Upload
nguyentruc
View
213
Download
0
Embed Size (px)
Citation preview
Integrated CNS: Time for a conceptual change?
World ATM Congress 2018
Pascal Barret / Emilien Robert
SESAR iCNS Research
WAC 2018
CNS evolution: why and how?
1. Starting from GANP & the 6 EATM Master Plan key performance areas and ambitions
Integrated CNS: Time for a conceptual change?
Capacity
- Reduced aircraft separation- RPAS & autonomous drones
integration- Communication capacity- Surveillance capacity
Cost efficiency
- Integrated CNS and appropriate CNS redundancy
- Competitive CNS services- CNS rationalisation- Efficient use of spectrum- Automation to improve ATM
efficiency
Operational efficiency
- Airspace optimisation (FRA, Flexible use of airspace…)
- Enhanced arrival and departing procedure
- Reduced spacing, self-separation- Improved trajectories due to
automation
Environment
- Flight time reduction due to optimised trajectories
- Noise exposure optimisation- Reduced taxi time
Safety
- Global CNS services- Next generation of Safety nets &
Traffic alert- Reduce communication
misunderstanding- Reduce human intervention
- Generalisation of 3D approaches
Security
2. Identifying the drivers & challenges
- Secured ATCO-Pilot/aircraft exchanges
- Resilient CNS infrastructure
CNS evolution: why and how?
Integrated CNS: Time for a conceptual change?
Increased Digitalisation, Connectivity and High
Automation Levels
Performance Based Integrated CNS Combined Satellite-based, Airborne and Ground-
based CNS
Safe, secure and resilient
infrastructure
Moving focus from physical assets to delivery
of services
Rationalized infrastructure
Increased Civil-Military Synergies and Dual
Use
Efficient use and long-term availability of suitable
radio spectrum
3. Building the SESAR vision through 8 key messages
CNS evolution: why and how?
Integrated CNS: Time for a conceptual change?
Integrated CNS: Time for a conceptual change? 5
CNS evolution: why and how?
Communication
PBCS
VHF
HF
SATCOM
Ground Navaids
Inertial
Primary radar
Secondary radar
NavigationPBN
SurveillancePBS
Infr
astr
uctu
reA
pp
licati
on
sO
PS
� Conventional� RNAV� RNP� ….
� Voice� Data (CPDLC)� AOC� ….
� 3 NM Separation� 5 NM Separation� ACAS� ….
Air traffic services
� Cross-domain mitigations take
place at the operational level
� Communication, Navigation and
Surveillance separated at the
infrastructure and application level
for good reasons
4. From the legacy CNS concept …
Integrated CNS: Time for a conceptual change? 6
Infr
astr
uctu
reA
pp
licati
on
sO
PS
Inte
gra
ted
CN
S R
oa
dm
ap
an
d s
tra
teg
y
Civ
il-M
ilit
ary
sy
ne
rgie
s &
du
al-
use
CNS robustness & opportunities
Performance-Based CNS
� GNSS, Datalink and ADS-B
created bridges between domains
� The assumption of independent
domain is no longer valid
� Integrated CNS supports this
evolution through 4 pillars:
� CNS Robustness & Opportunities
� Performance-Based CNS
� iCNS Roadmap & Strategy
� Civil-Military Synergies & Dual-Use
CNS evolution: why and how?
4. … toward an integrated CNS concept
Communication
PBCS
VHF, HF & SATCOM
Ground Navaids & Inertial
Radar & MLAT
NavigationPBN
SurveillancePBS
� Conventional� RNAV� RNP� ….
� Voice� Data (CPDLC)� AOC� ….
� 3 NM Separation� 5 NM Separation� ACAS� ….
Air traffic services
GNSS ADS-BDatalink
Integrated CNS: Time for a conceptual change? 7
Integrated CNS concept: CNS Robustness & Modernisation
Surveillance Navigation Communication
Multi-link
LDACS
SATCOM
AeroMacs
High bandwidth datalink
based on multiple link concept
will ensure a robust data exchange
Dual-frequency & Multi-
constellation GNSS will
provide a very accurate and robust positioning service
Clustered SSR
ADS-BM-LAT
Composite
Composite surveillance will
improve the efficiency and the robustness of the surveillance
infrastructure
⇒ Each domain is building is its own robustness, including its own back-ups
⇒ More efficiency could be achieved through a CNS cross-domain robustness concept !
Integrated CNS: Time for a conceptual change? 8
Surveillance
PBS
Navigation
PBN
Integrated CNS concept: Performance-Based CNS
Performance Based CNS
Communication
PBCS
Level of
integration
may vary
ESASSP PBN ManualGOLD PB CS Manual
� CNS requirements derived from the CNS robustness concept
Today Way ahead and next steps
Future CNS infrastructure backbone:
GNSS ADS-BDatalink
Supported by
Minimum Operational Network (MON): Fair rationalisation of legacy CNS infrastructure down to a
point where it can still operate as a backup or provide an efficient support.
Example - Decommissioning potential by 2030 (CP2 drafting):
ILS CAT I
20%
VOR
60%
NDB
90%
SSR Mode S
25%
Integrated CNS: Time for a conceptual change?
Integrated CNS concept: CNS Roadmap and Strategy
Performance-Based CNS framework
Now 2025 2030 2035
HF & VHF 25 & 8.33 kHz VHF 8.33 kHz & MON 25kHz & HF MON VHF 8.33 & 25kHz (climax)
SATCOM C,B SATCOM A/B
VDLM2
AeroMACS
Multilink
GPS L1ABAS/SBAS
DMEVOR
DFMCABAS/SBAS
MON DME/VOR
ADS-B/ADS-B SAT
Mode A/C/S
PSR
MLAT
MON Mode S
MON PSR MON MSPSR
Voice primary
Mode S
CompositeMLAT
Video
SMR MON SMRSMR primary
ADS-B
Tra
jecto
ry n
ego
tia
tio
n,
cle
ara
nce
& e
xch
an
ge
Aircra
ft p
ositio
nin
g,
gu
ida
nce
, d
erive
d d
ata
a
nd
ide
ntifica
tion
Aircra
ft p
ositio
n a
nd
gu
ida
nce
fo
r a
irp
ort
acce
ss
Applications
Performance Based:
Communication
Surveillance
Navigation
iSWIM
RNP 1+RFRNP 0.3
M/LATADS-B
Remote
TWR VSA, CAVSSURF, SURF IA
APM
ASEP:FIMITP, AIRB
ACAS XTSAA
SATCOM B
VDLM2
LDACS
D-TAXI
ASEP: A-IM
Mode S / MLAT & PSR primary
HF data
AMAN
B1 (CPDLC)
MessagingFlight object
CCOCDOTBS
PB CS
A-SMGCS
A-CDM
PB S
PB N
PB CNS
Non-PB:
GNSS primary
FRARNAV 5RNAV 1
MON: Minimum Operating Network
(Ext) Hybrid
ACAS IIMON MLAT
MON MLAT
Clustering
B2A
(CPDLC-EPP)
B3
(C
PD
LC
ad
v s
erv
ice
s)
Dig
ita
l vo
ice
(A
-G)
RP
AS
inte
gra
tio
n
Tra
jecto
ry
Ba
se
d O
PS
ILS MON ILS CAT I MON ILS CAT II/III
GBAS GPS L1 CAT I/II/III GBAS DFMC CAT I/II/III
SBAS DFMC
ABAS DFMC (H-ARAIM)
EVS SVS/CVS
ILS primary for CAT I/II/III ILS primary for CAT II/III
PBAOM
CAT II
Enhanced
ARR/DEP
proc. (1)CAT I
Enhanced
ARR/DEP
proc. (2)
V-ARAIMLNAV/VNAVGPS L1ABAS GPS L1SBAS
CAT I
IPv6 mobility, sec
AMHS, OLDI/FMTP
IP Backbone
IP Backbone VoIP
B2
B
(CP
DL
C-E
PP
)
MON RNP APNT
Digital voice (A-A)MON RNP APNT
SWIM, SOAAIS/MET
Integrated CNS concept: CNS Roadmap and Strategy
Integrated CNS: Time for a conceptual change? 11
Integrated CNS concept: Civil / Military synergies and dual-use
� A recognised institutional must
� Re-use available military capabilities
� Foster cross-fertilisation (dual-use, cybersecurity, equivalent
performance)
� Protect legacy infrastructure for some specific military needs
� Participate to spectrum efficiency
Where are we now ? And what’s next ?
� CNS concept evolution has already started
� CNS Roadmap and Strategy V.01 is available and considered as a base for EATM MP update
2018
� Consultation with stakeholders is already engaged and will continue
� Consultation outcome will be used for 2019 final version
� Still a huge work and numerous challenges in front of us…
Integrated CNS: Time for a conceptual change?
…bringing the integrated CNS concept into the different institutions
13
…and ensuring the proper coordination and dissemination.
CNS Symposium
02-03 October 2018
Brussels
Madrid
06-08 March 2018
Integrated CNS Conference
10– 12 April 2018
Washington D.C.
NSP / CSP /SSPstill separated
PJ14 EECNSEATM MP update
campaignCivil/Military CNS
CS ACNSPJ14 iCNS Solution Lead
Consultation
NSG/CSG/SSG/CNS Team
Where are we now ? And what’s next ?
Integrated CNS: Time for a conceptual change?
Where are we now ? And what’s next ?
14
…and potential candidates for benefits increase to be considered !
CYBERSECURITY ATM/CNS & U-Space/CNS BRIDGE AERONAUTICAL SPECTRUM
DIGITALISATION BIG DATA MANAGEMENT ARTIFICIAL INTELLIGENCE“3rd DIMENSION” & “INTERMODAL”
BUBBLES
Some domains have still to be developed,
Integrated CNS: Time for a conceptual change?
What’s next?
15Integrated CNS: Time for a conceptual change?
Check EUROCONTROL website,
registration will open soon!
Leave your business card at the stand to
stay tuned!!
Contact:[email protected]