COMMON SERVICES CENTERS CSC) SCHEMEEEN
NAABBLLIINNGGSSTTAATTEELLEEVVEELLCCSSCCRROOLLLL
Instruction Manual for the State
Coordinators
Infrastructure Leasing & Financial Services Ltd.
July 2008
8/13/2019 Instruction Manual July 08
2/26
8/13/2019 Instruction Manual July 08
3/26
the Scheme have been outlined in order to formulate a state specific approach for
implementation in most States.
2.2 A Generic CSC RFP was prepared and circulated to all the States/UTs. Based on theCSC RFP template, the State Governments have issued the state-specific RFPs for
selection of the Service Centre Agencies for setting up and operating the CSCs in theStates.
2.3 The key milestones that have been identified, to measure the progress during the Pre-SCA phase is outlined below:
a. Sensitisation of the State Governmentb. Notification of the State Designated Agency with a Nodal Officerc. State Empowered Committee Formationd. CSC Strategy Finalisatione. State Cabinet Approval of the Scheme/RFPf. Release of funds to the States (Revenue Support)g. SCA Mobilisationh. Sensitisation of various Content and Service Providersi. Identification of the G2C Services and sensitization of the Government
Departments to enable the delivery of services through the CSCs when they
would be ready
j. SWAN RFP Issuance/ Bill of Materials Approvalk. CSC RFP Issuancel. CSC Bid Evaluationm. SCA Selectionn. Issuance of Letter of Intent (LOI)o. Signing of the Master Service Agreement (MSA)
3
8/13/2019 Instruction Manual July 08
4/26
4
3. CSC Rollout Phase3.1 Pursuant to the MSA signing, the challenge lies in completion of the CSC rollout as
per the milestones/ timelines prescribed in the MSA. Although the prime
responsibility lies with the SCAs who are mandated to set up the centers as per the
contractual obligation, it is of utmost importance to consider this as a team effort bythe three main stakeholders: the SCA, the SDA and the NLSA to complete the CSC
rollout in a smooth manner within the defined timeframe.
3.2 The major activities that are to be carried out to enable the CSC rollout in the Statesupon completion of the MSA signing by the State Government with the selected
SCAs are listed below. Each of the three players (SDA/SCA/NLSA) has specific
roles to play to accomplish each of the following milestones, the details for which are
listed in Table 1. These activities are tried out in three States which have completed
one year of the implementation period. These States are Haryana, Jharkhand and
West Bengal.
4. CSC roll-out: Major Milestones/ Broad Activities (Upon signing of the MSA)a. Formation of the CSC Project Teamb. Setting up of the CSC Project Officec. Sensitisation of the Government Officials (State and District level)d. Awareness and Media Strategye. Capacity Building of the Team Membersf. Project Review and Monitoringg. CSC Location Identificationh. VLE Selection and Trainingi. Finalisation of the Connectivity Planj. G2C Services Enablementk. B2C Service Enablementl. Formation of the Empowered Committee and Monitoring Committee and holding
regular meetings
m. Certification of the CSCsn. Revenue Support Disbursemento. CSC Launchp. CSC Portal
The steps to be followed under each of the above activity are detailed out in Table 1.
8/13/2019 Instruction Manual July 08
5/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
Formation of
CSC Project
Team
Appointment of the Nodal OfficerAppointment of District Nodal
Offices from the SDA
Appointment of District / BlockNodal Officer
Appointment of State Head, District
Manager, Dedicated person for
Government Lisoning, MIS and
reporting, Service enablement team
(B2C and G2C), Technical Team,
for Connectivity, SCA Data center,
SCA Portal and IT infrastructure
Appointment of a Coordinator to facilitate
programme.
Facilitate the SDA to letter for appointment
Officers at various level
Setting up of
Project OfficeArrangement of office space for
Nodal Officer, member of the
SCAs and the NLSA Coordinator
Setup separate Offices at the Statelevel and District levels
Facilitate the SCA andwhenever required
Sensitization of
various
Stakeholders
(Parallel
Activity)
The SDA is to issue a letter/GOto the District Administration
broadly covering the following:
- Introducing CSC projectand roles and
responsibilities of District
Administration
- Introduction of the SCAs- Role of the SDA & the
NLSA
Facilitation of the Stategovernment in Sensitization
Develop awareness programmefor the citizens
Explain the SDA the State level sensitization
Draft letters on behaSDA/IT Secretary for c
to the various departmen
District level a
stakeholders
Prepare concept note, on the CSC Sche
circulation to the departm
Facilitate the SDA in aldocumentation/ follow u
5
8/13/2019 Instruction Manual July 08
6/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
Draft letter from DC/DM to blocklevel authorities on CSC project
Sensitization of all statedepartments, Regular Workshops
and meetings to be conducted by
the SDA
Sensitization all DepartmentHead & Divisional Workshop
Awareness andmedia strategy
(Parallel
Activity)
Logo Development andfinalization
Initiation and finalization theMedia strategy and awareness
campaigns
Comply to guidelines issued bythe SDA on Branding, Logo and
other aspects
Assist to develop the and follow up with
Government for approv
same
Capacity
Building of
Teams
(Parallel
Activity)
Training of the SDA teammembers on the CSC Scheme,
certification process, review and
monitoring, data entry in the
SMART database, etc
Training of SCA field teamfrequently
Explain the Nodal Oneed for training of th S
on the CSC Scheme, ce
process, review and m
SMART database
Facilitate the training prThe NLSA may propose
Modules for Capacity B
this SDA and State
District Administration
6
8/13/2019 Instruction Manual July 08
7/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
Project Review
and MonitoringMonthly review meetings with
the SDA, SCA, NLSA under
chairmanship of State IT
Secretary/ Head / Nodal Officer
of the SDA
Instruction for monthly ReviewMeeting at DC/DM level with
District Manager, SCA for CSC
progress status, once a month and
forwarding Minutes to the SDA
Monthly Progress Report to beasked from the SCA
Monitor the rollout progress asper the milestones prescribed in
the MSA and issue notification in
case of failure of meeting the
milestones/deadlines
Call for a regular review meetingon monthly basis and invite the
DIT officials to attend the same
Provide timely status to the SDAand NLSA for project review
meeting
Attend the review meeting at thedistrict level and share the
minutes of the meeting with SDA
and NLSA
Prepare a proper Roll Out Planand share the plan with SDA
To complete the rollout as per themilestones prescribed in the MSA
To submit regular reports to theSDA and attend the meetings
called by the SDA on regular
basis
To meet the action plan targetssuggested by the SDA/State
Government and submit
compliance report if asked for the
same
Coordinate with the organize the meeting
Inform the SCAs on behSDA
Prepare the Action Pwould be discussed
meeting with the progre
Attend the Review Megive suggestions on th
plan as prescribed
RFP/MSA
Prepare the MoM, get it the State IT Secret
Officer and share with th
Prepare the Action Placoming month as discus
meeting and note the
made
Assist the SCAs in meprescribed milestones o
rollout
Assist the SDA in moniSCAs as prescribed in th
7
8/13/2019 Instruction Manual July 08
8/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
Assist the SDA is issuito the SCAs in case of
the rollout process
Invite the DIT Officialsthe review meeting
CSC Location
IdentificationList of Identified Location to be
shared with the SCA if finalized
from the Governments side
The SDA is to send notification tothe District Authorities on
allocation of space in Govt.
premises (GPs) through the
Panchayat Department if decided
to locate the CSC at the GP level
Helping the SCA to getElectricity connection and
approval
Providing Government premisesto house the CSC on nominal rent
basis or free of cost (if agreed by
Conducting field survey, andidentification of location, sharing
information with the District
administration, the SDA and the
NLSA
Providing data for CSCmonitoring tool, to the
SDA/NLSA in prescribed format
(SMART format)
The SCA to consider connectivityas a prime parameter in CSC
location identification and setup
The SCA has to follow StateGovernments instruction if State
Government is involved in
Facilitating with Ecosmprobable CSC locations
Share the availablelocation data with the SC
If the CSCs are to be Government Premises/G
the NLSA is to assist th
drafting the letters /no
for circulation.
Once the locations are enter the same in the
database
8
8/13/2019 Instruction Manual July 08
9/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
the State Government to assist the
SCA in location identification)
location identification. Otherwise,
the SCA may select at its own
discretion based on the
survey/viability option, etc
provided the basic guidelines are
followed
VLE selection
and trainingShare the database on SHG
members, NGO database, if any
with the SCA for VLE selection
Advise the SCA to put anadvertisement for the VLE
selection as per the criteria
mentioned in the RFP
Assist the SCA is drafting theadvertisement for the VLE
selection in local language
To check whether the VLEs areappointed as per the criteria
prescribed in the RFP/MSA
Approval of the SCA-VLEagreement
Initiate the process of selection ofthe VLEs based on the
entrepreneurship skills or as
agreed upon in the MSA
Tie-ups with Organizations likeNYKS / Ex - Army Service
Board, Rural Development
Department, NGOs, Employment
Exchange, PMRY for potential
VLE database
The draft SCA-VLE agreement tobe submitted for the SDAs
approval
Release advertisement in the localnewspapers for VLE selection
Tie up with Financial Institutionsfor loan requirement of the VLEs
Facilitation in tie-uOrganizations like NY
Army Service Boar
Development Dept.,
Employment Exchange
department of post for
VLE database
Assist the SCA in draVLE advertisement
language
To assist the SDA in the SCA-VLE agreeme
the MSA
Assist the SDA in dranecessary documents, i
behalf of the SDA regar
selection
9
8/13/2019 Instruction Manual July 08
10/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
Conduct VLE Training onperiodic basis
Set up systems in accordancewith the Complaint and
suggestion system required under
the CSC Scheme
Connectivity Facilitating the SCA in Meetings,discussions and tie-ups with
various Service Providers
Monitor the SCAs connectivityoptions whether it is in line with
the CSC Guidelines (broadband)
Explore connectivity optionsShare the phase-wise connectivity
plan with the SDA/NLSA
Arrange to provide connectivityat the CSCs within the specified
time frame
Connectivity guidelines to befollowed as prescribed in the RFP
(Broadband)
Facilitate the SCA foavailable connectivity op
To assist the SDA in mthe connectivity optio
adopted by the SCAs
G2C Services
Enablement
(ParallelActivity)
Develop G2C EnablementFramework as per the Document
circulated to the State Anchors
Identify key departments and keyG2C services
Organise a State Level Seminarwith all the Departmental Heads,
Follow up with the StateGovernment/ SDA for delivery of
the G2C services
Participate in theState/Division/District Level
Seminar and request the
concerned authorities for speedy
Assist the SDA in deveG2C Framework (as
Guidelines circulated)
Assist the SDA in identkey G2C services
Follow up to organize Level/District Level sem
10
8/13/2019 Instruction Manual July 08
11/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
chaired by the Chief Secretary for
sensitization of delivery of the
G2C Services through the CSCs
Organise Division/District levelseminars for sensitization of
delivery of the G2C Services
through the CSCs
The SDA to consult withDepartmental Heads on one to
one basis and facilitate to extend
the G2C Services through the
CSCs
Initiation of MOU for G2CServices (between the Department
and the SCA)
Initiation of MOAs for UtilityServices (Utility Provider and the
SCA)
Assist the Departments/UtilityService Providers in finalizing the
transaction charges and the
payment mechanism
Follow up with the Departments
delivery of the G2C services
Offer hands on support if neededto the departments for speedy
delivery of the services
Initiate Meeting with the StateDepartments in assistance with
the SDA and finalise on the
modalities of the G2C Services
Finalise the transaction chargesand the payment mechanism of
the G2C Services/Utility Services
Enter with an MOU with theDepartments/Utility Service
Providers whose services are to
be delivered through the CSCs
To initiate pilot projects for G2Cservice delivery and suggest the
State Government to replicate the
same to all the Districts
Facilitate the meetingsthe SDA, State Departm
the SCAs in finali
modalities for deliver
G2C Services
Helping the SDA/ DepSCAs to finalise the M
follow up to sign the sam
Follow up with the Deto finalise the timefram
G2C services and fil
format given in G
circulated
To initiate pilot projecG2C service delivery an
the State Government to
the same to all the Distri
11
8/13/2019 Instruction Manual July 08
12/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
to provide the timeframe of the
G2C services as per the
prescribed format (Circulated to
the State Anchors)
Setting up of the MonitoringCommittee and organize regular
meeting
B2C Service
Enablement
(Parallel
Activity)
Facilitate the SCA to enablementof the B2C services as and when
required
Identification of B2C Servicesand tie-up
Executing tie-ups with serviceproviders
For Details refer B2C EnablementManual Note enclosed separately
Facilitate the SCA foservices
For details refer tEnablement Manual
enclosed separately
Empowered
Committee and
Monitoring
Committee
To set up an EmpoweredCommittee for overseeing the
CSC Implementation status in the
State
To organize regular EmpoweredCommittee Meeting and intimate
the DIT Officials/ NLSA/SCAs
To set up a MonitoringCommittee to coordinate with
functionaries of various
To attend the EmpoweredCommittee Meeting/Monitoring
Committee Meeting upon
intimation by the SDA
Discuss the rollout issues andseek Government support
wherever required
To follow the suggestions /instructions given by the
Empowered Committee/
To follow up with theorganize the Em
Committee Meeting, M
Committee Meeting o
basis
Assist the SDA to send to the Committee Memb
Officials/ SCAs
Finalise the agenda agenda notes and circ
12
8/13/2019 Instruction Manual July 08
13/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
concerned Government
Departments as well as district
level officers for ensuring smooth
implementation of the CSC
Scheme
To organize regular MonitoringCommittee Meeting and intimate
the DIT Officials/ NLSA/SCAs
Monitoring Committee on the
rollout issues
same to the Committee
in advance
Prepare presentations meeting
Draft the Minutes of theand get approval of the
circulate to the C
Members/ DIT/ SCAs/ N
Insist upon taking adecided by the C
Members and follow u
compliance of the same
SDA/SCA
Certification of
the CSCsSuggest the SCA to submit
requests for certification of the
CSCs for which the rollout has
been completed
Finalise the Certification Planissue notification for the same
(Refer Certification Guidelines)
To make sure that the CSCs havebeen rolled out as per the
certification criteria prescribed in
the RFP
Submit the list of CSCs to theSDA that have been rolled out
and ready for certification.
Initiate the certificatioand facilitate the SDA
the plan for certification
Design the Certificatioand Guidelines as
RFP/MSA
Share the same with the13
8/13/2019 Instruction Manual July 08
14/26
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
Create a Certification Teaminvolving the district/ block level
officials
Train the Certification Team toundertake the certification process
as per the RFP/MSA
Review the certification reportssubmitted by the Certification
Team
Issue letters to the SCAs to certifythe CSCs which meet the
prescribed criteria
Submit the request for CSCcertification with a request for
release of the revenue support as
per the MSA
To cooperate with the SDAsCertification Team to carry out
the certification process
their approval
Assist the SDA in compcertification process o
basis
RevenueSupport
To send the request to the DIT ,GOI for release of the 1st
instalment as per the CSC
Guidelines after completion of
minimum preparatory steps on the
CSC Scheme in the State
Upon receipt of the GOISanction, the SDA is to open a
Bank Account exclusively for the
CSC Scheme and send the details
to the DIT, GOI
Submit the request for CSCcertification with a request for
release of the revenue support as
per the MSA
To abide by the financialguidelines as laid down in the
RFP and as instructed by the SDA
For details of the accounting,auditing, etc, may refer Revenue
Support Disbursement Process
To read and undersRevenue Support Disb
Process circulated by th
To assist and guide thdocumentation work
follow the procedure as
in the Revenue
Disbursement Process
To follow up with thetimely submission
documents related to th
14
8/13/2019 Instruction Manual July 08
15/26
15
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
DIT, GOI releases 50% of the 1stinstalment and sends the request
for release of the States share
(50%) to the Department of
Expenditure, Ministry of Finance,
GOI through Additional Central
Assistance (ACA)
The SDA is to send a proposal tothe State Finance/ Planning
Department with a request to
release the ACA sanctioned by
the GOI under NeGP.
The fund has to be credited to thesame CSC Project Bank Account
opened exclusively by the SDA
for the CSC project.
The details regarding accounting,auditing would be available in the
Revenue Support Disbursement
Process circulated by the DIT,
GOI
Revenue Support to be disbursedto the SCA after successful
of the revenue support, i
To follow up with therelease of the revenue s
the SCAs on timely basi
8/13/2019 Instruction Manual July 08
16/26
16
TABLE 1: Enabling State Level CSC Rollout: Detail Activity List
Description SDA/State Government SCA NLSA
completion of the CSC rollout
and upon certification of the same
(Procedure to be followed as
mentioned in the Revenue
Support Disbursement Process)
CSC Launch The SDA to visit sample roll outCSCs for verification on time to
time basis and select CSC for a
formal launch
To invite dignitaries from GOI/States and organize for a formal
launch
To involve media for regularupdate of the progress for general
awareness to the citizens
Complete the roll out process by365 days from the signing of the
MSA
Cooperate with the SDA inidentification of a CSC for a
formal launch
Replicate the experiences fromthe model CSCs/ pilot CSCs to
other districts
Facilitate the SDA andlaunching of the CSC pr
To prepare the dobrochures and assist in
campaign
Find local media peregular update on t
scheme and for creatin
awareness
Others CSC related Portal needs to beprepared and Hosted
Start preparing the Back-endprocess of Portal and others
Helping out both SDA to develop the CSC port
8/13/2019 Instruction Manual July 08
17/26
5. Summary5.1 To understand in more detail, the approach or how to carry out the above activities, some
sample formats and methodology/ guidelines are enclosed along with this document as
mentioned below:
i. Formats of the letters that are to be drafted on behalf of the State Government forcirculation
ii. Formats of the Minutes of the Meetings that are too be draftediii. Copies of the MOUs that are signed with the Utility Service Providers/ Government
Departments/ Department of Posts/Others
iv. Sample SCA-VLE Agreementv. Certification Process/ Checklist/ Training Material
vi. G2C Enablement Frameworkvii. Manual for B2C Enablement
5.2 In brief, to complete the rollout process in an effective manner, the State Coordinators mayidentify and prioritise activities and divide them into quarterly activities keeping in line with
the State Level Implementation Plan. As indicated above, some of the activities are parallel
activities and some are sequential. Also some are one time activity and some are ongoing
activities.
5.3 The activities that are completed need to be highlighted under the column headed -Remarks/Tasks Completed. The reasons for delay in case of non completion of any tasks
need to be mentioned. The status of the above list of activities needs to be updated on monthly
basis. All the above mentioned activities are to be completed within a period of one year.
5.4 The tentative NLSA team size is indicated below:
Sl. No Activities NLSA State Team Size
1. Pre-SCA Phase One2. CSC Rollout Phase One- State Government
One-SCA Enablement
For Bigger StatesTwo- State Government
Two-SCA Enablement
17
8/13/2019 Instruction Manual July 08
18/26
8/13/2019 Instruction Manual July 08
19/26
Sample CSC LOGO/ Names
Jharkhand West Bengal
HaryanaBihar
8/13/2019 Instruction Manual July 08
20/26
CSCs in Haryana, Jharkhand and West Bengal
CSC Review Meetin
Press Release on Tath a Mitra, West Ben al
VLE Awarded by SREI in West Bengal
for highest revenue generation in a month
Jharkhand
Har ana
West Ben al
8/13/2019 Instruction Manual July 08
21/26
8/13/2019 Instruction Manual July 08
22/26
Sample MOU
8/13/2019 Instruction Manual July 08
23/26
8/13/2019 Instruction Manual July 08
24/26
8/13/2019 Instruction Manual July 08
25/26
8/13/2019 Instruction Manual July 08
26/26