13
Integrated Energy Centre MR AZWINNDINI NDOU 012 406 7568/ 082 335 9679

Integrated Energy Centre · 2017. 9. 12. · Nkomazi Sasol MP Planning stage Qaba-Mdeni Sasol EC Collapsed Eshane Total KZN Renovations completed Dithakong Total NC Collapsed Mutale

  • Upload
    others

  • View
    5

  • Download
    1

Embed Size (px)

Citation preview

  • Integrated Energy Centre

    MR AZWINNDINI NDOU

    012 406 7568/ 082 335 9679

  • PRESENTATION OUTLINE

    Introduction

    Legal mandate

    Objectives

    Partners

    IeC roll out status

    Pictures

  • INTRODUCTION IeC is a government programme aimed at

    addressing energy access, poverty alleviation, job creation and promote rural enterprise development

    Government prioritized rural development to address socio-economic conditions through Comprehensive Rural Development Programme

    IeC is One-stop energy shop that provides energy solutions to communities

    Success of IeC relies on solid partnership with the industry and other stakeholders.

  • INTRODUCTION CONT

    The IeC programme has been on a pilot or experimental basis and 13 IeCs have been established. Construction of 2 new projects have been completed. 3 projects are in planning stage.

    The IeC project focus on provision of liquid fuels and other energy products to remote rural and township communities.

  • LEGISLATIVE MANDATE WHITE PAPER ON ENERGY POLICY: (increased

    affordable energy services to disadvantaged communities, stimulate economic development by creating investor friendly climate, and securing energy supply by encouraging diversity of energy supplies and energy carriers).

    The DoE is finalizing a draft strategy which will serve as a blue print to roll out the IeCs.

    The strategy addresses issues of ownership, governance, funding and sustainability of the IeCs.

  • OBJECTIVES

    Energy access to rural and township areas

    Stimulate rural enterprise development

    Job creation and poverty alleviation

  • PARTNERS Department has partnered with the following stakeholders:

    Shell

    Sasol

    Total

    Engen

    PetroSA

    All Fuels

    Oryx

    Easigas

    Municipalities

    SEDA

    Provincial Goverments

  • STATUS

    Project Sponsor Province Status

    Mutale Sasol LP Operational

    Qunu Sasol EC Operational

    Ulundi Sasol KZN Operational

    Makwane Sasol FS Operational

    Ratlou Sasol NW Renovations completed

    Moshaweng Sasol NC Partially operational

    Nkomazi Sasol MP Planning stage

    Qaba-Mdeni Sasol EC Collapsed

    Eshane Total KZN Renovations completed

    Dithakong Total NC Collapsed

    Mutale Sasol LP Operational

  • STATUS CONT

    Project Sponsor Province Status

    Mbizana PetroSA EC Operational

    Qamatha PetroSA EC Under construction

    Ngwaabe Shell LP Operational

    Bushbuckridge Engen MP Under construction

    Maphumulo Engen KZN Planning

    Thulamela Oryx LP Operation

    Mzumbe All Fuels KZN Planning