Instructions for Completing the
Supplier Verification of
Purchased ProductPackage
What does SVPP consist of?
P a rt S u b m iss io n W a rra n t1 p e r A ssem b ly
-R e q u ire d-
B a lloo n e d P rin t
S a m p lesM e asu red
P rin t A ttrib u te R e p o rt (P A R )fo r ea ch a ssem bly a nd a ll
su b -le ve l co m p o ne n ts.-R e q u ire d-
P ro ce ss F lowD ia g ram
B a lloo n e d P rin t(w h e re re q u ire d)
C o n tro l P lan fo r asse m b ly ad n d lo w er
le ve l a s a p pro pria te-R e q u ire d-
C a p a b ility S tu dy-O p tio n a l-
(R e q u ire d fo r C rit ica lto Q ua lity fe a tu re s)
"S V P P P a cka g e"
When is SVPP Required?• New Product• Engineering Change
– New revision level– Part number change, etc.
• Process Change– Change of equipment.– Change of sub-tier supplier.– Tooling / Die / Mold change.
• Manufacturing Location Change• As suporting documentation for:
– To document relevant MDA (Material Deviation) information.– To verify the part after an MDA has expired.– To document Corrective Action results / information.
• Other changes to part or process????
Submitting the SVPP Report
• Any discrepancies MUST be communicated prior to sending the SVPP report.– If a discrepant SVPP Report is sent without prior approval, an MRN will
be generated for the lot and will affect the supplier’s quality report.
• SVPP reports must be submitted separately to each Climate Control facility.– Only the Quality Manager (or designated representative) at the receiving
facility may waive this requirement. If the requirement is waived, a copy of another facilities SVPP may be submitted. Please note, this option is for special cases only and should not be requested for each submittal.
• The supplier completes #1 - #7 with the appropriate information. The grayed areas are completed by Climate Control upon receipt of SVPP Package.
How to Complete the PAR Form
#8 The Symbol field is used for reference symbols as appropriate.– It is used to allow the actual dimension to
remain numeric, therefore enabling the automatic calculations used in other portions of the document.
– Symbols may be used other than those shown.
How to Complete the PAR Form
#9 & #10 Whenever possible, use only numeric values in these columns. – Under normal conditions, do not add units of measure (mm, in, etc.)
here. Again, this enables automatic calculations. In the case of documenting notes, please be as specific and detailed as possible.
How to Complete the PAR Form
#11 Following the numeric format wherever possible, enter the measured or observed values
for the actual samples. – When completing fields for notes,
be as specific as possible. In most cases “OK” will not be accepted.
How to Complete the PAR Form
–Note the Green and Red formatting. This is used as an aid to identifying out of spec conditions. However, the supplier remains responsible for identifying in-spec and out-of-spec conditions.
•This is automatic when purely numeric values are used and when the nominal and tolerance values are completed correctly.
•In the case where non-numeric values are used, the format defaults back to black. This is OK.
#17 The supplier is responsible for completing these columns with either “Y” or “N”. – If numeric data is used properly, this column should
complete automatically. For notes and other non-numerical data, “#VALUE!” or similar may appear. If so, manual completion is necessary.
– If the data does not meet the specifications, the supplier must initiate communication with Climate Control to determine the next action.on results.
– The extent that these fields are completed are at the discretion of the receiving plant.
How to Complete the PAR Form
How to Complete the PAR Form
Questions????
Examples of Completed FormsSheetmetal Assembly Example
Example of a top level sheetmetal assembly. (As Purchased)
Examples of Completed FormsSheetmetal Assembly Example
1E10023(Frame Assembly
-Sealing)PAR &
Ballooned Print
3A86980H02PAR &
Ballooned Print
1E00758G01(Frame
Assembly)PAR &
Ballooned Print
1E00764H01(Bracket -
Expansion Valve)PAR &
Ballooned Print
1E00756H01(Panel - Unit
Frame)PAR &
Ballooned Print
1E00757H01(Panel - Uniot
Frame)PAR &
Ballooned Print
1E00765G01(Base Assembly -
Evap / HeaterBase)PAR &
Ballooned Print
1E00754G01(Base Assembly -
Coil Support)PAR &
Ballooned Print
1E00753H01(Bracket - Filter)
PAR &Ballooned Print)
1E00751H01(Base - Coil
Support)PAR &
Ballooned Print 1E00766H01(Tube - DrainCondensate)
PAR &Ballooned Print
1E00755H01(Panel - Unit
Base)PAR &
Ballooned Print
3A86518H03(Nut Weld Pilot
Projection,M8X1.25)
PAR &Ballooned Print)The SVPP
requirements would cascade as shown here.
Examples of Completed FormsSheetmetal Assembly Example
Examples of Completed FormsSheetmetal Assembly Example
97 Y
98 Y
99 Y
100 Y
101 Y
102 2ea Y
103 Y
104 Y
105 3ea Y
#
Sym
bo
l
(R
, Ø, e
tc.)
Numeric Value or Description
Applied Tolerance
Supplier Measurement Results (required)
Climate Control Verification Results (optional)
Con
form
?
(Y/N
)
Receptacle DT04-3PWedge W3P
Seal 114017
n/a n/a W3S
Seal 114017 - Pin C
Terminal 1062-16-0144
Wedge W3S
Wire STIP - Pin A
Wire STIN - Pin B
Connector DT06-3S
Low Tolerance
High Tolerance
Sample 1
Sample 2
Sample 3
Sample 4
Sample 5
Sample 5
Sample 1
Sample 2
Sample 3
Sample 4
n/a n/a DT06-3S DT06-3S
W3S W3S W3S
DT06-3S DT06-3S DT06-3S
n/a n/aSTIP - Pin
ASTIP - Pin
A
n/a n/aSTIN - Pin
B
114017 - Pin C
114017 - Pin C
114017 - Pin Cn/a n/a
114017 - Pin C
114017 - Pin C
n/a n/a1062-16-0144 (2x)
1062-16-0144 (2x)
1062-16-0144 (2x)
1062-16-0144 (2x)
1062-16-0144 (2x)
n/a n/a DT04-3P DT04-3P DT04-3P DT04-3P DT04-3P
n/a n/a W3P W3P W3P W3P W3P
n/a n/a114017
(3x)114017
(3x)114017
(3x)114017
(3x)114017
(3x)
STIN - Pin B
STIN - Pin B
STIP - Pin A
STIP - Pin A
STIP - Pin A
W3S
STIN - Pin B
STIN - Pin B
Examples of Completed FormsCable Assembly Example
Questions????
• Contact: – Supply Chain [email protected]