    COMMON SERVICES CENTERS CSC) SCHEMEEEN

    NAABBLLIINNGGSSTTAATTEELLEEVVEELLCCSSCCRROOLLLL

    Instruction Manual for the State

    Coordinators

    Infrastructure Leasing & Financial Services Ltd.

    July 2008

  • 8/13/2019 Instruction Manual July 08

    2/26

  • 8/13/2019 Instruction Manual July 08

    3/26

    the Scheme have been outlined in order to formulate a state specific approach for

    implementation in most States.

    2.2 A Generic CSC RFP was prepared and circulated to all the States/UTs. Based on theCSC RFP template, the State Governments have issued the state-specific RFPs for

    selection of the Service Centre Agencies for setting up and operating the CSCs in theStates.

    2.3 The key milestones that have been identified, to measure the progress during the Pre-SCA phase is outlined below:

    a. Sensitisation of the State Governmentb. Notification of the State Designated Agency with a Nodal Officerc. State Empowered Committee Formationd. CSC Strategy Finalisatione. State Cabinet Approval of the Scheme/RFPf. Release of funds to the States (Revenue Support)g. SCA Mobilisationh. Sensitisation of various Content and Service Providersi. Identification of the G2C Services and sensitization of the Government

    Departments to enable the delivery of services through the CSCs when they

    would be ready

    j. SWAN RFP Issuance/ Bill of Materials Approvalk. CSC RFP Issuancel. CSC Bid Evaluationm. SCA Selectionn. Issuance of Letter of Intent (LOI)o. Signing of the Master Service Agreement (MSA)

    3

  • 8/13/2019 Instruction Manual July 08

    4/26

    4

    3. CSC Rollout Phase3.1 Pursuant to the MSA signing, the challenge lies in completion of the CSC rollout as

    per the milestones/ timelines prescribed in the MSA. Although the prime

    responsibility lies with the SCAs who are mandated to set up the centers as per the

    contractual obligation, it is of utmost importance to consider this as a team effort bythe three main stakeholders: the SCA, the SDA and the NLSA to complete the CSC

    rollout in a smooth manner within the defined timeframe.

    3.2 The major activities that are to be carried out to enable the CSC rollout in the Statesupon completion of the MSA signing by the State Government with the selected

    SCAs are listed below. Each of the three players (SDA/SCA/NLSA) has specific

    roles to play to accomplish each of the following milestones, the details for which are

    listed in Table 1. These activities are tried out in three States which have completed

    one year of the implementation period. These States are Haryana, Jharkhand and

    West Bengal.

    4. CSC roll-out: Major Milestones/ Broad Activities (Upon signing of the MSA)a. Formation of the CSC Project Teamb. Setting up of the CSC Project Officec. Sensitisation of the Government Officials (State and District level)d. Awareness and Media Strategye. Capacity Building of the Team Membersf. Project Review and Monitoringg. CSC Location Identificationh. VLE Selection and Trainingi. Finalisation of the Connectivity Planj. G2C Services Enablementk. B2C Service Enablementl. Formation of the Empowered Committee and Monitoring Committee and holding

    regular meetings

    m. Certification of the CSCsn. Revenue Support Disbursemento. CSC Launchp. CSC Portal

    The steps to be followed under each of the above activity are detailed out in Table 1.

  • 8/13/2019 Instruction Manual July 08

    5/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    Formation of

    CSC Project

    Team

    Appointment of the Nodal OfficerAppointment of District Nodal

    Offices from the SDA

    Appointment of District / BlockNodal Officer

    Appointment of State Head, District

    Manager, Dedicated person for

    Government Lisoning, MIS and

    reporting, Service enablement team

    (B2C and G2C), Technical Team,

    for Connectivity, SCA Data center,

    SCA Portal and IT infrastructure

    Appointment of a Coordinator to facilitate

    programme.

    Facilitate the SDA to letter for appointment

    Officers at various level

    Setting up of

    Project OfficeArrangement of office space for

    Nodal Officer, member of the

    SCAs and the NLSA Coordinator

    Setup separate Offices at the Statelevel and District levels

    Facilitate the SCA andwhenever required

    Sensitization of

    various

    Stakeholders

    (Parallel

    Activity)

    The SDA is to issue a letter/GOto the District Administration

    broadly covering the following:

    - Introducing CSC projectand roles and

    responsibilities of District

    Administration

    - Introduction of the SCAs- Role of the SDA & the

    NLSA

    Facilitation of the Stategovernment in Sensitization

    Develop awareness programmefor the citizens

    Explain the SDA the State level sensitization

    Draft letters on behaSDA/IT Secretary for c

    to the various departmen

    District level a

    stakeholders

    Prepare concept note, on the CSC Sche

    circulation to the departm

    Facilitate the SDA in aldocumentation/ follow u

    5

  • 8/13/2019 Instruction Manual July 08

    6/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    Draft letter from DC/DM to blocklevel authorities on CSC project

    Sensitization of all statedepartments, Regular Workshops

    and meetings to be conducted by

    the SDA

    Sensitization all DepartmentHead & Divisional Workshop

    Awareness andmedia strategy

    (Parallel

    Activity)

    Logo Development andfinalization

    Initiation and finalization theMedia strategy and awareness

    campaigns

    Comply to guidelines issued bythe SDA on Branding, Logo and

    other aspects

    Assist to develop the and follow up with

    Government for approv

    same

    Capacity

    Building of

    Teams

    (Parallel

    Activity)

    Training of the SDA teammembers on the CSC Scheme,

    certification process, review and

    monitoring, data entry in the

    SMART database, etc

    Training of SCA field teamfrequently

    Explain the Nodal Oneed for training of th S

    on the CSC Scheme, ce

    process, review and m

    SMART database

    Facilitate the training prThe NLSA may propose

    Modules for Capacity B

    this SDA and State

    District Administration

    6

  • 8/13/2019 Instruction Manual July 08

    7/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    Project Review

    and MonitoringMonthly review meetings with

    the SDA, SCA, NLSA under

    chairmanship of State IT

    Secretary/ Head / Nodal Officer

    of the SDA

    Instruction for monthly ReviewMeeting at DC/DM level with

    District Manager, SCA for CSC

    progress status, once a month and

    forwarding Minutes to the SDA

    Monthly Progress Report to beasked from the SCA

    Monitor the rollout progress asper the milestones prescribed in

    the MSA and issue notification in

    case of failure of meeting the

    milestones/deadlines

    Call for a regular review meetingon monthly basis and invite the

    DIT officials to attend the same

    Provide timely status to the SDAand NLSA for project review

    meeting

    Attend the review meeting at thedistrict level and share the

    minutes of the meeting with SDA

    and NLSA

    Prepare a proper Roll Out Planand share the plan with SDA

    To complete the rollout as per themilestones prescribed in the MSA

    To submit regular reports to theSDA and attend the meetings

    called by the SDA on regular

    basis

    To meet the action plan targetssuggested by the SDA/State

    Government and submit

    compliance report if asked for the

    same

    Coordinate with the organize the meeting

    Inform the SCAs on behSDA

    Prepare the Action Pwould be discussed

    meeting with the progre

    Attend the Review Megive suggestions on th

    plan as prescribed

    RFP/MSA

    Prepare the MoM, get it the State IT Secret

    Officer and share with th

    Prepare the Action Placoming month as discus

    meeting and note the

    made

    Assist the SCAs in meprescribed milestones o

    rollout

    Assist the SDA in moniSCAs as prescribed in th

    7

  • 8/13/2019 Instruction Manual July 08

    8/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    Assist the SDA is issuito the SCAs in case of

    the rollout process

    Invite the DIT Officialsthe review meeting

    CSC Location

    IdentificationList of Identified Location to be

    shared with the SCA if finalized

    from the Governments side

    The SDA is to send notification tothe District Authorities on

    allocation of space in Govt.

    premises (GPs) through the

    Panchayat Department if decided

    to locate the CSC at the GP level

    Helping the SCA to getElectricity connection and

    approval

    Providing Government premisesto house the CSC on nominal rent

    basis or free of cost (if agreed by

    Conducting field survey, andidentification of location, sharing

    information with the District

    administration, the SDA and the

    NLSA

    Providing data for CSCmonitoring tool, to the

    SDA/NLSA in prescribed format

    (SMART format)

    The SCA to consider connectivityas a prime parameter in CSC

    location identification and setup

    The SCA has to follow StateGovernments instruction if State

    Government is involved in

    Facilitating with Ecosmprobable CSC locations

    Share the availablelocation data with the SC

    If the CSCs are to be Government Premises/G

    the NLSA is to assist th

    drafting the letters /no

    for circulation.

    Once the locations are enter the same in the

    database

    8

  • 8/13/2019 Instruction Manual July 08

    9/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    the State Government to assist the

    SCA in location identification)

    location identification. Otherwise,

    the SCA may select at its own

    discretion based on the

    survey/viability option, etc

    provided the basic guidelines are

    followed

    VLE selection

    and trainingShare the database on SHG

    members, NGO database, if any

    with the SCA for VLE selection

    Advise the SCA to put anadvertisement for the VLE

    selection as per the criteria

    mentioned in the RFP

    Assist the SCA is drafting theadvertisement for the VLE

    selection in local language

    To check whether the VLEs areappointed as per the criteria

    prescribed in the RFP/MSA

    Approval of the SCA-VLEagreement

    Initiate the process of selection ofthe VLEs based on the

    entrepreneurship skills or as

    agreed upon in the MSA

    Tie-ups with Organizations likeNYKS / Ex - Army Service

    Board, Rural Development

    Department, NGOs, Employment

    Exchange, PMRY for potential

    VLE database

    The draft SCA-VLE agreement tobe submitted for the SDAs

    approval

    Release advertisement in the localnewspapers for VLE selection

    Tie up with Financial Institutionsfor loan requirement of the VLEs

    Facilitation in tie-uOrganizations like NY

    Army Service Boar

    Development Dept.,

    Employment Exchange

    department of post for

    VLE database

    Assist the SCA in draVLE advertisement

    language

    To assist the SDA in the SCA-VLE agreeme

    the MSA

    Assist the SDA in dranecessary documents, i

    behalf of the SDA regar

    selection

    9

  • 8/13/2019 Instruction Manual July 08

    10/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    Conduct VLE Training onperiodic basis

    Set up systems in accordancewith the Complaint and

    suggestion system required under

    the CSC Scheme

    Connectivity Facilitating the SCA in Meetings,discussions and tie-ups with

    various Service Providers

    Monitor the SCAs connectivityoptions whether it is in line with

    the CSC Guidelines (broadband)

    Explore connectivity optionsShare the phase-wise connectivity

    plan with the SDA/NLSA

    Arrange to provide connectivityat the CSCs within the specified

    time frame

    Connectivity guidelines to befollowed as prescribed in the RFP

    (Broadband)

    Facilitate the SCA foavailable connectivity op

    To assist the SDA in mthe connectivity optio

    adopted by the SCAs

    G2C Services

    Enablement

    (ParallelActivity)

    Develop G2C EnablementFramework as per the Document

    circulated to the State Anchors

    Identify key departments and keyG2C services

    Organise a State Level Seminarwith all the Departmental Heads,

    Follow up with the StateGovernment/ SDA for delivery of

    the G2C services

    Participate in theState/Division/District Level

    Seminar and request the

    concerned authorities for speedy

    Assist the SDA in deveG2C Framework (as

    Guidelines circulated)

    Assist the SDA in identkey G2C services

    Follow up to organize Level/District Level sem

    10

  • 8/13/2019 Instruction Manual July 08

    11/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    chaired by the Chief Secretary for

    sensitization of delivery of the

    G2C Services through the CSCs

    Organise Division/District levelseminars for sensitization of

    delivery of the G2C Services

    through the CSCs

    The SDA to consult withDepartmental Heads on one to

    one basis and facilitate to extend

    the G2C Services through the

    CSCs

    Initiation of MOU for G2CServices (between the Department

    and the SCA)

    Initiation of MOAs for UtilityServices (Utility Provider and the

    SCA)

    Assist the Departments/UtilityService Providers in finalizing the

    transaction charges and the

    payment mechanism

    Follow up with the Departments

    delivery of the G2C services

    Offer hands on support if neededto the departments for speedy

    delivery of the services

    Initiate Meeting with the StateDepartments in assistance with

    the SDA and finalise on the

    modalities of the G2C Services

    Finalise the transaction chargesand the payment mechanism of

    the G2C Services/Utility Services

    Enter with an MOU with theDepartments/Utility Service

    Providers whose services are to

    be delivered through the CSCs

    To initiate pilot projects for G2Cservice delivery and suggest the

    State Government to replicate the

    same to all the Districts

    Facilitate the meetingsthe SDA, State Departm

    the SCAs in finali

    modalities for deliver

    G2C Services

    Helping the SDA/ DepSCAs to finalise the M

    follow up to sign the sam

    Follow up with the Deto finalise the timefram

    G2C services and fil

    format given in G

    circulated

    To initiate pilot projecG2C service delivery an

    the State Government to

    the same to all the Distri

    11

  • 8/13/2019 Instruction Manual July 08

    12/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    to provide the timeframe of the

    G2C services as per the

    prescribed format (Circulated to

    the State Anchors)

    Setting up of the MonitoringCommittee and organize regular

    meeting

    B2C Service

    Enablement

    (Parallel

    Activity)

    Facilitate the SCA to enablementof the B2C services as and when

    required

    Identification of B2C Servicesand tie-up

    Executing tie-ups with serviceproviders

    For Details refer B2C EnablementManual Note enclosed separately

    Facilitate the SCA foservices

    For details refer tEnablement Manual

    enclosed separately

    Empowered

    Committee and

    Monitoring

    Committee

    To set up an EmpoweredCommittee for overseeing the

    CSC Implementation status in the

    State

    To organize regular EmpoweredCommittee Meeting and intimate

    the DIT Officials/ NLSA/SCAs

    To set up a MonitoringCommittee to coordinate with

    functionaries of various

    To attend the EmpoweredCommittee Meeting/Monitoring

    Committee Meeting upon

    intimation by the SDA

    Discuss the rollout issues andseek Government support

    wherever required

    To follow the suggestions /instructions given by the

    Empowered Committee/

    To follow up with theorganize the Em

    Committee Meeting, M

    Committee Meeting o

    basis

    Assist the SDA to send to the Committee Memb

    Officials/ SCAs

    Finalise the agenda agenda notes and circ

    12

  • 8/13/2019 Instruction Manual July 08

    13/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    concerned Government

    Departments as well as district

    level officers for ensuring smooth

    implementation of the CSC

    Scheme

    To organize regular MonitoringCommittee Meeting and intimate

    the DIT Officials/ NLSA/SCAs

    Monitoring Committee on the

    rollout issues

    same to the Committee

    in advance

    Prepare presentations meeting

    Draft the Minutes of theand get approval of the

    circulate to the C

    Members/ DIT/ SCAs/ N

    Insist upon taking adecided by the C

    Members and follow u

    compliance of the same

    SDA/SCA

    Certification of

    the CSCsSuggest the SCA to submit

    requests for certification of the

    CSCs for which the rollout has

    been completed

    Finalise the Certification Planissue notification for the same

    (Refer Certification Guidelines)

    To make sure that the CSCs havebeen rolled out as per the

    certification criteria prescribed in

    the RFP

    Submit the list of CSCs to theSDA that have been rolled out

    and ready for certification.

    Initiate the certificatioand facilitate the SDA

    the plan for certification

    Design the Certificatioand Guidelines as

    RFP/MSA

    Share the same with the13

  • 8/13/2019 Instruction Manual July 08

    14/26

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    Create a Certification Teaminvolving the district/ block level

    officials

    Train the Certification Team toundertake the certification process

    as per the RFP/MSA

    Review the certification reportssubmitted by the Certification

    Team

    Issue letters to the SCAs to certifythe CSCs which meet the

    prescribed criteria

    Submit the request for CSCcertification with a request for

    release of the revenue support as

    per the MSA

    To cooperate with the SDAsCertification Team to carry out

    the certification process

    their approval

    Assist the SDA in compcertification process o

    basis

    RevenueSupport

    To send the request to the DIT ,GOI for release of the 1st

    instalment as per the CSC

    Guidelines after completion of

    minimum preparatory steps on the

    CSC Scheme in the State

    Upon receipt of the GOISanction, the SDA is to open a

    Bank Account exclusively for the

    CSC Scheme and send the details

    to the DIT, GOI

    Submit the request for CSCcertification with a request for

    release of the revenue support as

    per the MSA

    To abide by the financialguidelines as laid down in the

    RFP and as instructed by the SDA

    For details of the accounting,auditing, etc, may refer Revenue

    Support Disbursement Process

    To read and undersRevenue Support Disb

    Process circulated by th

    To assist and guide thdocumentation work

    follow the procedure as

    in the Revenue

    Disbursement Process

    To follow up with thetimely submission

    documents related to th

    14

  • 8/13/2019 Instruction Manual July 08

    15/26

    15

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    DIT, GOI releases 50% of the 1stinstalment and sends the request

    for release of the States share

    (50%) to the Department of

    Expenditure, Ministry of Finance,

    GOI through Additional Central

    Assistance (ACA)

    The SDA is to send a proposal tothe State Finance/ Planning

    Department with a request to

    release the ACA sanctioned by

    the GOI under NeGP.

    The fund has to be credited to thesame CSC Project Bank Account

    opened exclusively by the SDA

    for the CSC project.

    The details regarding accounting,auditing would be available in the

    Revenue Support Disbursement

    Process circulated by the DIT,

    GOI

    Revenue Support to be disbursedto the SCA after successful

    of the revenue support, i

    To follow up with therelease of the revenue s

    the SCAs on timely basi

  • 8/13/2019 Instruction Manual July 08

    16/26

    16

    TABLE 1: Enabling State Level CSC Rollout: Detail Activity List

    Description SDA/State Government SCA NLSA

    completion of the CSC rollout

    and upon certification of the same

    (Procedure to be followed as

    mentioned in the Revenue

    Support Disbursement Process)

    CSC Launch The SDA to visit sample roll outCSCs for verification on time to

    time basis and select CSC for a

    formal launch

    To invite dignitaries from GOI/States and organize for a formal

    launch

    To involve media for regularupdate of the progress for general

    awareness to the citizens

    Complete the roll out process by365 days from the signing of the

    MSA

    Cooperate with the SDA inidentification of a CSC for a

    formal launch

    Replicate the experiences fromthe model CSCs/ pilot CSCs to

    other districts

    Facilitate the SDA andlaunching of the CSC pr

    To prepare the dobrochures and assist in

    campaign

    Find local media peregular update on t

    scheme and for creatin

    awareness

    Others CSC related Portal needs to beprepared and Hosted

    Start preparing the Back-endprocess of Portal and others

    Helping out both SDA to develop the CSC port

  • 8/13/2019 Instruction Manual July 08

    17/26

    5. Summary5.1 To understand in more detail, the approach or how to carry out the above activities, some

    sample formats and methodology/ guidelines are enclosed along with this document as

    mentioned below:

    i. Formats of the letters that are to be drafted on behalf of the State Government forcirculation

    ii. Formats of the Minutes of the Meetings that are too be draftediii. Copies of the MOUs that are signed with the Utility Service Providers/ Government

    Departments/ Department of Posts/Others

    iv. Sample SCA-VLE Agreementv. Certification Process/ Checklist/ Training Material

    vi. G2C Enablement Frameworkvii. Manual for B2C Enablement

    5.2 In brief, to complete the rollout process in an effective manner, the State Coordinators mayidentify and prioritise activities and divide them into quarterly activities keeping in line with

    the State Level Implementation Plan. As indicated above, some of the activities are parallel

    activities and some are sequential. Also some are one time activity and some are ongoing

    activities.

    5.3 The activities that are completed need to be highlighted under the column headed -Remarks/Tasks Completed. The reasons for delay in case of non completion of any tasks

    need to be mentioned. The status of the above list of activities needs to be updated on monthly

    basis. All the above mentioned activities are to be completed within a period of one year.

    5.4 The tentative NLSA team size is indicated below:

    Sl. No Activities NLSA State Team Size

    1. Pre-SCA Phase One2. CSC Rollout Phase One- State Government

    One-SCA Enablement

    For Bigger StatesTwo- State Government

    Two-SCA Enablement

    17

  • 8/13/2019 Instruction Manual July 08

    18/26

  • 8/13/2019 Instruction Manual July 08

    19/26

    Sample CSC LOGO/ Names

    Jharkhand West Bengal

    HaryanaBihar

  • 8/13/2019 Instruction Manual July 08

    20/26

    CSCs in Haryana, Jharkhand and West Bengal

    CSC Review Meetin

    Press Release on Tath a Mitra, West Ben al

    VLE Awarded by SREI in West Bengal

    for highest revenue generation in a month

    Jharkhand

    Har ana

    West Ben al

  • 8/13/2019 Instruction Manual July 08

    21/26

  • 8/13/2019 Instruction Manual July 08

    22/26

    Sample MOU