building.

The compressor buildings will be a solid construction (concrete walls or brick walls) with sound

proof doors and air ventilation systems. The combustion air intake filter equipment and the

exhaust ducts and stacks will be located outside, adjacent to the compressor building. It is

assumed that the gas turbine driver will be equipped with an additional enclosure.

Two gas coolers, each equipped with 10 low noise fans and one recycle cooler with four fans will

be located to the north of the compressor buildings. The area between the compressor buildings

and the gas coolers is reserved for the pipe work. Piping, which is located above ground, must be

equipped with a sound proof cladding.

Page 10 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

As the pipeline transport capacity will be initially approx. 10 billion cubic meters / year the first

construction phase comprises only part of the above mentioned processing units for the 20

BCM/y case. Namely these are three gas compressor units, one gas cooler, one fuel gas skid

and one power generator. Furthermore there will be three metering sections and three filter units.

Also the piping above ground and diverse operation and administration building have to be

considered. Due to the 2+1 sparing philosophy, 2 gas compressor units have to be taken into

account during normal operation.

To guarantee the final transport capacity of approx. 20 billion cubic meters / year an extension of

the existent gas compressor station will be necessary. Thus the implementation of three

additional gas compressor units plus piping is intended in a second construction phase.

Page 11 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

5 NOISE MODELLING

5.1 Methodology

In order to determine the extent of noise emission from the proposed site a 3D computer noise

model has been developed. The model was developed using the prediction software

‚SoundPLAN, Version 7.1,‘ in conjunction with topographic information supplied in digital form.

The significant noise sources were built in the model at the locations obtained from the provided

plot plans.

The noise predictions have been performed according to ISO 9613-2. The method incorporates

the influence of geometrical divergence, ground absorption, atmospheric absorption (in

accordance with ISO 9613-1), shielding (barrier) attenuation and meteorological conditions.

For the noise assessment of the planned compressor station, sound power data from Section 6

were used, assuming the scenario of normal operation mode for each development phase

separately.

According to ISO 9613-2, Table 5, the accuracy of the model is within a range of ±3 dB.

5.2 Meteorological conditions considered

The noise model has been based on the following meteorological conditions which need to be

verified during detail engineering phase:

Table 5: Meteorological conditions considered in the noise model

Temperature (°C) Relative

Humidity (%)

Barometric

Pressure (hPa)

Wind Speed and Direction

15 70 1015 ≈ 3 m/s North-East

Cmet was generally set to zero. No vegetation was considered within the noise model. The ground

beneath the noise sources were modelled as fully reflective (ground absorption zero). Outside of

the proposed compressor station the ground was considered as agriculturally used area with a

ground absorption factor 0,85.

Page 12 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

6 NOISE CONTROL SPECIFICATIONS AND ASSOCITATED NOISE CONTROL MEASURES (NCM)

The following outlines the source sound power levels to be associated with the major noise

emitting equipment at the proposed site:

Table 6: Noise Specifications

Exhaust stack opening per unit, including stack surface LWA ≤ 86 dB(A)

NCM:

Exhaust silencer with staggered splitters

Exhaust duct outside compressor building, per unit LWA ≤ 85 dB(A)

NCM:

Sound proof cladding

Filter house, combustion air intake, per unit LWA ≤ 78 dB(A)

NCM:

Air intake silencer with staggered splitters

Air intake duct outside compressor building, per unit LWA ≤ 78 dB(A)

NCM:

Sound proof cladding

Turbine enclosure ventilation inlet, per unit LWA ≤ 76 dB(A)

NCM:

Inlet silencer

Turbine enclosure ventilation outlet, per unit LWA ≤ 76 dB(A)

NCM:

Outlet silencer

Oil cooler outside compressor building, per unit LWA ≤ 90 dB(A)

NCM:

To be guaranteed by the supplier

Oil mist separator outlet, per unit LWA ≤ 78 dB(A)

NCM:

To be guaranteed by the supplier

Gas compressor unit inside compressor building

for one unit LWA ≤ 110 dB(A)

NCM:

To be guaranteed by the supplier

(enclosed gas turbine package).

100 mm sound proof cladding of gas pipes inside

the compressor building.

Resulting sound pressure level inside the building,

averaged: LpA approx. 94 dB(A)

Page 13 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Compressor building

Walls R’w ≥ 48 dB

NCM:

Concrete or brickwork, m ≥ 280 kg/m²

Roof R’w ≥ 45 dB

NCM:

Concrete, m ≥ 210 kg/m², plus thermal insulation

Explosion relief panel, approx. 200 m²,

as part of the roof of each compressor building R’w ≥ 26 dB

NCM:

To be guaranteed by the supplier

Doors, in situ R’w ≥ 30 dB

NCM:

To be guaranteed by the supplier

Building ventilation inlet, per opening

(four per building assumed) LWA ≤ 67 dB(A)

NCM:

Air inlet silencers with staggered splitters

Building ventilation outlet on roof, per unit

(four per building assumed) LWA ≤ 84 dB(A)

NCM:

To be guaranteed by the supplier

Gas cooler with 10 fans, per cooler

(two coolers considered) LWA ≤ 91 dB(A)

NCM:

To be guaranteed by the supplier

One Start-up cooler with 4 fans LWA ≤ 87 dB(A)

NCM:

To be guaranteed by the supplier

Gas flow noise within gas coolers, per cooler

(identical for the two gas cooler and the start-up cooler) LWA ≤ 91 dB(A)

NCM:

To be reviewed during detail engineering.

Page 14 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Gas cooler, vertical pipework, upstream LWA ≤ 77 dB(A) / m

NCM:

To be reviewed during detail engineering,

probably 100 mm sound proof cladding.

Gas cooler header, discharge side, above ground LWA ≤ 76 dB(A) / m

NCM:

To be reviewed during detail engineering,

probably 150 mm sound proof cladding.

Gas cooler, vertical pipework, downstream LWA ≤ 74 dB(A) / m

NCM:

To be reviewed during detail engineering,

probably 100 mm sound proof cladding.

Station inlet filter, per unit

(in total four filter assumed) LWA ≤ 75 dB(A)

NCM:

To be reviewed during detail engineering,

normally no action needed.

Meter run, per unit LWA ≤ 87 dB(A)

NCM:

To be reviewed during detail engineering,

probably 100 mm sound proof cladding.

Compressor piping outdoors, suction side of

compressor, per unit LWA ≤ 78 dB(A) / m

NCM:

To be reviewed during detail engineering,

probably 200 mm sound proof cladding.

Compressor piping outdoors, discharge side of

compressor, per unit LWA ≤ 80 dB(A) / m

NCM:

To be reviewed during detail engineering,

probably 200 mm sound proof cladding.

Recycle valve, per unit LWA ≤ 85 dB(A)

NCM:

To be reviewed during detail engineering,

probably enclosed.

Header, suction side LWA ≤ 66 dB(A) / m

NCM:

To be reviewed during detail engineering.

Page 15 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Header, discharge side, above ground LWA ≤ 68 dB(A) / m

NCM:

To be reviewed during detail engineering,

probably 200 mm sound proof cladding.

Air compressor, per unit

Air intake

Room ventilation outlet

LWA ≤ 65 dB(A)

LWA ≤ 66 dB(A)

NCM:

Within Utility Building.

Silencers at intake and outlet

Boiler room (Heating)

Stack

Room ventilation, air intake

Room ventilation, outlet

LWA ≤ 76 dB(A)

LWA ≤ 70 dB(A)

LWA ≤ 70 dB(A)

NCM:

Within Utility Building.

probably silencers at intake and outlet

Fuel gas skid I and II

Building surface (walls, roof, door)

Room ventilation, intake

Room ventilation, outlet

LWA ≤ 64 dB(A)

LWA ≤ 66 dB(A)

LWA ≤ 66 dB(A)

NCM:

Solid or lightweight construction,

walls and roof R’w ≥ 37 dB

Door R’w ≥ 30 dB

Power generation I and II (Gas)

Building surface (walls, roof, door)

Stack opening

Room ventilation, intake

Room ventilation, outlet

LWA ≤ 74 dB(A)

LWA ≤ 88 dB(A)

LWA ≤ 74 dB(A)

LWA ≤ 74 dB(A)

NCM:

Solid or lightweight construction,

walls and roof R’w ≥ 37 dB

Door R’w ≥ 30 dB

Main Power generation I and II (Diesel)

Package surface (walls, roof, door)

Mean sound level at 1 m distance all package surfaces

Stack opening

LWA ≤ 85 dB(A)

LWA ≤ 88 dB(A)

NCM:

Sound pressure level to be guaranteed by the supplier,

Generator has to be installed into an insulating container

Page 16 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Emergency Power generation I and II (Diesel)

Building surface (walls, roof, door)

Stack opening

Room ventilation, intake

Room ventilation, outlet

Cooling Air inlet

LWA ≤ 78 dB(A)

LWA ≤ 88 dB(A)

LWA ≤ 80 dB(A)

LWA ≤ 70 dB(A)

LWA ≤ 81 dB(A)

NCM:

Solid or lightweight construction,

walls and roof R’w ≥ 36 dB

Door R’w ≥ 30 dB

Administration Building, Electrical Building,

Workshop / Stores Building

It is assumed, that sound pressure levels inside these

buildings are usually not higher than

LpA = 85 dB(A)

NCM:

Solid or lightweight Building construction,

walls and roof R’w ≥ 37 dB

Doors R’w ≥ 30 dB

Ventilation openings (if necessary) LwA ≤ 75 dB(A)

Air condition units outdoors (6 assumed) LwA ≤ 85 dB(A)

Optional

(instead of one turbine driven gas compressor):

Combined Cycle - Steam Turbine with gas compressor,

installed within a solid building

Average sound pressure inside turbine hall

Four heat recovery steam generator

One condensate Cooler

LpA 96 dB(A)

LWA 94 dB(A) / unit

LWA 93 dB(A)

NCM:

Solid or lightweight Building construction,

walls and roof R’w ≥ 48 dB

Large Door R’w ≥ 30 dB

Small Doors R’w ≥ 25 dB

Ventilation openings, air intake LwA ≤ 75 dB(A)

Ventilation openings, air outlet LwA ≤ 84 dB(A)

Additional remarks:

All specified sound power levels must be free of a tonal noise characteristic. A tonal characteristic

may exist if the sound pressure levels of two adjacent 1/3 octave bands differ by 5 dB or more.

Page 17 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Noise with a tonal characteristic may be produced by the gas compressors due to their blade

passing frequency. This subject should be reviewed during detail engineering phase for further

decisions.

Tonal noise characteristics are especially not acceptable at the Non Return Valves (NRV) or the

filter screens.

Impulsive noise is likely not to be considered under normal operation. However, the fuel gas vent

system will be activated after shut down of a compressor unit, thus the sound power level of this

system should not exceed LWA = 100 dB(A).

Due to the highest priority of environmental and safety aspects noise emissions during

emergency cases are likely not to be considered within an environmental impact study.

Nevertheless for the reason of engineering criticality assessment noise emissions of emergency

power generators are also considered in the present study. According to routinely necessary test

runs of Diesel Power Generators are regarded.

Page 18 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

7 PREDICTED NOISE LEVELS

Noise levels in the area surrounding the site have been predicted using SoundPlan 7.1 as

described in Section 5.1 above. The prediction software is well recognized and accepted for its

accuracy and validity.

The predicted noise levels at each receptor, based on the modelled data outlined in Section 6 are

summarized in Table 7 and

Table 8 below.

Table 7: Plant operation noise at sensitive receptors (construction phase I)

Point No.

Sensitive receptor

Initial noise level

at night time

in dB(A)

Additional noise level

at night time

in dB(A)

Total noise level

at night time

in dB(A)

Increase of background

noise in dB(A)

1 Thymaria 29,4 20,6 29,9 0,5

2 Tavri 29,4 21,4 30,0 0,6

3 Peplos 29,4 25,7 30,9 1,5

4 Kipoi 29,4 18,7 29,8 0,4

5 Station fence, west 59,2

6 Station fence, south 54,8

7 Station fence, east 50,8

Table 8: Plant operation noise at sensitive receptors (construction phase II)

Point No.

Sensitive receptor

Initial noise level

at night time

in dB(A)

Additional noise level

at night time

in dB(A)

Total noise level

at night time

in dB(A)

Increase of background

noise in dB(A)

1 Thymaria 29,9 19,3 30,3 0,4

2 Tavri 30,0 20,1 30,5 0,4

3 Peplos 30,9 25,6 32,1 1,1

4 Kipoi 29,8 19,9 30,2 0,4

5 Station fence, west 59,2 53,1 60,2

6 Station fence, south 54,8 54,4 57,6

7 Station fence, east 50,8 53,4 55,3

From the table above, it can be seen that noise levels will be about 13 dB(A) below the

45 dB(A) criterion suggested by the World Bank, the WHO and the Greek legislation for outdoor

noise levels in residential areas during night time.

Page 19 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

Further, the predicted noise levels at the station fence comply with the project specification

outlined in Section 1.3.4.

The contribution of each individual noise source to the additional total sound pressure level at the

sensitive receptors for each development phase can be drawn from the numerical charts in

Attachment 3. The noise contour plots for the scenarios modelled are shown in Attachment 4.

For the calculation of the resulting total noise level for each development phase at the nearest

receptor point, baseline measurements have been performed by Genest & Partner in November

30th 2012. As shown in the tables above, the additional predicted noise levels at each receptor

point, is less than the initial noise level. From that it can be derived that the predicted noise-

increase of the proposed site lies within a range of 3 dB(A) for each development phase. The

method of approach takes into account that the operation of the compressor station during the

initial development stage will contribute to the background noise considered for construction

phase II.

Page 20 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

8 CONCLUSION

It is proposed to develop a gas compressor station in the district Evros, Greece, near the Turkish

border. The final compressor station will be developed in two construction phases as referred to

in chapter 4.2. The first comprises of 2+1 gas compressor units, the second of three units, each

along with the necessary auxiliary equipment.

To predict the noise impact in the surrounding area a 3D noise model was developed. The

prediction results in this report indicates that noise received at the closest residences at the

villages Thymaria, Tavri, Peplos and Kipoi from the full capacity operation of each construction

phase of the proposed gas compressor site GCS00 shall be deemed to be complied with the

guidelines of the World Bank and the WHO at all times.

This will be achieved by noise control treatment to plant equipment as specified in Section 6.

This Study comprises 22 pages and 4 Attachments.

Genest und Partner

Ingenieurgesellschaft mbH

Ludwigshafen/Rhein, February 23th 2013

Scherer/ Dr. Hunsmann

Page 21 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

GLOSSARY OF TERMS

Lp / LpA unweighted / A-weighted sound pressure level in dB / dB(A)

Lpi Sound pressure level inside of rooms or enclosures in dB / dB(A)

Leq / LAeq unweighted / A-weighted energy averaged noise from a source, equivalent

continuous sound pressure level over a given period in dB / dB(A)

LW / LWA unweighted / A-weighted sound power level in dB / dB(A)

L‘W Sound power level per unit (m or m²)

R‘w Sound transmission loss in dB

De Insertion loss in dB

S Area in m²

s Distance in m

K0 Solid angle index in dB

Adiv Attenuation by geometric divergence

Aatm Attenuation by atmospheric absorption

Agr Attenuation by ground effect

Abar Attenuation by barrier or screening

Amisc Attenuation by miscellaneous effects

Cmet Meteorological correction

dLrefl Increase of noise by reflection

Page 22 of 22 Area Code

Comp. Code

System Code

Disc. Code

Doc.- Type

Ser. No.

Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00

ATTACHMENTS

Attachment 1: Topographical overview

Attachment 2: Station layout

Attachment 3: Detailed noise prediction results

Attachment 4: Noise contour plot

2 Tavri

1 Thymaria

4 Kipoi

7 Station Fence East

3 Peplos

6 Station Fence South

5 Station Fence West

34942000

34942000

34942500

34942500

34943000

34943000

34943500

34943500

34944000

34944000

34944500

34944500

34945000

34945000

34945500

34945500

34946000

34946000

34946500

34946500

34947000

34947000

34947500

34947500

4547000

4547000

4547500

4547500

4548000

4548000

4548500

4548500

4549000

4549000

4549500

4549500

4550000

4550000

4550500

4550500

4551000

4551000

4551500

4551500

4552000

4552000

Attachment 1

GCS00-WGP

127D5 G1, Rev. 00

Trans Adriatic Pipeline AG

Proposed Gas Compression Station

GCS00 at district Evros, Greece

Topographical Overview

Map Source:

Google Earth

-----------------------------------------------------------

Legend

Receptor

Industry building

noise source (point)

noise source (line)

noise source (area)

Noise Level

LAeq

= 25 dB(A)

= 30 dB(A)

= 35 dB(A)

= 40 dB(A)

= 45 dB(A)

= 50 dB(A)

= 55 dB(A)

= 60 dB(A)

= 65 dB(A)

= 70 dB(A)

= 75 dB(A)

Scale (on paper size A3) 1:20000

00 100 200 400 600 800 1000m

Vent

Oil CoolerOil Cooler

Unit 1Unit 1

+17,10m

Compressor Building

Unit 2Unit 2

Oil Cooler

Stack

Stack

Stack

Unit 3

Transportation Gas Cooler

Start Up Gas CoolerTransportation Gas Cooler

+17,10m

+17,10m

+1,50m

+1,50m

%%P 0,00m

%%P 0,00m

%%P 0,00m

+1,50m

- 1,50m

- 1,50m

%%P 0,00m

%%P 0,00m

%%P 0,00m

- 1,50m

%%P 0,00m

- 1,50m

%%P 0,00m

Extinguishing Water Supply(Small Sewage Works)

(Small Sewage Works)

Waste Water Treatment Plant

Unit 4

Unit 5Unit 6

Workshop Building

+9,00m

Administration Building

+4,50m

+9,00m

Stores Building

Main Power Generation (Diesel)Electrical Building

+4,50m

Diesel Fuel Tank

Sunshade Parking Area

Emergency Power Generation (Diesel)

Emergency Exit

Second Access for Fire Brigade and Emergency Exit

Emergency Exit

Emergency Exit

m²

6,3KW

5KW

m²

Compressor Building

Compressor Building

Compressor Building

Compressor Building

Compressor Building

Parking Area

+4,50m+9,00m

Utility Building

Chromatograph

Condensate\PTank

Scraper Receiving Station

Scraper Launching Station

Metering

Filter Separator 1-5

+4,50m

Fuel Gas Skid

Fuel Gas Filter

+4,50m

Power Generation (Gas)

+70,00mDN 1200

34944900

34944900

34945000

34945000

34945100

34945100

34945200

34945200

34945300

34945300

4549300

4549300

4549400

4549400

4549500

4549500

4549600

4549600

4549700

4549700

Attachment 2.1

GCS00-WGP127D5 G1, Rev. 00

Trans Adriatic Pipeline AG

Proposed Gas Compression Station

GCS00 at district Evros, Greece

Station Layout

Construction phase I

Map Source:1) Drawing file GCS00-ENT-000-Q-DQA-0007_PL.dxf

-----------------------------------------------------------

Legend

Receptor

Industry building

noise source (point)

noise source (line)

noise source (area)

Elevation point

Elevation line

Punkt

Noise LevelLAeq

= 25 dB(A)= 30 dB(A)= 35 dB(A)= 40 dB(A)= 45 dB(A)= 50 dB(A)= 55 dB(A)= 60 dB(A)= 65 dB(A)= 70 dB(A)= 75 dB(A)

Scale (on paper size A3) 1:200000 10 20 40 60 80 100

m

Vent

Oil CoolerOil Cooler

Unit 1Unit 1

+17,10m

Compressor Building

Unit 2Unit 2

Oil Cooler

Stack

Stack

Stack

Unit 3

Transportation Gas Cooler

Start Up Gas CoolerTransportation Gas Cooler

+17,10m

+17,10m

+1,50m

+1,50m

%%P 0,00m

%%P 0,00m

%%P 0,00m

+1,50m

- 1,50m

- 1,50m

%%P 0,00m

%%P 0,00m

%%P 0,00m

- 1,50m

%%P 0,00m

- 1,50m

%%P 0,00m

Extinguishing Water Supply(Small Sewage Works)

(Small Sewage Works)

Waste Water Treatment Plant

Unit 4

Unit 5Unit 6

Workshop Building

+9,00m

Administration Building

+4,50m

+9,00m

Stores Building

Main Power Generation (Diesel)Electrical Building

+4,50m

Diesel Fuel Tank

Sunshade Parking Area

Emergency Power Generation (Diesel)

Emergency Exit

Second Access for Fire Brigade and Emergency Exit

Emergency Exit

Emergency Exit

m²

6,3KW

5KW

m²

Compressor Building

Compressor Building

Compressor Building

Compressor Building

Compressor Building

Parking Area

+4,50m+9,00m

Utility Building

Chromatograph

Condensate\PTank

Scraper Receiving Station

Scraper Launching Station

Metering

Filter Separator 1-5

+4,50m

Fuel Gas Skid

Fuel Gas Filter

+4,50m

Power Generation (Gas)

+70,00mDN 1200

34944900

34944900

34945000

34945000

34945100

34945100

34945200

34945200

34945300

34945300

4549300

4549300

4549400

4549400

4549500

4549500

4549600

4549600

4549700

4549700

Attachment 2.2

GCS00-WGP127D5 G1, Rev. 00

Trans Adriatic Pipeline AG

Proposed Gas Compression Station

GCS00 at district Evros, Greece

Station Layout

Construction phase II

Map Source:1) Drawing file GCS00-ENT-000-Q-DQA-0007_PL.dxf

-----------------------------------------------------------

Legend

Receptor

Industry building

noise source (point)

noise source (line)

noise source (area)

Elevation point

Elevation line

Punkt

Noise LevelLAeq

= 25 dB(A)= 30 dB(A)= 35 dB(A)= 40 dB(A)= 45 dB(A)= 50 dB(A)= 55 dB(A)= 60 dB(A)= 65 dB(A)= 70 dB(A)= 75 dB(A)

Scale (on paper size A3) 1:200000 10 20 40 60 80 100

m

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Legende Source No. Number of sourceSource Source nameGroup Group nameLi dB(A) Indoor sound pressure levelR'w dB Transmission lossLw' dB(A) Sound power level per m,m²l or S m,m² Size of source (length or area)Lw dB(A) Sound power level per unitKo dB Correction for non spherical emissions m Distance source - receptor pointAdiv dB Attenuation due to divergenceAgr dB Attenuation due to ground effectsAbar dB Attenuation due to barrierAatm dB Attenuation due to atmospheric absorptiondLrefl dB Increase of noise due to reflectionsCmet Meteorological correctionLr,i dB(A) Assessed sound pressure at receiver

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.1 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 1 Thymaria Ld = 20,6 dB(A) Ln = 20,6 dB(A)

203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 2456,13 -78,80 -0,60 -0,07 -6,03 2,66 0,00 4,17

204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 2450,21 -78,78 -0,68 -0,07 -6,03 2,53 0,00 3,98

205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 2442,24 -78,75 -0,81 -0,07 -6,02 2,54 0,00 3,90

206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 2441,11 -78,74 -0,81 -0,07 -6,02 2,54 0,00 3,90

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2557,34 -79,15 0,90 -4,18 -3,80 0,00 0,00 -0,23

11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2555,37 -79,14 0,90 -4,18 -3,80 0,00 0,00 -0,22

12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2568,81 -79,19 0,92 -4,19 -3,82 0,00 0,00 -0,28

13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2566,58 -79,18 0,92 -4,19 -3,82 0,00 0,00 -0,27

5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 2557,02 -79,15 0,42 -2,67 -2,93 0,00 0,00 -1,33

4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2550,78 -79,13 1,97 -4,32 -2,96 0,00 0,00 -12,36

3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 2562,07 -79,16 1,60 -4,64 -8,68 0,00 0,00 -16,22

6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 2557,01 -79,15 3,95 -4,05 -1,49 0,00 0,00 0,27

22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2566,49 -79,18 1,98 - -0,73 0,00 0,00 -22,75

21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2573,83 -79,20 1,64 - -4,19 0,00 0,00 -33,82

7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2565,06 -79,17 1,64 -4,64 -8,70 0,00 0,00 -19,85

18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2550,70 -79,13 1,97 -4,31 -2,97 0,00 0,00 -12,36

19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2555,63 -79,14 1,97 -4,31 -2,97 0,00 0,00 -12,38

15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2549,53 -79,12 1,62 -4,60 -8,70 0,00 0,00 -19,78

16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2557,02 -79,15 1,62 -4,60 -8,72 0,00 0,00 -19,82

17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 2553,67 -79,14 3,90 -3,59 -1,80 0,00 0,00 0,37

2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 2556,85 -79,15 -0,10 -1,81 -4,73 0,00 0,00 -16,27

20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 2565,73 -79,18 -0,03 - -1,44 0,00 0,00 -25,49

14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 2553,13 -79,13 -0,09 -0,79 -4,87 0,00 0,00 -14,31

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.2 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 2562,26 -79,16 -1,08 -3,09 -3,77 0,00 0,00 -16,96

29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2555,61 -79,14 0,08 -3,57 -2,18 0,00 0,00 -4,81

27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2551,87 -79,13 0,11 0,00 -9,11 2,54 0,00 -5,60

9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 2562,07 -79,16 -0,72 -3,57 -5,41 0,00 0,00 7,28

40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2626,18 -79,38 1,06 -4,23 -3,92 0,00 0,00 -0,47

41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2624,27 -79,37 1,06 -4,23 -3,92 0,00 0,00 -0,46

42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2637,71 -79,42 1,08 -4,25 -3,95 0,00 0,00 -0,53

43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2635,54 -79,41 1,08 -4,23 -3,93 0,00 0,00 -0,49

35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 2626,04 -79,38 0,47 -3,82 -2,28 0,00 0,00 -2,01

34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2619,77 -79,36 2,02 -4,35 -2,97 0,00 0,00 -12,59

33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 2631,12 -79,39 1,67 -4,64 -8,85 0,00 0,00 -16,55

36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 2626,03 -79,38 3,96 -4,56 -0,99 0,00 0,00 0,04

52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2635,27 -79,41 2,03 - -0,95 0,00 0,00 -25,38

51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2642,65 -79,43 1,71 - -5,18 0,00 0,00 -35,69

37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2634,12 -79,40 1,71 -4,64 -8,86 0,00 0,00 -20,18

48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2619,63 -79,36 2,02 -4,35 -2,97 0,00 0,00 -12,59

49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2624,43 -79,37 2,02 - -0,71 0,00 0,00 -21,31

45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2618,49 -79,35 1,70 -4,64 -8,83 0,00 0,00 -20,11

46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2625,78 -79,38 1,70 - -5,04 0,00 0,00 -23,43

47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 2622,52 -79,37 3,92 -4,56 -0,99 0,00 0,00 0,01

32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 2625,88 -79,38 0,14 -3,46 -4,31 0,00 0,00 -17,49

50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 2634,51 -79,41 0,18 - -1,63 0,00 0,00 -27,28

44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 2622,00 -79,36 0,14 -3,65 -4,22 0,00 0,00 -16,53

38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 2631,16 -79,40 -0,90 -3,22 -3,87 0,00 0,00 -17,25

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.3 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2624,92 -79,37 0,39 -3,79 -2,27 0,00 0,00 -5,05

56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2620,76 -79,36 0,36 -0,53 - 2,51 0,00 -7,14

39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 2630,97 -79,39 -0,51 -3,69 -5,57 0,00 0,00 6,96

196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 2604,66 -79,31 1,73 - -8,67 0,00 0,00 -43,04

197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 2587,70 -79,25 1,70 -1,41 - 0,00 0,00 -27,66

198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 2574,28 -79,21 1,54 - -8,19 0,00 0,00 -51,26

199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 2567,85 -79,18 1,58 -1,17 - 0,00 0,00 -30,66

200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 2561,89 -79,16 1,60 -1,21 - 0,00 0,00 -44,19

201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 2554,98 -79,14 1,61 -1,24 - 0,00 0,00 -30,02

190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 2563,26 -79,17 1,80 - -8,36 0,00 0,00 -47,54

192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 2570,61 -79,19 1,80 - -8,33 0,00 0,00 -57,95

193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 2575,36 -79,21 1,80 - -8,32 0,00 0,00 -48,10

194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 2580,59 -79,23 1,80 - -9,54 0,00 0,00 -50,45

195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 2594,48 -79,27 1,80 - -8,83 0,00 0,00 -40,96

202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 2551,85 -79,13 1,78 - -8,33 0,00 0,00 -40,38

191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 2577,87 -79,22 1,34 -4,73 - 0,00 0,00 -23,23

59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 2654,22 -79,47 0,96 -4,28 -6,61 0,00 0,00 -12,40

60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 2646,15 -79,44 0,95 -4,27 -6,59 0,00 0,00 -12,36

61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 2638,00 -79,42 0,94 -4,27 -6,58 0,00 0,00 -12,33

65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 2563,43 -79,17 0,29 -3,21 -7,19 0,00 0,00 -19,94

66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 2560,73 -79,16 1,51 - -5,08 0,00 0,00 -36,00

63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 2563,10 -79,17 0,26 -3,46 -7,15 0,00 0,00 -23,32

64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 2563,17 -79,17 0,77 - -4,66 0,00 0,00 -44,77

68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 2556,01 -79,14 0,14 -0,01 -7,30 0,00 0,00 -16,82

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.4 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 2559,62 -79,16 0,15 -4,34 -6,73 0,00 0,00 -23,83

67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2562,15 -79,16 -4,56 - -6,04 0,00 0,00 -27,60

69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2558,34 -79,15 -4,56 0,00 -6,03 0,00 0,00 -15,73

162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 2600,80 -79,29 1,94 -4,29 - 0,00 0,00 -5,27

163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 2598,10 -79,29 1,94 -4,16 - 0,00 0,00 -5,19

164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 2595,40 -79,28 1,94 -4,01 - 0,00 0,00 -5,11

74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 2601,23 -79,30 1,33 -4,56 -8,93 0,00 0,00 9,90

75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 2605,55 -79,31 1,33 -4,72 -8,79 0,00 0,00 7,04

165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 2503,83 -78,96 0,10 - -2,99 0,00 0,00 -18,36

167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 2496,23 -78,94 0,03 -2,68 -5,61 0,00 0,00 -8,05

170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 2499,70 -78,95 0,01 - -3,25 0,00 0,00 -16,12

171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 2498,28 -78,94 0,91 - -1,93 0,00 0,00 -22,40

168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 2491,97 -78,92 -0,21 -2,06 -5,75 0,00 0,00 -9,88

173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 2504,62 -78,97 -0,15 -4,09 -1,99 0,00 0,00 4,80

166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 2497,92 -78,94 -0,47 -3,95 -4,94 0,00 0,00 -9,64

169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2492,37 -78,92 -4,55 0,00 -5,88 0,00 0,00 -7,34

172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2501,57 -78,96 -4,55 - -5,90 0,00 0,00 -21,16

90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2597,53 -79,28 1,90 -0,52 - 0,00 0,00 -19,96

77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2588,32 -79,25 1,84 -0,39 - 0,00 0,00 -15,94

91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2598,39 -79,29 1,90 -0,53 - 0,00 0,00 -19,96

79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2589,20 -79,26 1,84 -0,39 - 0,00 0,00 -15,94

92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2599,25 -79,29 1,91 -0,53 - 0,00 0,00 -19,97

80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2590,08 -79,26 1,84 -0,39 - 0,00 0,00 -15,95

93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2600,30 -79,29 1,91 -0,53 - 0,00 0,00 -19,97

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.5 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2591,10 -79,26 1,85 -0,40 - 0,00 0,00 -15,95

94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2601,16 -79,30 1,92 -0,54 - 0,00 0,00 -19,98

82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2591,98 -79,26 1,85 -0,40 - 0,00 0,00 -15,96

95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2602,02 -79,30 1,92 -0,54 - 0,00 0,00 -19,98

83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2592,85 -79,27 1,86 -0,40 - 0,00 0,00 -15,96

96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2603,08 -79,30 1,93 -0,54 - 0,00 0,00 -19,99

84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2593,88 -79,27 1,86 -0,40 - 0,00 0,00 -15,96

97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2603,94 -79,30 1,93 -0,54 - 0,00 0,00 -19,99

85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2594,76 -79,27 1,87 -0,40 - 0,00 0,00 -15,97

98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2604,80 -79,31 1,93 -0,54 - 0,00 0,00 -20,01

86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2595,64 -79,28 1,87 -0,40 - 0,00 0,00 -15,97

99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2605,86 -79,31 1,94 -0,55 - 0,00 0,00 -20,02

87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2596,68 -79,28 1,88 -0,40 - 0,00 0,00 -15,98

100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2606,72 -79,31 1,94 -0,55 - 0,00 0,00 -20,03

88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2597,56 -79,28 1,88 -0,41 - 0,00 0,00 -15,98

101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2607,58 -79,32 1,95 -0,55 - 0,00 0,00 -20,04

89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2598,43 -79,29 1,89 -0,41 - 0,00 0,00 -15,99

160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 2598,56 -79,29 1,32 -4,23 -9,07 0,00 0,00 10,90

71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 2598,26 -79,29 0,68 -0,13 -9,18 0,00 0,00 1,07

73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 2598,26 -79,29 0,68 -0,13 -9,18 0,00 0,00 5,07

78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2608,03 -79,32 2,00 -0,66 - 0,00 0,00 -20,93

131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2608,90 -79,32 2,01 -0,66 - 0,00 0,00 -20,94

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2609,76 -79,32 2,01 -0,67 - 0,00 0,00 -20,95

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2610,83 -79,33 2,01 -0,67 - 0,00 0,00 -20,96

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.6 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2611,69 -79,33 2,02 -0,68 - 0,00 0,00 -20,97

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2612,55 -79,33 2,02 -0,68 - 0,00 0,00 -20,97

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2613,59 -79,34 2,03 -0,69 - 0,00 0,00 -20,99

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2614,45 -79,34 2,03 -0,69 - 0,00 0,00 -20,99

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2615,31 -79,34 2,03 -0,70 - 0,00 0,00 -21,00

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2616,38 -79,35 2,04 -0,70 - 0,00 0,00 -21,01

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2617,25 -79,35 2,04 -0,70 - 0,00 0,00 -21,02

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2618,11 -79,35 2,04 -0,71 - 0,00 0,00 -21,03

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2619,17 -79,36 2,05 -0,71 - 0,00 0,00 -21,04

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2620,04 -79,36 2,05 -0,71 - 0,00 0,00 -21,05

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2620,90 -79,36 2,05 -0,72 - 0,00 0,00 -21,06

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2621,97 -79,36 2,06 -0,72 - 0,00 0,00 -21,07

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2622,83 -79,37 2,06 -0,72 - 0,00 0,00 -21,08

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2623,70 -79,37 2,06 -0,73 - 0,00 0,00 -21,09

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2624,74 -79,37 2,07 -0,73 - 0,00 0,00 -21,10

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2625,60 -79,38 2,07 -0,73 - 0,00 0,00 -21,11

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2626,46 -79,38 2,07 -0,73 - 0,00 0,00 -21,12

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2627,53 -79,38 2,08 -0,74 - 0,00 0,00 -21,13

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2628,39 -79,39 2,08 -0,74 - 0,00 0,00 -21,14

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2629,26 -79,39 2,08 -0,74 - 0,00 0,00 -21,15

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2630,30 -79,39 2,09 -0,74 - 0,00 0,00 -21,16

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2631,17 -79,40 2,09 -0,74 - 0,00 0,00 -21,16

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2632,03 -79,40 2,09 -0,75 - 0,00 0,00 -21,18

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2633,10 -79,40 2,10 -0,75 - 0,00 0,00 -21,19

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.7 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2633,96 -79,40 2,10 -0,75 - 0,00 0,00 -21,20

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2634,83 -79,41 2,10 -0,75 - 0,00 0,00 -21,21

70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2617,88 -79,35 0,80 -0,14 -9,29 0,00 0,00 5,02

76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2600,52 -79,29 1,98 -0,59 - 0,00 0,00 -17,68

102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2601,39 -79,30 1,99 -0,60 - 0,00 0,00 -17,69

103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2602,26 -79,30 1,99 -0,60 - 0,00 0,00 -17,70

104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2603,31 -79,30 2,00 -0,61 - 0,00 0,00 -17,71

105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2604,18 -79,31 2,00 -0,62 - 0,00 0,00 -17,72

106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2605,05 -79,31 2,00 -0,63 - 0,00 0,00 -17,72

107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2606,09 -79,31 2,01 -0,64 - 0,00 0,00 -17,73

108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2606,96 -79,31 2,01 -0,64 - 0,00 0,00 -17,74

109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2607,83 -79,32 2,01 -0,65 - 0,00 0,00 -17,75

110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2608,89 -79,32 2,02 -0,66 - 0,00 0,00 -17,77

111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2609,76 -79,32 2,02 -0,66 - 0,00 0,00 -17,78

112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2610,63 -79,33 2,02 -0,67 - 0,00 0,00 -17,79

113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2611,67 -79,33 2,03 -0,67 - 0,00 0,00 -17,80

114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2612,54 -79,33 2,03 -0,68 - 0,00 0,00 -17,81

115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2613,41 -79,34 2,04 -0,68 - 0,00 0,00 -17,82

116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2614,47 -79,34 2,04 -0,69 - 0,00 0,00 -17,83

117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2615,33 -79,34 2,04 -0,69 - 0,00 0,00 -17,84

118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2616,21 -79,35 2,05 -0,69 - 0,00 0,00 -17,85

119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2617,28 -79,35 2,05 -0,70 - 0,00 0,00 -17,86

120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2618,15 -79,35 2,05 -0,70 - 0,00 0,00 -17,87

121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2619,01 -79,35 2,06 -0,70 - 0,00 0,00 -17,87

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.8 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2620,05 -79,36 2,06 -0,71 - 0,00 0,00 -17,88

123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2620,92 -79,36 2,06 -0,71 - 0,00 0,00 -17,89

124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2621,79 -79,36 2,07 -0,71 - 0,00 0,00 -17,90

125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2622,85 -79,37 2,07 -0,72 - 0,00 0,00 -17,91

126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2623,72 -79,37 2,07 -0,72 - 0,00 0,00 -17,92

127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2624,59 -79,37 2,08 -0,72 - 0,00 0,00 -17,93

128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2625,63 -79,38 2,08 -0,72 - 0,00 0,00 -17,94

129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2626,49 -79,38 2,08 -0,73 - 0,00 0,00 -17,95

130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2627,36 -79,38 2,09 -0,73 - 0,00 0,00 -17,96

72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2617,88 -79,35 0,80 -0,14 -9,29 0,00 0,00 5,02

161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 2590,02 -79,26 1,31 -3,83 -9,30 0,00 0,00 6,48

28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 2568,06 -79,18 -4,57 0,00 - 0,00 0,00 -4,22

23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 2547,88 -79,12 1,34 -4,32 -3,35 0,00 0,00 4,77

24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 2551,24 -79,13 2,92 -3,53 -5,02 2,53 0,00 5,00

1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 2544,75 -79,11 1,06 -0,81 -7,78 2,12 0,00 7,48

25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 2567,35 -79,18 1,30 -3,78 -9,28 0,00 0,00 2,42

26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 2580,98 -79,23 1,31 -4,00 -9,15 0,00 0,00 3,73

58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 2637,06 -79,41 -4,58 -4,03 - 0,00 0,00 -8,77

31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 2616,94 -79,35 1,46 -4,35 -3,45 0,00 0,00 4,53

53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 2620,32 -79,36 2,97 -8,08 -0,95 2,71 0,00 4,52

30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 2613,96 -79,34 1,14 -4,42 -6,00 2,32 0,00 5,70

54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 2636,22 -79,41 1,37 -9,56 -6,96 0,00 0,00 -1,19

55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 2649,86 -79,46 1,39 -6,43 -7,99 0,00 0,00 2,32

186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2511,70 -78,99 -4,55 - -5,92 0,00 0,00 -33,50

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.9 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2513,56 -79,00 -4,55 - -5,93 0,00 0,00 -34,41

188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2515,42 -79,00 -4,55 - -5,93 0,00 0,00 -34,94

176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 2506,58 -78,97 -4,50 -0,27 -5,91 0,00 0,00 -18,65

210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 2504,46 -78,97 -0,12 -4,23 -5,35 2,53 0,00 0,87

209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 2504,05 -78,96 -0,15 -4,21 -5,34 2,53 0,00 0,87

189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 2548,93 -79,12 -4,56 - -6,01 0,00 0,00 -30,97

182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 2508,85 -78,98 -4,54 0,00 -5,92 0,00 0,00 -11,43

177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 2547,53 -79,11 -4,51 -0,26 -6,01 0,00 0,00 -8,88

179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 2545,34 -79,11 -4,51 -0,26 -6,00 0,00 0,00 -8,87

178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 2546,43 -79,11 -4,51 -0,26 -6,01 0,00 0,00 -8,88

174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 2548,45 -79,12 1,47 - -8,31 0,00 0,00 -46,04

180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 2524,80 -79,04 1,44 -0,52 - 0,00 0,00 -22,97

181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2522,76 -79,03 2,17 -3,78 - 0,00 0,00 -32,67

184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 2528,95 -79,05 1,52 - -8,41 0,00 0,00 -40,43

185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2531,20 -79,06 2,21 - - 0,00 0,00 -51,20

183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 2505,68 -78,97 1,43 -2,06 - 0,00 0,00 -29,48

175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 2526,80 -79,04 0,92 -4,67 - 0,00 0,00 -28,09

207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2487,18 -78,91 -0,46 - -3,26 0,00 0,00 -10,51

208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2490,12 -78,92 -0,42 - -3,09 0,00 0,00 -11,19

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.10 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 2 Tavri Ld = 21,4 dB(A) Ln = 21,4 dB(A)

203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 2820,80 -80,00 -0,62 -2,97 -5,73 0,00 0,00 -2,31

204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 2814,49 -79,98 -0,70 -2,59 -5,77 0,00 0,00 -2,03

205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 2803,32 -79,95 -0,82 0,00 -6,56 2,54 0,00 2,21

206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 2804,01 -79,95 -0,82 0,00 -6,57 2,54 0,00 2,20

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2867,31 -80,14 0,91 -4,19 -3,89 0,00 0,00 -1,31

11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2868,19 -80,14 0,91 -4,19 -3,89 0,00 0,00 -1,31

12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2879,63 -80,18 0,93 -4,19 -3,91 0,00 0,00 -1,35

13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2880,49 -80,18 0,93 -4,19 -3,91 0,00 0,00 -1,35

5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 2875,51 -80,17 0,42 -7,54 -1,09 0,00 0,00 -5,38

4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2868,89 -80,15 1,97 -7,07 -1,03 0,00 0,00 -14,21

3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 2880,93 -80,18 1,59 - -4,83 0,00 0,00 -22,66

6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 2875,52 -80,17 3,96 -6,14 -0,40 0,00 0,00 -1,75

22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2871,76 -80,16 1,97 0,00 -3,18 0,00 0,00 -9,30

21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2879,65 -80,18 1,62 0,00 -9,68 0,00 0,00 -17,22

7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2884,14 -80,19 1,62 - -4,74 0,00 0,00 -26,62

18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2865,52 -80,14 1,97 -1,73 -1,98 0,00 0,00 -9,81

19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2863,31 -80,13 1,97 0,00 -3,18 0,00 0,00 -9,27

15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2866,05 -80,14 1,61 -3,04 -8,13 0,00 0,00 -18,68

16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2862,70 -80,13 1,61 0,00 -9,65 0,00 0,00 -17,15

17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 2864,17 -80,13 3,92 -1,98 -0,60 0,00 0,00 2,21

2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 2875,29 -80,17 -0,12 -6,61 -2,80 0,00 0,00 -20,18

20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 2870,86 -80,15 -0,08 0,00 -4,47 0,00 0,00 -14,86

14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 2864,41 -80,13 -0,11 -0,35 -4,51 0,00 0,00 -14,54

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.11 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 2873,85 -80,16 -1,08 -3,09 -4,08 0,00 0,00 -18,27

29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2877,07 -80,17 0,05 0,00 -2,37 0,00 0,00 -2,49

27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2863,56 -80,13 0,10 0,00 -9,73 2,54 0,00 -7,22

9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 2873,87 -80,16 -0,73 -0,27 -6,03 0,00 0,00 8,94

40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2941,22 -80,36 1,06 -4,23 -4,00 0,00 0,00 -1,54

41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2942,08 -80,37 1,06 -0,66 -3,46 0,00 0,00 2,58

42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2953,54 -80,40 1,08 -4,23 -4,03 0,00 0,00 -1,58

43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2954,38 -80,40 1,08 -4,23 -4,03 0,00 0,00 -1,58

35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 2949,36 -80,39 0,47 - -0,92 0,00 0,00 -9,00

34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2942,74 -80,37 2,01 - -0,70 0,00 0,00 -17,84

33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 2954,79 -80,40 1,65 - -4,74 0,00 0,00 -25,86

36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 2949,37 -80,39 3,97 -9,56 -0,39 0,00 0,00 -5,36

52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2945,71 -80,38 2,01 0,00 -3,22 0,00 0,00 -9,52

51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2953,60 -80,40 1,69 0,00 -9,83 0,00 0,00 -17,53

37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2958,00 -80,41 1,69 - -4,79 0,00 0,00 -29,58

48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2939,38 -80,36 2,01 -5,23 -1,17 0,00 0,00 -12,68

49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2937,23 -80,35 2,01 0,00 -3,22 0,00 0,00 -9,49

45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2939,90 -80,36 1,67 -7,83 -6,66 0,00 0,00 -22,16

46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2936,64 -80,35 1,67 0,00 -9,80 0,00 0,00 -17,46

47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 2938,07 -80,35 3,94 -5,73 -0,38 0,00 0,00 -1,53

32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 2949,14 -80,39 0,16 - -1,93 0,00 0,00 -23,92

50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 2944,81 -80,37 0,15 0,00 -4,58 0,00 0,00 -14,97

44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 2938,30 -80,35 0,15 -2,29 -4,02 0,00 0,00 -15,95

38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 2947,75 -80,38 -0,91 -3,22 -4,19 0,00 0,00 -18,55

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.12 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2950,87 -80,39 0,40 -2,51 -2,03 0,00 0,00 -4,53

56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2937,49 -80,35 0,33 -4,06 -8,46 2,29 0,00 -10,26

39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 2947,77 -80,38 -0,53 -0,33 -6,16 0,00 0,00 8,73

196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 2971,60 -80,45 1,88 - -9,64 0,00 0,00 -44,95

197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 2959,80 -80,42 1,87 - -9,41 0,00 0,00 -42,65

198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 2946,26 -80,38 1,86 - -9,26 0,00 0,00 -55,40

199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 2940,06 -80,36 1,85 - -9,43 0,00 0,00 -44,18

200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 2933,64 -80,34 1,85 - - 0,00 0,00 -54,29

201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 2926,27 -80,32 1,84 - -9,57 0,00 0,00 -41,82

190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 2922,37 -80,31 1,84 -4,64 - 0,00 0,00 -33,93

192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 2930,43 -80,33 1,85 - -9,44 0,00 0,00 -56,63

193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 2935,79 -80,35 1,85 -7,31 - 0,00 0,00 -37,87

194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 2940,91 -80,36 1,86 -4,59 - 0,00 0,00 -44,47

195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 2955,11 -80,40 1,87 -4,49 - 0,00 0,00 -31,27

202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 2916,68 -80,29 1,84 - -9,50 0,00 0,00 -41,08

191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 2943,70 -80,37 1,79 -4,99 - 0,00 0,00 -25,27

59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 2882,14 -80,19 0,93 0,00 -7,84 0,00 0,00 -10,10

60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 2873,24 -80,16 0,92 0,00 -7,83 0,00 0,00 -10,06

61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 2864,27 -80,13 0,92 0,00 -7,82 0,00 0,00 -10,03

65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 2803,86 -79,95 0,27 -3,75 -7,61 0,00 0,00 -21,71

66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 2804,60 -79,95 1,50 - -6,56 0,00 0,00 -34,23

63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 2798,93 -79,93 0,23 0,00 -7,82 0,00 0,00 -21,33

64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 2799,08 -79,93 0,77 0,00 -7,77 0,00 0,00 -30,15

68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 2795,90 -79,92 0,08 0,00 -7,85 0,00 0,00 -18,20

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.13 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 2799,99 -79,94 0,09 -4,30 -7,25 0,00 0,00 -25,15

67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2804,21 -79,95 -4,49 -7,97 -6,61 0,00 0,00 -25,01

69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2795,28 -79,92 -4,49 0,00 -6,59 0,00 0,00 -16,99

162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 2835,62 -80,05 1,93 -0,42 - 0,00 0,00 -2,75

163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 2832,65 -80,04 1,93 -0,46 - 0,00 0,00 -2,77

164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 2829,66 -80,03 1,93 -0,50 - 0,00 0,00 -2,80

74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 2888,95 -80,21 1,31 0,00 - 0,00 0,00 12,15

75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 2908,43 -80,27 1,33 0,00 - 0,00 0,00 9,21

165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 2809,46 -79,96 0,06 - -3,86 0,00 0,00 -17,01

167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 2803,77 -79,95 0,01 -5,89 -4,78 0,00 0,00 -11,46

170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 2802,54 -79,94 0,11 0,00 -5,92 0,00 0,00 -6,99

171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 2801,02 -79,94 0,93 0,00 -6,64 0,00 0,00 -11,79

168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 2796,67 -79,92 -0,33 0,00 -5,94 0,00 0,00 -9,13

173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 2810,28 -79,97 -0,20 -3,12 -2,20 0,00 0,00 4,52

166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 2803,05 -79,94 -0,50 -3,92 -5,43 0,00 0,00 -11,13

169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2796,50 -79,92 -4,48 0,00 -6,60 0,00 0,00 -8,99

172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2804,55 -79,95 -4,48 0,00 -6,61 0,00 0,00 -9,03

90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2859,79 -80,12 1,86 0,00 - 0,00 0,00 -20,80

77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2863,09 -80,13 1,79 0,00 - 0,00 0,00 -17,04

91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2860,72 -80,12 1,86 0,00 - 0,00 0,00 -20,80

79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2864,04 -80,13 1,80 0,00 - 0,00 0,00 -17,04

92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2861,66 -80,12 1,86 0,00 - 0,00 0,00 -20,81

80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2865,01 -80,13 1,80 0,00 - 0,00 0,00 -17,04

93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2862,82 -80,13 1,87 0,00 - 0,00 0,00 -20,81

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.14 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2866,08 -80,14 1,81 0,00 - 0,00 0,00 -17,04

94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2863,76 -80,13 1,87 0,00 - 0,00 0,00 -20,81

82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2867,02 -80,14 1,81 0,00 - 0,00 0,00 -17,05

95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2864,69 -80,13 1,88 0,00 - 0,00 0,00 -20,81

83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2868,00 -80,14 1,81 0,00 - 0,00 0,00 -17,05

96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2865,84 -80,14 1,88 0,00 - 0,00 0,00 -20,82

84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2869,12 -80,15 1,82 0,00 - 0,00 0,00 -17,05

97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2866,78 -80,14 1,89 0,00 - 0,00 0,00 -20,82

85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2870,07 -80,15 1,82 0,00 - 0,00 0,00 -17,05

98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2867,72 -80,14 1,89 0,00 - 0,00 0,00 -20,82

86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2871,04 -80,15 1,83 0,00 - 0,00 0,00 -17,06

99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2868,87 -80,15 1,89 0,00 - 0,00 0,00 -20,82

87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2872,16 -80,16 1,83 0,00 - 0,00 0,00 -17,06

100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2869,81 -80,15 1,90 0,00 - 0,00 0,00 -20,83

88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2873,11 -80,16 1,84 0,00 - 0,00 0,00 -17,06

101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2870,75 -80,15 1,90 0,00 - 0,00 0,00 -20,83

89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2874,08 -80,16 1,84 0,00 - 0,00 0,00 -17,06

160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 2884,92 -80,19 1,31 0,00 - 0,00 0,00 12,96

71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 2866,65 -80,14 0,63 0,00 -8,65 0,00 0,00 0,84

73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 2866,65 -80,14 0,63 0,00 -8,65 0,00 0,00 4,84

78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2872,05 -80,16 1,96 0,00 - 0,00 0,00 -21,50

131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2872,99 -80,16 1,96 0,00 - 0,00 0,00 -21,50

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2873,93 -80,16 1,97 0,00 - 0,00 0,00 -21,50

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2875,08 -80,17 1,97 0,00 - 0,00 0,00 -21,51

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.15 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2876,02 -80,17 1,98 0,00 - 0,00 0,00 -21,51

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2876,96 -80,17 1,98 0,00 - 0,00 0,00 -21,51

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2878,11 -80,17 1,98 0,00 - 0,00 0,00 -21,52

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2879,05 -80,18 1,99 0,00 - 0,00 0,00 -21,52

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2879,98 -80,18 1,99 0,00 - 0,00 0,00 -21,52

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2881,14 -80,18 1,99 0,00 - 0,00 0,00 -21,53

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2882,08 -80,19 2,00 0,00 - 0,00 0,00 -21,53

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2883,02 -80,19 2,00 0,00 - 0,00 0,00 -21,53

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2884,16 -80,19 2,00 0,00 - 0,00 0,00 -21,54

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2885,10 -80,20 2,01 0,00 - 0,00 0,00 -21,54

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2886,04 -80,20 2,01 0,00 - 0,00 0,00 -21,54

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2887,20 -80,20 2,02 0,00 - 0,00 0,00 -21,54

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2888,14 -80,20 2,02 0,00 - 0,00 0,00 -21,55

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2889,07 -80,21 2,02 0,00 - 0,00 0,00 -21,55

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2890,22 -80,21 2,03 0,00 - 0,00 0,00 -21,55

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2891,16 -80,21 2,03 0,00 - 0,00 0,00 -21,56

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2892,10 -80,22 2,03 0,00 - 0,00 0,00 -21,56

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2893,26 -80,22 2,04 0,00 - 0,00 0,00 -21,56

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2894,20 -80,22 2,04 0,00 - 0,00 0,00 -21,57

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2895,13 -80,23 2,04 0,00 - 0,00 0,00 -21,57

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2896,29 -80,23 2,04 0,00 - 0,00 0,00 -21,58

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2897,23 -80,23 2,05 0,00 - 0,00 0,00 -21,58

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2898,17 -80,23 2,05 0,00 - 0,00 0,00 -21,58

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2899,32 -80,24 2,05 0,00 - 0,00 0,00 -21,59

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.16 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2900,26 -80,24 2,06 0,00 - 0,00 0,00 -21,59

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2901,20 -80,24 2,06 0,00 - 0,00 0,00 -21,59

70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2887,93 -80,20 0,74 0,00 -8,70 0,00 0,00 4,84

76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2874,74 -80,16 1,94 0,00 - 0,00 0,00 -18,38

102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2875,68 -80,17 1,95 0,00 - 0,00 0,00 -18,39

103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2876,62 -80,17 1,95 0,00 - 0,00 0,00 -18,39

104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2877,77 -80,17 1,95 0,00 - 0,00 0,00 -18,39

105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2878,71 -80,18 1,96 0,00 - 0,00 0,00 -18,39

106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2879,66 -80,18 1,96 0,00 - 0,00 0,00 -18,40

107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2880,79 -80,18 1,97 0,00 - 0,00 0,00 -18,40

108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2881,73 -80,19 1,97 0,00 - 0,00 0,00 -18,40

109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2882,68 -80,19 1,97 0,00 - 0,00 0,00 -18,40

110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2883,82 -80,19 1,98 0,00 - 0,00 0,00 -18,41

111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2884,76 -80,19 1,98 0,00 - 0,00 0,00 -18,41

112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2885,70 -80,20 1,98 0,00 - 0,00 0,00 -18,41

113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2886,85 -80,20 1,99 0,00 - 0,00 0,00 -18,42

114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2887,79 -80,20 1,99 0,00 - 0,00 0,00 -18,42

115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2888,73 -80,21 1,99 0,00 - 0,00 0,00 -18,42

116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2889,88 -80,21 2,00 0,00 - 0,00 0,00 -18,43

117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2890,82 -80,21 2,00 0,00 - 0,00 0,00 -18,43

118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2891,77 -80,22 2,00 0,00 - 0,00 0,00 -18,43

119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2892,91 -80,22 2,01 0,00 - 0,00 0,00 -18,44

120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2893,84 -80,22 2,01 0,00 - 0,00 0,00 -18,44

121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2894,79 -80,22 2,01 0,00 - 0,00 0,00 -18,44

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.17 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2895,92 -80,23 2,02 0,00 - 0,00 0,00 -18,44

123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2896,86 -80,23 2,02 0,00 - 0,00 0,00 -18,45

124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2897,80 -80,23 2,02 0,00 - 0,00 0,00 -18,45

125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2898,95 -80,24 2,03 0,00 - 0,00 0,00 -18,45

126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2899,89 -80,24 2,03 0,00 - 0,00 0,00 -18,46

127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2900,83 -80,24 2,04 0,00 - 0,00 0,00 -18,46

128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2901,97 -80,25 2,04 0,00 - 0,00 0,00 -18,46

129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2902,91 -80,25 2,04 0,00 - 0,00 0,00 -18,47

130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2903,85 -80,25 2,04 0,00 - 0,00 0,00 -18,47

72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2887,92 -80,20 0,74 0,00 -8,70 0,00 0,00 4,84

161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 2863,62 -80,13 1,29 0,00 - 0,00 0,00 8,47

28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 2869,99 -80,15 -4,50 0,00 - 0,00 0,00 -6,34

23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 2857,08 -80,11 1,37 -4,35 -3,48 0,00 0,00 3,65

24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 2860,96 -80,12 2,92 -3,34 -2,46 3,41 0,00 7,64

1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 2858,99 -80,12 0,98 -2,64 -5,30 1,54 0,00 6,46

25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 2864,39 -80,13 1,28 0,00 - 0,07 0,00 4,33

26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 2878,73 -80,18 1,30 0,00 - 0,20 0,00 5,83

58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 2943,98 -80,37 -4,51 0,00 - 0,00 0,00 -6,88

31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 2930,95 -80,33 1,48 -4,38 -3,57 0,00 0,00 3,42

53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 2934,83 -80,34 2,96 -7,20 -0,92 2,23 0,00 3,95

30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 2932,87 -80,34 1,13 -6,24 -4,60 2,45 0,00 4,40

54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 2938,36 -80,35 1,35 0,00 - 0,00 0,00 3,91

55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 2952,70 -80,40 1,36 0,00 - 0,07 0,00 5,36

186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2868,07 -80,14 -4,49 -0,25 -6,76 0,00 0,00 -18,64

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.18 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2870,03 -80,15 -4,49 -0,25 -6,77 0,00 0,00 -18,64

188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2871,99 -80,16 -4,49 -0,24 -6,77 0,00 0,00 -18,65

176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 2866,48 -80,14 -4,44 -0,33 -6,76 0,00 0,00 -20,66

210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 2865,33 -80,14 -0,03 -2,72 -5,91 1,89 0,00 0,09

209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 2865,57 -80,14 -0,03 -2,20 -6,03 1,75 0,00 0,36

189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 2907,31 -80,26 -4,49 -0,21 -6,86 0,00 0,00 -13,81

182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 2872,70 -80,16 -4,48 - -6,78 0,00 0,00 -26,34

177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 2908,08 -80,26 -4,45 -0,31 -6,86 0,00 0,00 -10,87

179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 2909,28 -80,27 -4,45 -0,30 -6,86 0,00 0,00 -10,87

178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 2908,68 -80,27 -4,45 -0,30 -6,86 0,00 0,00 -10,87

174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 2910,58 -80,27 1,64 - -9,93 0,00 0,00 -43,99

180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 2889,56 -80,21 1,61 - -9,88 0,00 0,00 -35,74

181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2887,40 -80,20 2,20 - - 0,00 0,00 -42,68

184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 2886,29 -80,20 1,55 -4,67 - 0,00 0,00 -28,68

185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2888,64 -80,21 2,21 -4,75 - 0,00 0,00 -35,32

183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 2865,51 -80,14 1,46 -4,23 - 0,00 0,00 -33,24

175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 2887,98 -80,20 1,05 -4,65 - 0,00 0,00 -30,32

207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2818,27 -79,99 -0,50 0,00 -6,56 1,87 0,00 1,82

208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2821,39 -80,00 -0,46 0,00 -6,56 1,87 0,00 1,85

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.19 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 3 Peplos Ld = 25,7 dB(A) Ln = 25,7 dB(A)

203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 1818,07 -76,18 0,41 -8,05 -3,41 0,00 0,00 -0,24

204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 1816,75 -76,18 0,37 -8,77 -3,29 0,00 0,00 -0,88

205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 1810,36 -76,15 0,29 -2,92 -4,63 2,35 0,00 5,95

206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 1813,42 -76,16 0,30 -2,92 -4,64 2,35 0,00 5,92

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 1733,37 -75,77 1,05 -4,24 -3,70 0,00 0,00 3,34

11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 1738,23 -75,79 1,06 -4,23 -3,70 0,00 0,00 3,33

12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 1736,38 -75,78 1,05 -4,24 -3,70 0,00 0,00 3,33

13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 1741,65 -75,81 1,06 -4,24 -3,70 0,00 0,00 3,31

5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 1748,24 -75,84 0,52 - -0,58 0,00 0,00 -10,85

4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 1746,66 -75,84 2,12 - -0,72 0,00 0,00 -20,58

3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 1749,53 -75,85 1,82 - -4,13 0,00 0,00 -27,05

6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 1748,23 -75,84 3,94 - -0,27 0,00 0,00 -7,48

22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 1725,61 -75,73 2,10 -4,38 -2,78 0,00 0,00 -8,72

21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 1727,53 -75,74 1,85 -4,65 -6,84 0,00 0,00 -14,37

7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 1750,30 -75,85 1,88 - -4,32 0,00 0,00 -31,06

18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 1740,72 -75,81 2,11 -4,36 -2,77 0,00 0,00 -8,77

19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 1728,56 -75,75 2,10 -4,36 -2,77 0,00 0,00 -8,71

15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 1743,64 -75,82 1,88 -4,65 -6,88 0,00 0,00 -14,45

16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 1725,16 -75,73 1,85 -4,65 -6,82 0,00 0,00 -14,33

17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 1733,44 -75,77 3,88 -4,61 -0,87 0,00 0,00 3,62

2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 1748,23 -75,84 0,27 - -1,08 0,00 0,00 -23,55

20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 1725,45 -75,73 0,22 -2,72 -3,60 0,00 0,00 -11,99

14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 1734,84 -75,78 0,32 -2,95 -3,59 0,00 0,00 -11,44

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.20 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 1737,04 -75,79 -0,87 -3,26 -2,88 0,00 0,00 -12,65

29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 1753,45 -75,87 0,41 - -0,51 0,00 0,00 -10,64

27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 1735,69 -75,78 0,51 -0,30 -7,66 2,48 0,00 -0,75

9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 1737,27 -75,79 -0,43 -3,74 -4,15 0,00 0,00 12,02

40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 1752,85 -75,87 1,06 -4,24 -3,71 0,00 0,00 3,23

41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 1757,66 -75,89 1,07 -4,24 -3,72 0,00 0,00 3,22

42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 1756,36 -75,88 1,06 -4,24 -3,72 0,00 0,00 3,21

43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 1761,56 -75,91 1,07 -4,25 -3,72 0,00 0,00 3,20

35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 1767,80 -75,94 0,53 - -0,59 0,00 0,00 -11,01

34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 1765,94 -75,93 2,12 - -0,72 0,00 0,00 -20,54

33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 1769,31 -75,95 1,82 - -4,17 0,00 0,00 -27,22

36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 1767,79 -75,94 3,94 - -0,27 0,00 0,00 -7,65

52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 1745,43 -75,83 2,10 -4,39 -2,79 0,00 0,00 -8,84

51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 1747,67 -75,84 1,85 -4,65 -6,89 0,00 0,00 -14,52

37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 1770,21 -75,95 1,88 - -4,35 0,00 0,00 -31,19

48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 1759,97 -75,90 2,11 -4,39 -2,80 0,00 0,00 -8,91

49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 1747,94 -75,84 2,10 -4,39 -2,79 0,00 0,00 -8,85

45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 1762,86 -75,92 1,88 -4,65 -6,94 0,00 0,00 -14,62

46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 1744,57 -75,83 1,85 -4,65 -6,89 0,00 0,00 -14,50

47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 1752,76 -75,87 3,88 -4,59 -0,87 0,00 0,00 3,55

32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 1767,78 -75,94 0,27 - -1,09 0,00 0,00 -23,70

50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 1745,24 -75,83 0,22 -3,68 -3,21 0,00 0,00 -12,67

44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 1754,16 -75,87 0,32 -3,85 -3,18 0,00 0,00 -12,01

38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 1756,75 -75,89 -0,86 -3,27 -2,90 0,00 0,00 -12,78

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.21 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 1772,53 -75,96 0,42 - -0,51 0,00 0,00 -10,97

56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 1754,98 -75,88 0,52 -1,03 -8,64 2,52 0,00 -2,50

39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 1756,96 -75,89 -0,42 -3,75 -4,19 0,00 0,00 11,89

196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 1845,03 -76,31 2,16 - -6,80 0,00 0,00 -38,20

197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 1851,32 -76,34 2,17 - -6,76 0,00 0,00 -37,42

198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 1848,62 -76,33 2,18 - -6,85 0,00 0,00 -52,91

199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 1847,88 -76,33 2,18 - -6,91 0,00 0,00 -44,62

200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 1845,97 -76,32 2,18 - -6,79 0,00 0,00 -57,57

201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 1843,89 -76,31 2,18 - -6,89 0,00 0,00 -43,93

190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 1822,93 -76,21 2,15 -8,13 -7,23 0,00 0,00 -28,54

192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 1825,51 -76,22 2,15 - -6,91 0,00 0,00 -54,96

193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 1827,46 -76,23 2,15 -7,91 -7,28 0,00 0,00 -30,16

194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 1828,19 -76,23 2,15 -5,89 -7,66 0,00 0,00 -37,28

195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 1831,27 -76,25 2,15 -4,76 -8,13 0,00 0,00 -23,51

202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 1831,48 -76,25 2,16 -6,79 -7,52 0,00 0,00 -26,23

191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 1838,30 -76,28 2,05 -5,11 -8,02 0,00 0,00 -17,35

59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 1596,80 -75,06 0,96 -4,28 -5,12 0,00 0,00 -6,49

60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 1594,36 -75,04 0,96 -4,28 -5,11 0,00 0,00 -6,47

61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 1591,97 -75,03 0,96 -4,28 -5,11 0,00 0,00 -6,46

65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 1610,54 -75,13 0,63 -5,39 -4,94 0,00 0,00 -15,51

66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 1616,28 -75,16 1,65 - -4,36 0,00 0,00 -33,03

63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 1602,59 -75,09 0,65 -3,67 -4,84 0,00 0,00 -16,75

64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 1602,59 -75,09 0,90 -4,58 -4,57 0,00 0,00 -26,55

68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 1609,09 -75,12 0,73 -3,59 -4,87 0,00 0,00 -13,36

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.22 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 1611,12 -75,13 0,72 -4,57 -4,58 0,00 0,00 -17,31

67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 1613,28 -75,15 -4,72 - -3,80 0,00 0,00 -22,66

69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 1604,12 -75,10 -4,72 0,00 -3,78 0,00 0,00 -9,59

162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 1603,42 -75,09 1,98 -4,76 -8,18 0,00 0,00 2,60

163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 1602,70 -75,09 1,98 -4,76 -8,18 0,00 0,00 2,61

164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 1601,95 -75,09 1,98 -4,76 -8,18 0,00 0,00 2,62

74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 1704,16 -75,62 1,47 -4,56 -6,57 1,03 0,00 17,12

75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 1705,33 -75,63 1,47 -4,56 -6,58 1,13 0,00 14,36

165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 1719,50 -75,70 0,58 - -2,56 0,00 0,00 -13,75

167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 1722,16 -75,71 0,59 - -2,28 0,00 0,00 -12,79

170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 1714,28 -75,67 0,58 -4,34 -3,76 0,00 0,00 -4,42

171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 1713,96 -75,67 1,21 -4,53 -4,69 0,00 0,00 -9,83

168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 1716,89 -75,69 0,57 -4,38 -3,75 0,00 0,00 -6,17

173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 1719,67 -75,70 0,73 -3,49 -2,57 0,00 0,00 8,97

166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 1718,22 -75,69 0,47 -4,47 -3,71 0,00 0,00 -4,74

169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 1715,92 -75,68 -4,72 0,00 -4,05 0,00 0,00 -2,44

172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 1714,69 -75,68 -4,72 0,00 -4,04 0,00 0,00 -2,43

90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1652,27 -75,35 2,05 -2,00 - 0,00 0,00 -14,68

77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1673,65 -75,47 2,07 -1,51 - 0,00 0,00 -11,25

91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1652,51 -75,35 2,05 -2,03 - 0,00 0,00 -14,70

79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1673,88 -75,47 2,07 -1,53 - 0,00 0,00 -11,28

92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1652,74 -75,36 2,05 -2,06 - 0,00 0,00 -14,73

80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1674,15 -75,47 2,07 -1,55 - 0,00 0,00 -11,30

93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1653,05 -75,36 2,05 -2,09 - 0,00 0,00 -14,76

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.23 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1674,36 -75,47 2,07 -1,57 - 0,00 0,00 -11,33

94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1653,29 -75,36 2,05 -2,11 - 0,00 0,00 -14,78

82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1674,58 -75,47 2,07 -1,59 - 0,00 0,00 -11,35

95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1653,53 -75,36 2,05 -2,13 - 0,00 0,00 -14,80

83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1674,86 -75,47 2,08 -1,61 - 0,00 0,00 -11,38

96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1653,80 -75,36 2,05 -2,16 - 0,00 0,00 -14,83

84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1675,16 -75,47 2,08 -1,63 - 0,00 0,00 -11,40

97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1654,04 -75,36 2,05 -2,17 - 0,00 0,00 -14,85

85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1675,38 -75,47 2,08 -1,65 - 0,00 0,00 -11,42

98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1654,28 -75,36 2,05 -2,19 - 0,00 0,00 -14,87

86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1675,66 -75,48 2,08 -1,66 - 0,00 0,00 -11,45

99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1654,58 -75,37 2,05 -2,21 - 0,00 0,00 -14,89

87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1675,93 -75,48 2,08 -1,68 - 0,00 0,00 -11,47

100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1654,83 -75,37 2,05 -2,23 - 0,00 0,00 -14,91

88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1676,16 -75,48 2,08 -1,69 - 0,00 0,00 -11,49

101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1655,06 -75,37 2,05 -2,26 - 0,00 0,00 -14,93

89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1676,44 -75,48 2,08 -1,70 - 0,00 0,00 -11,51

160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 1695,54 -75,58 1,46 -4,56 -6,55 0,79 0,00 17,73

71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 1663,46 -75,41 0,88 -1,24 -8,92 0,00 0,00 4,32

73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 1663,45 -75,41 0,88 -1,24 -8,92 0,00 0,00 8,32

78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1656,63 -75,38 2,11 -2,81 - 0,00 0,00 -15,76

131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1656,87 -75,38 2,11 -2,84 - 0,00 0,00 -15,77

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1657,12 -75,38 2,11 -2,88 - 0,00 0,00 -15,79

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1657,40 -75,38 2,11 -2,92 - 0,00 0,00 -15,80

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.24 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1657,64 -75,38 2,11 -2,95 - 0,00 0,00 -15,82

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1657,89 -75,38 2,11 -2,98 - 0,00 0,00 -15,83

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1658,21 -75,38 2,11 -3,09 - 0,00 0,00 -15,85

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1658,46 -75,39 2,11 -3,17 - 0,00 0,00 -15,86

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1658,70 -75,39 2,11 -3,25 - 0,00 0,00 -15,87

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1658,99 -75,39 2,11 -3,34 - 0,00 0,00 -15,89

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1659,24 -75,39 2,11 -3,40 - 0,00 0,00 -15,90

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1659,49 -75,39 2,11 -3,46 - 0,00 0,00 -15,91

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1659,77 -75,39 2,11 -3,53 - 0,00 0,00 -15,93

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1660,02 -75,39 2,11 -3,59 - 0,00 0,00 -15,94

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1660,27 -75,40 2,11 -3,64 - 0,00 0,00 -15,95

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1660,56 -75,40 2,11 -3,70 - 0,00 0,00 -15,96

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1660,81 -75,40 2,11 -3,75 - 0,00 0,00 -15,97

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1661,07 -75,40 2,11 -3,80 - 0,00 0,00 -15,98

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1661,39 -75,40 2,11 -3,85 - 0,00 0,00 -15,99

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1661,64 -75,40 2,11 -3,89 - 0,00 0,00 -16,00

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1661,90 -75,40 2,11 -3,92 - 0,00 0,00 -16,01

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1662,20 -75,41 2,11 -3,97 - 0,00 0,00 -16,03

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1662,45 -75,41 2,11 -4,00 - 0,00 0,00 -16,03

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1662,70 -75,41 2,11 -4,04 - 0,00 0,00 -16,04

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1663,05 -75,41 2,11 -4,08 - 0,00 0,00 -16,05

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1663,30 -75,41 2,11 -4,11 - 0,00 0,00 -16,06

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1663,56 -75,41 2,11 -4,14 - 0,00 0,00 -16,07

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1663,86 -75,41 2,11 -4,17 - 0,00 0,00 -16,08

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.25 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1664,12 -75,42 2,11 -4,20 - 0,00 0,00 -16,09

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1664,37 -75,42 2,11 -4,24 - 0,00 0,00 -16,10

70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 1668,98 -75,44 0,88 -2,09 -8,25 0,00 0,00 8,10

76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1674,10 -75,47 2,14 -2,54 - 0,00 0,00 -13,06

102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1674,35 -75,47 2,14 -2,57 - 0,00 0,00 -13,07

103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1674,59 -75,47 2,14 -2,61 - 0,00 0,00 -13,08

104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1674,89 -75,47 2,14 -2,64 - 0,00 0,00 -13,10

105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1675,13 -75,47 2,14 -2,66 - 0,00 0,00 -13,11

106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1675,37 -75,47 2,14 -2,69 - 0,00 0,00 -13,13

107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1675,67 -75,48 2,14 -2,72 - 0,00 0,00 -13,14

108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1675,92 -75,48 2,14 -2,77 - 0,00 0,00 -13,15

109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1676,17 -75,48 2,14 -2,87 - 0,00 0,00 -13,17

110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1676,44 -75,48 2,14 -2,98 - 0,00 0,00 -13,18

111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1676,69 -75,48 2,14 -3,06 - 0,00 0,00 -13,19

112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1676,94 -75,48 2,14 -3,14 - 0,00 0,00 -13,21

113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1677,26 -75,48 2,15 -3,23 - 0,00 0,00 -13,22

114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1677,51 -75,49 2,15 -3,30 - 0,00 0,00 -13,23

115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1677,76 -75,49 2,15 -3,37 - 0,00 0,00 -13,24

116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1678,06 -75,49 2,15 -3,44 - 0,00 0,00 -13,25

117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1678,31 -75,49 2,15 -3,50 - 0,00 0,00 -13,26

118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1678,56 -75,49 2,15 -3,55 - 0,00 0,00 -13,27

119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1678,82 -75,49 2,15 -3,62 - 0,00 0,00 -13,29

120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1679,07 -75,49 2,15 -3,66 - 0,00 0,00 -13,30

121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1679,33 -75,49 2,15 -3,71 - 0,00 0,00 -13,31

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.26 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1679,64 -75,50 2,15 -3,76 - 0,00 0,00 -13,32

123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1679,89 -75,50 2,15 -3,81 - 0,00 0,00 -13,33

124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1680,14 -75,50 2,15 -3,85 - 0,00 0,00 -13,33

125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1680,45 -75,50 2,15 -3,89 - 0,00 0,00 -13,34

126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1680,70 -75,50 2,15 -3,93 - 0,00 0,00 -13,35

127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1680,96 -75,50 2,15 -3,97 - 0,00 0,00 -13,36

128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1681,27 -75,50 2,15 -4,00 - 0,00 0,00 -13,37

129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1681,53 -75,51 2,15 -4,04 - 0,00 0,00 -13,38

130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1681,79 -75,51 2,15 -4,07 - 0,00 0,00 -13,39

72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 1668,98 -75,44 0,88 -2,09 -8,25 0,00 0,00 8,10

161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 1675,78 -75,48 1,44 -4,55 -6,49 0,00 0,00 12,49

28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 1719,83 -75,70 -4,76 -0,01 -7,02 2,49 0,00 5,02

23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 1730,97 -75,76 1,37 -4,22 -2,99 0,00 0,00 8,62

24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 1731,70 -75,76 3,04 -4,64 -3,75 0,18 0,00 6,29

1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 1739,06 -75,80 1,26 -4,37 -4,77 0,00 0,00 8,32

25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 1708,57 -75,64 1,49 -4,56 -6,59 2,46 0,00 10,52

26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 1715,70 -75,68 1,49 -4,56 -6,61 2,47 0,00 11,92

58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 1739,23 -75,80 -4,79 0,00 -7,10 2,49 0,00 4,82

31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 1749,54 -75,85 1,38 -4,30 -3,07 0,00 0,00 8,38

53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 1750,43 -75,86 3,04 -4,67 -3,80 0,20 0,00 6,14

30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 1757,56 -75,89 1,26 -4,45 -4,75 0,11 0,00 8,28

54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 1728,00 -75,74 1,49 -4,56 -6,64 2,44 0,00 10,35

55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 1735,54 -75,78 1,50 -4,56 -6,66 2,46 0,00 11,76

186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 1810,13 -76,15 -4,75 -0,02 -4,27 0,00 0,00 -12,17

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.27 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 1810,56 -76,15 -4,75 -0,02 -4,27 0,00 0,00 -12,18

188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 1811,00 -76,15 -4,75 -0,02 -4,27 0,00 0,00 -12,18

176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 1815,97 -76,17 -4,68 -0,09 -4,28 0,00 0,00 -14,22

210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 1817,26 -76,18 0,51 -4,28 -4,22 1,80 0,00 4,62

209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 1818,38 -76,19 0,51 -4,28 -4,22 1,80 0,00 4,62

189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 1819,26 -76,19 -4,76 -1,92 -4,29 0,00 0,00 -9,15

182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 1823,19 -76,21 -4,73 - -4,30 0,00 0,00 -25,98

177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 1823,21 -76,21 -4,70 -0,08 -4,30 0,00 0,00 -4,28

179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 1829,03 -76,24 -4,70 -0,08 -4,31 0,00 0,00 -4,32

178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 1826,12 -76,22 -4,70 -0,08 -4,31 0,00 0,00 -4,30

174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 1826,09 -76,22 2,05 - -7,01 0,00 0,00 -43,61

180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 1827,33 -76,23 2,05 - -6,68 0,00 0,00 -36,02

181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 1826,56 -76,22 2,58 - - 0,00 0,00 -45,81

184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 1814,58 -76,17 2,03 -5,51 -7,87 0,00 0,00 -21,30

185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 1814,81 -76,17 2,56 -4,77 - 0,00 0,00 -26,37

183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 1815,56 -76,17 2,04 -4,10 -8,44 0,00 0,00 -25,75

175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 1820,86 -76,20 1,82 -4,91 -8,00 0,00 0,00 -22,26

207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 1762,47 -75,91 0,44 -4,38 -4,05 2,53 0,00 5,62

208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 1763,11 -75,92 0,44 -4,39 -4,05 2,53 0,00 5,61

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.28 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 4 Kipoi Ld = 18,7 dB(A) Ln = 18,7 dB(A)

203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 2838,99 -80,06 0,56 - -4,27 0,00 0,00 -19,38

204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 2843,84 -80,07 0,56 - -4,32 0,00 0,00 -19,72

205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 2848,92 -80,09 0,57 - -4,36 0,00 0,00 -19,97

206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 2850,88 -80,09 0,57 - -4,36 0,00 0,00 -19,99

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2722,48 -79,69 1,46 -4,74 -3,85 0,00 0,00 -0,83

11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2725,64 -79,70 1,47 -4,74 -3,87 0,00 0,00 -0,84

12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2712,83 -79,66 1,45 -4,76 -3,83 0,00 0,00 -0,80

13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2716,36 -79,67 1,47 -4,76 -3,85 0,00 0,00 -0,81

5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 2726,93 -79,71 0,60 - -1,40 0,00 0,00 -19,27

4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2732,16 -79,72 2,15 - -1,82 0,00 0,00 -29,89

3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 2722,69 -79,69 1,86 - -7,41 0,00 0,00 -35,12

6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 2726,94 -79,71 4,01 - -0,57 0,00 0,00 -16,22

22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2711,89 -79,66 2,13 -5,03 -2,50 0,00 0,00 -12,99

21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2705,68 -79,64 1,87 -5,37 -8,60 0,00 0,00 -20,72

7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2720,19 -79,68 1,89 - -7,51 0,00 0,00 -38,86

18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2730,54 -79,72 2,14 - -1,82 0,00 0,00 -29,89

19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2722,65 -79,69 2,13 - -1,81 0,00 0,00 -29,88

15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2732,44 -79,72 1,89 - -7,53 0,00 0,00 -38,90

16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2720,44 -79,68 1,87 - -7,51 0,00 0,00 -38,87

17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 2725,79 -79,70 3,97 - -0,55 0,00 0,00 -16,01

2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 2727,03 -79,71 0,47 - -2,21 0,00 0,00 -33,81

20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 2712,49 -79,66 0,45 -4,29 -4,08 0,00 0,00 -17,74

14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 2726,71 -79,70 0,47 - -2,25 0,00 0,00 -32,92

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.29 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 2719,04 -79,68 -0,45 -3,64 -4,02 0,00 0,00 -17,65

29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2729,73 -79,71 0,53 - -1,01 0,00 0,00 -19,10

27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2728,10 -79,71 1,00 - -6,38 0,00 0,00 -28,76

9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 2719,27 -79,68 0,00 -4,12 -5,81 0,00 0,00 6,53

40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2665,10 -79,51 1,33 -4,83 -3,63 0,00 0,00 -0,64

41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2668,33 -79,52 1,33 -4,82 -3,64 0,00 0,00 -0,65

42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2655,60 -79,48 1,30 -4,85 -3,58 0,00 0,00 -0,61

43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2659,21 -79,49 1,30 -4,83 -3,60 0,00 0,00 -0,62

35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 2669,81 -79,52 0,55 - -1,38 0,00 0,00 -19,13

34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2674,96 -79,54 2,10 - -1,80 0,00 0,00 -29,76

33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 2665,64 -79,51 1,78 - -7,32 0,00 0,00 -34,93

36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 2669,82 -79,52 3,99 - -0,56 0,00 0,00 -16,10

52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2654,45 -79,47 2,10 -5,21 -2,30 0,00 0,00 -12,81

51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2648,34 -79,45 1,81 -5,65 -8,30 0,00 0,00 -20,56

37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2663,18 -79,50 1,81 - -7,42 0,00 0,00 -38,66

48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2673,24 -79,53 2,11 - -1,81 0,00 0,00 -29,76

49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2665,17 -79,51 2,11 - -1,81 0,00 0,00 -29,75

45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2675,18 -79,54 1,83 - -7,45 0,00 0,00 -38,71

46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2662,92 -79,50 1,83 - -7,43 0,00 0,00 -38,65

47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 2668,39 -79,52 3,96 - -0,54 0,00 0,00 -15,89

32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 2669,93 -79,52 0,37 - -2,17 0,00 0,00 -33,65

50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 2655,05 -79,47 0,38 -4,34 -3,96 0,00 0,00 -17,56

44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 2669,01 -79,52 0,39 - -2,20 0,00 0,00 -32,70

38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 2661,96 -79,50 -0,62 -3,55 -3,91 0,00 0,00 -17,43

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.30 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2672,34 -79,53 0,47 - -1,01 0,00 0,00 -19,22

56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2670,71 -79,52 0,81 - -6,26 0,00 0,00 -28,62

39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 2663,08 -79,50 -0,19 -4,06 -5,63 0,00 0,00 6,76

196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 2715,44 -79,67 2,01 -5,32 - 0,00 0,00 -31,93

197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 2732,88 -79,72 2,03 - - 0,00 0,00 -49,99

198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 2744,01 -79,76 2,05 - - 0,00 0,00 -61,70

199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 2749,48 -79,78 2,05 - - 0,00 0,00 -53,45

200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 2754,15 -79,79 2,06 - - 0,00 0,00 -66,99

201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 2759,56 -79,81 2,07 - - 0,00 0,00 -52,86

190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 2744,83 -79,76 2,07 -5,23 - 0,00 0,00 -33,08

192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 2739,14 -79,74 2,06 -5,25 - 0,00 0,00 -44,13

193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 2735,53 -79,73 2,05 -5,26 - 0,00 0,00 -34,82

194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 2731,10 -79,72 2,05 - - 0,00 0,00 -62,95

195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 2719,58 -79,68 2,03 -5,31 - 0,00 0,00 -30,39

202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 2758,03 -79,80 2,08 - - 0,00 0,00 -51,26

191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 2737,18 -79,74 1,97 -5,17 - 0,00 0,00 -23,96

59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 2599,67 -79,29 0,97 -5,97 -5,32 0,00 0,00 -12,61

60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 2606,83 -79,31 0,97 -5,92 -5,35 0,00 0,00 -12,62

61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 2614,09 -79,34 0,97 -5,87 -5,39 0,00 0,00 -12,64

65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 2687,98 -79,58 0,83 -5,06 -7,01 0,00 0,00 -21,50

66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 2691,60 -79,59 1,67 -5,86 -9,41 0,00 0,00 -25,78

63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 2686,80 -79,58 0,82 -5,08 -7,00 0,00 0,00 -24,64

64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 2686,74 -79,58 0,92 -5,20 -6,99 0,00 0,00 -34,04

68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 2694,69 -79,60 0,83 -8,01 -7,03 0,00 0,00 -24,32

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.31 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 2691,50 -79,59 0,82 -5,05 -7,02 0,00 0,00 -24,59

67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2689,69 -79,59 -4,80 -0,33 -6,34 0,00 0,00 -17,05

69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2691,56 -79,59 -4,80 - -6,35 0,00 0,00 -36,91

162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 2651,51 -79,46 2,04 -6,08 - 0,00 0,00 -6,50

163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 2653,92 -79,47 2,04 -6,06 - 0,00 0,00 -6,51

164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 2656,32 -79,48 2,04 -6,05 - 0,00 0,00 -6,52

74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 2673,17 -79,53 1,51 -5,43 -8,56 0,94 0,00 10,28

75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 2669,20 -79,52 1,51 -5,45 -8,54 0,48 0,00 6,99

165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 2767,60 -79,83 0,63 -4,69 -5,52 0,00 0,00 -12,33

167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 2775,18 -79,86 0,63 - -3,73 0,00 0,00 -27,12

170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 2770,01 -79,84 0,62 -4,69 -5,52 0,00 0,00 -10,66

171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 2771,25 -79,85 1,24 -4,93 -6,06 0,00 0,00 -15,74

168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 2777,76 -79,87 0,63 - -3,73 0,00 0,00 -29,22

173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 2766,91 -79,83 0,81 -4,25 -2,75 2,47 0,00 6,45

166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 2772,61 -79,85 0,55 -4,64 -5,53 0,00 0,00 -10,80

169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2777,14 -79,86 -4,80 - -6,55 0,00 0,00 -29,38

172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2768,42 -79,84 -4,80 -0,14 -6,53 0,00 0,00 -9,30

90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2664,76 -79,51 2,25 -6,88 - 0,00 0,00 -24,08

77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2678,35 -79,55 2,26 -6,61 - 0,00 0,00 -20,22

91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2664,01 -79,50 2,25 -6,89 - 0,00 0,00 -24,08

79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2677,58 -79,55 2,26 -6,61 - 0,00 0,00 -20,22

92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2663,26 -79,50 2,25 -6,90 - 0,00 0,00 -24,08

80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2676,84 -79,54 2,26 -6,62 - 0,00 0,00 -20,22

93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2662,35 -79,50 2,25 -6,91 - 0,00 0,00 -24,08

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.32 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2675,94 -79,54 2,26 -6,63 - 0,00 0,00 -20,21

94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2661,60 -79,49 2,25 -6,91 - 0,00 0,00 -24,07

82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2675,18 -79,54 2,26 -6,64 - 0,00 0,00 -20,21

95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2660,85 -79,49 2,25 -6,92 - 0,00 0,00 -24,07

83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2674,44 -79,54 2,26 -6,65 - 0,00 0,00 -20,21

96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2659,93 -79,49 2,25 -6,93 - 0,00 0,00 -24,07

84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2673,55 -79,53 2,26 -6,65 - 0,00 0,00 -20,20

97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2659,18 -79,49 2,25 -6,94 - 0,00 0,00 -24,06

85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2672,79 -79,53 2,26 -6,66 - 0,00 0,00 -20,20

98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2658,43 -79,48 2,25 -6,95 - 0,00 0,00 -24,06

86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2672,04 -79,53 2,26 -6,67 - 0,00 0,00 -20,20

99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2657,51 -79,48 2,25 -6,96 - 0,00 0,00 -24,06

87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2671,14 -79,53 2,26 -6,68 - 0,00 0,00 -20,19

100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2656,77 -79,48 2,25 -6,96 - 0,00 0,00 -24,05

88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2670,38 -79,52 2,26 -6,69 - 0,00 0,00 -20,19

101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2656,02 -79,48 2,25 -6,97 - 0,00 0,00 -24,05

89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2669,63 -79,52 2,26 -6,69 - 0,00 0,00 -20,19

160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 2674,25 -79,54 1,50 -5,44 -8,56 0,34 0,00 10,47

71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 2666,73 -79,51 1,23 -5,47 -6,72 0,00 0,00 -1,48

73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 2666,74 -79,51 1,23 -5,47 -6,72 0,00 0,00 2,52

78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2655,96 -79,48 2,27 -7,02 - 0,00 0,00 -24,77

131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2655,21 -79,47 2,27 -7,03 - 0,00 0,00 -24,77

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2654,46 -79,47 2,27 -7,04 - 0,00 0,00 -24,77

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2653,53 -79,47 2,27 -7,05 - 0,00 0,00 -24,77

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.33 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2652,78 -79,47 2,27 -7,06 - 0,00 0,00 -24,76

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2652,03 -79,46 2,27 -7,07 - 0,00 0,00 -24,76

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2651,14 -79,46 2,27 -7,08 - 0,00 0,00 -24,76

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2650,39 -79,46 2,27 -7,09 - 0,00 0,00 -24,76

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2649,65 -79,46 2,27 -7,10 - 0,00 0,00 -24,75

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2648,72 -79,45 2,27 -7,11 - 0,00 0,00 -24,75

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2647,97 -79,45 2,27 -7,12 - 0,00 0,00 -24,75

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2647,22 -79,45 2,27 -7,13 - 0,00 0,00 -24,75

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2646,30 -79,44 2,27 -7,14 - 0,00 0,00 -24,74

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2645,55 -79,44 2,27 -7,15 - 0,00 0,00 -24,74

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2644,81 -79,44 2,27 -7,16 - 0,00 0,00 -24,74

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2643,88 -79,44 2,27 -7,17 - 0,00 0,00 -24,74

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2643,13 -79,43 2,27 -7,18 - 0,00 0,00 -24,73

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2642,39 -79,43 2,27 -7,19 - 0,00 0,00 -24,73

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2641,49 -79,43 2,27 -7,20 - 0,00 0,00 -24,73

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2640,75 -79,43 2,26 -7,21 - 0,00 0,00 -24,73

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2640,01 -79,42 2,26 -7,22 - 0,00 0,00 -24,72

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2639,08 -79,42 2,26 -7,23 - 0,00 0,00 -24,72

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2638,33 -79,42 2,26 -7,24 - 0,00 0,00 -24,72

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2637,59 -79,42 2,26 -7,25 - 0,00 0,00 -24,72

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2636,70 -79,41 2,26 -7,26 - 0,00 0,00 -24,72

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2635,95 -79,41 2,26 -7,27 - 0,00 0,00 -24,71

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2635,20 -79,41 2,26 -7,28 - 0,00 0,00 -24,71

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2634,28 -79,41 2,26 -7,29 - 0,00 0,00 -24,71

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.34 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2633,53 -79,40 2,26 -7,30 - 0,00 0,00 -24,71

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2632,79 -79,40 2,26 -7,31 - 0,00 0,00 -24,70

70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2649,63 -79,46 1,22 -5,56 -6,62 0,00 0,00 2,58

76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2667,11 -79,51 2,29 -6,83 - 0,00 0,00 -21,61

102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2666,37 -79,51 2,29 -6,84 - 0,00 0,00 -21,60

103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2665,63 -79,51 2,29 -6,85 - 0,00 0,00 -21,60

104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2664,71 -79,51 2,29 -6,86 - 0,00 0,00 -21,60

105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2663,97 -79,50 2,29 -6,86 - 0,00 0,00 -21,60

106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2663,23 -79,50 2,29 -6,87 - 0,00 0,00 -21,59

107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2662,32 -79,50 2,29 -6,88 - 0,00 0,00 -21,59

108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2661,58 -79,49 2,29 -6,89 - 0,00 0,00 -21,59

109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2660,84 -79,49 2,29 -6,90 - 0,00 0,00 -21,59

110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2659,91 -79,49 2,29 -6,91 - 0,00 0,00 -21,58

111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2659,17 -79,49 2,29 -6,92 - 0,00 0,00 -21,58

112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2658,43 -79,48 2,29 -6,93 - 0,00 0,00 -21,58

113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2657,53 -79,48 2,29 -6,94 - 0,00 0,00 -21,57

114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2656,79 -79,48 2,29 -6,95 - 0,00 0,00 -21,57

115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2656,05 -79,48 2,29 -6,95 - 0,00 0,00 -21,57

116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2655,13 -79,47 2,29 -6,97 - 0,00 0,00 -21,57

117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2654,39 -79,47 2,29 -6,97 - 0,00 0,00 -21,56

118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2653,65 -79,47 2,29 -6,98 - 0,00 0,00 -21,56

119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2652,71 -79,47 2,29 -6,99 - 0,00 0,00 -21,56

120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2651,97 -79,46 2,29 -7,00 - 0,00 0,00 -21,56

121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2651,23 -79,46 2,29 -7,01 - 0,00 0,00 -21,55

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.35 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2650,33 -79,46 2,29 -7,02 - 0,00 0,00 -21,55

123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2649,59 -79,46 2,29 -7,03 - 0,00 0,00 -21,55

124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2648,85 -79,45 2,29 -7,04 - 0,00 0,00 -21,55

125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2647,94 -79,45 2,29 -7,05 - 0,00 0,00 -21,54

126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2647,20 -79,45 2,29 -7,06 - 0,00 0,00 -21,54

127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2646,45 -79,45 2,29 -7,07 - 0,00 0,00 -21,54

128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2645,56 -79,44 2,29 -7,08 - 0,00 0,00 -21,54

129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2644,83 -79,44 2,29 -7,09 - 0,00 0,00 -21,53

130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2644,08 -79,44 2,29 -7,10 - 0,00 0,00 -21,53

72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2649,62 -79,46 1,22 -5,56 -6,62 0,00 0,00 2,58

161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 2676,70 -79,54 1,48 -5,44 -8,56 0,00 0,00 5,50

28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 2708,88 -79,65 -4,80 -0,49 - 2,53 0,00 -3,45

23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 2730,50 -79,72 1,76 -4,55 -3,62 0,00 0,00 4,09

24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 2727,52 -79,71 3,09 - -1,24 0,00 0,00 -11,34

1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 2735,51 -79,73 1,33 - -3,52 0,00 0,00 -12,86

25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 2708,02 -79,65 1,53 -5,26 -8,74 2,17 0,00 3,41

26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 2694,88 -79,60 1,53 -5,31 -8,68 1,76 0,00 4,49

58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 2650,96 -79,46 -4,80 -0,72 - 2,54 0,00 -3,25

31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 2672,62 -79,53 1,68 -4,58 -3,51 0,00 0,00 4,28

53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 2669,69 -79,52 3,06 - -1,24 0,00 0,00 -11,22

30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 2677,49 -79,55 1,28 - -3,49 0,00 0,00 -12,71

54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 2650,07 -79,46 1,50 -5,52 -8,46 1,05 0,00 2,47

55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 2636,96 -79,41 1,49 -5,60 -8,39 0,33 0,00 3,23

186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2786,85 -79,89 -4,80 -9,81 -6,57 0,00 0,00 -28,06

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.36 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2785,32 -79,89 -4,80 -9,96 -6,57 0,00 0,00 -28,21

188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2783,80 -79,88 -4,80 - -6,57 0,00 0,00 -28,36

176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 2793,34 -79,91 -4,80 -8,12 -6,59 0,00 0,00 -28,41

210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 2795,65 -79,92 0,51 - -4,80 0,00 0,00 -21,05

209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 2796,38 -79,92 0,51 - -4,79 0,00 0,00 -21,05

189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 2756,48 -79,80 -4,80 -0,13 -6,50 0,00 0,00 -13,22

182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 2793,68 -79,92 -4,80 - -6,59 0,00 0,00 -33,48

177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 2759,09 -79,81 -4,80 -0,06 -6,51 0,00 0,00 -10,16

179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 2763,04 -79,82 -4,80 -0,06 -6,52 0,00 0,00 -10,18

178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 2761,06 -79,81 -4,80 -0,06 -6,51 0,00 0,00 -10,17

174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 2759,23 -79,81 2,01 -8,10 - 0,00 0,00 -36,04

180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 2780,53 -79,87 2,03 - - 0,00 0,00 -47,51

181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2782,37 -79,88 2,50 - - 0,00 0,00 -54,23

184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 2772,28 -79,85 2,04 - - 0,00 0,00 -33,02

185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2770,90 -79,84 2,50 - - 0,00 0,00 -45,94

183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 2794,01 -79,92 2,06 - - 0,00 0,00 -52,85

175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 2775,68 -79,86 1,89 -5,01 - 0,00 0,00 -29,18

207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2794,38 -79,92 0,52 - -4,18 2,54 0,00 -10,16

208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2791,91 -79,91 0,52 - -4,16 2,54 0,00 -10,47

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.37 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 5 Station Fence West Ld = 59,2 dB(A) Ln = 59,2 dB(A)

203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 157,11 -54,92 3,00 - -0,29 0,00 0,00 23,61

204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 154,95 -54,80 3,00 - -0,28 1,99 0,00 25,34

205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 147,71 -54,38 3,00 0,00 -0,38 2,60 0,00 37,84

206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 150,73 -54,56 3,00 0,00 -0,39 2,59 0,00 37,65

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 129,61 -53,25 3,00 -6,16 -1,01 0,00 0,00 28,59

11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 131,51 -53,37 3,00 - -0,16 0,00 0,00 22,58

12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 141,28 -53,99 3,00 -7,34 -0,53 0,00 0,00 27,13

13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 143,09 -54,10 3,00 -7,60 -0,58 0,00 0,00 26,72

5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 139,74 -53,90 3,00 - -0,11 0,00 0,00 20,85

4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 133,70 -53,51 3,91 -8,65 -0,18 0,00 0,00 13,64

3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 144,69 -54,20 3,34 - -0,47 0,00 0,00 6,26

6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 139,73 -53,90 3,17 -9,15 -0,05 0,00 0,00 21,06

22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 131,58 -53,38 3,88 0,00 -0,96 0,00 0,00 21,61

21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 139,27 -53,87 3,99 0,00 -0,79 0,00 0,00 20,35

7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 147,67 -54,38 4,10 - -0,49 0,00 0,00 2,66

18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 129,08 -53,21 3,84 0,00 -0,94 0,00 0,00 21,75

19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 124,23 -52,88 3,75 0,00 -0,92 0,00 0,00 22,03

15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 130,40 -53,30 3,85 0,00 -0,74 0,00 0,00 20,83

16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 123,07 -52,79 3,72 0,00 -0,71 0,00 0,00 21,24

17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 126,05 -53,00 3,00 0,00 -0,34 0,00 0,00 30,66

2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 139,85 -53,91 3,08 - -0,19 0,00 0,00 7,47

20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 131,55 -53,37 3,07 0,00 -0,30 0,00 0,00 19,23

14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 126,77 -53,05 3,07 -0,18 -0,29 0,00 0,00 20,11

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.38 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 135,87 -53,65 3,00 -5,36 -0,26 0,00 0,00 13,87

29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 142,71 -54,08 3,00 0,00 -0,22 0,00 0,00 28,70

27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 126,64 -53,04 3,00 0,00 -0,83 0,04 0,00 29,16

9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 136,23 -53,68 3,00 -6,31 -0,34 0,00 0,00 38,81

40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 201,13 -57,06 3,00 -7,32 -0,75 0,00 0,00 23,87

41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 202,37 -57,11 3,00 -7,88 -0,59 0,00 0,00 23,42

42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 213,28 -57,57 3,00 -5,76 -1,40 0,00 0,00 24,27

43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 214,46 -57,62 3,00 - -0,19 0,00 0,00 19,67

35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 209,90 -57,43 3,53 - -0,17 3,22 0,00 12,80

34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 203,45 -57,16 4,63 - -0,28 0,00 0,00 2,49

33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 215,15 -57,65 4,21 - -0,88 0,00 0,00 -2,43

36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 209,89 -57,43 4,11 - -0,10 1,75 0,00 12,69

52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 204,62 -57,21 4,64 0,00 -1,31 0,00 0,00 18,18

51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 212,49 -57,54 4,68 0,00 -1,16 0,00 0,00 17,00

37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 218,28 -57,77 4,72 - -0,89 0,00 0,00 -5,63

48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 199,53 -56,99 4,60 - -0,17 0,00 0,00 9,02

49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 196,39 -56,85 4,58 0,00 -1,28 0,00 0,00 18,52

45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 200,39 -57,03 4,60 - -0,60 0,00 0,00 1,44

46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 195,65 -56,82 4,57 0,00 -1,08 0,00 0,00 17,69

47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 197,56 -56,91 3,49 -5,88 -0,10 1,00 0,00 22,60

32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 209,48 -57,42 3,20 - -0,26 0,00 0,00 -4,28

50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 203,55 -57,17 3,11 0,00 -0,46 0,00 0,00 15,32

44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 198,08 -56,93 3,24 -3,02 -0,42 0,00 0,00 13,43

38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 207,35 -57,33 3,00 -5,63 -0,39 0,00 0,00 9,80

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.39 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 212,03 -57,52 3,00 - -0,15 2,63 0,00 17,21

56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 197,61 -56,91 3,00 -9,33 -0,59 1,14 0,00 17,31

39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 207,76 -57,34 3,00 -6,41 -0,54 0,00 0,00 34,85

196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 250,81 -58,98 4,50 - -1,08 0,00 0,00 -13,15

197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 244,59 -58,76 4,46 - -1,12 0,00 0,00 -13,52

198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 234,96 -58,41 4,40 - -1,09 0,00 0,00 -25,17

199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 230,57 -58,25 4,37 - -1,12 0,00 0,00 -17,58

200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 225,53 -58,06 4,33 - -1,11 0,00 0,00 -31,41

201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 219,85 -57,83 4,29 - -1,15 0,00 0,00 -17,74

190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 205,65 -57,25 4,17 -6,01 -0,97 0,00 0,00 0,82

192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 212,68 -57,55 4,24 - -0,90 0,00 0,00 -21,29

193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 217,20 -57,73 4,27 -4,90 -1,04 0,00 0,00 -0,29

194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 221,24 -57,89 4,30 -3,94 -1,08 0,00 0,00 -8,25

195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 232,46 -58,32 4,37 -1,09 -1,35 0,00 0,00 7,10

202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 206,56 -57,29 4,18 - -0,95 0,00 0,00 -6,96

191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 227,32 -58,12 3,42 -5,87 -1,34 0,00 0,00 8,08

59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 188,90 -56,52 5,05 0,00 -1,14 0,00 0,00 24,39

60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 181,47 -56,17 5,01 0,00 -1,11 0,00 0,00 24,73

61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 174,11 -55,81 4,97 0,00 -1,07 0,00 0,00 25,09

65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 100,44 -51,03 3,09 -3,74 -0,31 0,00 0,00 17,34

66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 96,76 -50,71 3,28 - -0,40 0,00 0,00 4,32

63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 103,12 -51,26 3,08 -3,39 -0,31 0,00 0,00 14,32

64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 103,17 -51,26 3,39 - -0,24 0,00 0,00 -6,73

68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 94,53 -50,50 3,00 0,00 -0,29 0,00 0,00 21,70

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.40 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 97,48 -50,77 3,00 -4,72 -0,29 0,00 0,00 13,47

67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,00 98,83 -50,89 -3,78 - -0,23 0,00 0,00 5,44

69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,00 98,52 -50,86 -3,77 0,00 -0,23 0,00 0,00 19,14

162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 136,49 -53,69 3,07 -1,49 -0,92 0,01 0,00 35,65

163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 134,09 -53,54 3,05 -1,82 -0,90 0,01 0,00 35,47

164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 131,71 -53,38 3,03 -2,21 -0,87 0,01 0,00 35,24

74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 140,46 -53,94 3,41 0,00 -0,83 0,63 0,00 50,63

75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 149,72 -54,50 3,53 0,00 -0,88 0,53 0,00 47,19

165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 76,62 -48,68 3,04 - -0,13 0,00 0,00 18,03

167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 74,05 -48,38 3,03 - -0,13 0,00 0,00 21,08

170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 68,74 -47,74 3,00 0,00 -0,16 0,00 0,00 33,88

171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 67,89 -47,63 3,00 0,00 -0,38 0,00 0,00 28,85

168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 66,56 -47,46 3,00 0,00 -0,16 0,00 0,00 32,45

173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 77,31 -48,76 3,00 -6,05 -0,06 0,01 0,00 38,15

166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 71,37 -48,06 3,00 -4,73 -0,17 0,00 0,00 28,70

169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,00 65,96 -47,38 -3,49 0,00 -0,16 0,00 0,00 30,98

172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,00 70,78 -47,99 -3,52 0,00 -0,17 0,00 0,00 30,32

90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 131,86 -53,39 3,12 0,00 -3,62 0,00 0,00 32,42

77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 127,28 -53,09 3,09 0,00 -3,53 2,09 0,00 38,80

91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 132,77 -53,45 3,13 0,00 -3,64 0,00 0,00 32,35

79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 128,23 -53,15 3,09 0,00 -3,56 1,88 0,00 38,51

92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 133,68 -53,51 3,13 0,00 -3,67 0,00 0,00 32,27

80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 129,20 -53,22 3,09 0,00 -3,58 1,90 0,00 38,43

93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 134,79 -53,59 3,13 0,00 -3,69 0,00 0,00 32,17

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.41 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 130,29 -53,29 3,09 0,00 -3,61 1,91 0,00 38,35

94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 135,70 -53,64 3,14 0,00 -3,72 0,00 0,00 32,09

82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 131,24 -53,35 3,10 0,00 -3,64 1,92 0,00 38,28

95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 136,61 -53,70 3,14 0,00 -3,74 0,00 0,00 32,01

83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 132,21 -53,42 3,10 0,00 -3,66 1,93 0,00 38,20

96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 137,73 -53,77 3,15 0,00 -3,77 0,00 0,00 31,92

84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 133,34 -53,49 3,10 0,00 -3,69 1,95 0,00 38,12

97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 138,65 -53,83 3,15 0,00 -3,79 0,00 0,00 31,84

85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 134,29 -53,55 3,10 0,00 -3,72 1,96 0,00 38,04

98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 139,55 -53,89 3,15 0,00 -3,82 0,04 0,00 31,80

86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 135,26 -53,62 3,11 0,00 -3,74 1,97 0,00 37,97

99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 140,67 -53,96 3,16 0,00 -3,84 0,13 0,00 31,80

87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 136,39 -53,69 3,11 0,00 -3,77 1,99 0,00 37,89

100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 141,59 -54,01 3,16 0,00 -3,87 0,13 0,00 31,72

88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 137,34 -53,75 3,11 0,00 -3,79 2,00 0,00 37,82

101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 142,50 -54,07 3,16 0,00 -3,89 0,13 0,00 31,65

89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 138,31 -53,81 3,12 0,00 -3,82 2,01 0,00 37,74

160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 136,54 -53,70 3,34 0,00 -0,81 0,59 0,00 51,59

71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 134,77 -53,58 3,00 0,00 -1,69 0,60 0,00 37,33

73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 134,77 -53,58 3,00 0,00 -1,69 0,60 0,00 41,33

78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 143,22 -54,11 3,19 0,00 -3,91 0,07 0,00 30,83

131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 144,14 -54,17 3,20 0,00 -3,93 0,21 0,00 30,90

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 145,05 -54,22 3,20 0,00 -3,96 1,10 0,00 31,72

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 146,19 -54,29 3,21 0,00 -3,98 1,49 0,00 32,01

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.42 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 147,11 -54,34 3,21 0,00 -4,01 1,50 0,00 31,95

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 148,03 -54,40 3,22 0,00 -4,03 1,50 0,00 31,88

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 149,14 -54,46 3,22 0,00 -4,06 1,51 0,00 31,80

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 150,06 -54,52 3,22 0,00 -4,08 1,52 0,00 31,74

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 150,98 -54,57 3,23 0,00 -4,11 1,53 0,00 31,67

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 152,12 -54,64 3,23 0,00 -4,13 1,54 0,00 31,59

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 153,04 -54,69 3,24 0,00 -4,16 1,54 0,00 31,53

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 153,96 -54,74 3,24 0,00 -4,18 1,55 0,00 31,46

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 155,09 -54,80 3,25 0,00 -4,21 1,56 0,00 31,38

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 156,01 -54,86 3,25 0,00 -4,23 1,56 0,00 31,32

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 156,94 -54,91 3,26 0,00 -4,26 1,57 0,00 31,26

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 158,08 -54,97 3,26 0,00 -4,28 1,58 0,00 31,18

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 159,00 -55,02 3,27 0,00 -4,31 1,59 0,00 31,12

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 159,92 -55,07 3,27 0,00 -4,33 1,59 0,00 31,05

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 161,04 -55,13 3,28 0,00 -4,36 1,60 0,00 30,98

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 161,97 -55,18 3,28 0,00 -4,38 1,61 0,00 30,92

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 162,89 -55,23 3,29 0,00 -4,41 1,61 0,00 30,85

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 164,03 -55,29 3,29 0,00 -4,43 1,62 0,00 30,78

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 164,96 -55,34 3,30 0,00 -4,46 1,63 0,00 30,72

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 165,88 -55,39 3,30 0,00 -4,48 1,63 0,00 30,65

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 167,01 -55,45 3,30 0,00 -4,51 1,64 0,00 30,58

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 167,94 -55,49 3,31 0,00 -4,53 1,65 0,00 30,52

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 168,86 -55,54 3,31 0,00 -4,56 1,65 0,00 30,46

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 170,01 -55,60 3,32 0,00 -4,58 1,66 0,00 30,38

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.43 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 170,93 -55,65 3,32 0,00 -4,61 1,67 0,00 30,32

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 171,86 -55,70 3,33 0,00 -4,63 1,67 0,00 30,27

70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 155,10 -54,80 3,00 0,00 -1,84 0,79 0,00 40,15

76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 139,69 -53,90 3,17 0,00 -3,86 2,01 0,00 36,26

102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 140,63 -53,95 3,17 0,00 -3,88 2,02 0,00 36,19

103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 141,57 -54,01 3,18 0,00 -3,90 2,03 0,00 36,12

104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 142,73 -54,08 3,18 0,00 -3,93 2,05 0,00 36,04

105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 143,67 -54,14 3,19 0,00 -3,96 2,06 0,00 35,97

106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 144,61 -54,20 3,19 0,00 -3,98 2,07 0,00 35,91

107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 145,75 -54,26 3,20 0,00 -4,01 2,08 0,00 35,83

108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 146,69 -54,32 3,20 0,00 -4,04 2,09 0,00 35,76

109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 147,64 -54,38 3,20 0,00 -4,06 2,10 0,00 35,70

110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 148,79 -54,44 3,21 0,00 -4,09 2,12 0,00 35,62

111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 149,73 -54,50 3,21 0,00 -4,12 2,13 0,00 35,55

112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 150,68 -54,55 3,22 0,00 -4,14 2,14 0,00 35,49

113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 151,82 -54,62 3,22 0,00 -4,17 1,04 0,00 34,31

114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 152,77 -54,67 3,22 0,00 -4,19 0,95 0,00 34,14

115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 153,71 -54,73 3,23 0,00 -4,22 0,86 0,00 33,98

116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 154,87 -54,79 3,23 0,00 -4,25 0,75 0,00 33,78

117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 155,81 -54,84 3,24 0,00 -4,27 0,76 0,00 33,71

118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 156,76 -54,90 3,24 0,00 -4,30 0,77 0,00 33,64

119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 157,92 -54,96 3,25 0,00 -4,33 0,77 0,00 33,56

120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 158,86 -55,01 3,25 0,00 -4,35 0,78 0,00 33,50

121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 159,80 -55,06 3,26 0,00 -4,37 0,08 0,00 32,73

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.44 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 160,94 -55,13 3,26 0,00 -4,40 0,00 0,00 32,56

123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 161,88 -55,18 3,27 0,00 -4,43 0,00 0,00 32,49

124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 162,83 -55,23 3,27 0,00 -4,45 0,00 0,00 32,42

125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 163,99 -55,29 3,28 0,00 -4,48 0,00 0,00 32,33

126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 164,93 -55,34 3,28 0,00 -4,51 0,00 0,00 32,26

127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 165,88 -55,39 3,28 0,00 -4,53 0,00 0,00 32,19

128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 167,01 -55,45 3,29 0,00 -4,56 0,00 0,00 32,11

129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 167,96 -55,50 3,29 0,00 -4,58 0,00 0,00 32,04

130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 168,90 -55,54 3,30 0,00 -4,61 0,00 0,00 31,97

72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 155,10 -54,80 3,00 0,00 -1,84 0,79 0,00 40,15

161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 124,43 -52,89 3,20 0,00 -0,75 0,60 0,00 47,72

28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 129,28 -53,22 -4,20 0,00 -0,53 0,00 0,00 32,06

23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 120,57 -52,62 3,00 -3,88 -0,43 0,00 0,00 36,29

24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 122,72 -52,77 3,07 0,00 -1,18 2,41 0,00 38,75

1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 123,02 -52,79 3,00 0,00 -0,50 2,18 0,00 43,88

25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 126,16 -53,01 3,15 0,00 -0,77 0,93 0,00 43,66

26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 135,92 -53,66 3,35 0,00 -0,82 0,50 0,00 44,18

58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 202,87 -57,14 -4,44 0,00 -0,83 0,00 0,00 27,61

31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 191,34 -56,63 3,00 -4,42 -0,80 0,00 0,00 31,36

53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 194,20 -56,76 4,15 -6,03 -0,95 7,57 0,00 35,20

30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 193,14 -56,71 3,20 - -0,34 9,46 0,00 33,42

54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 200,27 -57,02 4,20 0,00 -1,14 1,03 0,00 40,44

55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 210,07 -57,44 4,29 0,00 -1,18 0,46 0,00 40,93

186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 166,43 -55,42 -4,35 0,00 -0,39 0,00 0,00 12,85

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.45 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 167,70 -55,48 -4,35 0,00 -0,40 0,00 0,00 12,78

188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 168,99 -55,55 -4,36 0,00 -0,40 0,00 0,00 12,71

176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,00 169,95 -55,60 -3,59 -1,89 -0,40 0,00 0,00 9,53

210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 170,25 -55,61 3,00 -8,04 -0,33 1,14 0,00 27,16

209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 171,18 -55,66 3,00 -8,40 -0,33 1,20 0,00 26,80

189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 194,23 -56,76 -4,42 -1,00 -0,46 0,00 0,00 15,38

182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 177,87 -55,99 -4,22 - -0,42 0,00 0,00 -2,98

177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 197,05 -56,88 -3,77 -1,09 -0,46 0,00 0,00 18,80

179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 201,15 -57,06 -3,79 -0,99 -0,47 0,00 0,00 18,69

178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 199,09 -56,97 -3,78 -1,14 -0,47 0,00 0,00 18,64

174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 199,96 -57,01 3,58 - -0,97 0,00 0,00 -15,12

180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 188,76 -56,51 3,46 - -0,93 0,00 0,00 -9,70

181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 187,33 -56,44 4,46 - -3,62 0,00 0,00 -11,18

184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 178,41 -56,02 3,31 -1,35 -1,06 0,00 0,00 11,10

185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 180,43 -56,12 4,41 -3,37 -3,61 0,00 0,00 9,69

183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 168,90 -55,54 3,43 -9,07 -0,73 0,00 0,00 -1,00

175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 183,40 -56,26 3,00 -4,82 -1,12 0,00 0,00 5,82

207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 108,99 -51,74 3,00 0,00 -0,28 2,49 0,00 40,47

208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 110,83 -51,89 3,00 0,00 -0,29 2,49 0,00 40,32

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.46 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 6 Station Fence South Ld = 54,8 dB(A) Ln = 54,8 dB(A)

203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 405,33 -63,15 4,66 - -0,71 0,00 0,00 11,16

204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 408,16 -63,21 4,67 - -0,72 0,00 0,00 11,14

205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 409,11 -63,23 4,67 - -0,73 0,00 0,00 13,88

206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 411,80 -63,29 4,68 - -0,74 0,00 0,00 13,52

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 285,23 -60,10 2,99 -4,90 -2,38 0,00 0,00 21,62

11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 289,80 -60,23 2,99 -4,95 -2,33 0,00 0,00 21,49

12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 280,42 -59,95 2,99 -4,90 -2,37 0,00 0,00 21,77

13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 285,52 -60,10 2,99 -5,02 -2,31 0,00 0,00 21,56

5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 295,55 -60,40 4,24 - -0,21 0,00 0,00 10,18

4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 298,14 -60,48 5,06 - -0,31 0,00 0,00 0,06

3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 293,53 -60,35 4,68 - -1,18 0,00 0,00 -5,53

6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 295,55 -60,40 4,66 - -0,10 0,00 0,00 11,49

22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 273,88 -59,74 4,98 0,00 -1,57 0,00 0,00 15,73

21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 270,77 -59,64 4,96 0,00 -1,44 0,00 0,00 14,89

7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 292,39 -60,31 5,04 - -1,18 0,00 0,00 -8,79

18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 294,05 -60,36 5,05 - -0,25 0,00 0,00 3,69

19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 282,67 -60,02 5,01 -9,87 -0,27 0,00 0,00 6,92

15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 296,79 -60,44 5,05 - -0,92 0,00 0,00 -3,01

16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 279,51 -59,92 4,99 - -0,98 0,00 0,00 4,74

17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 287,22 -60,16 4,27 -9,08 -0,09 0,00 0,00 15,94

2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 295,66 -60,41 3,48 - -0,33 0,00 0,00 -4,94

20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 274,24 -59,75 3,48 0,00 -0,61 0,00 0,00 12,95

14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 288,37 -60,19 3,50 - -0,39 0,00 0,00 1,93

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.47 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 284,49 -60,07 2,99 -4,77 -0,59 0,00 0,00 7,70

29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 300,16 -60,54 3,59 - -0,19 0,00 0,00 5,78

27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 290,12 -60,24 2,99 - -0,76 0,00 0,00 8,59

9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 284,75 -60,08 2,99 -4,80 -0,83 0,00 0,00 33,43

40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 264,22 -59,43 2,99 -4,90 -2,19 0,00 0,00 22,47

41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 269,15 -59,59 2,99 -4,94 -2,10 0,00 0,00 22,36

42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 262,61 -59,38 2,99 -4,94 -2,20 0,00 0,00 22,48

43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 268,03 -59,56 2,99 -5,01 -2,11 0,00 0,00 22,32

35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 276,91 -59,84 4,12 - -0,19 0,00 0,00 10,17

34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 277,85 -59,87 4,99 - -0,26 0,00 0,00 1,36

33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 276,25 -59,82 4,60 - -0,91 0,00 0,00 -1,42

36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 276,91 -59,84 4,57 - -0,09 0,00 0,00 11,61

52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 253,71 -59,08 4,90 0,00 -1,50 0,00 0,00 16,38

51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 252,73 -59,05 4,89 0,00 -1,36 0,00 0,00 15,50

37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 275,92 -59,81 4,98 - -0,85 0,00 0,00 -1,36

48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 272,78 -59,71 4,97 -8,63 -0,31 0,00 0,00 8,40

49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 260,46 -59,31 4,92 -7,08 -0,48 0,00 0,00 10,13

45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 275,75 -59,80 4,98 - -0,91 0,00 0,00 3,33

46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 257,02 -59,19 4,90 -6,52 -1,14 0,00 0,00 9,07

47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 265,39 -59,47 4,13 -6,28 -0,15 0,00 0,00 19,24

32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 277,08 -59,84 3,38 - -0,32 0,00 0,00 -3,10

50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 253,91 -59,09 3,38 0,00 -0,57 0,00 0,00 13,57

44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 266,56 -59,51 3,39 -7,59 -0,43 0,00 0,00 6,42

38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 265,55 -59,47 2,99 -4,72 -0,54 0,00 0,00 8,40

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.48 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 281,52 -59,98 3,43 - -0,18 0,00 0,00 8,47

56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 268,27 -59,56 2,99 -7,07 -0,94 0,00 0,00 15,42

39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 265,68 -59,48 2,99 -4,83 -0,77 0,00 0,00 34,05

196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 353,54 -61,96 4,91 0,00 -1,98 0,00 0,00 2,91

197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 365,52 -62,25 4,96 - -1,62 0,00 0,00 -17,07

198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 368,28 -62,32 4,97 - -1,73 0,00 0,00 -30,86

199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 370,20 -62,36 4,97 - -1,82 0,00 0,00 -23,16

200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 371,06 -62,38 4,98 - -1,58 0,00 0,00 -31,69

201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 372,23 -62,41 4,98 - -1,58 0,00 0,00 -19,15

190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 350,85 -61,89 4,91 0,00 -1,97 0,00 0,00 1,92

192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 349,83 -61,87 4,91 -2,26 -1,82 0,00 0,00 -11,23

193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 349,44 -61,86 4,90 0,00 -1,96 0,00 0,00 0,19

194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 347,91 -61,82 4,91 - -1,46 0,00 0,00 -19,14

195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 345,10 -61,75 4,90 -5,91 -1,86 0,00 0,00 -1,14

202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 363,05 -62,19 4,95 - -1,47 0,00 0,00 -8,83

191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 358,08 -62,07 4,36 -8,26 -1,96 0,00 0,00 2,08

59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 134,46 -53,56 4,65 0,00 -0,88 0,00 0,00 27,21

60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 139,91 -53,91 4,71 0,00 -0,90 0,00 0,00 26,89

61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 145,77 -54,27 4,76 0,00 -0,93 0,00 0,00 26,56

65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 217,40 -57,74 3,62 0,00 -0,65 0,00 0,00 14,56

66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 221,52 -57,90 4,69 0,00 -1,67 0,00 0,00 12,53

63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 215,66 -57,67 3,47 0,00 -0,64 0,00 0,00 11,36

64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 215,62 -57,67 4,68 0,00 -0,64 0,00 0,00 3,16

68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 223,78 -57,99 3,76 -4,36 -0,67 0,00 0,00 10,23

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.49 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 222,06 -57,92 3,36 -4,73 -0,66 0,00 0,00 6,29

67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 219,39 -57,82 -4,38 0,00 -0,52 0,00 0,00 11,30

69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 220,43 -57,86 -4,38 - -0,52 0,00 0,00 0,10

162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 181,68 -56,18 3,76 0,00 -1,25 0,00 0,00 35,00

163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 183,85 -56,28 3,79 0,00 -1,26 0,00 0,00 34,91

164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 186,03 -56,38 3,81 0,00 -1,27 0,00 0,00 34,82

74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 240,12 -58,60 4,49 0,00 -1,32 1,19 0,00 47,12

75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 236,74 -58,48 4,47 0,00 -1,30 1,07 0,00 44,27

165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 312,55 -60,89 4,77 0,00 -0,73 0,00 0,00 20,24

167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 319,51 -61,08 4,81 - -0,52 0,00 0,00 7,93

170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 312,79 -60,90 4,78 0,00 -0,73 0,00 0,00 21,93

171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 313,73 -60,92 5,07 0,00 -1,25 0,00 0,00 16,76

168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 319,96 -61,09 4,81 - -0,56 0,00 0,00 8,87

173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 312,09 -60,88 4,26 0,00 -0,55 2,51 0,00 35,35

166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 316,20 -60,99 4,14 -4,69 -0,73 0,00 0,00 16,40

169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 319,18 -61,07 -4,58 - -0,75 0,00 0,00 4,60

172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 311,65 -60,87 -4,56 0,00 -0,74 0,00 0,00 15,85

90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 206,87 -57,31 3,43 0,00 -5,50 0,00 0,00 26,94

77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 225,84 -58,07 3,42 0,00 -6,05 0,00 0,00 29,55

91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 206,36 -57,28 3,42 0,00 -5,49 0,00 0,00 26,97

79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 225,36 -58,05 3,42 0,00 -6,04 0,00 0,00 29,58

92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 205,86 -57,26 3,42 0,00 -5,47 0,00 0,00 27,00

80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 224,92 -58,03 3,42 0,00 -6,03 0,00 0,00 29,60

93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 205,27 -57,24 3,42 0,00 -5,46 0,00 0,00 27,04

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.50 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 224,34 -58,01 3,41 0,00 -6,01 0,00 0,00 29,64

94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 204,77 -57,22 3,42 0,00 -5,45 0,00 0,00 27,07

82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 223,87 -57,99 3,41 0,00 -6,00 0,00 0,00 29,67

95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 204,28 -57,20 3,42 0,00 -5,43 0,00 0,00 27,10

83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 223,45 -57,98 3,41 0,00 -5,99 0,00 0,00 29,69

96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 203,67 -57,17 3,41 0,00 -5,42 0,00 0,00 27,14

84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 222,92 -57,96 3,41 0,00 -5,98 0,00 0,00 29,72

97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 203,19 -57,15 3,41 0,00 -5,41 0,00 0,00 27,17

85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 222,46 -57,94 3,41 0,00 -5,96 0,00 0,00 29,75

98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 202,71 -57,13 3,41 0,00 -5,40 0,00 0,00 27,20

86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 222,05 -57,92 3,41 0,00 -5,95 0,00 0,00 29,78

99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 202,13 -57,10 3,41 0,00 -5,38 0,00 0,00 27,23

87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 221,51 -57,90 3,40 0,00 -5,94 0,00 0,00 29,81

100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 201,66 -57,08 3,41 0,00 -5,37 0,00 0,00 27,26

88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 221,06 -57,88 3,40 0,00 -5,93 0,00 0,00 29,84

101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 201,19 -57,06 3,40 0,00 -5,36 0,00 0,00 27,29

89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 220,66 -57,87 3,40 0,00 -5,92 0,00 0,00 29,86

160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 235,06 -58,42 4,46 0,00 -1,30 0,92 0,00 47,83

71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 212,86 -57,55 2,99 0,00 -2,22 0,00 0,00 32,22

73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 212,83 -57,55 2,99 0,00 -2,22 0,00 0,00 36,22

78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 201,80 -57,09 3,48 0,00 -5,37 0,00 0,00 26,60

131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 201,34 -57,07 3,47 0,00 -5,36 0,00 0,00 26,63

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 200,89 -57,05 3,47 0,00 -5,35 0,00 0,00 26,66

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 200,32 -57,03 3,47 0,00 -5,34 0,00 0,00 26,70

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.51 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 199,87 -57,01 3,47 0,00 -5,33 0,00 0,00 26,72

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 199,43 -56,99 3,46 0,00 -5,32 0,00 0,00 26,75

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 198,91 -56,97 3,46 0,00 -5,30 0,00 0,00 26,79

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 198,47 -56,95 3,46 0,00 -5,29 0,00 0,00 26,81

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 198,04 -56,93 3,46 0,00 -5,28 0,00 0,00 26,84

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 197,50 -56,90 3,45 0,00 -5,27 0,00 0,00 26,88

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 197,08 -56,88 3,45 0,00 -5,26 0,00 0,00 26,90

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 196,66 -56,87 3,45 0,00 -5,25 0,00 0,00 26,93

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 196,13 -56,84 3,45 0,00 -5,23 0,00 0,00 26,96

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 195,71 -56,82 3,45 0,00 -5,22 0,00 0,00 26,99

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 195,31 -56,81 3,44 0,00 -5,21 0,00 0,00 27,02

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,79 -56,78 3,44 0,00 -5,20 0,00 0,00 27,05

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,39 -56,77 3,44 0,00 -5,19 0,00 0,00 27,07

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,00 -56,75 3,44 0,00 -5,18 0,00 0,00 27,10

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 193,54 -56,73 3,43 0,00 -5,17 0,00 0,00 27,13

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 193,15 -56,71 3,43 0,00 -5,16 0,00 0,00 27,15

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 192,77 -56,69 3,43 0,00 -5,15 0,00 0,00 27,18

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 192,29 -56,67 3,43 0,00 -5,14 0,00 0,00 27,21

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,91 -56,65 3,43 0,00 -5,13 0,00 0,00 27,23

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,54 -56,64 3,42 0,00 -5,12 0,00 0,00 27,26

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,12 -56,62 3,42 0,00 -5,11 0,00 0,00 27,29

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 190,76 -56,60 3,42 0,00 -5,10 0,00 0,00 27,31

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 190,40 -56,59 3,42 0,00 -5,09 0,00 0,00 27,33

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 189,95 -56,56 3,42 0,00 -5,08 0,00 0,00 27,36

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.52 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 189,60 -56,55 3,41 0,00 -5,07 0,00 0,00 27,38

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 189,26 -56,53 3,41 0,00 -5,06 0,00 0,00 27,41

70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 203,03 -57,14 2,99 0,00 -2,16 0,00 0,00 36,69

76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 217,77 -57,75 3,53 0,00 -5,85 0,00 0,00 28,76

102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 217,35 -57,74 3,53 0,00 -5,83 0,00 0,00 28,79

103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 216,93 -57,72 3,53 0,00 -5,82 0,00 0,00 28,81

104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 216,42 -57,70 3,52 0,00 -5,81 0,00 0,00 28,84

105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 216,00 -57,68 3,52 0,00 -5,80 0,00 0,00 28,87

106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 215,59 -57,66 3,52 0,00 -5,79 0,00 0,00 28,89

107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 215,10 -57,65 3,52 0,00 -5,78 0,00 0,00 28,92

108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 214,70 -57,63 3,52 0,00 -5,77 0,00 0,00 28,95

109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 214,30 -57,61 3,51 0,00 -5,76 0,00 0,00 28,97

110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 213,80 -57,59 3,51 0,00 -5,75 0,00 0,00 29,00

111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 213,41 -57,58 3,51 0,00 -5,74 0,00 0,00 29,03

112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 213,02 -57,56 3,51 0,00 -5,73 0,00 0,00 29,05

113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 212,57 -57,54 3,51 0,00 -5,71 0,00 0,00 29,08

114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 212,19 -57,53 3,50 0,00 -5,71 0,00 0,00 29,10

115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 211,81 -57,51 3,50 0,00 -5,70 0,00 0,00 29,12

116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 211,35 -57,49 3,50 0,00 -5,68 0,00 0,00 29,15

117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 210,99 -57,48 3,50 0,00 -5,67 0,00 0,00 29,17

118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 210,62 -57,46 3,49 0,00 -5,67 0,00 0,00 29,20

119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 210,14 -57,44 3,49 0,00 -5,65 0,00 0,00 29,22

120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 209,78 -57,43 3,49 0,00 -5,64 0,00 0,00 29,25

121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 209,43 -57,41 3,49 0,00 -5,64 0,00 0,00 29,27

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.53 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 209,02 -57,40 3,49 0,00 -5,63 0,00 0,00 29,29

123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 208,67 -57,38 3,49 0,00 -5,62 0,00 0,00 29,32

124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 208,33 -57,37 3,48 0,00 -5,61 0,00 0,00 29,34

125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 207,91 -57,35 3,48 0,00 -5,60 0,00 0,00 29,36

126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 207,58 -57,34 3,48 0,00 -5,59 0,00 0,00 29,38

127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 207,25 -57,32 3,48 0,00 -5,58 0,00 0,00 29,40

128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 206,87 -57,31 3,48 0,00 -5,57 0,00 0,00 29,43

129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 206,55 -57,29 3,48 0,00 -5,56 0,00 0,00 29,45

130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 206,23 -57,28 3,47 0,00 -5,56 0,00 0,00 29,47

72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 203,03 -57,14 2,99 0,00 -2,16 0,00 0,00 36,69

161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 225,15 -58,04 4,39 0,00 -1,25 0,46 0,00 43,12

28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 268,95 -59,59 -4,53 0,00 -1,10 0,00 0,00 24,80

23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 289,78 -60,23 2,99 -3,61 -1,01 0,00 0,00 28,35

24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 287,55 -60,17 4,74 -7,96 -0,87 0,00 0,00 22,98

1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 296,59 -60,44 4,17 -7,16 -0,75 0,00 0,00 27,82

25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 261,04 -59,33 4,61 0,00 -1,41 1,74 0,00 38,98

26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 257,86 -59,22 4,60 0,00 -1,40 2,18 0,00 40,97

58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 247,62 -58,87 -4,51 0,00 -1,01 2,33 0,00 27,95

31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 265,68 -59,48 2,99 -3,64 -0,95 0,00 0,00 29,15

53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 264,37 -59,44 4,64 0,00 -2,06 0,00 0,00 30,37

30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 273,22 -59,72 4,02 0,00 -1,02 0,00 0,00 35,28

54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 238,68 -58,55 4,48 0,00 -1,31 1,67 0,00 39,66

55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 235,81 -58,44 4,47 0,00 -1,30 1,16 0,00 40,69

186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 366,83 -62,28 -4,61 - -0,87 0,00 0,00 -7,13

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.54 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 366,12 -62,26 -4,61 - -0,86 0,00 0,00 -7,13

188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 365,43 -62,25 -4,60 - -0,86 0,00 0,00 -7,11

176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 374,11 -62,45 -4,28 -7,99 -0,88 0,00 0,00 -4,60

210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 376,19 -62,50 4,56 - -0,71 0,00 0,00 7,95

209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 377,26 -62,52 4,56 - -0,71 0,00 0,00 7,89

189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 354,56 -61,99 -4,60 0,00 -0,84 0,00 0,00 10,59

182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 378,24 -62,55 -4,54 - -0,89 0,00 0,00 -9,37

177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 358,52 -62,08 -4,25 -0,51 -0,85 0,00 0,00 13,32

179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 364,33 -62,22 -4,26 -0,48 -0,86 0,00 0,00 13,19

178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 361,42 -62,15 -4,26 -0,50 -0,85 0,00 0,00 13,25

174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 360,31 -62,13 4,37 0,00 -2,01 0,00 0,00 1,22

180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 372,65 -62,42 4,45 - -1,75 0,00 0,00 -16,31

181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 373,45 -62,44 5,23 - -6,01 0,00 0,00 -19,30

184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 360,54 -62,13 4,36 -5,69 -1,83 0,00 0,00 0,93

185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 359,88 -62,12 5,20 - -4,17 0,00 0,00 -10,12

183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 374,20 -62,45 4,47 - -1,74 0,00 0,00 -21,29

175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 366,80 -62,28 3,30 -7,31 -1,97 0,00 0,00 -3,23

207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 349,30 -61,86 4,45 0,00 -0,86 0,00 0,00 28,73

208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 347,73 -61,82 4,44 0,00 -0,86 0,00 0,00 28,77

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.55 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 7 Station Fence East Ld = 50,8 dB(A) Ln = 50,8 dB(A)

203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 477,44 -64,57 4,85 - -0,84 0,00 0,00 9,96

204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 482,88 -64,67 4,86 - -0,85 0,00 0,00 9,65

205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 489,59 -64,79 4,88 - -0,87 0,00 0,00 7,89

206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 491,10 -64,82 4,88 - -0,87 0,00 0,00 8,23

10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 371,21 -62,38 2,99 -4,81 -2,74 0,00 0,00 19,05

11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 373,20 -62,43 2,99 -4,84 -2,72 0,00 0,00 18,99

12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 359,77 -62,11 2,99 -4,77 -2,66 0,00 0,00 19,45

13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 362,10 -62,17 2,99 -4,76 -2,64 0,00 0,00 19,42

5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 371,46 -62,39 4,59 - -0,22 0,00 0,00 8,48

4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 377,57 -62,53 5,25 - -0,35 0,00 0,00 -2,11

3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 366,50 -62,27 4,94 - -1,15 0,00 0,00 -4,89

6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 371,46 -62,39 4,93 - -0,10 0,00 0,00 10,27

22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 361,73 -62,16 5,22 0,00 -1,83 0,00 0,00 13,30

21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 354,33 -61,98 5,20 0,00 -1,82 0,00 0,00 12,42

7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 363,58 -62,20 5,22 - -1,13 0,00 0,00 -7,92

18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 377,49 -62,53 5,25 - -0,44 0,00 0,00 -3,37

19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 372,56 -62,42 5,24 - -0,32 0,00 0,00 -0,19

15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 378,72 -62,56 5,25 - -1,31 0,00 0,00 -9,28

16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 371,25 -62,39 5,23 - -1,11 0,00 0,00 -3,42

17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 374,49 -62,46 4,67 - -0,12 0,00 0,00 9,18

2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 371,47 -62,39 3,79 - -0,38 0,00 0,00 -6,65

20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 362,35 -62,17 3,78 0,00 -0,79 0,00 0,00 10,65

14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 375,18 -62,48 3,89 - -0,45 0,00 0,00 -4,73

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.56 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 366,13 -62,26 2,98 -4,73 -0,75 0,00 0,00 5,38

29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 373,17 -62,43 4,05 - -0,26 0,00 0,00 10,45

27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 376,58 -62,51 2,99 - -1,01 0,00 0,00 0,80

9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 366,88 -62,28 2,98 -4,75 -1,05 0,00 0,00 31,04

40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 303,99 -60,65 2,99 -4,98 -2,45 0,00 0,00 20,92

41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 306,42 -60,72 2,99 -4,97 -2,46 0,00 0,00 20,84

42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 293,13 -60,33 2,99 -4,74 -2,48 0,00 0,00 21,43

43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 295,97 -60,42 2,99 -4,71 -2,47 0,00 0,00 21,40

35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 305,74 -60,70 4,29 - -0,22 0,00 0,00 13,90

34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 311,51 -60,86 5,09 - -0,27 0,00 0,00 2,06

33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 301,06 -60,57 4,71 - -0,93 0,00 0,00 3,10

36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 305,73 -60,70 4,70 - -0,10 0,00 0,00 14,70

52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 293,88 -60,36 5,04 0,00 -1,64 0,00 0,00 15,12

51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 286,82 -60,14 5,01 0,00 -1,52 0,00 0,00 14,37

37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 298,32 -60,49 5,05 - -1,00 0,00 0,00 3,40

48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 310,81 -60,84 5,09 - -0,34 0,00 0,00 -0,89

49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 304,79 -60,67 5,08 - -0,28 0,00 0,00 1,84

45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 312,32 -60,88 5,09 - -1,05 0,00 0,00 -7,03

46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 303,18 -60,63 5,06 - -0,93 0,00 0,00 -1,19

47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 307,16 -60,74 4,38 - -0,10 0,00 0,00 11,20

32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 305,86 -60,70 3,52 - -0,40 0,00 0,00 -0,48

50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 294,42 -60,37 3,56 0,00 -0,65 0,00 0,00 12,37

44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 307,89 -60,76 3,58 - -0,36 0,00 0,00 -2,38

38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 299,27 -60,51 2,98 -4,70 -0,62 0,00 0,00 7,29

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.57 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 307,66 -60,75 3,64 -5,67 -0,34 0,00 0,00 16,88

56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 309,43 -60,80 2,99 - -0,84 0,00 0,00 2,91

39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 299,80 -60,53 2,98 -4,74 -0,87 0,00 0,00 32,98

196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 347,10 -61,80 4,89 0,00 -1,95 0,00 0,00 3,07

197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 364,56 -62,23 4,95 - -1,50 0,00 0,00 -14,42

198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 375,75 -62,49 4,98 - -1,74 0,00 0,00 -22,73

199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 381,21 -62,62 5,00 - -1,62 0,00 0,00 -20,00

200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 385,96 -62,72 5,01 - -1,64 0,00 0,00 -33,60

201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 391,47 -62,85 5,02 - -1,66 0,00 0,00 -19,47

190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 377,52 -62,53 4,98 0,00 -2,09 0,00 0,00 1,23

192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 371,53 -62,39 4,96 0,00 -2,06 0,00 0,00 -9,69

193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 367,70 -62,30 4,95 0,00 -2,05 0,00 0,00 -0,29

194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 363,16 -62,19 4,95 - -1,46 0,00 0,00 -19,71

195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 351,23 -61,90 4,90 0,00 -1,97 0,00 0,00 4,51

202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 390,38 -62,82 5,02 - -1,59 0,00 0,00 -16,37

191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 368,72 -62,33 4,40 -4,75 -2,05 0,00 0,00 5,29

59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 303,65 -60,64 5,39 0,00 -1,61 0,00 0,00 20,15

60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 312,61 -60,89 5,41 0,00 -1,64 0,00 0,00 19,88

61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 321,66 -61,14 5,43 0,00 -1,67 0,00 0,00 19,62

65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 388,41 -62,78 4,54 0,00 -1,13 0,00 0,00 9,96

66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 388,99 -62,79 5,25 0,00 -2,54 0,00 0,00 7,32

63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 391,74 -62,85 4,57 0,00 -1,14 0,00 0,00 6,78

64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 391,71 -62,85 5,26 0,00 -1,14 0,00 0,00 -1,93

68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 396,49 -62,96 4,60 -4,26 -1,16 0,00 0,00 5,71

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.58 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 392,48 -62,87 4,50 -4,72 -1,14 0,00 0,00 2,02

67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 388,66 -62,78 -4,57 0,00 -0,92 0,00 0,00 5,74

69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 396,03 -62,95 -4,57 - -0,93 0,00 0,00 -7,65

162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 353,43 -61,96 4,85 0,00 -2,23 0,00 0,00 29,32

163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 356,42 -62,03 4,86 0,00 -2,25 0,00 0,00 29,24

164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 359,43 -62,10 4,87 0,00 -2,27 0,00 0,00 29,16

74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 325,45 -61,24 4,87 0,00 -1,68 0,12 0,00 43,44

75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 317,93 -61,04 4,85 0,00 -1,65 0,00 0,00 40,68

165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 425,18 -63,56 5,09 0,00 -0,98 0,00 0,00 17,63

167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 432,56 -63,71 5,11 -9,89 -0,78 0,00 0,00 9,86

170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 429,68 -63,65 5,10 0,00 -0,99 0,00 0,00 19,23

171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 431,23 -63,69 5,32 0,00 -1,59 0,00 0,00 13,90

168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 437,40 -63,81 5,12 - -0,71 0,00 0,00 3,45

173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 424,38 -63,55 4,71 0,00 -0,72 2,53 0,00 32,97

166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 431,34 -63,69 4,63 -4,71 -0,99 0,00 0,00 13,91

169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 437,07 -63,80 -4,64 - -1,03 0,00 0,00 -1,81

172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 427,83 -63,62 -4,62 0,00 -1,01 0,00 0,00 12,76

90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 340,49 -61,63 4,09 0,00 -8,68 0,00 0,00 20,10

77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 345,11 -61,75 3,98 0,00 -8,95 0,00 0,00 23,53

91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 339,56 -61,61 4,09 0,00 -8,65 0,00 0,00 20,14

79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 344,17 -61,73 3,97 0,00 -8,93 0,00 0,00 23,57

92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 338,63 -61,59 4,08 0,00 -8,63 0,00 0,00 20,18

80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 343,23 -61,70 3,97 0,00 -8,91 0,00 0,00 23,61

93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 337,48 -61,56 4,08 0,00 -8,61 0,00 0,00 20,23

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.59 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 342,15 -61,68 3,96 0,00 -8,88 0,00 0,00 23,65

94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 336,55 -61,53 4,07 0,00 -8,58 0,00 0,00 20,27

82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 341,22 -61,65 3,96 0,00 -8,86 0,00 0,00 23,69

95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 335,62 -61,51 4,07 0,00 -8,56 0,00 0,00 20,31

83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 340,28 -61,63 3,95 0,00 -8,84 0,00 0,00 23,73

96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 334,47 -61,48 4,06 0,00 -8,54 0,00 0,00 20,36

84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 339,18 -61,60 3,95 0,00 -8,81 0,00 0,00 23,78

97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 333,53 -61,45 4,06 0,00 -8,52 0,00 0,00 20,40

85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 338,25 -61,58 3,94 0,00 -8,79 0,00 0,00 23,82

98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 332,61 -61,43 4,05 0,00 -8,49 0,00 0,00 20,44

86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 337,31 -61,55 3,93 0,00 -8,77 0,00 0,00 23,86

99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 331,46 -61,40 4,04 0,00 -8,47 0,00 0,00 20,49

87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 336,20 -61,52 3,93 0,00 -8,74 0,00 0,00 23,91

100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 330,53 -61,38 4,04 0,00 -8,45 0,00 0,00 20,53

88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 335,27 -61,50 3,92 0,00 -8,72 0,00 0,00 23,95

101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 329,60 -61,35 4,03 0,00 -8,43 0,00 0,00 20,57

89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 334,33 -61,48 3,92 0,00 -8,69 0,00 0,00 23,99

160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 328,10 -61,31 4,88 0,00 -1,69 0,00 0,00 44,04

71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 337,20 -61,55 3,32 0,00 -2,84 0,00 0,00 27,93

73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 337,20 -61,55 3,32 0,00 -2,84 0,00 0,00 31,93

78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 328,74 -61,33 4,15 0,00 -8,41 0,00 0,00 20,01

131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 327,81 -61,30 4,15 0,00 -8,38 0,00 0,00 20,05

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 326,87 -61,28 4,14 0,00 -8,36 0,00 0,00 20,09

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 325,72 -61,25 4,14 0,00 -8,34 0,00 0,00 20,14

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.60 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 324,79 -61,22 4,13 0,00 -8,31 0,00 0,00 20,19

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 323,86 -61,20 4,13 0,00 -8,29 0,00 0,00 20,23

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 322,73 -61,17 4,12 0,00 -8,27 0,00 0,00 20,28

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 321,80 -61,14 4,12 0,00 -8,25 0,00 0,00 20,32

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 320,87 -61,12 4,11 0,00 -8,22 0,00 0,00 20,36

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 319,72 -61,09 4,10 0,00 -8,20 0,00 0,00 20,41

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 318,78 -61,06 4,10 0,00 -8,18 0,00 0,00 20,45

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 317,85 -61,04 4,09 0,00 -8,15 0,00 0,00 20,49

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 316,71 -61,01 4,09 0,00 -8,13 0,00 0,00 20,55

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 315,78 -60,98 4,08 0,00 -8,11 0,00 0,00 20,59

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 314,85 -60,95 4,07 0,00 -8,08 0,00 0,00 20,63

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 313,70 -60,92 4,07 0,00 -8,06 0,00 0,00 20,68

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 312,77 -60,90 4,06 0,00 -8,04 0,00 0,00 20,72

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 311,84 -60,87 4,06 0,00 -8,01 0,00 0,00 20,76

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 310,71 -60,84 4,05 0,00 -7,99 0,00 0,00 20,82

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 309,78 -60,81 4,04 0,00 -7,97 0,00 0,00 20,86

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 308,85 -60,79 4,04 0,00 -7,94 0,00 0,00 20,90

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 307,70 -60,75 4,03 0,00 -7,92 0,00 0,00 20,95

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 306,77 -60,73 4,03 0,00 -7,90 0,00 0,00 20,99

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 305,84 -60,70 4,02 0,00 -7,87 0,00 0,00 21,04

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 304,71 -60,67 4,01 0,00 -7,85 0,00 0,00 21,09

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 303,78 -60,64 4,01 0,00 -7,83 0,00 0,00 21,13

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 302,85 -60,62 4,00 0,00 -7,80 0,00 0,00 21,17

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 301,70 -60,58 3,99 0,00 -7,78 0,00 0,00 21,22

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.61 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 300,78 -60,56 3,99 0,00 -7,76 0,00 0,00 21,27

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 299,85 -60,53 3,98 0,00 -7,73 0,00 0,00 21,31

70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 316,02 -60,99 3,14 0,00 -2,75 0,00 0,00 32,41

76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 332,61 -61,43 4,13 0,00 -8,65 0,00 0,00 22,88

102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 331,69 -61,41 4,13 0,00 -8,63 0,00 0,00 22,92

103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 330,76 -61,38 4,12 0,00 -8,61 0,00 0,00 22,96

104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 329,63 -61,35 4,11 0,00 -8,58 0,00 0,00 23,01

105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 328,71 -61,33 4,11 0,00 -8,56 0,00 0,00 23,05

106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 327,79 -61,30 4,10 0,00 -8,54 0,00 0,00 23,09

107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 326,68 -61,27 4,10 0,00 -8,51 0,00 0,00 23,14

108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 325,76 -61,25 4,09 0,00 -8,49 0,00 0,00 23,18

109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 324,83 -61,23 4,09 0,00 -8,47 0,00 0,00 23,22

110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 323,70 -61,19 4,08 0,00 -8,44 0,00 0,00 23,27

111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 322,78 -61,17 4,08 0,00 -8,42 0,00 0,00 23,31

112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 321,86 -61,15 4,07 0,00 -8,40 0,00 0,00 23,36

113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 320,74 -61,12 4,06 0,00 -8,37 0,00 0,00 23,41

114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 319,82 -61,09 4,06 0,00 -8,35 0,00 0,00 23,45

115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 318,90 -61,07 4,05 0,00 -8,33 0,00 0,00 23,49

116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 317,77 -61,03 4,05 0,00 -8,30 0,00 0,00 23,54

117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 316,85 -61,01 4,04 0,00 -8,28 0,00 0,00 23,58

118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 315,93 -60,98 4,03 0,00 -8,25 0,00 0,00 23,62

119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 314,80 -60,95 4,03 0,00 -8,23 0,00 0,00 23,68

120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 313,88 -60,93 4,02 0,00 -8,20 0,00 0,00 23,72

121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 312,96 -60,90 4,02 0,00 -8,18 0,00 0,00 23,76

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.62 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 311,85 -60,87 4,01 0,00 -8,16 0,00 0,00 23,81

123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 310,94 -60,85 4,00 0,00 -8,13 0,00 0,00 23,85

124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 310,02 -60,82 4,00 0,00 -8,11 0,00 0,00 23,89

125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 308,89 -60,79 3,99 0,00 -8,08 0,00 0,00 23,95

126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 307,97 -60,76 3,99 0,00 -8,06 0,00 0,00 23,99

127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 307,05 -60,74 3,98 0,00 -8,04 0,00 0,00 24,03

128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 305,95 -60,71 3,97 0,00 -8,01 0,00 0,00 24,08

129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 305,03 -60,68 3,97 0,00 -7,99 0,00 0,00 24,12

130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 304,12 -60,65 3,96 0,00 -7,97 0,00 0,00 24,17

72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 316,02 -60,99 3,14 0,00 -2,75 0,00 0,00 32,41

161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 341,55 -61,66 4,93 0,00 -1,75 0,00 0,00 39,08

28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 360,34 -62,13 -4,60 0,00 -1,47 2,48 0,00 24,30

23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 380,94 -62,61 2,99 -3,53 -1,23 0,00 0,00 25,84

24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 376,90 -62,52 5,04 - -0,33 0,00 0,00 14,96

1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 383,45 -62,67 4,58 - -0,69 0,00 0,00 14,52

25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 361,47 -62,15 4,99 0,00 -1,83 1,12 0,00 35,49

26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 347,74 -61,82 4,95 0,00 -1,78 0,85 0,00 37,02

58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 291,65 -60,29 -4,55 0,00 -1,19 0,00 0,00 23,98

31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 312,99 -60,90 2,99 -3,59 -1,07 0,00 0,00 27,63

53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 309,03 -60,79 4,83 - -0,29 0,00 0,00 17,09

30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 316,28 -60,99 4,28 - -0,55 15,79 0,00 32,77

54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 292,15 -60,30 4,76 0,00 -1,55 0,66 0,00 36,92

55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 278,62 -59,89 4,70 0,00 -1,49 0,00 0,00 38,12

186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 423,05 -63,52 -4,63 -2,27 -1,00 0,00 0,00 1,59

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.63 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase Icalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 421,37 -63,49 -4,63 0,00 -0,99 0,00 0,00 3,90

188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 419,69 -63,45 -4,63 0,00 -0,99 0,00 0,00 3,94

176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 429,17 -63,64 -4,35 -0,39 -1,01 0,00 0,00 1,62

210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 431,35 -63,69 4,73 - -0,77 4,03 0,00 13,86

209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 431,97 -63,70 4,73 - -0,77 4,29 0,00 13,71

189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 389,97 -62,81 -4,62 0,00 -0,92 0,00 0,00 9,66

182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 428,48 -63,63 -4,57 - -1,01 0,00 0,00 -9,68

177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 392,40 -62,87 -4,30 -0,45 -0,93 0,00 0,00 12,46

179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 395,99 -62,95 -4,31 -0,42 -0,93 0,00 0,00 12,40

178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 394,18 -62,91 -4,30 -0,45 -0,93 0,00 0,00 12,42

174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 392,16 -62,86 4,54 -2,83 -2,09 0,00 0,00 -2,27

180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 413,91 -63,33 4,59 - -1,78 0,00 0,00 -15,25

181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 416,20 -63,38 5,30 - -5,89 0,00 0,00 -19,06

184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 406,96 -63,18 4,64 0,00 -2,23 0,00 0,00 5,45

185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 405,53 -63,15 5,28 0,00 -6,75 0,00 0,00 3,76

183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 429,81 -63,66 4,66 - -1,77 0,00 0,00 -19,35

175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 410,64 -63,26 3,58 -4,76 -2,24 0,00 0,00 -1,66

207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 441,31 -63,89 4,76 - -0,79 0,00 0,00 15,07

208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 438,44 -63,83 4,75 - -0,79 1,30 0,00 16,58

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.1.64 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Legende Source No. Number of sourceSource Source nameGroup Group nameLi dB(A) Indoor sound pressure levelR'w dB Transmission lossLw' dB(A) Sound power level per m,m²l or S m,m² Size of source (length or area)Lw dB(A) Sound power level per unitKo dB Correction for non spherical emissions m Distance source - receptor pointAdiv dB Attenuation due to divergenceAgr dB Attenuation due to ground effectsAbar dB Attenuation due to barrierAatm dB Attenuation due to atmospheric absorptiondLrefl dB Increase of noise due to reflectionsCmet Meteorological correctionLr,i dB(A) Assessed sound pressure at receiver

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.1 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 1 Thymaria Ld = 19,3 dB(A) Ln = 19,3 dB(A)

11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2644,58 -79,44 1,10 -4,24 -3,95 0,00 0,00 -0,53

69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2714,09 -79,66 1,26 -4,29 -4,07 0,00 0,00 -0,77

40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2695,61 -79,61 1,22 -4,28 -4,04 0,00 0,00 -0,71

41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2693,74 -79,60 1,22 -4,28 -4,04 0,00 0,00 -0,70

12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2642,68 -79,43 1,10 -4,24 -3,95 0,00 0,00 -0,53

70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2712,23 -79,66 1,26 -4,29 -4,07 0,00 0,00 -0,77

13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2656,33 -79,48 1,13 -4,26 -3,98 0,00 0,00 -0,59

42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2707,19 -79,64 1,24 -4,30 -4,07 0,00 0,00 -0,76

71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2725,88 -79,70 1,29 -4,31 -4,10 0,00 0,00 -0,83

72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2723,65 -79,70 1,28 -4,30 -4,09 0,00 0,00 -0,79

14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2654,05 -79,47 1,13 -4,25 -3,96 0,00 0,00 -0,55

43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2705,07 -79,64 1,24 -4,28 -4,05 0,00 0,00 -0,73

29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 2654,90 -79,47 -4,58 - - 0,00 0,00 -22,52

58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 2706,31 -79,64 -4,59 -7,85 - 0,00 0,00 -13,11

87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 2724,28 -79,70 -4,59 - - 0,00 0,00 -22,25

160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2649,82 -79,46 2,15 -0,84 - 0,00 0,00 -21,39

161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2650,68 -79,46 2,15 -0,85 - 0,00 0,00 -21,40

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2651,56 -79,46 2,15 -0,85 - 0,00 0,00 -21,41

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2652,64 -79,47 2,15 -0,86 - 0,00 0,00 -21,42

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2653,50 -79,47 2,16 -0,86 - 0,00 0,00 -21,43

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2654,37 -79,47 2,16 -0,87 - 0,00 0,00 -21,44

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2655,41 -79,47 2,16 -0,87 - 0,00 0,00 -21,45

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2656,27 -79,48 2,16 -0,88 - 0,00 0,00 -21,46

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.2 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2657,14 -79,48 2,17 -0,88 - 0,00 0,00 -21,47

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2658,21 -79,48 2,17 -0,89 - 0,00 0,00 -21,48

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2659,08 -79,49 2,17 -0,89 - 0,00 0,00 -21,49

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2659,94 -79,49 2,17 -0,89 - 0,00 0,00 -21,50

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2661,01 -79,49 2,17 -0,90 - 0,00 0,00 -21,51

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2661,88 -79,50 2,18 -0,90 - 0,00 0,00 -21,52

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2662,74 -79,50 2,18 -0,90 - 0,00 0,00 -21,53

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2663,82 -79,50 2,18 -0,91 - 0,00 0,00 -21,55

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2664,68 -79,51 2,18 -0,91 - 0,00 0,00 -21,56

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2665,55 -79,51 2,19 -0,91 - 0,00 0,00 -21,58

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2666,59 -79,51 2,19 -0,92 - 0,00 0,00 -21,59

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2667,45 -79,51 2,19 -0,92 - 0,00 0,00 -21,60

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2668,32 -79,52 2,19 -0,92 - 0,00 0,00 -21,62

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2669,39 -79,52 2,19 -0,93 - 0,00 0,00 -21,63

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2670,26 -79,52 2,20 -0,93 - 0,00 0,00 -21,64

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2671,13 -79,53 2,20 -0,93 - 0,00 0,00 -21,65

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2672,17 -79,53 2,20 -0,93 - 0,00 0,00 -21,67

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2673,04 -79,53 2,20 -0,94 - 0,00 0,00 -21,68

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2673,91 -79,54 2,20 -0,94 - 0,00 0,00 -21,69

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2674,98 -79,54 2,21 -0,94 - 0,00 0,00 -21,70

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2675,85 -79,54 2,21 -0,94 - 0,00 0,00 -21,71

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2676,72 -79,54 2,21 -0,95 - 0,00 0,00 -21,72

2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 2665,92 -79,51 1,54 -4,37 -3,51 0,00 0,00 4,36

60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 2735,49 -79,73 1,66 -4,40 -3,61 0,00 0,00 4,13

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.3 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 2686,30 -79,58 1,57 -4,38 -3,54 0,00 0,00 4,29

53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 2689,75 -79,59 3,01 -8,20 -0,85 0,00 0,00 1,60

82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 2731,75 -79,72 3,04 - -0,45 0,00 0,00 -5,52

24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 2662,24 -79,50 3,00 - -0,43 1,54 0,00 -3,51

169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 2495,81 -78,94 0,09 - -2,98 0,00 0,00 -18,34

22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2660,71 -79,49 2,04 - -0,91 0,00 0,00 -25,15

80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2730,25 -79,72 2,09 - -0,91 0,00 0,00 -25,25

81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2725,63 -79,70 2,08 - -0,77 0,00 0,00 -23,55

23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2655,97 -79,48 2,04 - -0,76 0,00 0,00 -23,40

78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2731,37 -79,72 1,80 - -4,91 0,00 0,00 -35,44

20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2661,86 -79,50 1,73 - -4,89 0,00 0,00 -35,29

19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2654,65 -79,47 1,73 - -3,97 0,00 0,00 -33,48

77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2724,34 -79,70 1,78 - -3,99 0,00 0,00 -33,64

21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 2657,88 -79,48 3,94 - -0,34 0,00 0,00 -9,73

79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 2727,49 -79,71 3,95 - -0,35 0,00 0,00 -9,92

170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 2488,07 -78,91 0,13 -2,36 -5,54 0,00 0,00 -7,92

6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 2645,39 -79,44 0,48 -3,83 -2,29 0,00 0,00 -2,08

35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 2695,63 -79,61 0,52 -3,85 -2,33 0,00 0,00 -2,27

64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 2715,06 -79,67 0,52 -3,85 -2,34 0,00 0,00 -2,34

5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2651,16 -79,46 2,04 -4,36 -2,99 0,00 0,00 -12,70

63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2720,85 -79,69 2,07 -4,38 -3,04 0,00 0,00 -12,96

34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2689,34 -79,58 2,07 -4,38 -3,02 0,00 0,00 -12,85

171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 2489,50 -78,91 0,93 -3,72 -6,46 0,00 0,00 -14,30

33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 2700,73 -79,62 1,74 -4,65 -9,01 0,00 0,00 -16,88

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.4 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 2709,10 -79,65 1,74 -4,65 -9,02 0,00 0,00 -16,92

4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 2639,45 -79,42 1,68 -4,64 -8,87 0,00 0,00 -16,59

65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 2715,05 -79,67 3,99 -4,56 -1,01 0,00 0,00 -0,26

7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 2645,38 -79,44 3,97 -4,56 -1,00 0,00 0,00 -0,03

36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 2695,62 -79,61 3,98 -4,57 -1,01 0,00 0,00 -0,20

8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2636,99 -79,41 1,72 -4,64 -8,87 0,00 0,00 -20,19

66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2706,63 -79,64 1,78 -4,65 -9,04 0,00 0,00 -20,53

168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 2491,47 -78,92 0,04 - -3,11 0,00 0,00 -10,88

52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2704,63 -79,63 2,07 - -1,00 0,00 0,00 -25,86

17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2653,66 -79,47 2,04 - -0,85 0,00 0,00 -24,61

75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2723,10 -79,69 2,08 - -0,85 0,00 0,00 -24,71

51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2712,04 -79,66 1,78 - -5,26 0,00 0,00 -35,93

16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2646,74 -79,45 1,72 - -4,42 0,00 0,00 -34,51

74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2716,15 -79,67 1,79 - -5,26 0,00 0,00 -35,94

37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2703,75 -79,63 1,78 -4,65 -9,03 0,00 0,00 -20,51

165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 2483,94 -78,89 -0,22 -2,05 -5,74 0,00 0,00 -9,82

48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2689,13 -79,58 2,07 -4,38 -3,02 0,00 0,00 -12,85

49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2693,80 -79,60 2,07 - -0,71 0,00 0,00 -21,28

45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2688,02 -79,58 1,77 -4,65 -8,99 0,00 0,00 -20,44

46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2695,12 -79,60 1,77 - -5,27 0,00 0,00 -23,69

47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 2691,94 -79,59 3,94 -4,56 -1,01 0,00 0,00 -0,22

18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 2658,48 -79,48 0,26 - -1,46 0,00 0,00 -25,95

76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 2728,07 -79,71 0,36 - -1,49 0,00 0,00 -26,14

32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 2695,47 -79,60 0,29 -3,70 -4,32 0,00 0,00 -17,82

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.5 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 2715,57 -79,67 0,30 -3,83 -4,26 0,00 0,00 -17,94

3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 2645,89 -79,44 0,19 -3,64 -4,24 0,00 0,00 -17,62

73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 2723,89 -79,70 0,35 - -1,51 0,00 0,00 -27,01

50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 2703,87 -79,63 0,32 - -1,68 0,00 0,00 -27,49

15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 2654,44 -79,47 0,23 - -1,46 0,00 0,00 -26,80

44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 2691,43 -79,59 0,30 -4,07 -4,12 0,00 0,00 -16,91

88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 2629,94 -79,39 0,93 -4,27 -6,57 0,00 0,00 -12,30

89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 2621,81 -79,36 0,92 -4,27 -6,55 0,00 0,00 -12,26

91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 2556,04 -79,14 0,31 -4,20 -7,07 0,00 0,00 -20,77

92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2558,28 -79,15 0,78 - -4,59 0,00 0,00 -47,40

94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 2549,16 -79,12 0,34 -0,88 -7,46 0,00 0,00 -20,77

95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2549,06 -79,12 0,77 -4,36 -6,91 0,00 0,00 -34,46

96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 2549,02 -79,12 0,14 -0,01 -7,29 0,00 0,00 -16,79

90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 2552,63 -79,13 0,14 -4,34 -6,72 0,00 0,00 -23,79

98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 2659,80 -79,49 1,05 -0,16 -9,53 0,00 0,00 4,87

102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2642,44 -79,43 2,13 -2,64 - 0,00 0,00 -19,50

103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2643,31 -79,44 2,14 -2,64 - 0,00 0,00 -19,51

104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2644,18 -79,44 2,14 -2,66 - 0,00 0,00 -20,61

105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2645,24 -79,44 2,14 -2,66 - 0,00 0,00 -20,63

106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2646,11 -79,44 2,14 -2,66 - 0,00 0,00 -20,64

107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2646,98 -79,45 2,15 -2,67 - 0,00 0,00 -20,66

108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2648,03 -79,45 2,15 -2,67 - 0,00 0,00 -20,67

109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2648,90 -79,45 2,15 -2,67 - 0,00 0,00 -20,69

110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2649,77 -79,46 2,15 -2,68 - 0,00 0,00 -20,70

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.6 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2650,84 -79,46 2,16 -2,70 - 0,00 0,00 -20,71

112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2651,71 -79,46 2,16 -2,71 - 0,00 0,00 -20,73

113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2652,58 -79,47 2,16 -2,73 - 0,00 0,00 -20,74

114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2653,63 -79,47 2,16 -2,74 - 0,00 0,00 -20,75

115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2654,49 -79,47 2,17 -2,75 - 0,00 0,00 -20,76

116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2655,37 -79,47 2,17 -2,77 - 0,00 0,00 -20,77

117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2656,43 -79,48 2,17 -2,78 - 0,00 0,00 -20,79

118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2657,30 -79,48 2,17 -2,79 - 0,00 0,00 -20,80

119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2658,17 -79,48 2,18 -2,80 - 0,00 0,00 -20,81

120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2659,25 -79,49 2,18 -2,81 - 0,00 0,00 -20,82

121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2660,12 -79,49 2,18 -2,81 - 0,00 0,00 -20,83

122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2660,99 -79,49 2,18 -2,81 - 0,00 0,00 -20,84

123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2662,04 -79,50 2,19 -2,81 - 0,00 0,00 -20,85

124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2662,90 -79,50 2,19 -2,81 - 0,00 0,00 -20,85

125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2663,77 -79,50 2,19 -2,81 - 0,00 0,00 -20,85

126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2664,84 -79,51 2,19 -2,81 - 0,00 0,00 -20,86

127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2665,71 -79,51 2,19 -2,80 - 0,00 0,00 -20,86

128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2666,58 -79,51 2,20 -2,80 - 0,00 0,00 -20,87

129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2667,63 -79,51 2,20 -2,80 - 0,00 0,00 -20,87

130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2668,49 -79,52 2,20 -2,80 - 0,00 0,00 -20,88

131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2669,37 -79,52 2,20 -2,80 - 0,00 0,00 -20,88

99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 2659,80 -79,49 1,05 -0,16 -9,53 0,00 0,00 4,87

100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 2697,87 -79,61 1,43 -5,28 -8,71 0,00 0,00 8,17

162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 2698,08 -79,61 1,43 -4,80 -8,94 0,00 0,00 8,62

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.7 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 2697,30 -79,61 1,43 -5,00 -8,84 0,00 0,00 6,49

163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 2592,70 -79,27 1,93 -3,85 - 0,00 0,00 -5,03

164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 2590,00 -79,26 1,93 -3,67 - 0,00 0,00 -4,93

59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 2731,95 -79,72 1,24 - -1,66 0,00 0,00 -5,70

30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 2683,37 -79,57 1,21 -4,43 -6,12 2,31 0,00 5,40

1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 2662,17 -79,50 1,19 - -1,63 0,00 0,00 -5,65

25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 2654,05 -79,47 1,39 -8,28 -7,05 0,00 0,00 -0,04

54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 2705,45 -79,64 1,45 -9,31 -7,18 0,00 0,00 -1,32

83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 2723,33 -79,69 -4,59 -0,65 -6,42 0,00 0,00 3,65

55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 2719,11 -79,68 1,46 -6,28 -8,24 0,00 0,00 2,07

26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 2667,70 -79,51 1,41 - -6,79 3,14 0,00 2,22

84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 2736,91 -79,74 1,48 - -7,00 0,00 0,00 -0,96

173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 2496,79 -78,94 -0,16 -4,11 -1,97 0,00 0,00 4,82

167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 2489,89 -78,92 -0,47 -3,95 -4,93 0,00 0,00 -9,59

38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 2700,63 -79,62 -0,72 -3,36 -3,98 0,00 0,00 -17,54

67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 2719,12 -79,68 -0,68 -3,39 -4,01 0,00 0,00 -17,61

9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 2649,56 -79,46 -0,85 -3,26 -3,90 0,00 0,00 -17,33

166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2484,33 -78,90 -4,55 0,00 -5,86 0,00 0,00 -7,29

172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2486,21 -78,90 -4,55 0,00 -5,86 0,00 0,00 -7,30

93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2553,91 -79,14 -4,56 - -6,02 0,00 0,00 -26,75

97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2551,32 -79,13 -4,56 0,00 -6,02 0,00 0,00 -15,69

28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2643,01 -79,43 0,40 -3,80 -2,29 0,91 0,00 -4,20

57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 2694,54 -79,60 0,44 -3,82 -2,33 0,00 0,00 -5,31

86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 2712,68 -79,66 0,44 -3,81 -2,34 0,90 0,00 -4,47

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.8 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 2728,14 -79,71 0,73 - -4,74 0,00 0,00 -19,95

27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2658,76 -79,49 0,49 - -4,60 0,00 0,00 -19,84

56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 2690,03 -79,59 0,60 -1,14 - 2,54 0,00 -8,59

39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 2700,44 -79,62 -0,31 -3,81 -5,74 0,00 0,00 6,65

10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 2649,37 -79,45 -0,46 -3,72 -5,62 0,33 0,00 7,21

68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 2718,93 -79,68 -0,25 -3,85 -5,79 0,00 0,00 6,57

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.9 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 2 Tavri Ld = 20,1 dB(A) Ln = 20,1 dB(A)

11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2960,87 -80,42 1,10 -4,25 -4,04 0,00 0,00 -1,60

69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 3034,75 -80,63 1,25 -4,29 -4,15 0,00 0,00 -1,83

40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 3015,08 -80,58 1,21 -4,28 -4,12 0,00 0,00 -1,77

41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 3015,92 -80,58 1,21 -0,69 -3,56 0,00 0,00 2,38

12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2961,72 -80,42 1,10 -0,62 -3,54 0,00 0,00 2,51

70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 3035,58 -80,64 1,25 -0,66 -3,63 0,00 0,00 2,32

13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2973,11 -80,46 1,12 -4,25 -4,06 0,00 0,00 -1,64

42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 3027,42 -80,61 1,23 -4,28 -4,15 0,00 0,00 -1,81

71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 3047,00 -80,67 1,27 -4,30 -4,18 0,00 0,00 -1,87

72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 3047,99 -80,67 1,28 -4,30 -4,18 0,00 0,00 -1,87

14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2974,12 -80,46 1,12 -4,25 -4,06 0,00 0,00 -1,65

43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 3028,23 -80,62 1,23 -4,28 -4,15 0,00 0,00 -1,81

29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 2963,07 -80,43 -4,51 0,00 - 0,00 0,00 -7,02

58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 3017,94 -80,59 -4,52 0,00 - 0,00 0,00 -7,41

87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 3037,07 -80,64 -4,52 0,00 - 0,00 0,00 -7,54

160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2917,54 -80,29 2,11 -1,68 - 0,00 0,00 -23,67

161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2918,48 -80,30 2,11 -1,67 - 0,00 0,00 -23,67

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2919,43 -80,30 2,11 -1,67 - 0,00 0,00 -23,67

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2920,59 -80,30 2,11 -1,67 - 0,00 0,00 -23,67

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2921,53 -80,30 2,12 -1,66 - 0,00 0,00 -23,67

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2922,47 -80,31 2,12 -1,66 - 0,00 0,00 -23,67

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2923,61 -80,31 2,12 -1,66 - 0,00 0,00 -23,67

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2924,55 -80,31 2,12 -1,65 - 0,00 0,00 -23,66

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.10 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2925,49 -80,32 2,13 -1,65 - 0,00 0,00 -23,66

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2926,65 -80,32 2,13 -1,64 - 0,00 0,00 -23,66

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2927,59 -80,32 2,13 -1,64 - 0,00 0,00 -23,66

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2928,53 -80,33 2,13 -1,64 - 0,00 0,00 -23,65

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2929,67 -80,33 2,14 -1,63 - 0,00 0,00 -23,65

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2930,61 -80,33 2,14 -1,63 - 0,00 0,00 -23,65

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2931,55 -80,33 2,14 -1,62 - 0,00 0,00 -23,64

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2932,71 -80,34 2,14 -1,63 - 0,00 0,00 -23,72

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2933,65 -80,34 2,15 -1,63 - 0,00 0,00 -23,72

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2934,58 -80,34 2,15 -1,62 - 0,00 0,00 -23,72

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2935,73 -80,35 2,15 -1,62 - 0,00 0,00 -23,72

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2936,67 -80,35 2,15 -1,61 - 0,00 0,00 -23,72

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2937,61 -80,35 2,15 -1,60 - 0,00 0,00 -23,71

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2938,77 -80,36 2,16 -1,59 - 0,00 0,00 -23,71

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2939,71 -80,36 2,16 -1,59 - 0,00 0,00 -23,71

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2940,65 -80,36 2,16 -1,58 - 0,00 0,00 -23,70

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2941,80 -80,36 2,16 -1,57 - 0,00 0,00 -23,70

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2942,74 -80,37 2,17 -1,56 - 0,00 0,00 -23,70

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2943,68 -80,37 2,17 -1,55 - 0,00 0,00 -23,69

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2944,84 -80,37 2,17 -1,54 - 0,00 0,00 -23,69

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2945,78 -80,38 2,17 -1,53 - 0,00 0,00 -23,68

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2946,71 -80,38 2,17 -1,52 - 0,00 0,00 -23,68

2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 2983,18 -80,49 1,56 -4,40 -3,63 0,00 0,00 3,25

60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 3057,14 -80,70 1,67 -4,43 -3,73 0,00 0,00 3,03

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.11 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 3004,89 -80,55 1,59 -4,41 -3,66 0,00 0,00 3,19

53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 3008,80 -80,56 3,00 -6,94 -1,01 0,00 0,00 1,71

82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 3053,42 -80,69 3,02 - -0,59 0,00 0,00 -2,13

24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 2979,52 -80,48 2,98 - -0,58 0,89 0,00 -1,04

169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 2813,09 -79,98 0,06 - -3,87 0,00 0,00 -17,00

22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2976,10 -80,47 2,03 - -0,91 0,00 0,00 -19,80

80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 3050,00 -80,68 2,07 - -0,93 0,00 0,00 -19,98

81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 3052,06 -80,68 2,07 - -1,03 0,00 0,00 -21,27

23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2978,20 -80,47 2,03 - -1,02 0,00 0,00 -21,11

78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 3049,52 -80,68 1,76 - -4,98 0,00 0,00 -29,03

20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2975,60 -80,46 1,70 - -4,92 0,00 0,00 -28,81

19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2978,80 -80,47 1,70 - -5,34 0,00 0,00 -31,01

77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 3052,64 -80,69 1,76 - -5,39 0,00 0,00 -31,21

21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 2977,34 -80,47 3,95 - -0,42 0,00 0,00 -7,19

79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 3051,21 -80,68 3,96 - -0,43 0,00 0,00 -7,35

170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 2807,27 -79,96 -0,05 -5,77 -4,82 0,00 0,00 -11,83

6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 2969,97 -80,45 0,48 - -0,93 0,00 0,00 -9,42

35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 3023,17 -80,60 0,51 - -0,97 0,00 0,00 -10,12

64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 3043,79 -80,66 0,52 - -0,90 0,00 0,00 -9,20

5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2976,14 -80,47 2,03 - -0,87 0,00 0,00 -19,51

63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 3049,97 -80,68 2,06 - -0,83 0,00 0,00 -19,25

34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 3016,54 -80,58 2,05 - -0,71 0,00 0,00 -22,10

171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 2808,82 -79,96 0,93 -7,86 -4,06 0,00 0,00 -17,09

33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 3028,60 -80,62 1,71 - -5,06 0,00 0,00 -26,95

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.12 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 3037,49 -80,64 1,72 - -5,15 0,00 0,00 -27,17

4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 2963,68 -80,43 1,66 - -4,83 0,00 0,00 -26,14

65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 3043,80 -80,66 3,99 -9,44 -0,39 0,00 0,00 -5,50

7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 2969,98 -80,45 3,98 -9,94 -0,39 0,00 0,00 -5,81

36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 3023,18 -80,60 3,99 - -0,41 0,00 0,00 -6,57

8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2961,08 -80,42 1,69 - -4,88 0,00 0,00 -29,81

66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 3034,89 -80,63 1,75 - -5,23 0,00 0,00 -30,90

168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 2805,96 -79,95 -0,10 0,00 -5,94 0,00 0,00 -1,87

52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 3019,62 -80,59 2,05 0,00 -3,26 0,00 0,00 -9,73

17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2965,39 -80,43 2,02 0,00 -3,23 0,00 0,00 -9,57

75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 3039,31 -80,65 2,06 0,00 -3,27 0,00 0,00 -9,79

51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 3027,51 -80,61 1,74 0,00 -9,98 0,00 0,00 -17,83

16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2957,99 -80,41 1,69 0,00 -9,84 0,00 0,00 -17,55

74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 3031,91 -80,63 1,75 0,00 -9,99 0,00 0,00 -17,85

37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 3031,81 -80,63 1,75 - -5,11 0,00 0,00 -30,65

165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 2800,35 -79,94 -0,33 0,00 -5,95 0,00 0,00 -9,13

48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 3013,20 -80,57 2,05 -5,17 -1,22 0,00 0,00 -12,85

49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 3011,11 -80,57 2,05 0,00 -3,25 0,00 0,00 -9,71

45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 3013,71 -80,57 1,73 -7,72 -6,99 0,00 0,00 -22,54

46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 3010,53 -80,56 1,73 0,00 -9,95 0,00 0,00 -17,76

47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 3011,92 -80,57 3,95 -5,52 -0,39 0,00 0,00 -1,52

18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 2977,07 -80,47 0,25 - -2,03 0,00 0,00 -23,72

76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 3050,95 -80,68 0,34 - -2,08 0,00 0,00 -23,91

32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 3022,95 -80,60 0,28 - -2,07 0,00 0,00 -24,88

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.13 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 3044,28 -80,66 0,31 - -1,96 0,00 0,00 -24,04

3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 2970,45 -80,45 0,21 - -1,98 0,00 0,00 -24,06

73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 3040,07 -80,65 0,40 0,00 -4,75 0,00 0,00 -15,16

50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 3018,72 -80,59 0,28 0,00 -4,69 0,00 0,00 -15,17

15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 2966,14 -80,44 0,25 0,00 -4,63 0,00 0,00 -14,99

44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 3012,15 -80,57 0,28 -2,34 -4,11 0,00 0,00 -16,18

88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 2855,32 -80,11 0,91 0,00 -7,80 0,00 0,00 -10,00

89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 2846,39 -80,08 0,90 0,00 -7,79 0,00 0,00 -9,97

91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 2805,88 -79,95 0,27 -3,80 -7,65 0,00 0,00 -21,81

92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2805,28 -79,95 0,77 - -5,83 0,00 0,00 -44,35

94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 2802,84 -79,94 0,23 -2,28 -7,67 0,00 0,00 -23,32

95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2802,76 -79,94 0,76 -5,86 -7,18 0,00 0,00 -37,05

96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 2797,82 -79,93 0,08 0,00 -7,85 0,00 0,00 -18,21

90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 2801,82 -79,94 0,08 -4,30 -7,25 0,00 0,00 -25,16

98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 2933,42 -80,34 0,98 -0,18 -9,98 0,00 0,00 3,48

102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2920,21 -80,30 2,09 0,00 - 0,00 0,00 -18,53

103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2921,15 -80,30 2,10 0,00 - 0,00 0,00 -18,53

104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2922,09 -80,31 2,10 0,00 - 0,00 0,00 -18,53

105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2923,24 -80,31 2,10 0,00 - 0,00 0,00 -18,54

106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2924,18 -80,31 2,10 0,00 - 0,00 0,00 -18,54

107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2925,12 -80,31 2,11 0,00 - 0,00 0,00 -18,55

108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2926,26 -80,32 2,11 0,00 - 0,00 0,00 -18,55

109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2927,20 -80,32 2,11 0,00 - 0,00 0,00 -18,55

110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2928,14 -80,32 2,11 0,00 - 0,00 0,00 -18,56

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.14 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2929,28 -80,33 2,12 0,00 - 0,00 0,00 -18,56

112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2930,23 -80,33 2,12 0,00 - 0,00 0,00 -18,57

113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2931,17 -80,33 2,12 0,00 - 0,00 0,00 -18,57

114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2932,32 -80,34 2,12 0,00 - 0,00 0,00 -18,57

115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2933,26 -80,34 2,13 0,00 - 0,00 0,00 -18,58

116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2934,20 -80,34 2,13 0,00 - 0,00 0,00 -18,58

117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2935,35 -80,35 2,13 0,00 - 0,00 0,00 -18,59

118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2936,29 -80,35 2,13 0,00 - 0,00 0,00 -18,59

119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2937,24 -80,35 2,14 0,00 - 0,00 0,00 -18,59

120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2938,38 -80,35 2,14 0,00 - 0,00 0,00 -18,60

121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2939,32 -80,36 2,14 0,00 - 0,00 0,00 -18,60

122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2940,26 -80,36 2,14 0,00 - 0,00 0,00 -18,61

123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2941,39 -80,36 2,15 0,00 - 0,00 0,00 -18,61

124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2942,33 -80,37 2,15 0,00 - 0,00 0,00 -18,61

125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2943,27 -80,37 2,15 0,00 - 0,00 0,00 -18,62

126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2944,42 -80,37 2,15 0,00 - 0,00 0,00 -18,62

127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2945,36 -80,37 2,16 0,00 - 0,00 0,00 -18,63

128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2946,31 -80,38 2,16 0,00 - 0,00 0,00 -18,63

129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2947,44 -80,38 2,16 0,00 - 0,00 0,00 -18,63

130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2948,38 -80,38 2,16 0,00 - 0,00 0,00 -18,64

131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2949,32 -80,39 2,16 0,00 - 0,00 0,00 -18,64

99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 2933,42 -80,34 0,98 -0,18 -9,98 0,00 0,00 3,48

100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 2995,73 -80,52 1,40 0,00 - 0,00 0,00 10,63

162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 2991,50 -80,51 1,40 0,00 - 0,00 0,00 10,85

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.15 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 2993,38 -80,52 1,40 0,00 - 0,00 0,00 8,80

163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 2826,69 -80,02 1,93 -0,54 - 0,00 0,00 -2,82

164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 2823,71 -80,01 1,92 -0,57 - 0,00 0,00 -2,84

59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 3058,22 -80,70 1,23 - -2,09 0,00 0,00 -6,37

30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 3006,72 -80,55 1,19 -6,12 -4,76 2,43 0,00 4,18

1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 2984,19 -80,49 1,17 - -2,05 6,34 0,00 0,05

25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 2957,56 -80,41 1,37 0,00 - 0,10 0,00 3,92

54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 3012,50 -80,57 1,41 0,00 - 0,03 0,00 3,60

83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 3031,50 -80,63 -4,52 0,00 -7,15 0,00 0,00 2,71

55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 3026,71 -80,61 1,42 0,00 - 0,07 0,00 5,02

26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 2971,78 -80,45 1,38 0,00 - 0,06 0,00 5,26

84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 3045,78 -80,67 1,44 0,00 - 0,08 0,00 5,00

173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 2813,82 -79,98 -0,20 -3,09 -2,20 0,00 0,00 4,54

167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 2806,70 -79,96 -0,50 -3,92 -5,43 0,00 0,00 -11,14

38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 3021,61 -80,60 -0,74 -3,34 -4,30 0,00 0,00 -18,83

67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 3041,27 -80,65 -0,69 -3,38 -4,33 0,00 0,00 -18,91

9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 2967,40 -80,44 -0,86 -3,25 -4,22 0,00 0,00 -18,63

166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2800,17 -79,94 -4,48 0,00 -6,60 0,00 0,00 -9,01

172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2805,27 -79,95 -4,48 -5,13 -6,62 0,00 0,00 -14,17

93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2806,50 -79,96 -4,49 -7,92 -6,62 0,00 0,00 -24,97

97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2797,17 -79,93 -4,49 0,00 -6,60 0,00 0,00 -17,00

28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2970,06 -80,45 0,41 -4,04 -1,60 1,23 0,00 -4,45

57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 3024,73 -80,61 0,44 -3,04 -2,12 0,00 0,00 -5,32

86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 3043,92 -80,66 0,45 -4,23 -1,79 0,00 0,00 -6,22

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.16 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 3052,16 -80,68 0,69 - -5,99 0,00 0,00 -18,00

27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2978,16 -80,47 0,46 - -5,80 0,00 0,00 -17,82

56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 3011,56 -80,57 0,56 -4,16 -8,70 2,28 0,00 -10,59

39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 3021,62 -80,60 -0,34 -0,38 -6,31 0,00 0,00 8,51

10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 2967,36 -80,44 -0,48 -2,79 -6,18 0,00 0,00 6,24

68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 3041,28 -80,65 -0,28 -3,83 -6,24 0,00 0,00 5,13

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.17 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 3 Peplos Ld = 25,6 dB(A) Ln = 25,6 dB(A)

11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 1758,45 -75,89 1,06 -4,24 -3,72 0,00 0,00 3,21

69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 1781,05 -76,01 1,07 -4,25 -3,74 0,00 0,00 3,08

40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 1774,67 -75,97 1,07 -4,25 -3,73 0,00 0,00 3,11

41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 1779,42 -76,00 1,08 -4,26 -3,74 0,00 0,00 3,09

12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 1763,25 -75,92 1,07 -4,25 -3,73 0,00 0,00 3,18

70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 1785,78 -76,03 1,08 -4,26 -3,74 0,37 0,00 3,42

13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 1761,58 -75,91 1,06 -4,25 -3,72 0,00 0,00 3,18

42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 1778,66 -75,99 1,07 -4,25 -3,73 0,00 0,00 3,09

71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 1784,66 -76,02 1,07 -4,26 -3,74 0,00 0,00 3,06

72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 1790,33 -76,05 1,09 -4,26 -3,75 0,00 0,00 3,03

14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 1767,32 -75,94 1,07 -4,25 -3,73 0,00 0,00 3,16

43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 1783,80 -76,02 1,08 -4,26 -3,74 0,00 0,00 3,06

29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 1744,74 -75,83 -4,80 0,00 -7,12 2,49 0,00 4,76

58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 1761,59 -75,91 -4,80 0,00 -7,19 2,49 0,00 4,61

87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 1767,81 -75,94 -4,80 0,00 -7,21 2,49 0,00 4,55

160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1669,01 -75,44 2,11 -4,58 - 0,00 0,00 -16,21

161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1669,28 -75,44 2,11 -4,59 - 0,00 0,00 -16,21

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1669,55 -75,44 2,11 -4,61 - 0,00 0,00 -16,22

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1669,86 -75,45 2,11 -4,62 - 0,00 0,00 -16,22

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1670,13 -75,45 2,11 -4,63 - 0,00 0,00 -16,23

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1670,40 -75,45 2,11 -4,64 - 0,00 0,00 -16,23

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1670,75 -75,45 2,11 -4,65 - 0,00 0,00 -16,24

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1671,02 -75,45 2,11 -4,66 - 0,00 0,00 -16,24

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.18 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1671,29 -75,45 2,11 -4,67 - 0,00 0,00 -16,25

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1671,61 -75,45 2,11 -4,68 - 0,00 0,00 -16,25

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1671,88 -75,46 2,11 -4,68 - 0,00 0,00 -16,26

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1672,15 -75,46 2,11 -4,69 - 0,00 0,00 -16,26

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1672,46 -75,46 2,11 -4,70 - 0,00 0,00 -16,27

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1672,74 -75,46 2,11 -4,70 - 0,00 0,00 -16,27

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1673,01 -75,46 2,11 -4,71 - 0,00 0,00 -16,28

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1673,33 -75,46 2,11 -4,72 - 0,00 0,00 -16,28

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1673,61 -75,47 2,11 -4,72 - 0,00 0,00 -16,29

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1673,88 -75,47 2,11 -4,73 - 0,00 0,00 -16,29

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1674,24 -75,47 2,11 -4,73 - 0,00 0,00 -16,29

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1674,52 -75,47 2,11 -4,74 - 0,00 0,00 -16,30

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1674,79 -75,47 2,11 -4,74 - 0,00 0,00 -16,30

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1675,12 -75,47 2,11 -4,74 - 0,00 0,00 -16,31

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1675,40 -75,47 2,11 -4,75 - 0,00 0,00 -16,31

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1675,68 -75,48 2,11 -4,75 - 0,00 0,00 -16,31

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1676,05 -75,48 2,11 -4,75 - 0,00 0,00 -16,32

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1676,33 -75,48 2,11 -4,76 - 0,00 0,00 -16,32

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1676,61 -75,48 2,11 -4,76 - 0,00 0,00 -16,32

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1676,94 -75,48 2,11 -4,76 - 0,00 0,00 -16,33

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1677,22 -75,48 2,11 -4,76 - 0,00 0,00 -16,33

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1677,50 -75,49 2,11 -4,76 - 0,00 0,00 -16,33

2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 1764,49 -75,92 1,39 -4,33 -3,10 0,00 0,00 8,25

60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 1788,11 -76,04 1,40 -2,62 -4,62 0,00 0,00 8,33

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.19 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 1771,16 -75,96 1,39 -4,34 -3,11 0,00 0,00 8,20

53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 1772,16 -75,96 3,04 -4,68 -3,82 0,72 0,00 6,53

82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 1786,66 -76,03 3,04 - -0,34 0,00 0,00 -0,12

24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 1763,21 -75,92 3,04 -4,68 -3,81 0,00 0,00 5,86

169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 1739,10 -75,80 0,61 - -2,52 0,55 0,00 -14,72

22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 1759,32 -75,90 2,10 - -0,70 0,00 0,00 -20,29

80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 1782,57 -76,01 2,10 - -0,71 0,00 0,00 -20,39

81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 1794,37 -76,07 2,11 - -0,77 0,00 0,00 -21,43

23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 1771,27 -75,96 2,11 - -0,77 0,00 0,00 -21,32

78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 1779,75 -76,00 1,85 - -3,83 0,00 0,00 -30,17

20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 1756,45 -75,88 1,85 - -3,82 0,00 0,00 -30,05

19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 1774,62 -75,97 1,88 - -4,30 0,00 0,00 -31,13

77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 1797,67 -76,09 1,88 - -4,32 0,00 0,00 -31,27

21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 1766,50 -75,93 3,88 - -0,26 0,00 0,00 -6,68

79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 1789,66 -76,05 3,89 - -0,26 0,00 0,00 -6,82

170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 1741,76 -75,81 0,60 - -2,39 0,00 0,00 -13,75

6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 1773,71 -75,97 0,53 - -0,59 0,00 0,00 -11,05

35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 1789,68 -76,05 0,53 - -0,59 0,00 0,00 -11,19

64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 1796,39 -76,08 0,53 - -0,59 0,00 0,00 -11,23

5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 1775,50 -75,98 2,12 - -0,82 0,00 0,00 -21,75

63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 1798,42 -76,09 2,12 - -0,82 0,00 0,00 -21,86

34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 1787,57 -76,04 2,12 - -0,71 0,00 0,00 -20,55

171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 1742,06 -75,81 1,25 - -1,64 0,01 0,00 -21,34

33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 1791,40 -76,06 1,82 - -4,21 0,00 0,00 -27,42

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.20 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 1794,32 -76,07 1,82 - -4,21 0,00 0,00 -27,45

4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 1771,88 -75,96 1,82 - -4,17 0,00 0,00 -27,25

65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 1796,38 -76,08 3,95 - -0,28 0,00 0,00 -7,88

7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 1773,70 -75,97 3,94 - -0,27 0,00 0,00 -7,69

36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 1789,67 -76,05 3,94 - -0,27 0,00 0,00 -7,83

8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 1771,13 -75,96 1,88 - -4,35 0,00 0,00 -31,19

66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 1793,46 -76,07 1,88 - -4,37 0,00 0,00 -31,33

168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 1733,85 -75,77 0,60 -5,27 -3,60 0,14 0,00 0,24

52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 1767,60 -75,94 2,10 -4,39 -2,80 0,00 0,00 -8,96

17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 1751,14 -75,86 2,10 -4,39 -2,79 0,00 0,00 -8,87

75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 1774,09 -75,97 2,10 -4,39 -2,80 0,00 0,00 -9,00

51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 1770,16 -75,95 1,85 -4,65 -6,96 0,00 0,00 -14,69

16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 1748,98 -75,85 1,85 -4,65 -6,90 0,00 0,00 -14,53

74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 1771,64 -75,96 1,85 -4,65 -6,96 0,00 0,00 -14,70

37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 1792,42 -76,06 1,88 - -4,37 0,00 0,00 -31,32

165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 1736,53 -75,79 0,57 -4,38 -3,78 0,00 0,00 -6,29

48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 1781,56 -76,01 2,11 -4,40 -2,81 0,00 0,00 -9,03

49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 1769,68 -75,95 2,10 -4,39 -2,80 0,00 0,00 -8,97

45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 1784,42 -76,02 1,88 -4,66 -7,00 0,00 0,00 -14,78

46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 1766,36 -75,93 1,85 -4,65 -6,95 0,00 0,00 -14,66

47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 1774,44 -75,97 3,88 -4,60 -0,88 0,00 0,00 3,44

18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 1765,06 -75,93 0,29 - -1,12 0,00 0,00 -22,29

76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 1788,24 -76,04 0,29 - -1,13 0,00 0,00 -22,43

32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 1789,66 -76,05 0,28 - -1,10 0,00 0,00 -23,87

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.21 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 1796,60 -76,08 0,28 - -1,11 0,00 0,00 -24,00

3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 1773,90 -75,97 0,27 - -1,10 0,00 0,00 -23,82

73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 1774,40 -75,97 0,26 -4,02 -3,08 0,00 0,00 -12,98

50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 1767,38 -75,94 0,23 -3,99 -3,08 0,00 0,00 -12,94

15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 1751,42 -75,86 0,25 -3,83 -3,15 0,00 0,00 -12,75

44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 1775,83 -75,98 0,29 -3,99 -3,11 0,00 0,00 -12,23

88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 1589,55 -75,02 0,96 -4,28 -5,11 0,00 0,00 -6,44

89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 1587,29 -75,01 0,96 -4,28 -5,10 0,00 0,00 -6,42

91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 1626,45 -75,22 0,70 -5,98 -4,90 0,00 0,00 -16,07

92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 1621,57 -75,19 0,92 - -3,33 0,00 0,00 -44,00

94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 1632,58 -75,25 0,71 -4,67 -5,01 0,00 0,00 -17,86

95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 1632,57 -75,25 0,94 - -3,32 0,00 0,00 -43,95

96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 1624,11 -75,20 0,76 -3,61 -4,91 0,00 0,00 -13,47

90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 1623,99 -75,20 0,74 -4,57 -4,61 0,00 0,00 -17,39

98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 1681,66 -75,51 0,89 -4,16 -6,40 0,00 0,00 7,83

102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1686,36 -75,53 2,15 -4,51 - 0,00 0,00 -13,50

103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1686,62 -75,53 2,15 -4,52 - 0,00 0,00 -13,50

104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1686,89 -75,53 2,15 -4,54 - 0,00 0,00 -13,51

105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1687,22 -75,54 2,15 -4,56 - 0,00 0,00 -13,52

106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1687,48 -75,54 2,15 -4,57 - 0,00 0,00 -13,52

107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1687,75 -75,54 2,15 -4,58 - 0,00 0,00 -13,53

108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1688,08 -75,54 2,15 -4,60 - 0,00 0,00 -13,53

109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1688,35 -75,54 2,15 -4,61 - 0,00 0,00 -13,54

110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1688,62 -75,54 2,15 -4,62 - 0,00 0,00 -13,54

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.22 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1688,93 -75,54 2,15 -4,63 - 0,00 0,00 -13,55

112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1689,20 -75,55 2,15 -4,64 - 0,00 0,00 -13,55

113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1689,47 -75,55 2,15 -4,65 - 0,00 0,00 -13,56

114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1689,82 -75,55 2,15 -4,66 - 0,00 0,00 -13,56

115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1690,09 -75,55 2,15 -4,67 - 0,00 0,00 -13,57

116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1690,36 -75,55 2,15 -4,68 - 0,00 0,00 -13,57

117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1690,70 -75,55 2,15 -4,69 - 0,00 0,00 -13,57

118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1690,97 -75,55 2,15 -4,69 - 0,00 0,00 -13,58

119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1691,24 -75,56 2,15 -4,70 - 0,00 0,00 -13,58

120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1691,54 -75,56 2,15 -4,71 - 0,00 0,00 -13,59

121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1691,81 -75,56 2,15 -4,71 - 0,00 0,00 -13,59

122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1692,09 -75,56 2,15 -4,72 - 0,00 0,00 -13,59

123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1692,43 -75,56 2,15 -4,73 - 0,00 0,00 -13,60

124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1692,71 -75,56 2,15 -4,73 - 0,00 0,00 -13,60

125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1692,98 -75,57 2,15 -4,73 - 0,00 0,00 -13,61

126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1693,32 -75,57 2,15 -4,74 - 0,00 0,00 -13,61

127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1693,60 -75,57 2,15 -4,74 - 0,00 0,00 -13,61

128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1693,88 -75,57 2,15 -4,75 - 0,00 0,00 -13,62

129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1694,22 -75,57 2,15 -4,75 - 0,00 0,00 -13,62

130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1694,50 -75,57 2,15 -4,75 - 0,00 0,00 -13,62

131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1694,78 -75,57 2,15 -4,76 - 0,00 0,00 -13,63

99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 1681,66 -75,51 0,89 -4,16 -6,40 0,00 0,00 7,83

100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 1735,71 -75,78 1,48 -4,56 -6,66 1,46 0,00 16,28

162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 1731,78 -75,76 1,47 -4,56 -6,65 1,47 0,00 16,51

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.23 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 1733,14 -75,77 1,47 -4,56 -6,65 1,49 0,00 14,49

163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 1601,24 -75,08 1,98 -4,76 -8,18 0,00 0,00 2,62

164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 1600,52 -75,08 1,98 -4,76 -8,17 0,00 0,00 2,63

59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 1795,67 -76,08 1,27 -4,45 -4,82 0,00 0,00 7,92

30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 1779,03 -76,00 1,26 -4,45 -4,79 0,53 0,00 8,56

1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 1772,17 -75,96 1,26 -4,45 -4,78 0,00 0,00 8,07

25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 1733,50 -75,77 1,49 -4,56 -6,66 2,28 0,00 10,14

54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 1750,38 -75,85 1,49 -4,56 -6,70 2,26 0,00 9,99

83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 1756,65 -75,89 -4,80 0,00 -4,14 2,31 0,00 12,49

55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 1758,32 -75,89 1,50 -4,56 -6,73 2,47 0,00 11,59

26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 1741,15 -75,81 1,50 -4,56 -6,68 2,46 0,00 11,72

84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 1764,68 -75,93 1,50 -4,56 -6,75 2,47 0,00 11,60

173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 1738,81 -75,80 0,75 -4,07 -2,20 0,80 0,00 9,49

167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 1737,84 -75,79 0,49 -4,47 -3,75 0,00 0,00 -4,85

38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 1778,80 -75,99 -0,85 -3,29 -2,94 0,00 0,00 -12,92

67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 1785,23 -76,03 -0,85 -3,29 -2,94 0,00 0,00 -12,96

9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 1762,42 -75,91 -0,86 -3,28 -2,91 0,00 0,00 -12,82

166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 1735,58 -75,78 -4,72 0,00 -4,09 0,00 0,00 -2,59

172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 1741,35 -75,81 -4,72 - -4,11 0,00 0,00 -18,23

93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 1631,05 -75,24 -4,72 - -3,85 0,00 0,00 -23,43

97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 1619,14 -75,18 -4,72 0,00 -3,82 0,00 0,00 -9,71

28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 1777,95 -75,99 0,42 - -0,51 0,00 0,00 -11,04

57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 1794,54 -76,07 0,42 - -0,52 0,00 0,00 -10,99

86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 1800,72 -76,10 0,42 - -0,52 0,00 0,00 -11,02

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.24 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 1790,73 -76,05 0,55 - -3,66 0,00 0,00 -12,16

27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 1766,89 -75,94 0,53 - -3,68 0,00 0,00 -11,46

56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 1777,31 -75,99 0,54 -3,56 -7,24 2,52 0,00 -3,73

39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 1779,00 -76,00 -0,41 -3,76 -4,24 0,00 0,00 11,74

10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 1762,63 -75,92 -0,42 -3,75 -4,20 0,00 0,00 11,85

68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 1785,44 -76,03 -0,40 -3,76 -4,25 0,01 0,00 11,71

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.25 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 4 Kipoi Ld = 19,9 dB(A) Ln = 19,9 dB(A)

11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2649,93 -79,46 1,28 -4,86 -3,56 0,00 0,00 -0,59

69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2593,26 -79,27 1,09 -4,97 -3,26 0,00 0,00 -0,41

40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2608,18 -79,32 1,14 -4,94 -3,34 0,00 0,00 -0,46

41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2611,48 -79,33 1,14 -4,92 -3,36 0,00 0,00 -0,47

12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2653,19 -79,47 1,28 -4,84 -3,57 0,00 0,00 -0,60

70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2596,58 -79,28 1,09 -4,95 -3,28 0,00 0,00 -0,42

13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2640,12 -79,42 1,25 -4,88 -3,51 0,00 0,00 -0,56

42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2598,83 -79,29 1,11 -4,96 -3,29 0,00 0,00 -0,43

71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2583,59 -79,24 1,06 -4,99 -3,21 0,00 0,00 -0,38

72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2587,60 -79,25 1,06 -4,97 -3,23 0,00 0,00 -0,39

14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2644,04 -79,44 1,25 -4,86 -3,53 0,00 0,00 -0,57

43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2602,52 -79,30 1,11 -4,94 -3,31 0,00 0,00 -0,44

29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 2636,17 -79,41 -4,80 -0,79 - 2,54 0,00 -3,21

58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 2593,97 -79,27 -4,80 -1,04 - 2,55 0,00 -3,14

87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 2579,36 -79,22 -4,80 -1,15 - 2,55 0,00 -3,13

160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2619,93 -79,36 2,26 -7,49 - 0,00 0,00 -24,67

161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2619,19 -79,36 2,26 -7,50 - 0,00 0,00 -24,67

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2618,44 -79,35 2,26 -7,51 - 0,00 0,00 -24,67

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2617,51 -79,35 2,26 -7,52 - 0,00 0,00 -24,67

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2616,77 -79,35 2,26 -7,53 - 0,00 0,00 -24,67

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2616,03 -79,34 2,26 -7,54 - 0,00 0,00 -24,66

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2615,14 -79,34 2,26 -7,55 - 0,00 0,00 -24,66

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2614,40 -79,34 2,26 -7,56 - 0,00 0,00 -24,66

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.26 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2613,66 -79,34 2,26 -7,57 - 0,00 0,00 -24,66

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2612,74 -79,33 2,26 -7,59 - 0,00 0,00 -24,66

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2612,00 -79,33 2,26 -7,60 - 0,00 0,00 -24,65

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2611,26 -79,33 2,26 -7,61 - 0,00 0,00 -24,65

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2610,34 -79,33 2,26 -7,62 - 0,00 0,00 -24,65

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2609,60 -79,32 2,26 -7,63 - 0,00 0,00 -24,65

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2608,86 -79,32 2,26 -7,64 - 0,00 0,00 -24,65

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2607,94 -79,32 2,26 -7,66 - 0,00 0,00 -24,65

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2607,20 -79,32 2,26 -7,67 - 0,00 0,00 -24,64

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2606,46 -79,31 2,26 -7,68 - 0,00 0,00 -24,64

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2605,58 -79,31 2,26 -7,69 - 0,00 0,00 -24,64

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2604,84 -79,31 2,26 -7,70 - 0,00 0,00 -24,64

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2604,10 -79,31 2,26 -7,71 - 0,00 0,00 -24,64

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2603,18 -79,30 2,26 -7,73 - 0,00 0,00 -24,64

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2602,44 -79,30 2,26 -7,74 - 0,00 0,00 -24,64

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2601,70 -79,30 2,26 -7,75 - 0,00 0,00 -24,63

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2600,82 -79,29 2,26 -7,76 - 0,00 0,00 -24,63

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2600,08 -79,29 2,26 -7,77 - 0,00 0,00 -24,63

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2599,35 -79,29 2,26 -7,78 - 0,00 0,00 -24,63

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2598,42 -79,29 2,26 -7,80 - 0,00 0,00 -24,63

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2597,69 -79,28 2,26 -7,81 - 0,00 0,00 -24,63

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2596,95 -79,28 2,26 -7,82 - 0,00 0,00 -24,63

2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 2632,26 -79,40 1,59 -4,59 -3,41 0,00 0,00 4,41

60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 2575,92 -79,21 1,45 -4,62 -3,25 0,00 0,00 4,59

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.27 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 2615,64 -79,34 1,55 -4,60 -3,36 0,00 0,00 4,46

53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 2612,71 -79,33 3,00 - -1,23 0,00 0,00 -11,08

82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 2578,80 -79,22 2,97 -5,96 -2,77 0,00 0,00 2,25

24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 2635,14 -79,41 3,03 -5,67 -3,09 2,54 0,00 4,62

169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 2780,08 -79,87 0,65 -4,67 -5,55 0,00 0,00 -12,34

22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2635,32 -79,41 2,08 -5,27 -2,22 0,00 0,00 -12,76

80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2578,79 -79,22 2,02 -5,49 -1,98 0,00 0,00 -12,60

81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2587,14 -79,25 2,02 -5,44 -2,03 0,00 0,00 -12,62

23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2643,49 -79,44 2,08 -5,22 -2,27 0,00 0,00 -12,78

78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2576,79 -79,21 1,70 -6,13 -7,84 0,00 0,00 -20,46

20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2633,37 -79,40 1,79 -5,73 -8,21 0,00 0,00 -20,53

19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2645,79 -79,44 1,79 -5,62 -8,30 0,00 0,00 -20,56

77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2589,48 -79,26 1,70 -5,98 -7,95 0,00 0,00 -20,46

21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 2640,21 -79,42 3,95 -4,84 -0,84 0,00 0,00 -0,16

79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 2583,78 -79,24 3,92 -4,90 -0,77 0,00 0,00 0,01

170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 2787,80 -79,90 0,65 - -3,73 0,00 0,00 -27,51

6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 2653,98 -79,47 0,53 - -1,38 0,00 0,00 -19,13

35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 2613,16 -79,34 0,49 - -1,36 0,00 0,00 -18,96

64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 2597,59 -79,28 0,47 - -1,36 0,00 0,00 -18,95

5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2649,27 -79,45 2,08 - -1,79 0,00 0,00 -29,68

63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2592,96 -79,27 2,02 - -1,76 0,00 0,00 -29,50

34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2618,23 -79,35 2,05 - -1,78 0,00 0,00 -29,60

171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 2786,60 -79,89 1,27 - -3,81 0,00 0,00 -31,83

33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 2609,05 -79,32 1,69 - -7,22 0,00 0,00 -34,72

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.28 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 2602,36 -79,30 1,68 - -7,20 0,00 0,00 -34,69

4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 2658,83 -79,49 1,77 - -7,31 0,00 0,00 -34,90

65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 2597,59 -79,28 3,96 - -0,55 0,00 0,00 -15,93

7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 2653,99 -79,47 3,99 - -0,56 0,00 0,00 -16,11

36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 2613,17 -79,34 3,97 - -0,55 0,00 0,00 -15,94

8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2660,84 -79,49 1,81 - -7,42 0,00 0,00 -38,65

66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2604,34 -79,31 1,72 - -7,31 0,00 0,00 -38,43

168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 2782,57 -79,88 0,64 -4,67 -5,56 0,00 0,00 -5,33

52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2597,48 -79,28 2,04 -5,42 -2,06 0,00 0,00 -12,65

17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2639,27 -79,42 2,08 -5,26 -2,24 0,00 0,00 -12,77

75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2582,54 -79,23 2,03 -5,48 -1,99 0,00 0,00 -12,61

51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2591,46 -79,26 1,73 -6,02 -7,94 0,00 0,00 -20,47

16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2644,98 -79,44 1,81 -5,66 -8,28 0,00 0,00 -20,56

74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2588,15 -79,25 1,72 -6,04 -7,92 0,00 0,00 -20,47

37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2606,64 -79,31 1,73 - -7,32 0,00 0,00 -38,45

165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 2790,17 -79,90 0,65 - -3,74 0,00 0,00 -29,21

48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2616,40 -79,35 2,05 - -1,78 0,00 0,00 -29,59

49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2608,16 -79,32 2,05 - -1,78 0,00 0,00 -29,58

45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2618,38 -79,35 1,75 - -7,35 0,00 0,00 -38,50

46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2605,86 -79,31 1,75 - -7,34 0,00 0,00 -38,45

47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 2611,44 -79,33 3,94 - -0,53 0,00 0,00 -15,72

18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 2639,23 -79,42 0,39 -4,38 -3,92 0,00 0,00 -16,77

76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 2582,76 -79,23 0,21 -4,42 -3,75 0,00 0,00 -16,62

32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 2613,20 -79,34 0,23 - -2,11 0,00 0,00 -33,45

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.29 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 2597,17 -79,28 0,19 - -2,12 0,00 0,00 -33,49

3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 2653,54 -79,47 0,33 - -2,17 0,00 0,00 -33,67

73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 2581,87 -79,23 0,20 -4,41 -3,75 0,00 0,00 -17,35

50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 2598,06 -79,29 0,22 -4,37 -3,80 0,00 0,00 -17,40

15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 2638,59 -79,42 0,35 -4,37 -3,91 0,00 0,00 -17,51

44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 2612,40 -79,33 0,28 - -2,17 0,00 0,00 -32,58

88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 2621,27 -79,36 0,97 -5,83 -5,43 0,00 0,00 -12,65

89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 2628,55 -79,39 0,97 -5,78 -5,47 0,00 0,00 -12,67

91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 2698,01 -79,61 0,85 -5,02 -7,05 0,00 0,00 -21,51

92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2694,94 -79,60 0,95 -5,14 -7,03 0,00 0,00 -35,66

94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 2705,67 -79,64 0,86 -7,37 -7,08 0,00 0,00 -26,87

95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2705,75 -79,64 0,97 - -6,57 0,00 0,00 -54,60

96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 2704,13 -79,63 0,85 -7,97 -7,07 0,00 0,00 -24,33

90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 2700,95 -79,62 0,84 -5,01 -7,06 0,00 0,00 -24,59

98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 2613,74 -79,34 1,22 -5,79 -6,40 0,00 0,00 2,69

102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2631,23 -79,40 2,28 -7,26 - 0,00 0,00 -21,50

103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2630,49 -79,39 2,28 -7,27 - 0,00 0,00 -21,49

104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2629,75 -79,39 2,28 -7,28 - 0,00 0,00 -21,49

105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2628,85 -79,39 2,28 -7,29 - 0,00 0,00 -21,49

106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2628,11 -79,38 2,28 -7,30 - 0,00 0,00 -21,49

107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2627,37 -79,38 2,28 -7,31 - 0,00 0,00 -21,49

108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2626,48 -79,38 2,28 -7,32 - 0,00 0,00 -21,48

109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2625,75 -79,38 2,28 -7,33 - 0,00 0,00 -21,48

110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2625,01 -79,37 2,28 -7,34 - 0,00 0,00 -21,48

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.30 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2624,09 -79,37 2,28 -7,35 - 0,00 0,00 -21,48

112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2623,35 -79,37 2,28 -7,36 - 0,00 0,00 -21,48

113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2622,62 -79,37 2,28 -7,37 - 0,00 0,00 -21,47

114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2621,73 -79,36 2,28 -7,39 - 0,00 0,00 -21,47

115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2620,99 -79,36 2,28 -7,40 - 0,00 0,00 -21,47

116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2620,26 -79,36 2,28 -7,41 - 0,00 0,00 -21,47

117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2619,35 -79,36 2,28 -7,42 - 0,00 0,00 -21,47

118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2618,61 -79,35 2,28 -7,43 - 0,00 0,00 -21,46

119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2617,88 -79,35 2,28 -7,44 - 0,00 0,00 -21,46

120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2616,95 -79,35 2,28 -7,45 - 0,00 0,00 -21,46

121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2616,21 -79,35 2,28 -7,46 - 0,00 0,00 -21,46

122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2615,48 -79,34 2,28 -7,47 - 0,00 0,00 -21,46

123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2614,59 -79,34 2,28 -7,48 - 0,00 0,00 -21,45

124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2613,86 -79,34 2,28 -7,49 - 0,00 0,00 -21,45

125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2613,13 -79,34 2,28 -7,50 - 0,00 0,00 -21,45

126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2612,22 -79,33 2,28 -7,52 - 0,00 0,00 -21,45

127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2611,48 -79,33 2,28 -7,53 - 0,00 0,00 -21,45

128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2610,75 -79,33 2,28 -7,54 - 0,00 0,00 -21,44

129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2609,87 -79,32 2,28 -7,55 - 0,00 0,00 -21,44

130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2609,13 -79,32 2,28 -7,56 - 0,00 0,00 -21,44

131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2608,40 -79,32 2,28 -7,57 - 0,00 0,00 -21,44

99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 2613,73 -79,34 1,22 -5,79 -6,40 0,00 0,00 2,69

100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 2597,44 -79,28 1,43 -5,86 -8,15 1,18 0,00 9,67

162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 2596,56 -79,28 1,44 -5,87 -8,15 0,52 0,00 9,20

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.31 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 2597,42 -79,28 1,44 -5,86 -8,15 0,57 0,00 7,22

163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 2658,72 -79,49 2,04 -6,03 - 0,00 0,00 -6,52

164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 2661,13 -79,49 2,04 -6,02 - 0,00 0,00 -6,53

59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 2581,75 -79,23 1,14 -5,29 -5,43 2,53 0,00 5,73

30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 2620,87 -79,36 1,20 - -3,42 0,00 0,00 -12,50

1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 2638,09 -79,42 1,23 -5,07 -5,68 2,53 0,00 5,59

25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 2635,26 -79,41 1,48 -5,60 -8,38 1,10 0,00 2,55

54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 2592,95 -79,27 1,42 -5,87 -8,13 2,25 0,00 3,76

83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 2578,40 -79,22 -4,80 -0,61 -6,08 1,15 0,00 5,45

55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 2579,85 -79,22 1,40 -5,97 -8,05 1,83 0,00 4,79

26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 2622,15 -79,37 1,46 -5,68 -8,30 0,38 0,00 3,30

84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 2565,48 -79,18 1,37 -6,08 -7,96 0,45 0,00 3,48

173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 2779,10 -79,87 0,83 -4,25 -2,78 2,47 0,00 6,41

167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 2785,05 -79,89 0,58 -4,63 -5,56 0,00 0,00 -10,83

38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 2604,64 -79,31 -0,84 -3,44 -3,78 0,00 0,00 -17,22

67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 2590,25 -79,26 -0,89 -3,92 -3,72 0,00 0,00 -17,65

9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 2646,63 -79,45 -0,68 -4,02 -3,85 0,00 0,00 -17,85

166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2789,56 -79,90 -4,80 - -6,58 0,00 0,00 -29,45

172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2789,40 -79,90 -4,80 - -6,58 0,00 0,00 -29,45

93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2700,92 -79,62 -4,80 -0,29 -6,37 0,00 0,00 -17,07

97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2700,98 -79,62 -4,80 - -6,37 0,00 0,00 -36,97

28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2657,53 -79,48 0,46 - -1,01 0,00 0,00 -19,24

57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 2615,83 -79,34 0,41 - -0,99 0,00 0,00 -19,05

86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 2601,29 -79,30 0,40 - -0,99 0,00 0,00 -19,04

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.32 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 2583,59 -79,24 0,36 - -5,84 15,54 0,00 -12,44

27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2639,56 -79,42 0,65 - -6,05 15,60 0,00 -12,65

56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 2614,19 -79,34 0,52 - -6,12 0,00 0,00 -28,50

39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 2606,30 -79,31 -0,43 -3,99 -5,43 0,00 0,00 6,97

10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 2647,97 -79,45 -0,25 -4,04 -5,58 0,00 0,00 6,81

68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 2591,41 -79,26 -0,50 -3,97 -5,38 0,00 0,00 7,03

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.33 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 5 Station Fence West Ld = 53,1 dB(A) Ln = 53,1 dB(A)

11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 220,52 -57,86 3,00 -6,17 -1,34 0,00 0,00 23,64

69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 294,04 -60,36 3,00 -5,09 -2,27 0,00 0,00 21,28

40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 274,39 -59,76 3,00 -6,03 -1,55 0,00 0,00 21,66

41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 275,30 -59,79 3,00 - -0,33 0,00 0,00 18,87

12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 221,65 -57,91 3,00 -7,55 -0,71 0,00 0,00 22,84

70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 294,88 -60,38 3,00 - -0,26 0,00 0,00 18,24

13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 232,62 -58,33 3,00 -6,28 -1,19 1,37 0,00 24,58

42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 286,71 -60,14 3,00 -5,76 -1,66 0,00 0,00 21,44

71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 306,29 -60,71 3,00 -5,07 -2,17 0,00 0,00 21,05

72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 307,26 -60,74 3,00 -6,06 -1,55 0,00 0,00 20,65

14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 233,90 -58,37 3,00 -6,06 -1,15 0,00 0,00 23,42

43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 287,56 -60,17 3,00 -6,37 -1,32 0,00 0,00 21,15

29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 222,00 -57,92 -4,47 0,00 -0,91 0,00 0,00 26,72

58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 277,17 -59,85 -4,54 0,00 -1,13 0,00 0,00 24,49

87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 296,43 -60,43 -4,56 0,00 -1,21 0,00 0,00 23,81

160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 188,00 -56,48 3,41 0,00 -5,03 0,00 0,00 27,49

161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 188,93 -56,52 3,41 0,00 -5,06 0,00 0,00 27,43

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 189,87 -56,56 3,42 0,00 -5,08 0,00 0,00 27,37

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,02 -56,61 3,43 0,00 -5,11 0,00 0,00 27,30

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,95 -56,66 3,43 0,00 -5,13 0,00 0,00 27,23

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 192,88 -56,70 3,43 0,00 -5,15 0,00 0,00 27,17

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,01 -56,75 3,44 0,00 -5,18 0,00 0,00 27,10

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,94 -56,79 3,45 0,00 -5,21 0,00 0,00 27,04

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.34 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 195,88 -56,83 3,45 0,00 -5,23 0,00 0,00 26,98

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 197,03 -56,88 3,46 0,00 -5,26 0,00 0,00 26,91

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 197,96 -56,92 3,46 0,00 -5,28 0,00 0,00 26,85

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 198,89 -56,96 3,47 0,00 -5,30 0,00 0,00 26,79

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 200,04 -57,01 3,47 0,00 -5,33 0,00 0,00 26,72

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 200,97 -57,05 3,48 0,00 -5,35 0,00 0,00 26,66

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 201,91 -57,10 3,48 0,00 -5,38 0,00 0,00 26,60

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 203,06 -57,14 3,49 0,00 -5,41 0,00 0,00 26,53

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 203,99 -57,18 3,49 0,00 -5,43 0,00 0,00 26,47

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 204,93 -57,22 3,50 0,00 -5,45 0,00 0,00 26,41

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 206,06 -57,27 3,50 0,00 -5,48 0,00 0,00 26,34

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 206,99 -57,31 3,51 0,00 -5,50 0,00 0,00 26,28

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 207,93 -57,35 3,51 0,00 -5,53 0,00 0,00 26,23

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 209,08 -57,40 3,52 0,00 -5,55 0,00 0,00 26,16

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 210,01 -57,44 3,52 0,00 -5,58 0,00 0,00 26,10

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 210,95 -57,48 3,53 0,00 -5,60 0,00 0,00 26,04

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 212,09 -57,52 3,53 0,00 -5,63 0,00 0,00 25,98

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 213,02 -57,56 3,54 0,00 -5,65 0,00 0,00 25,92

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 213,96 -57,60 3,54 0,00 -5,67 0,00 0,00 25,86

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 215,11 -57,65 3,55 0,00 -5,70 0,00 0,00 25,79

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 216,05 -57,68 3,55 0,00 -5,73 0,00 0,00 25,74

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 216,98 -57,72 3,56 0,00 -5,75 0,00 0,00 25,68

2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 242,89 -58,70 3,00 -3,64 -0,88 0,00 0,00 29,99

60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 316,68 -61,00 3,00 -3,52 -1,07 0,00 0,00 27,62

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.35 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 264,48 -59,44 3,00 -3,63 -0,94 0,00 0,00 29,20

53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 267,66 -59,54 4,66 -8,69 -0,62 0,11 0,00 23,14

82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 312,32 -60,88 4,85 - -0,33 0,00 0,00 15,35

24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 238,48 -58,54 4,49 - -0,28 8,44 0,00 25,94

169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 89,87 -50,06 3,11 - -0,16 0,00 0,00 17,80

22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 235,02 -58,41 4,81 - -0,27 0,00 0,00 2,31

80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 308,97 -60,79 5,10 - -0,33 0,00 0,00 0,00

81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 310,96 -60,85 5,10 - -0,45 0,00 0,00 -2,67

23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 237,64 -58,51 4,83 - -0,40 0,00 0,00 -0,70

78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 308,57 -60,78 5,09 - -0,96 0,00 0,00 -3,81

20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 234,48 -58,39 4,80 - -0,75 0,00 0,00 -1,37

19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 238,49 -58,54 4,82 - -0,93 0,00 0,00 -5,76

77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 311,61 -60,86 5,10 - -1,16 0,00 0,00 -7,86

21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 236,52 -58,47 3,91 - -0,09 0,00 0,00 11,31

79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 310,11 -60,82 4,40 - -0,13 0,00 0,00 8,75

170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 88,84 -49,96 3,10 - -0,15 0,00 0,00 18,38

6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 230,00 -58,23 3,75 - -0,18 3,24 0,00 11,95

35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 282,41 -60,01 4,17 - -0,19 0,00 0,00 9,79

64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 302,88 -60,62 4,29 - -0,21 0,00 0,00 8,88

5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 236,03 -58,45 4,82 - -0,37 0,00 0,00 -0,39

63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 309,00 -60,79 5,10 - -0,36 0,00 0,00 -1,37

34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 275,82 -59,80 4,99 - -0,32 0,00 0,00 -0,01

171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 89,74 -50,05 3,18 - -0,19 0,00 0,00 10,20

33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 287,77 -60,17 4,66 - -1,01 0,00 0,00 -3,41

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.36 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 296,60 -60,44 4,70 - -1,06 0,00 0,00 -3,91

4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 223,83 -57,99 4,28 - -0,93 0,00 0,00 -2,96

65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 302,87 -60,62 4,69 - -0,10 0,00 0,00 10,43

7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 230,00 -58,23 4,28 - -0,11 0,00 0,00 10,01

36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 282,40 -60,01 4,60 - -0,09 0,00 0,00 11,38

8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 221,29 -57,89 4,73 - -0,92 0,00 0,00 -6,05

66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 294,02 -60,36 5,05 - -1,05 0,00 0,00 -7,11

168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 82,61 -49,33 3,01 -0,22 -0,20 0,74 0,00 38,14

52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 278,61 -59,89 5,00 0,00 -1,59 0,00 0,00 15,59

17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 224,26 -58,01 4,76 0,00 -1,39 0,00 0,00 17,42

75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 298,40 -60,49 5,06 0,00 -1,65 0,00 0,00 14,99

51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 286,54 -60,14 5,02 0,00 -1,51 0,00 0,00 14,39

16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 216,88 -57,72 4,71 0,00 -1,18 0,00 0,00 16,83

74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 290,96 -60,27 5,04 0,00 -1,53 0,00 0,00 14,25

37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 290,96 -60,27 5,04 - -1,01 0,00 0,00 -6,76

165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 81,54 -49,22 3,00 0,00 -0,19 0,00 0,00 30,67

48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 272,27 -59,69 4,98 - -0,20 0,00 0,00 5,82

49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 269,99 -59,62 4,97 0,00 -1,56 0,00 0,00 15,86

45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 272,90 -59,71 4,98 - -0,78 0,00 0,00 -1,75

46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 269,45 -59,60 4,96 0,00 -1,43 0,00 0,00 14,94

47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 270,84 -59,65 4,17 -7,17 -0,09 0,00 0,00 18,27

18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 236,34 -58,46 3,25 - -0,29 0,00 0,00 -2,01

76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 309,99 -60,82 3,62 - -0,38 0,00 0,00 -4,10

32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 282,05 -60,00 3,40 - -0,32 0,00 0,00 -5,18

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.37 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 303,23 -60,63 3,52 - -0,35 0,00 0,00 -6,06

3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 230,30 -58,24 3,24 - -0,29 0,00 0,00 -5,17

73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 299,00 -60,51 3,47 0,00 -0,66 0,00 0,00 12,14

50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 277,60 -59,86 3,46 0,00 -0,62 0,00 0,00 12,82

15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 224,83 -58,03 3,23 0,00 -0,51 0,00 0,00 14,53

44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 271,24 -59,66 3,47 -4,76 -0,53 0,00 0,00 9,08

88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 166,97 -55,45 4,92 -6,84 -0,35 0,00 0,00 19,29

89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 159,97 -55,07 4,87 -8,64 -0,32 0,00 0,00 17,84

91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 90,33 -50,11 3,06 -3,79 -0,27 0,00 0,00 18,21

92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 93,25 -50,39 3,26 - -0,21 0,00 0,00 -10,86

94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 82,61 -49,33 3,01 0,00 -0,25 0,00 0,00 19,78

95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 82,63 -49,33 3,00 0,00 -0,25 0,00 0,00 8,58

96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 83,96 -49,47 3,00 0,00 -0,25 0,00 0,00 22,76

90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 86,99 -49,78 3,00 -4,71 -0,26 0,00 0,00 14,50

98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 200,88 -57,05 3,00 0,00 -2,15 0,00 0,00 36,80

102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 185,34 -56,35 3,38 0,00 -5,03 0,00 0,00 30,83

103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 186,28 -56,40 3,38 0,00 -5,05 0,00 0,00 30,76

104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 187,23 -56,44 3,39 0,00 -5,07 0,00 0,00 30,70

105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 188,39 -56,49 3,39 0,00 -5,10 0,00 0,00 30,62

106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 189,33 -56,54 3,39 0,00 -5,13 0,00 0,00 30,56

107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 190,28 -56,58 3,40 0,00 -5,15 0,00 0,00 30,50

108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 191,43 -56,63 3,40 0,00 -5,18 0,00 0,00 30,42

109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 192,37 -56,67 3,41 0,00 -5,20 0,00 0,00 30,36

110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 193,32 -56,72 3,41 0,00 -5,23 0,00 0,00 30,30

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.38 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 194,48 -56,77 3,42 0,00 -5,26 0,00 0,00 30,22

112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 195,42 -56,81 3,42 0,00 -5,28 0,00 0,00 30,16

113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,37 -56,85 3,43 0,00 -5,31 0,00 0,00 30,10

114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,52 -56,90 3,44 0,00 -5,33 0,00 0,00 30,02

115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,47 -56,95 3,44 0,00 -5,36 0,00 0,00 29,96

116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,41 -56,99 3,44 0,00 -5,38 0,00 0,00 29,90

117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,58 -57,04 3,45 0,00 -5,41 0,00 0,00 29,83

118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 201,52 -57,08 3,45 0,00 -5,44 0,00 0,00 29,77

119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 202,47 -57,12 3,46 0,00 -5,46 0,00 0,00 29,71

120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 203,63 -57,17 3,47 0,00 -5,49 0,00 0,00 29,64

121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 204,58 -57,21 3,47 0,00 -5,51 0,00 0,00 29,58

122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 205,52 -57,25 3,47 0,00 -5,54 0,00 0,00 29,52

123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 206,67 -57,30 3,48 0,00 -5,57 0,00 0,00 29,44

124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 207,61 -57,34 3,48 0,00 -5,59 0,00 0,00 29,39

125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 208,56 -57,38 3,49 0,00 -5,61 0,00 0,00 29,33

126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 209,72 -57,42 3,49 0,00 -5,64 0,00 0,00 29,25

127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 210,67 -57,46 3,50 0,00 -5,67 0,00 0,00 29,20

128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 211,61 -57,50 3,50 0,00 -5,69 0,00 0,00 29,14

129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 212,75 -57,55 3,51 0,00 -5,72 0,00 0,00 29,07

130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 213,70 -57,59 3,51 0,00 -5,74 0,00 0,00 29,01

131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 214,65 -57,63 3,52 0,00 -5,77 0,00 0,00 28,95

99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 200,88 -57,05 3,00 0,00 -2,15 0,00 0,00 36,80

100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 251,43 -59,00 4,55 0,00 -1,37 0,31 0,00 44,84

162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 248,74 -58,91 4,53 0,00 -1,35 0,41 0,00 45,23

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.39 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 248,95 -58,91 4,53 0,00 -1,35 0,40 0,00 43,17

163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 129,35 -53,23 3,02 -9,93 -0,66 0,02 0,00 27,89

164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 127,08 -53,07 3,01 - -0,64 0,02 0,00 27,69

59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 317,14 -61,02 4,30 - -0,63 0,00 0,00 15,01

30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 265,85 -59,48 3,97 - -0,44 1,08 0,00 22,15

1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 243,52 -58,72 3,78 - -0,47 2,39 0,00 19,78

25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 219,72 -57,83 4,36 0,00 -1,23 0,60 0,00 39,27

54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 272,21 -59,69 4,68 0,00 -1,46 0,02 0,00 36,91

83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 291,49 -60,28 -4,55 0,00 -0,69 0,00 0,00 29,49

55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 286,50 -60,13 4,74 0,00 -1,52 0,12 0,00 38,01

26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 229,30 -58,20 4,43 0,00 -1,27 0,41 0,00 40,17

84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 305,75 -60,70 4,82 0,00 -1,60 0,13 0,00 37,52

173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 90,27 -50,10 3,00 -5,15 -0,08 0,02 0,00 37,69

167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 85,80 -49,66 3,00 -4,72 -0,20 0,60 0,00 27,69

38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 280,64 -59,96 3,00 -5,13 -0,55 0,00 0,00 7,52

67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 300,27 -60,54 3,00 -4,97 -0,60 0,00 0,00 7,04

9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 226,74 -58,10 3,00 -5,24 -0,44 0,00 0,00 9,37

166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 80,93 -49,15 -3,78 0,00 -0,19 0,01 0,00 28,89

172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 87,51 -49,83 -3,83 - -0,21 0,28 0,00 13,95

93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,00 87,50 -49,83 -3,62 - -0,21 0,00 0,00 8,00

97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,00 87,47 -49,83 -3,62 0,00 -0,21 0,00 0,00 20,35

28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 230,63 -58,25 3,00 - -0,16 2,70 0,00 12,69

57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 284,25 -60,07 3,47 -9,92 -0,19 0,00 0,00 13,28

86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 303,24 -60,63 3,63 - -0,21 0,00 0,00 10,29

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.40 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 311,34 -60,86 3,00 - -0,93 0,00 0,00 1,48

27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 237,68 -58,51 3,00 - -0,73 0,00 0,00 4,17

56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 270,84 -59,65 3,00 - -0,73 2,29 0,00 13,38

39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 280,95 -59,96 3,00 -5,15 -0,77 0,00 0,00 33,25

10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 227,16 -58,12 3,00 -6,46 -0,59 0,86 0,00 34,83

68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 300,54 -60,55 3,00 -5,16 -0,82 0,00 0,00 32,61

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.41 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 6 Station Fence South Ld = 54,4 dB(A) Ln = 54,4 dB(A)

11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 261,90 -59,35 2,99 -4,93 -2,19 0,00 0,00 22,53

69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 266,34 -59,50 2,99 -4,93 -2,23 0,00 0,00 22,34

40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 263,00 -59,39 2,99 -4,94 -2,21 0,00 0,00 22,46

41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 267,95 -59,55 2,99 -5,00 -2,12 0,00 0,00 22,32

12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 266,87 -59,52 2,99 -4,99 -2,10 0,00 0,00 22,39

70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 271,23 -59,66 2,99 -4,99 -2,15 0,00 0,00 22,19

13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 260,69 -59,31 2,99 -4,92 -2,20 0,00 0,00 22,56

42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 264,94 -59,45 2,99 -4,89 -2,20 0,00 0,00 22,46

71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 268,67 -59,58 2,99 -4,84 -2,22 0,00 0,00 22,36

72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 274,48 -59,76 2,99 -4,86 -2,10 0,00 0,00 22,27

14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 266,68 -59,51 2,99 -5,00 -2,09 0,00 0,00 22,39

43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 270,28 -59,63 2,99 -4,93 -2,09 0,00 0,00 22,34

29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 245,57 -58,80 -4,50 0,00 -1,00 2,32 0,00 28,03

58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 248,10 -58,88 -4,51 0,00 -1,01 2,33 0,00 27,94

87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 251,85 -59,01 -4,51 0,00 -1,03 2,34 0,00 27,79

160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 184,02 -56,29 3,39 0,00 -4,93 0,00 0,00 27,75

161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 183,75 -56,28 3,38 0,00 -4,93 0,00 0,00 27,77

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 183,48 -56,26 3,38 0,00 -4,92 0,00 0,00 27,79

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 183,15 -56,25 3,38 0,00 -4,91 0,00 0,00 27,81

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 182,90 -56,24 3,38 0,00 -4,91 0,00 0,00 27,83

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 182,65 -56,22 3,38 0,00 -4,90 0,00 0,00 27,85

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 182,38 -56,21 3,38 0,00 -4,89 0,00 0,00 27,86

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 182,15 -56,20 3,38 0,00 -4,89 0,00 0,00 27,88

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.42 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 181,92 -56,19 3,38 0,00 -4,88 0,00 0,00 27,90

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 181,62 -56,18 3,37 0,00 -4,87 0,00 0,00 27,92

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 181,40 -56,16 3,37 0,00 -4,87 0,00 0,00 27,93

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 181,19 -56,15 3,37 0,00 -4,86 0,00 0,00 27,95

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,91 -56,14 3,37 0,00 -4,86 0,00 0,00 27,97

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,70 -56,13 3,37 0,00 -4,85 0,00 0,00 27,98

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,50 -56,12 3,37 0,00 -4,85 0,00 0,00 27,99

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,24 -56,11 3,37 0,00 -4,84 0,00 0,00 28,01

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,05 -56,10 3,37 0,00 -4,84 0,00 0,00 28,02

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,87 -56,09 3,37 0,00 -4,83 0,00 0,00 28,04

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,67 -56,08 3,36 0,00 -4,83 0,00 0,00 28,05

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,50 -56,07 3,36 0,00 -4,82 0,00 0,00 28,06

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,33 -56,07 3,36 0,00 -4,82 0,00 0,00 28,07

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,11 -56,05 3,36 0,00 -4,81 0,00 0,00 28,09

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,95 -56,05 3,36 0,00 -4,81 0,00 0,00 28,10

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,80 -56,04 3,36 0,00 -4,80 0,00 0,00 28,11

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,65 -56,03 3,36 0,00 -4,80 0,00 0,00 28,12

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,51 -56,03 3,36 0,00 -4,80 0,00 0,00 28,13

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,37 -56,02 3,36 0,00 -4,79 0,00 0,00 28,14

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,19 -56,01 3,36 0,00 -4,79 0,00 0,00 28,15

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,06 -56,00 3,36 0,00 -4,79 0,00 0,00 28,16

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 177,94 -56,00 3,36 0,00 -4,78 0,00 0,00 28,17

2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 260,67 -59,31 2,99 -3,56 -0,92 0,00 0,00 29,41

60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 271,63 -59,67 2,99 -3,56 -0,95 0,00 0,00 29,03

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.43 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 261,74 -59,35 2,99 -3,57 -0,93 0,00 0,00 29,36

53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 261,45 -59,34 4,62 0,00 -2,04 0,00 0,00 30,46

82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 269,95 -59,62 4,66 -1,89 -1,94 0,00 0,00 28,44

24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 260,02 -59,29 4,61 0,00 -2,04 0,00 0,00 30,51

169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 329,33 -61,34 4,83 0,00 -0,76 0,00 0,00 19,83

22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 256,91 -59,19 4,91 0,00 -1,51 0,00 0,00 16,28

80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 265,99 -59,49 4,95 -8,18 -0,33 0,00 0,00 9,01

81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 278,07 -59,88 4,99 - -0,25 0,00 0,00 6,59

23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 269,40 -59,60 4,96 0,00 -1,56 0,00 0,00 15,87

78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 263,10 -59,39 4,93 -8,73 -1,00 0,00 0,00 6,83

20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 253,91 -59,09 4,89 0,00 -1,36 0,00 0,00 15,46

19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 272,91 -59,71 4,97 0,00 -1,45 0,00 0,00 14,82

77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 281,46 -59,98 5,00 - -0,87 0,00 0,00 0,41

21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 264,41 -59,44 4,13 0,00 -0,57 0,00 0,00 25,12

79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 273,24 -59,72 4,19 -7,65 -0,10 0,00 0,00 17,71

170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 336,33 -61,53 4,85 - -0,56 0,00 0,00 7,89

6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 275,07 -59,78 4,11 - -0,19 0,00 0,00 10,25

35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 277,30 -59,85 4,13 - -0,19 0,00 0,00 10,32

64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 281,10 -59,97 4,15 - -0,20 0,00 0,00 10,19

5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 274,82 -59,77 4,98 - -0,26 0,00 0,00 2,61

63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 282,51 -60,01 5,01 - -0,29 0,00 0,00 0,59

34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 276,41 -59,82 4,99 - -0,25 0,00 0,00 3,44

171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 335,51 -61,51 5,14 - -0,60 0,00 0,00 0,95

33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 278,13 -59,88 4,61 - -0,96 0,00 0,00 -2,88

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.44 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 279,78 -59,93 4,62 - -1,10 0,00 0,00 -4,49

4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 275,47 -59,79 4,60 - -0,92 0,00 0,00 -2,52

65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 281,09 -59,97 4,59 - -0,10 0,00 0,00 11,59

7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 275,07 -59,78 4,56 - -0,09 0,00 0,00 11,69

36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 277,29 -59,85 4,57 - -0,09 0,00 0,00 11,72

8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 275,69 -59,80 4,98 - -0,82 0,00 0,00 -3,60

66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 279,28 -59,91 4,99 - -1,10 0,00 0,00 -7,69

168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 329,40 -61,35 4,83 0,00 -0,76 0,00 0,00 26,85

52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 254,25 -59,10 4,90 0,00 -1,50 0,00 0,00 16,36

17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 251,78 -59,01 4,89 0,00 -1,50 0,00 0,00 16,45

75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 258,18 -59,23 4,92 0,00 -1,52 0,00 0,00 16,23

51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 255,62 -59,14 4,90 0,00 -1,37 0,00 0,00 15,40

16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 252,34 -59,03 4,88 0,00 -1,35 0,00 0,00 15,52

74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 256,54 -59,18 4,90 0,00 -1,37 0,00 0,00 15,37

37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 278,67 -59,89 4,99 - -0,87 0,00 0,00 -4,76

165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 336,35 -61,53 4,87 - -0,54 0,00 0,00 3,62

48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 270,65 -59,64 4,96 0,00 -1,56 0,00 0,00 15,83

49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 258,23 -59,23 4,92 0,00 -1,52 0,00 0,00 16,23

45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 273,63 -59,74 4,97 0,00 -1,45 0,00 0,00 14,80

46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 254,76 -59,11 4,89 0,00 -1,37 0,00 0,00 15,43

47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 263,20 -59,40 4,12 0,00 -0,57 0,00 0,00 25,15

18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 262,57 -59,38 3,36 0,00 -0,59 0,00 0,00 13,96

76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 271,47 -59,67 3,41 -9,13 -0,41 0,00 0,00 4,77

32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 277,41 -59,85 3,38 - -0,32 0,00 0,00 -3,36

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.45 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 281,36 -59,98 3,40 - -0,31 0,00 0,00 -4,51

3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 275,16 -59,78 3,37 - -0,32 0,00 0,00 -3,34

73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 258,50 -59,24 3,33 0,00 -0,58 0,00 0,00 13,35

50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 254,26 -59,10 3,38 0,00 -0,57 0,00 0,00 13,55

15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 251,84 -59,01 3,37 0,00 -0,56 0,00 0,00 13,63

44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 264,29 -59,43 3,37 0,00 -0,59 0,00 0,00 13,91

88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 151,87 -54,62 4,81 0,00 -0,96 0,00 0,00 26,22

89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 158,33 -54,98 4,85 0,00 -1,00 0,00 0,00 25,87

91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 228,91 -58,19 3,68 0,00 -0,68 0,00 0,00 14,14

92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 225,33 -58,05 4,73 0,00 -0,67 0,00 0,00 1,18

94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 236,93 -58,48 3,77 -4,04 -0,70 0,00 0,00 6,90

95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 237,01 -58,49 4,78 - -0,54 0,00 0,00 -14,15

96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 234,33 -58,39 3,81 -4,63 -0,70 0,00 0,00 9,58

90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 231,64 -58,29 3,47 -4,72 -0,68 0,00 0,00 6,02

98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 189,07 -56,52 2,99 0,00 -2,08 0,00 0,00 37,39

102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 201,40 -57,07 3,45 0,00 -5,43 0,00 0,00 29,77

103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 201,16 -57,06 3,45 0,00 -5,43 0,00 0,00 29,79

104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,92 -57,05 3,45 0,00 -5,42 0,00 0,00 29,80

105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,64 -57,04 3,45 0,00 -5,41 0,00 0,00 29,82

106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,41 -57,03 3,45 0,00 -5,41 0,00 0,00 29,84

107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,19 -57,02 3,45 0,00 -5,40 0,00 0,00 29,85

108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,92 -57,01 3,44 0,00 -5,40 0,00 0,00 29,87

109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,71 -57,00 3,44 0,00 -5,39 0,00 0,00 29,88

110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,50 -56,99 3,44 0,00 -5,39 0,00 0,00 29,89

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.46 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,23 -56,98 3,44 0,00 -5,38 0,00 0,00 29,91

112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,03 -56,97 3,44 0,00 -5,37 0,00 0,00 29,92

113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,83 -56,96 3,44 0,00 -5,37 0,00 0,00 29,94

114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,62 -56,95 3,44 0,00 -5,36 0,00 0,00 29,95

115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,43 -56,94 3,44 0,00 -5,36 0,00 0,00 29,96

116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,25 -56,94 3,44 0,00 -5,35 0,00 0,00 29,97

117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,03 -56,93 3,43 0,00 -5,35 0,00 0,00 29,99

118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,86 -56,92 3,43 0,00 -5,34 0,00 0,00 30,00

119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,69 -56,91 3,43 0,00 -5,34 0,00 0,00 30,01

120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,45 -56,90 3,43 0,00 -5,33 0,00 0,00 30,02

121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,29 -56,89 3,43 0,00 -5,33 0,00 0,00 30,03

122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,14 -56,89 3,43 0,00 -5,33 0,00 0,00 30,04

123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,97 -56,88 3,43 0,00 -5,32 0,00 0,00 30,06

124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,83 -56,87 3,43 0,00 -5,32 0,00 0,00 30,06

125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,68 -56,87 3,43 0,00 -5,31 0,00 0,00 30,07

126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,51 -56,86 3,43 0,00 -5,31 0,00 0,00 30,08

127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,39 -56,85 3,43 0,00 -5,31 0,00 0,00 30,09

128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,26 -56,85 3,43 0,00 -5,30 0,00 0,00 30,10

129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,13 -56,84 3,43 0,00 -5,30 0,00 0,00 30,11

130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,01 -56,84 3,42 0,00 -5,30 0,00 0,00 30,12

131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 195,90 -56,83 3,42 0,00 -5,29 0,00 0,00 30,12

99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 189,07 -56,52 2,99 0,00 -2,08 0,00 0,00 37,39

100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 227,03 -58,11 4,41 0,00 -1,26 1,04 0,00 46,42

162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 223,27 -57,97 4,38 0,00 -1,24 0,98 0,00 46,69

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.47 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 225,15 -58,04 4,40 0,00 -1,25 1,01 0,00 44,62

163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 188,36 -56,49 3,84 0,00 -1,29 0,00 0,00 34,72

164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 190,59 -56,59 3,87 0,00 -1,30 0,00 0,00 34,63

59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 278,60 -59,89 4,06 -0,20 -1,03 0,00 0,00 34,93

30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 269,45 -59,60 3,99 -3,50 -0,79 0,00 0,00 32,10

1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 268,37 -59,57 3,98 -3,41 -0,82 0,00 0,00 32,18

25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 234,46 -58,39 4,46 0,00 -1,30 1,63 0,00 39,76

54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 237,14 -58,49 4,48 0,00 -1,31 1,68 0,00 39,72

83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 241,48 -58,65 -4,50 0,00 -0,57 1,22 0,00 32,51

55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 239,82 -58,59 4,49 0,00 -1,32 2,15 0,00 41,54

26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 236,29 -58,46 4,47 0,00 -1,30 2,15 0,00 41,66

84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 247,13 -58,85 4,54 0,00 -1,35 2,19 0,00 41,39

173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 328,50 -61,32 4,35 0,00 -0,58 2,52 0,00 34,96

167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 332,83 -61,44 4,23 -4,69 -0,77 0,00 0,00 16,02

38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 265,97 -59,49 2,99 -4,73 -0,55 0,00 0,00 8,37

67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 269,53 -59,60 2,99 -4,72 -0,55 0,00 0,00 8,26

9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 263,53 -59,41 2,99 -4,72 -0,54 0,00 0,00 8,46

166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 335,57 -61,51 -4,59 - -0,79 0,00 0,00 -1,97

172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 337,44 -61,56 -4,58 - -0,80 0,00 0,00 -0,32

93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 232,32 -58,31 -4,40 0,00 -0,55 0,00 0,00 10,75

97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 230,75 -58,26 -4,40 - -0,54 0,00 0,00 -4,00

28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 279,75 -59,93 3,42 - -0,18 0,00 0,00 8,26

57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 282,24 -60,00 3,44 - -0,18 0,00 0,00 8,47

86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 285,66 -60,11 3,47 - -0,19 0,00 0,00 8,70

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.48 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 274,43 -59,76 2,99 - -0,79 0,00 0,00 11,95

27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 264,71 -59,45 2,99 0,00 -1,55 0,00 0,00 22,00

56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 266,56 -59,51 2,99 0,00 -1,55 0,00 0,00 21,93

39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 266,23 -59,50 2,99 -4,83 -0,77 0,00 0,00 34,03

10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 263,85 -59,42 2,99 -4,83 -0,76 0,00 0,00 34,11

68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 270,01 -59,62 2,99 -4,82 -0,78 0,00 0,00 33,91

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.49 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

Name 7 Station Fence East Ld = 53,4 dB(A) Ln = 53,4 dB(A)

11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 286,71 -60,14 2,99 -5,09 -2,31 0,00 0,00 21,45

69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 225,50 -58,05 2,99 -5,67 -1,72 0,00 0,00 23,55

40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 240,96 -58,63 2,99 -5,49 -1,89 0,00 0,00 22,98

41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 244,02 -58,74 2,99 -5,75 -1,72 0,00 0,00 22,79

12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 289,30 -60,22 2,99 -5,08 -2,33 0,00 0,00 21,36

70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 228,77 -58,18 2,99 -5,94 -1,54 0,00 0,00 23,32

13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 275,79 -59,80 2,99 -4,78 -2,41 0,00 0,00 22,00

42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 231,20 -58,27 2,99 -5,53 -1,75 0,00 0,00 23,44

71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 215,83 -57,67 2,99 -5,10 -1,98 0,00 0,00 24,24

72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 219,92 -57,84 2,99 -5,04 -1,99 0,00 0,00 24,12

14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 279,01 -59,90 2,99 - -0,23 0,00 0,00 17,22

43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 234,75 -58,40 2,99 -5,81 -1,56 0,00 0,00 23,21

29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 274,48 -59,76 -4,54 0,00 -1,12 2,44 0,00 27,03

58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 227,06 -58,12 -4,48 0,00 -0,93 2,40 0,00 28,89

87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 211,47 -57,50 -4,45 0,00 -0,86 2,38 0,00 29,58

160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 283,74 -60,05 3,90 0,00 -7,35 0,00 0,00 22,09

161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 282,81 -60,02 3,89 0,00 -7,33 0,00 0,00 22,13

132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 281,87 -59,99 3,89 0,00 -7,31 0,00 0,00 22,18

133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 280,73 -59,96 3,88 0,00 -7,28 0,00 0,00 22,23

134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 279,80 -59,93 3,88 0,00 -7,26 0,00 0,00 22,28

135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 278,88 -59,90 3,87 0,00 -7,24 0,00 0,00 22,33

136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 277,76 -59,87 3,87 0,00 -7,21 0,00 0,00 22,38

137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 276,83 -59,84 3,86 0,00 -7,19 0,00 0,00 22,43

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.50 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 275,91 -59,81 3,86 0,00 -7,17 0,00 0,00 22,47

139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 274,76 -59,77 3,85 0,00 -7,14 0,00 0,00 22,53

140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 273,84 -59,74 3,85 0,00 -7,12 0,00 0,00 22,58

141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 272,91 -59,71 3,84 0,00 -7,10 0,00 0,00 22,62

142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 271,78 -59,68 3,84 0,00 -7,07 0,00 0,00 22,68

143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 270,85 -59,65 3,83 0,00 -7,05 0,00 0,00 22,73

144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 269,93 -59,62 3,83 0,00 -7,03 0,00 0,00 22,78

145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 268,79 -59,58 3,82 0,00 -7,00 0,00 0,00 22,83

146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 267,86 -59,55 3,82 0,00 -6,98 0,00 0,00 22,88

147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 266,94 -59,52 3,81 0,00 -6,96 0,00 0,00 22,93

148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 265,82 -59,48 3,81 0,00 -6,93 0,00 0,00 22,99

149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 264,90 -59,45 3,80 0,00 -6,91 0,00 0,00 23,03

150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 263,98 -59,42 3,80 0,00 -6,88 0,00 0,00 23,08

151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 262,84 -59,39 3,79 0,00 -6,86 0,00 0,00 23,14

152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 261,92 -59,36 3,79 0,00 -6,84 0,00 0,00 23,19

153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 260,99 -59,32 3,78 0,00 -6,81 0,00 0,00 23,24

154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 259,87 -59,29 3,78 0,00 -6,79 0,00 0,00 23,29

155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 258,95 -59,26 3,77 0,00 -6,76 0,00 0,00 23,34

156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 258,03 -59,23 3,77 0,00 -6,74 0,00 0,00 23,39

157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 256,89 -59,19 3,76 0,00 -6,71 0,00 0,00 23,45

158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 255,97 -59,16 3,75 0,00 -6,69 0,00 0,00 23,50

159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 255,05 -59,12 3,75 0,00 -6,67 0,00 0,00 23,55

2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 267,31 -59,53 2,99 -3,61 -0,95 0,00 0,00 29,11

60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 208,70 -57,38 2,99 -3,60 -0,76 0,00 0,00 31,45

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.51 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 249,21 -58,92 2,99 -3,61 -0,90 0,00 0,00 29,77

53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 245,35 -58,79 4,53 - -0,25 0,00 0,00 19,51

82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 210,64 -57,46 4,28 0,00 -1,76 0,00 0,00 32,29

24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 269,85 -59,61 4,66 0,00 -2,09 2,47 0,00 32,65

169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 432,40 -63,71 5,10 -8,64 -0,82 0,00 0,00 9,03

22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 270,70 -59,64 4,96 0,00 -1,56 0,00 0,00 15,82

80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 210,53 -57,46 4,66 0,00 -1,34 0,00 0,00 17,94

81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 219,17 -57,81 4,72 0,00 -1,37 0,00 0,00 17,60

23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 277,48 -59,86 4,98 0,00 -1,58 0,00 0,00 15,61

78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 208,52 -57,37 4,64 0,00 -1,14 0,00 0,00 17,14

20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 269,13 -59,59 4,95 0,00 -1,43 0,00 0,00 14,94

19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 279,45 -59,92 4,99 0,00 -1,48 0,00 0,00 14,60

77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 221,66 -57,91 4,72 0,00 -1,21 0,00 0,00 16,63

21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 274,72 -59,77 4,19 -2,54 -0,24 0,00 0,00 22,63

79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 215,68 -57,67 3,70 0,00 -0,50 0,00 0,00 26,53

170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 440,04 -63,86 5,11 - -0,73 0,00 0,00 -0,69

6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 288,15 -60,18 4,18 - -0,21 0,00 0,00 14,23

35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 244,92 -58,77 3,87 - -0,17 0,00 0,00 9,22

64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 229,53 -58,21 3,72 - -0,17 0,00 0,00 14,14

5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 282,98 -60,03 5,00 -9,95 -0,26 0,00 0,00 6,83

63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 225,09 -58,04 4,75 - -0,21 0,00 0,00 7,39

34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 250,07 -58,95 4,87 - -0,35 0,00 0,00 -0,63

171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 438,68 -63,83 5,33 - -0,91 0,00 0,00 -6,07

33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 240,78 -58,62 4,39 - -0,93 0,00 0,00 -3,19

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.52 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 234,15 -58,38 4,34 - -0,79 0,00 0,00 -0,21

4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 293,48 -60,34 4,68 - -0,93 0,00 0,00 -0,69

65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 229,53 -58,21 4,27 - -0,08 0,00 0,00 15,24

7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 288,15 -60,18 4,62 - -0,09 0,00 0,00 15,07

36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 244,92 -58,77 4,38 - -0,09 0,00 0,00 11,07

8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 295,71 -60,41 5,04 - -0,94 0,00 0,00 -4,37

66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 236,10 -58,45 4,80 - -0,80 0,00 0,00 -3,67

168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 436,78 -63,80 5,11 0,00 -1,01 0,00 0,00 24,44

52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 230,08 -58,23 4,78 0,00 -1,42 0,00 0,00 17,20

17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 276,40 -59,82 4,98 0,00 -1,58 0,00 0,00 15,64

75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 214,39 -57,62 4,69 0,00 -1,35 0,00 0,00 17,79

51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 223,69 -57,99 4,74 0,00 -1,22 0,00 0,00 16,55

16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 282,94 -60,03 5,00 0,00 -1,50 0,00 0,00 14,49

74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 220,22 -57,85 4,72 0,00 -1,20 0,00 0,00 16,68

37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 238,37 -58,54 4,81 - -0,91 0,00 0,00 -6,16

165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 444,40 -63,95 5,13 - -0,76 0,00 0,00 1,28

48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 248,48 -58,90 4,87 - -0,32 0,00 0,00 0,70

49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 240,92 -58,63 4,83 - -0,23 0,00 0,00 4,40

45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 250,36 -58,96 4,87 - -0,91 0,00 0,00 -5,39

46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 238,87 -58,56 4,82 - -0,75 0,00 0,00 1,62

47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 243,90 -58,74 3,96 - -0,08 0,00 0,00 13,43

18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 273,98 -59,75 3,41 0,00 -0,61 0,00 0,00 13,62

76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 214,39 -57,62 3,18 0,00 -0,48 0,00 0,00 15,65

32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 244,93 -58,77 3,25 - -0,27 0,00 0,00 -4,89

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.53 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 229,20 -58,20 3,22 - -0,28 0,00 0,00 0,41

3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 287,54 -60,17 3,42 - -0,37 0,00 0,00 0,01

73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 213,50 -57,58 3,13 0,00 -0,48 0,00 0,00 14,90

50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 230,54 -58,25 3,25 0,00 -0,52 0,00 0,00 14,32

15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 275,46 -59,79 3,37 0,00 -0,61 0,00 0,00 12,80

44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 244,88 -58,77 3,26 - -0,30 0,00 0,00 -0,55

88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 330,66 -61,38 5,44 0,00 -1,70 0,00 0,00 19,36

89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 339,68 -61,61 5,46 0,00 -1,73 0,00 0,00 19,11

91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 390,31 -62,82 4,56 0,00 -1,13 0,00 0,00 9,93

92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 389,62 -62,81 5,26 0,00 -1,13 0,00 0,00 -3,51

94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 395,32 -62,93 4,57 -2,77 -1,14 0,00 0,00 4,08

95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 395,42 -62,93 5,26 -6,53 -1,04 0,00 0,00 -10,07

96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 398,24 -63,00 4,61 -4,26 -1,17 0,00 0,00 5,68

90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 394,25 -62,91 4,50 -4,72 -1,14 0,00 0,00 1,99

98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 271,38 -59,66 2,99 0,00 -2,54 0,00 0,00 33,79

102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 288,20 -60,19 3,88 0,00 -7,58 0,00 0,00 24,94

103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 287,29 -60,16 3,87 0,00 -7,56 0,00 0,00 24,98

104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 286,38 -60,13 3,87 0,00 -7,54 0,00 0,00 25,03

105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 285,26 -60,10 3,86 0,00 -7,51 0,00 0,00 25,08

106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 284,35 -60,07 3,86 0,00 -7,49 0,00 0,00 25,13

107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 283,44 -60,04 3,85 0,00 -7,47 0,00 0,00 25,17

108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 282,34 -60,01 3,85 0,00 -7,44 0,00 0,00 25,23

109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 281,43 -59,98 3,84 0,00 -7,42 0,00 0,00 25,27

110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 280,51 -59,95 3,84 0,00 -7,40 0,00 0,00 25,32

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.54 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 279,39 -59,92 3,83 0,00 -7,37 0,00 0,00 25,38

112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 278,48 -59,89 3,83 0,00 -7,35 0,00 0,00 25,42

113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 277,57 -59,86 3,83 0,00 -7,32 0,00 0,00 25,47

114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 276,47 -59,83 3,82 0,00 -7,30 0,00 0,00 25,52

115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 275,56 -59,80 3,82 0,00 -7,28 0,00 0,00 25,57

116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 274,65 -59,77 3,81 0,00 -7,25 0,00 0,00 25,62

117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 273,53 -59,73 3,81 0,00 -7,23 0,00 0,00 25,68

118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 272,63 -59,70 3,80 0,00 -7,20 0,00 0,00 25,72

119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 271,72 -59,67 3,80 0,00 -7,18 0,00 0,00 25,77

120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 270,59 -59,64 3,79 0,00 -7,15 0,00 0,00 25,83

121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 269,69 -59,61 3,79 0,00 -7,13 0,00 0,00 25,87

122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 268,78 -59,58 3,78 0,00 -7,11 0,00 0,00 25,92

123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 267,69 -59,54 3,78 0,00 -7,08 0,00 0,00 25,98

124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 266,78 -59,52 3,77 0,00 -7,06 0,00 0,00 26,02

125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 265,88 -59,49 3,77 0,00 -7,04 0,00 0,00 26,07

126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 264,76 -59,45 3,76 0,00 -7,01 0,00 0,00 26,13

127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 263,86 -59,42 3,76 0,00 -6,99 0,00 0,00 26,18

128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 262,95 -59,39 3,75 0,00 -6,97 0,00 0,00 26,22

129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 261,86 -59,35 3,75 0,00 -6,94 0,00 0,00 26,28

130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 260,96 -59,32 3,74 0,00 -6,92 0,00 0,00 26,33

131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 260,05 -59,29 3,74 0,00 -6,89 0,00 0,00 26,38

99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 271,38 -59,66 2,99 0,00 -2,54 0,00 0,00 33,79

100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 227,21 -58,12 4,38 0,00 -1,26 0,48 0,00 45,82

162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 227,34 -58,13 4,38 0,00 -1,26 0,32 0,00 45,85

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.55 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 227,97 -58,15 4,38 0,00 -1,26 0,51 0,00 43,99

163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 362,41 -62,18 4,88 0,00 -2,28 0,00 0,00 29,08

164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 365,41 -62,25 4,88 0,00 -2,30 0,00 0,00 29,00

59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 214,06 -57,60 3,46 0,00 -0,83 2,21 0,00 39,24

30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 252,90 -59,05 3,85 - -0,45 10,76 0,00 30,29

1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 271,77 -59,68 4,00 0,00 -1,02 0,03 0,00 35,33

25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 271,38 -59,66 4,66 0,00 -1,46 0,72 0,00 37,62

54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 222,86 -57,95 4,37 0,00 -1,24 2,00 0,00 40,54

83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 206,88 -57,31 -4,44 0,00 -0,49 0,99 0,00 33,76

55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 215,94 -57,68 4,32 0,00 -1,21 1,63 0,00 41,86

26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 261,26 -59,33 4,61 0,00 -1,42 0,00 0,00 38,67

84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 200,39 -57,03 4,19 0,00 -1,14 0,40 0,00 41,29

173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 431,44 -63,69 4,73 -6,17 -0,32 0,95 0,00 25,50

167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 438,45 -63,83 4,65 - -0,70 0,00 0,00 5,34

38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 236,96 -58,49 2,98 -4,93 -0,48 0,00 0,00 9,22

67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 222,11 -57,92 2,97 -4,83 -0,46 0,00 0,00 9,91

9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 282,10 -60,00 2,98 -4,74 -0,58 0,00 0,00 7,80

166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 444,03 -63,94 -4,64 - -1,05 0,00 0,00 -3,13

172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 442,00 -63,90 -4,63 - -1,04 0,00 0,00 -6,42

93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 390,96 -62,83 -4,57 0,00 -0,92 0,00 0,00 5,68

97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 397,59 -62,98 -4,57 - -0,94 0,00 0,00 -7,65

28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 291,36 -60,28 3,51 -6,81 -0,28 0,00 0,00 16,14

57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 247,61 -58,87 3,07 - -0,17 0,00 0,00 8,59

86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 233,41 -58,35 2,98 -9,64 -0,18 0,00 0,00 14,80

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.56 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece

Construction phase IIcalculated sound propagation according to ISO 9613-2

Sourc

No.

Source Group Li

dB(A)

R'w

dB

Lw'

dB(A)

l or S

m,m²

Lw

dB(A)

Ko

dB

s

m

Adiv

dB

Agr

dB

Abar

dB

Aatm

dB

dLrefl

dB

Cmet Lr,i

dB(A)

85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 215,88 -57,68 2,98 -3,72 -1,07 0,00 0,00 20,52

27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 274,28 -59,76 2,99 -3,91 -1,22 0,00 0,00 18,10

56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 246,82 -58,84 2,98 - -0,70 0,00 0,00 5,19

39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 237,61 -58,51 2,98 -5,04 -0,67 0,08 0,00 34,98

10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 282,76 -60,02 2,98 -4,91 -0,82 0,04 0,00 33,41

68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 222,47 -57,94 2,98 -4,99 -0,64 0,05 0,00 35,60

Werner Genest + PartnerIngenieurgesellschaft mbH

Attachment 3.2.57 GCS00-WGP

127D5, Rev. 00

SoundPLAN 7.1

25

25

25

25

25

25

25

25

25

25

30

30

30

30

30

35

35

35

40

40

4550

5560

65

2 Tavri

1 Thymaria

4 Kipoi

7 Station Fence East

3 Peplos

6 Station Fence South

5 Station Fence West

34942500

34942500

34943000

34943000

34943500

34943500

34944000

34944000

34944500

34944500

34945000

34945000

34945500

34945500

34946000

34946000

34946500

34946500

34947000

34947000

34947500

34947500

34948000

34948000

4547000

4547000

4547500

4547500

4548000

4548000

4548500

4548500

4549000

4549000

4549500

4549500

4550000

4550000

4550500

4550500

4551000

4551000

4551500

4551500

Attachment 4.1

GCS00-WGP

127D5 G1, Rev. 00

Trans Adriatic Pipeline AG

Proposed Gas Compression Station

GCS00 at district Evros, Greece

Construction phase I

Noise Contour Map

Temperature 15 °C

Relative Humidity 70 %

Map Source:

Google Earth

-----------------------------------------------------------

Noise Propagation Outdoor

according to ISO 9613-2

Calculation Parameter:

T = 15°C, Humidity 70%, Air pressure 1015 mbar

Cmet = 0 dB

Wind 3 m/s toward receptor

Ground effect on proposed GCS00: fully reflective, G=0

Ground effect around: Agricultural area, G=0,85

Limits for attenuation by screening:

Single sound screen 20 dB

Multiple sound screens 25 dB

Calculation Grid 50 m

Height of noise contours 2 m above ground

Legend

Receptor

Industry building

noise source (point)

noise source (line)

noise source (area)

Noise Level

LAeq

= 25 dB(A)

= 30 dB(A)

= 35 dB(A)

= 40 dB(A)

= 45 dB(A)

= 50 dB(A)

= 55 dB(A)

= 60 dB(A)

= 65 dB(A)

= 70 dB(A)

= 75 dB(A)

Scale (on paper size A3) 1:20000

00 100 200 400 600 800 1000m

25

25

25

25

25

25

25

30

30

30

30

30

35

35

35

40

40

45

5055

60

65

2 Tavri

1 Thymaria

4 Kipoi

7 Station Fence East

3 Peplos

6 Station Fence South

5 Station Fence West

34942500

34942500

34943000

34943000

34943500

34943500

34944000

34944000

34944500

34944500

34945000

34945000

34945500

34945500

34946000

34946000

34946500

34946500

34947000

34947000

34947500

34947500

34948000

34948000

4547000

4547000

4547500

4547500

4548000

4548000

4548500

4548500

4549000

4549000

4549500

4549500

4550000

4550000

4550500

4550500

4551000

4551000

4551500

4551500

Attachment 4.2

GCS00-WGP

127D5 G1, Rev. 00

Trans Adriatic Pipeline AG

Proposed Gas Compression Station

GCS00 at district Evros, Greece

Construction phase II

Noise Contour Map

Temperature 15 °C

Relative Humidity 70 %

Map Source:

Google Earth

-----------------------------------------------------------

Noise Propagation Outdoor

according to ISO 9613-2

Calculation Parameter:

T = 15°C, Humidity 70%, Air pressure 1015 mbar

Cmet = 0 dB

Wind 3 m/s toward receptor

Ground effect on proposed GCS00: fully reflective, G=0

Ground effect around: Agricultural area, G=0,85

Limits for attenuation by screening:

Single sound screen 20 dB

Multiple sound screens 25 dB

Calculation Grid 50 m

Height of noise contours 2 m above ground

Legend

Receptor

Industry building

noise source (point)

noise source (line)

noise source (area)

Noise Level

LAeq

= 25 dB(A)

= 30 dB(A)

= 35 dB(A)

= 40 dB(A)

= 45 dB(A)

= 50 dB(A)

= 55 dB(A)

= 60 dB(A)

= 65 dB(A)

= 70 dB(A)

= 75 dB(A)

Scale (on paper size A3) 1:20000

00 100 200 400 600 800 1000m

Date 06/2013

Copyright Reserved: This document may not be copied, shown to or placThe latest version of the document is registered in the TAP Project's Data

Trans Adriatic Pipeline AG – Greece (Branch Office)21st Floor, Athens Tower, 2-4 Messogion Ave., 11527

Athens GreeceAthens, GreecePhone.: + 30 210 7454613

Fax: + 30 210 7454300

[email protected]

ced at the disposal of third parties without prior consent of TAP AG.abase.