Upload
dangnga
View
225
Download
0
Embed Size (px)
Citation preview
R
EPA CERTIFIED WOODBURNING FIREPLACE
Fire Risk.
WARNING
For use with solid wood fuel only.Other fuels may overfire and generate poisonous gases (i.e. carbon monoxide).
O-T LTested and Listed by
PortlandOregon USA
OMNI-Test Laboratories, Inc.C US
Model(s):
Installation ManualInstallation and Fireplace Setup
WARNINGHOT SURFACES! Glass and other surfaces are hot during operation AND cool down.
Hot glass will cause burns.• DO NOT touch glass until it is cooled• NEVER allow children to touch glass• Keep children away
• CAREFULLY SUPERVISE children in same room as fireplace.
• Alert children and adults to hazards of high temperatures.
High temperatures may ignite clothing or other flammable materials.• Keep clothing, furniture, draperies and other flammable
materials away.
INSTALLER: Leave this manual with party responsible for use and operation.OWNER: Retain this manual for future reference.
7100FP-BK-B7100FP-NL-B
• DO NOTstoreorusegasolineorotherflam-mablevaporsandliquidsinthevicinityofthisor any other appliance.
• DO NOToverfire.Overfiringwillvoidyourwarranty.
• Comply with all minimum clearances to com-bustiblesasspecified.Failuretocomplymaycausehousefire.
WARNING: If the information in these instructions is not followed exactly, a fire or explosion may result causing property damage, personal injury, or death.
Pour demander un exemplaire en français de ce Manuel dupropriétaire,visitezwww.quadrafire.com/translations.
Installation and service of this appliance should beperformedby
1Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
Safety Alert Key:• DANGER! Indicatesahazardoussituationwhich,ifnotavoidedwill result in death or serious injury.• WARNING!Indicatesahazardoussituationwhich,ifnotavoidedcould result in death or serious injury.• CAUTION! Indicatesahazardoussituationwhich,ifnotavoided,couldresultinminorormoderateinjury.• NOTICE:Indicatespracticeswhichmaycausedamagetothefireplaceortoproperty.
Table of Contents1 Product Specific & Important Safety Information
A.FireplaceCertification 4B.BTUEfficiencySpecifications 4C.MobileHomeApproved 4D.GlassSpecifications 5E.Non-CombustibleMaterials 5F.CombustibleMaterials 5G.ElectricalCodes 5
2 Getting Started A. Typical Fireplace System 6B. Design and Installation Considerations 7
1. Selecting Fireplace Locations 72. Locating Fireplace & Chimney 8
C. Tools and Supplies Needed 9D. Inspect Fireplace and Components 9E.FireplaceSystemRequirements 9
3 Framing and Clearances A. Fireplace Dimensions 10B. Clearances 11
1.MinimumClearancestoCombustibles 12C. Construct the Chase 13D.FrametheFireplace 14E.SecureandLeveltheFireplace 14F. ProtectiveMetalHearthStrips 15G.FacingMaterial 15H.OutsideAirKit 16I. AuxiliaryConvectionAirSystem 18J. HeatZoneKit(Optional) 19
4 Electrical Wiring 5 Chimney and Termination Requirements
A.ChimneyRequirements 23B.Offsets/Returns 24C.TerminationRequirements 25
6 Chimney Installation A. Typical Chimney System 26B.AssembleChimneySections 27C.InstallChimneyAirkit(CAK4A) 27D.SecureOffset/Return 29E. Install Ceiling Firestops 29F. Install Attic Insulation Shield 30G. Roof Penetration 31H.ManufacturedHomeInstallation 31I. InstallChase/ChaseTop 32J. TerminationCapRequirements 33K. Install Termination Cap 33
7 Finishing A.Template 35B FinishtheWall 35
1.Stone,BrickFinish 352.Tile,Granite,MarbleFinish 35
C. Mantel and Wall Projections 36D.FinishingtheHearthExtension 36E.Non-CombustibleSealantMaterial 38
8 Fireplace Setup A.FirebrickPlacement 39B.BaffleandBlanketPlacement 40C.InstallFascia(Fronts) 40
9 Reference Materials A.ChimneyComponents 41B.Accessories 45MESH-HHTFirescreen 45
2 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
►
Customer:Lot/Address
Model (circle one): 7100FP-BK-B 7100FP-NL-B
YES IF NO, WHY?Fireplace InstallVerified that the chase is insulated and sealed. Requirednon-combustibleboardisinstalled.Verifiedclearancestocombustibles.Fireplaceisleveledandsecured.Hearthextensionsize/heightdecided.Outsideairkitinstalled.OptionalHeatZonehasbeeninstalledbyaqualifiedservicetechnician.
Chimney Section 5 Chimney configuration complies with diagrams.Chimney installed, locked and secured in place with proper clearance. Chimney air kit installed.Firestops installed.Attic insulation shields installed.Roof flashing installed and sealed.Terminations installed and sealed.
Electrical Section 4 Switch wires properly installed.
Dealer/Distributor Phone #Serial #:
WARNING! Risk of Fire or Explosion! Failure to install fireplace acording to these instructions can lead to a fire or explosion.
ATTENTION INSTALLER:Follow this Standard Work Checklist
Thisstandardworkchecklististobeusedbytheinstallerinconjuctionwith,notinsteadof,theinstructionscontainedinthisinstallationmanual.
Date Installed:Location of Fireplace:Installer:
Finishing Section 7 CombustibleCombustiblematerialsmaterialsnotnotinstalledinstalledininnon-non-combustiblecombustibleareasareas.Verifiedallclearancesmeetinstallationmanualrequirements.Mantelsandwallprojectionscomplywithinstallationmanualrequirements. Protectivehearthstripsandhearthextensioninstalledpermanualrequirements.
Fireplace Setup Section 8 Allpackagingandprotectivematerialsremoved.Firebrick,baffleandceramicblanketinstalledcorrectly.Facia and doors properly installed.Manualbagandallofitscontentsareremovedfrominside/underthefireplaceandgiventothepartyresponsibleforuseandoperation.Allpackagingmaterialsareremovedfrominside/underthefireplace.
Hearth & Home Technologies recommends the following:• Photographing the installation and copying this checklist for your file.• Thatthischecklistremainvisibleatalltimesonthefireplaceuntiltheinstallationiscomplete.
Commentscommunicatedtopartyresponsible
Part#4017-254•RevB•01/29/13
__________________________by______________________on_________(Builder/Gen.Contractor)(Installer)(Date)
Comments:Furtherdescriptionoftheissues,whoisresponsible(Installer/Builder/OtherTrades,etc.)andcorrectiveactionneeded:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
3Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
1 Product Specific & Important Safety Information
Model: 7100FP
Laboratory: OMNITestLaboratories,Inc.Report No: 061-S-41-2
Type: Wood Fireplace
Standard: UL127-2011 and ULC-S610-M87 (A1998)and(UM)84-HUD,Manu-facturedHomeApproved.
A. Appliance Certification
NOTE:Hearth&HomeTechnologies,manufacturerofthisappliance,reservestherighttoalteritsproducts,theirspecificationsand/orpricewithoutnotice.
C. Mobile Home Approved This appliance is approved formobile home installationswhen not installed in a sleeping room and when an outside combustionair inlet isprovided.Thestructural integrityofthemobilehomefloor,ceiling,andwallsmustbemaintained.Theappliancemustbeproperlygroundedtotheframeofthemobilehomeanduseonlylisteddouble-wallconnectorpipe.D. Glass SpecificationsThisapplianceisequippedwith5mmceramicglass.Replaceglassonlywith5mmceramicglass.Pleasecon-tact your dealer for replacement glass.
Improper installation, adjustment, alteration, service ormaintenance can cause injury or property damage.
Forassistanceoradditionalinformation,consultaqualifiedinstaller,serviceagencyoryourdealer.
• Installation and use of any damaged appliance. • Modificationoftheappliance. • InstallationotherthanasinstructedbyHearth&Home Technologies. • Installationand/oruseofanycomponentpartnotapproved byHearth&HomeTechnologies. • Operatingappliancewithoutfullyassemblingall components. • DoNOTOverfire-Ifapplianceorchimneyconnectorglows, youareoverfiring.Anysuchactionthatmaycauseafirehazard.
WARNINGFire Risk.Hearth&HomeTechnologiesdisclaimsanyresponsibilityfor,andthewarrantywillbevoidedby,thefollowingactions:
B. BTU & Efficiency SpecificationsNOTE: This installation must conform with local codes. In the absenceoflocalcodesyoumustcomplywiththeUL127-2011, (UM) 84-HUD and NPFA211 in the U.S.A. and the ULC S610-M87 (A1998) and CAN/CSA-B365 Installation Codes in Canada.
The 7100FPmeets the U.S. Environmental ProtectionAgency’scribwoodemissionlimitsforwoodheaterssoldafterMay15,2015.
EPACertification#: 5714-1-03EPACertifiedEmissions: 3.1 grams per hour*LHVTestedEfficiency: 77.6 %**HHVTestedEfficiency: 71.8%
***EPABTUOutput: 12,100to58,800/hr.****PeakBTU/HourOutput: 92,400
VentSize: 8 inchesFireboxSize: 3.4cubicfeet
RecommendedLogLength: 24inchesFuel Seasoned Cord Wood
ChimneySize: 8 inchesHHT: SL300 Series
DuraVent: DuraPlus**WeightedaverageLHV(LowHeatingValue)efficiencyusingDouglasFirdimensional lumberanddatacollectedduringEPAemissiontest.LHVassumesthemoistureisalreadyinavaporstatesothereisnolossinenergytovaporize.****WeightedaverageHHV(HighHeatingValue)efficiencyusingDouglasFirdimensional lumberanddatacollectedduringEPAemissiontest.HHVincludestheenergyrequiredtovaporizethewater in the fuel.***ArangeofBTUoutputsbasedonEPADefaultEfficiencyandtheburnratesfromthelowandhighEPAtests,usingDouglasFirdimensionallumber.****A peak BTU out of the appliance calculated using the maxi-mumfirsthourburnrate fromtheHighEPATestand theBTUcontentofcordwood(8600)timestheefficiency.
4 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
G. Electrical Codes
NOTICE: This fireplace must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA 70-latest edition or the Canadian Electric Code CSA C22.1.
• A110-120VACcircuitforthisproductmustbeprotectedwith ground-fault circuit-interrupter protection, in compliancewiththeapplicableelectricalcodes,whenit is installed in damp locations.
WARNING! Improper installation, adjustment, alteration, service or maintenance can cause injury or property dam-age.
Hearth&HomeTechnologiesWILLNOTwarrantyappli-ancesthatexhibitevidenceofover-firing.Evidenceofover-firingincludes,butisnotlimitedto: • Warpedairtube • Deterioratedrefractorybrickretainers • Deterioratedbaffleandotherinteriorcomponents
E. Non-Combustible MaterialsMaterialwhichwillnotigniteandburn,composedofanycombinationofthefollowing: - Steel - Plaster - Brick - Iron - Concrete - Tile - Glass - SlateMaterials reported as passing ASTM E 136, Standard Test Method for Behavior of Metals, in a Vertical Tube Furnace of 750° C. F. Combustible MaterialsMaterialmadeof/orsurfacedwithanyofthefollowingmaterials: - Wood - Compressed Paper -PlantFibers -Plastic -Plywood/OSB -SheetRock(drywall)Anymaterialthatcanigniteandburn:flameproofedornot, plastered or un-plastered.
5Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
2 Getting Started
Termination Cap
Chimney penetrates roof preferably without affectingroof rafters
Offset/Return (with hanger straps)
Attic insulation shield must be used to keep insulation away from chimney if attic is insulated
Storm Collar
Framing headed off in ceiling joists
Mantel
Chimney system
Combustible framing/headeron top of V-shaped standoffs (spacers)
Non-combustible material
Hearth extension
Non-combustibleroof flashing maintainsminimum clearancearound chimney
Additional lateralsupport for chimneyabove roof (or enclosedin chase) if needed
Enclosed space aboveand around fireplace
Ceiling firestopon floor of attic
Support strapson rafter supportschimney (not shown)
Outsidecombustion air
Outsidecombustion air
Chimney Air Kit (CAK-4A) (not shown) must be used with SL300 chimney
Protective metalhearth strip(s)
A. Typical Fireplace System
Figure 2.1 Typical Fireplace System
6 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
D
CA
E
F
AH
GB
A
B
B
AI
In an exterior chase or projecting into a garage
Across a corner
Along a wall
As a room divider
24 in. (610mm)
24 in. (610mm)
24 in. (610mm)
48 in. (1219mm)
*If interior of chase will be drywalled, add the thickness to this measurement.
°Faceplate to sidewall
24 in. (610mm)
I
A
*
*
*
*
Figure 2.2 Fireplace Locations
NOTICE:• Illustrations and photos reflect typical installations and
are FOR DESIGN PURPOSES ONLY.• Illustrations/diagrams are not drawn to scale.• Actual installation/appearance may vary due to individual
design preference.• Hearth & Home Technologies reserves the right to alter
its products.
NOTICE: In addition to these framing dimensions, also reference the following section:
• Clearances (Section 3).
NOTICE: A minimum 1/2 in. air clearance at the back and a minimum 1 in. air clearance to the sides of the fireplace assembly must be maintained.Chimney sections at any level require a 2 in. mini-mum air space clearance between the framing and chimney sections.
B. Design and Installation Considerations
NOTICE: Check building codes prior to installation.
• Installation MUST comply with local, regional, state and national codes and regulations.
• Consult insurancecarrier, localbuildinginspector,fireofficialsorauthoritieshavingjurisdictionoverrestrictions,installation inspection and permits.
1. Selecting Fireplace LocationsThis fireplace may be used as a room divider, installedalong a wall, across a corner or used in an exterior chase. See Figure 2.2.
Locating the fireplace in a basement, near frequentlyopened doors, central heat outlets or returns, or other loca-tionsofconsiderableairmovementcanaffect theperfor-mance.
Outside air must be used for combustion. The 7100FPcomesequippedwithanoutsideairinlettofeedcombus-tion air from outside the home, along with an outside air terminationcap;themetalductisrequiredbutnotsupplied.Considerationshouldbegiventothesefactorsbeforede-ciding on a location.
Model # 7100FP A B° C D E F G H I
(Dimensionsfor finishedwalls)
in. 42-1/2 16 89-1/2 63-5/16 22-7/16 44-3/4 14-1/16 56-9/16 54-1/2
mm 1080 406 2273 1608 570 1137 357 1437 1384
7Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
2. Locating Fireplace & Chimney
Locationofthefireplaceandchimneywillaffectperfor-mance.
• Installwithinthewarmairspaceenclosedbythebuildingenvelope.Thishelpstoproducemoredraft,especiallyduringlightinganddie-downofthefire.
• Penetrate the highest part of the roof. This minimizes the effects of wind loading.
• Locate termination cap away from trees, adjacent structures,unevenrooflinesandotherobstructions.
• Minimize the use of chimney offsets. • Considerthefireplacelocationrelativetofloorandceiling
and attic joists.• Takeintoconsiderationtheterminationrequirementsin
Sections5and6.
Marginal Location:• Below peak
Location NOT recommended:• Not the highest point of the roof• Wind loading possible
Multi-level Roofs
Windward
Leeward
Recommended Location:• Above peak
Recommended:• Insulated exterior chase
in cooler climates
Recommended Location:• Above peak• Inside heated space
Location NOT recommended:• Too close to tree• Below adjacent structure• Lower roof line• Avoid outside wall
Marginal Location:• Wind loading possible
Not recommended in basement due to high negative pressure concerns that effect draft
Figure 2.3 Recommended Chimney Locations
• Installtheoutsideairkitwiththeintakefacingprevailingwinds during the heating season.
• Ensure adequate outdoor air for all combustionappliancesandexhaustequipment.
• Ensurefurnaceandairconditioningreturnventsarenotlocatedintheimmediatevicinityofthefireplace.
• Avoid installingthefireplaceneardoors,walkwaysorsmall isolated spaces.
• Recessedlightingshouldbea“sealedcan”design.• Attic hatches weather stripped or sealed.• Attic mounted duct work and air handler joints and seams
taped or sealed.
8 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
C. Tools and Supplies NeededBeforebeginningtheinstallationbesurethefollowingtoolsandbuildingsuppliesareavailable:
Reciprocating saw Framing material
Pliers Non-combustiblesealant
Hammer Gloves
Phillipsscrewdriver Framingsquare
Flatbladescrewdriver Electricdrillandbits
Plumbline Safetyglasses
Level Tapemeasure
1/2-3/4in.length,#6or#8self-drillingscrews
Misc. screws and nails
D. Inspect Fireplace and Components
WARNING! Risk of Fire and/or Explosion! Damaged parts could impair safe operation. DO NOT install dam-aged, incomplete or substitute components. Keep fire-place dry.
• Removefireplaceandcomponentsfrompackagingandinspect for damage.
• Vent system components and doors are shipped in separate packages.
• Report to your dealer any parts damaged in shipment.• Read all the instructions before starting the
installation. Follow these instructions carefully during the installation to ensure maximum safety and benefit.
E. Fireplace System RequirementsTheQuadra-Firefireplacesystemrequirementsconsistofthefollowing:
• Fireplace- Firebrick(includedwithfireplace)- Door(includedwithfireplace)- Non-combustible facingmaterial (included with
fireplace)- HearthExtension
• OutsideAir System (hood and collars includedwithfireplace)
• Fascia• Chimney System
- Chimneyairkit(includedwithfireplace,requiredwithSL300serieschimney)
- AtticInsulationShield(includedwithfireplace)- Chimney termination cap
• Non-combustiblefinishmaterial
Optionalcomponentsinclude:• Firescreen• Lintel Bar• HeatZoneKit
9Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
3 Framing and Clearances
A. Fireplace Dimensions
CL
Blower Electric Access(right side of fireplace)
3-1/2 in.(89 mm)
32-1/2 in.(826 mm)
38 in.(965 mm)
40 in.(1016 mm)
42-5/16 in.(1075 mm)
45-13/16 in.(1148 mm)
23-7/16 in.(595 mm)
13-3/16 in.(335 mm)
10-13/16 in.(259 mm)
4-5/16 in.(109 mm)
6 in.(152 mm)
1 in.(25 mm)
13-3/4 in.(349 mm)
9-7/16 in.(240 mm)
42 in.(1067 mm)
Auxilary
Outside Air
3 in.(76 mm)
1in.(25 mm)
1/2 in.(13 mm)
Figure 3.1 Fireplace Dimensions
10 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
B. ClearancesWARNING! Risk of Fire!
You must comply with all minimum air space clearances to combustibles as specified in Figure 3.2. DO NOT pack required air spaces with insulation or other materials. Framing or finishing material used on the front of, or in front of, the fireplace closer than the minimums listed must be constructed entirely of non-combustible materials (i.e., steel studs, concrete board, etc.). Failure to comply may cause fire.
Figure 3.2 Clearances to Combustible Materials
(ceiling)
(roof)
(ceiling)
2 in. (51 mm) min.
Attic Insulation
Shield
Ceiling Firestop(attic)
Storm Collar
Roof Flashing
2 in. min.(51 mm)
2 in. (51 mm) min.
2 in. (51 mm) min.
Ceiling Firestop Offset/Return with hanger straps
2 in.(51 mm)
min.
2 in. (51 mm) min.
Must have 2 in. (51 mm)minimum clearance
to header
Electrical wires must be 3-1/2: (89mm) from top
0 in. to levelof standoffs
1 in. (25mm) to side of appliance
1/2 in. (13 mm) to backof appliance
0 in.to floor
36 in. (914 mm) standoffs to ceiling
Chimney Air Kit required with SL chimney
11Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
1. Minimum Clearances to Combustibles
Position combustible/ non-combustible mantel60 in. (1524 mm) from base of fireplace
12 in.(305 mm)
46-1/4in.(1175 mm)
24 in.*(610 mm) 48-1/2 in.
(1232 mm)
42-1/2in.(1080 mm)
The �nished cavity depth must be no less than 24 in. (610 mm) from the �nished backwall to the outside of front wall framing.
2 x 4s must be used for the header and framing above the header to maintain pipe clearances.
Double studs to catch non-combustible board and wall facing material.
*If interior of chase will be drywalled, add the thickness to this measurement.
12 in.(305 mm)
When installing the outside air with an elbow/bend, allow a minimum cavity of 12 in. (305mm)
14 1/2 in. (368 mm) for SL300 Chimney16 in. (406 mm) for DuraPlus Chimney
Figure 3.3 Framing the Fireplace
WITHIN ENCLOSURE AREAFireplacetobackwall 1/2in.(13mm)Fireplace to sidewall 1in.(25mm)Ductbootstoframing 0in.(0mm)Top standoffs to header 0in.(0mm)Door opening to sidewall 22-7/8in.(581mm)
EXPOSED SURFACESFaceplate to sidewall 16in.(406mm)Heatzoneairgrillstoceiling 12in.(305mm)
MANTELNon-combustiblemantel(Non-combustibleframingmaterialsabovethefireplacetoceiling) 46in.(1168mm)Combustiblemantel(Combustibleframingmaterialsabovethefireplacetoceiling) 60in.(1524mm)Maximum mantel depth 12in.(305mm)
12 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
C. Construct the ChaseAchaseisaverticalboxlikestructurebuilttoenclosethefireplaceand/oritsventsystem.Verticalchimneysthatrunontheoutsideofabuildingmustbeinstalledinsideachase.
Incoldclimates,Hearth&HomeTechnologiesrecom-mendsthatthechasebewellinsulatedusingbatttypeinsulationbetweenthejoists.
Constructionofthechasemayvarywiththetypeofbuild-ing.Theseinstructionsarenotsubstitutesfortherequire-mentsoflocalbuildingcodes.LocalbuildingcodesMUSTbechecked.
Chasesshouldbeconstructedinthemannerofalloutsidewallsofthehometopreventcoldairdraftingproblems.Thechaseshouldnotbreaktheoutsidebuildingenvelopeinanymanner.Allouterwallsneedtobeinsulated.
Buildingcodesrequirefalseceilingandceilingfirestops/atticshieldsateachfloorofthechaseorevery10ft(3048mm)ofclearspacetocontrolspreadoffire.
Walls,ceiling,baseplateandcantileverflooratthefirstlevelofthechaseshouldbeinsulated(seeFigure3.4.)Vaporandairinfiltrationbarriersshouldbeinstalledinthechase as per regional codes for the rest of the home. Ad-ditionally,Hearth&HomeTechnologiesrecommendsthattheinsidesurfacesbedrywalledandtaped(ortheuseofanequivalentmethod)formaximumairtightness.
Holesandotheropeningsshouldbecaulkedwithhightemperaturecaulkorstuffedwithunfacedfiberglassinsulation.
Ceiling Firestop
Metal Chase Top
Round Termination Cap
False Ceiling
Insulation in the outside walls of the chase
Attic Insulation
Shield
Chimney
Ceiling Firestop
Tabs
False Ceiling False Ceiling Insulation Insulation
Storm Collar
Figure 3.4 Chase Assembly
1 2 3
All outside walls should be insulated.
Figure 3.5 Chase Constructions
1. Fireplace and chimney enclosed in an exterior chase. 2. Chimney offset through exterior wall and enclosed in chase. 3. Chase constructed on roof.
• The chase is constructed using framing materials much thesameasthewallsinyourhome.Avarietyofsidingmaterialsmaybeused includingbrick, stone, veneerbrick,orstandardsidingmaterials.
• In constructing the chase, several factorsmust beconsidered:- Maintain a 2 in. (51mm) air space around the
chimney.- The chase top must be constructed of non-
combustiblematerial.- Incoldclimates,afirestopspacerandatticinsulation
shieldshouldbeinstalledinaninsulatedfalseceilingat the 8 ft. (2438mm) level above the fireplaceassembly.Thisreducesheatlossthroughthechase.
- Incoldclimates, thewallsof thechaseshouldbeinsulatedtothelevelofthefalseceilingasshowninFigure3.4.Thiswillhelpreduceheatlossfromthehomearoundthefireplace.
Three examples of chase applications are shown in Fig-ure3.5.
WARNING! You must install false ceilings and ceil-ing firestops at each floor of the chase or every 10 ft (3.05 m) to control spread of fire.
WARNING! Risk of Fire! DO NOT seal area between fire stop opening and chimney pipe except where they enter the attic or leave the warm air envelope of the home (use 600° F sealant).
WARNING! Risk of Fire! You must maintain a minimum 2 in. (51 mm) air space clearance to insulation and other materials surrounding the chimney system.• Insulation and other materials must be firmly secured to
prevent accidental contact with chimney system.• The chase must be properly blocked to prevent blown
insulation or other combustibles from entering and making contact with fireplace or chimney.
• Failure to prevent contact between insulation or other materials and chimney system may cause overheating and fire.
13Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
D. Frame the Fireplace
NOTICE: Hearth extension designmust be determinedbeforeinstallationoffireplace.
Ifthefireplaceisplacedonthefloorthemaximumheightofafinishedraisedhearthis5-3/4”, ifyouwantahigherraisedhearththefireplacemustbeplacedonaplatform.
NOTICE: Wiring for fans must be done before framed enclosure is completed. If using a Heat Zone Kit, it also must be installed before enclosure is complete.
WARNING! Risk of Fire! You must comply with all minimum air space clearances to combustibles. DO NOT pack required air spaces with insulation or other materi-als.
WARNING! Risk of Fire! Comply with all minimum clear-ances specified.• A minimum 1/2 in. (13 mm) air clearance must be
maintained at the back and 1 in. (25 mm) to the sides of the fireplace assembly.
• Chimney sections at any level require a 2 in. (51 mm) minimum air space clearance between the framing and chimney section.
Figure3.3showsatypicalframing(using2x4lumber)ofthefireplace,assumingcombustiblematerialsareused.All required clearances to combustibles around the fire-placemust be adhered to. See Figure 3.2.Any framingacrossthetopofthefireplacemustbeabovethelevelofthetopstandoffs.(Norecessabovestandoffs.)
The finished cavity depth must be no less than 24 in.(610mm)fromthefinishedbackwalltotheoutsideoffrontwall framing. Framing must extend straight up all the way to the ceiling.
CAUTION! Risk of Cuts/Abrasions. Wear protective gloves and safety glasses during installation. Sheet metal edges are sharp.
WARNING! Risk of Fire! Prevent contact with sagging, loose insulation. • DO NOT install against vapor barriers or exposed
insulation.• Secure insulation and vapor barriers.• Provide minimum air space clearances at the sides and
back of the fireplace assembly as outlined in Section 3.
E. Secure and Level the FireplaceThis fireplacemaybeplacedoneither a combustible ornoncombustiblecontinuousflatsurface.Followtheinstruc-tionsforframinginSection3.Slidethefireplaceintoposi-tion.Besuretoprovidetheminimum1in.airclearanceatthesidesand1/2in.atthebackofthefireplace.
Thefireplaceshouldbepositionedsothefaceofthenon-combustiblematerialonthefireplacewillbeflushwiththeface of the drywall on the walls. See Figure 3.6.
Levelthefireplaceandshimasnecessary.Securethefire-place(usingthepalletmountingbracketslocatedoneithersideofthefireplace)tothesubfloor.
These surfaces must be even!
Drywall Non-combustiblefacing material
Figure 3.6 Drywall - Non-combustible Facing Material
Standoffs are attached to the fireplace.The unit can be positioned with the standoffs touchingcombustiblewallsorframingbutDONOTpackinsulationorothermaterials intheairspacebetweenthefireplaceand wall.
14 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
1in. (25 mm) Overlap
Metal strips 2 in. (51 mm) under edge of Fireplace and Hearth Extension and extended 2 in. (51 mm) beyond both sides of fireplace opening.Nail or screw metal strips in place.
Pallet Mounting/Floor Brackets
Raised Platform
Floor
2 in.(51 mm)
1 in. (25 mm) min.overlap
2 in.(51 mm)
Top piece must overlapbottom piece
Figure 3.8 Protect the Front of an Elevated Platform
F. Protective Metal Hearth Strips
Figure 3.7 Position the Protective Metal Hearth Strips
• Locatethetwoprotectivemetalhearthstripsmeasuringapproximately26in.x4in.(660mmx102mm)includedwiththisfireplace.
• Slideeachmetalstrip2in.(51mm)underfrontedgeoffireplace.
• Overlapstripsinthemiddleoffireplaceopeningby1in. (25mm)minimum.
• Metal stripsmust extendbeyond the front and sidesof the fireplace opening by at least 2 in. (51mm),Figure3.7).
• Protectthefrontofaplatformelevatedabovethehearthextensionwithmetalstrips(notincludedwithfireplace)per Figure 3.8. See Section 6 for hearth extension instructions.
WARNING! Risk of Fire! Protective metal hearth strips MUST be installed on combustible surfaces. DO NOT cover metal strips with combustible materials. Sparks or embers may ignite flooring.
WARNING! Risk of fire! High temperatures, sparks, embers or other burning material falling from the fireplace may ignite flooring or concealed combustible surfaces.• Protective metal hearth strips MUST be installed.• Hearth extensions MUST be installed exactly as
specified.
WARNING! Risk of Fire!Follow these instructions exactly.Facing materials must be installed properly to prevent fire.No materials may be substituted without authorization by Hearth & Home Technologies.
G. Facing Material
TOOLS NEEDED: Powered drill with #2 Phillips head bit;caulking gun.Onlynon-combustiblematerials(suppliedwithfireplace)maybeusedtocoverthemetalfireplacefront.
NOTE: All boards are pre-drilled for your convenience. Boards MUST be attached in the following order: bottom, top, and then the two sides, red-painted side out. The top and bottom board should each have a hang tag attached. Leave them attached for referral for the finishing operation.
• Attach the bottom board to the bottom of the outerfireplacecanwithenclosedscrews,ensuringtheboardis centered. DO NOT remove hang tags.
• Centerandattachthetopboardtotheoutercanandframingmembers. DO NOT remove hang tags.
• Using the SuperCalstick, run a light bead (1/8 in.minimum)between themetalsurfaceof thefireplaceandthebuttedgesofthetopboard.See Figure 3.9.
• Ensuringthetopofthesidepiecesandthetopboardalign, attach the side pieces to the outer can and framing members.
NOTICE: 1/8 in. of the facing material may be visible after finishing materials are applied. This 1/8 in. must be painted or the red will show.
Figure 3.9 Apply Non-combustible Materials
Side Board
Bottom Board
Side Board
Top Board
DO NOT remove hang
tags
Apply bead of Super Calstick to
edge here
15Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
H. Outside Air KitAnoutsideairkitmustbeusedforcombustion.Hearth&HomeTechnologiesrecommendsyouutilizetheshortestduct run to optimize the performance of the outside air kit.Theoutsideairinlethoodshouldbepositionedinamannerthatwillnotallowsnow,leaves,etc.toblocktheinlet.Insomeinstallationstheairductmayneedtoberunvertically.Insuchaninstallation,a3ft(914mm)heightdifferencemustbemaintainedfromthetopoftheupper-most chimney section to the outside air inlet hood.
Refer to Figures 3.10 and 3.11 when placing the outside air inlet hood.
The outside air kit is installed on the right hand side of the fireplace.SeeFigure3.12forhandlelocation/operation.
• Cut a 6-1/2 in. (165mm) hole in outside wall toaccommodate air piping.
• Use6in.(152mm)metalflexorrigidpiping(notsupplied)todirectlyconnectoutsideairtofireplaceintake.Insulatethepipetopreventfrostcondensation.
• Insulating thepipe isn’t requiredbutwillhelppreventfrost condensation.
• Use the supplied outside air inlet hood.• Seal between thewall and the pipewith silicone to
preventmoisturepenetrationandairleaks.• Sealbetweentheoutsideairinlethoodandthehouse
withsiliconetopreventairinfiltration.
CAUTION! Risk of Cuts/Abrasions. Wear protective gloves and safety glasses during installation. Sheet metal edges are sharp.
CAUTION! Risk of Fire or Asphyxiation! DO NOT draw outside combustion air from wall, floor or ceiling cavity, or enclosed spaces such as an attic or garage. • DO NOT place outside air inlet hood close to exhaust
vents or chimneys. Fumes or odor could be drawn into the room through the fireplace.
• Locate outside air inlet hood to prevent blockage from leaves, snow/ice, or other debris. Blockages could cause combustion air starvation.
16 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
3 ft. (91cm) min. from top of uppermost chimney section to outside air inlet.
Locate outside air inlet to prevent blockage from leaves, snow/ice, or other debris.
Attic insulation shield must be used to keep insulation away from chimney.
Ceiling firestop on floor of attic
Outlet blocked bysnow, leaves, etc.
NO
Garage orcombustible
liquids storage
NO
Attic spaceNO
Outlet placedhigher than 3 ft
below thetermination cap
NO
UL181 Listed Class 0 or Class 1 metal flex orrigid duct
Clear area outside
house or in ventilated
crawl space
YES
Figure 3.11 Outside Air Installation
Figure 3.10 Outside Air Inlet Locations
17Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
I. Auxiliary Convection Air SystemNote: Both the outside air and auxiliary air kits are installed ontherighthandsideofthefireplace.
Theauxiliaryconvectionairsystemallowstheoptionatthetimeofinstallationofthefireplace,toruna6inch(152mm)diameterducttotheoutsideofthehome,andbringoutsideairoverthefanswhereitisheatedandthendistributedintotheroom.Thisproducesapostivepres-sure inside the home.
Figure 3.13 Auxiliary Convection Air Duct
Alternatively,a6inch(152mm)ductcanberuntoan-other location in the home and used as a cold air return withinthehomeanddistributedintotheroomwherethefireplaceislocated.SeeFigure3.13.
If no ducting is installed, the fans will pull air from the roomandre-circulateheatedairbackintotheroom.
Figure 3.12 Outside Air
Termination Caps supplied with fireplace
UL 181 Listed Class 0 or Class 1 metal flex or rigid duct
Outside Air intake
Auxiliary Convection
Air
Open/Close Knob for
outside air
OUTSIDE AIR
OPENCLOSED
Auxiliary Convection Air LeverTheauxiliaryconvectionair lever is locked fromthe fac-tory.Ifyouaregoingtousethisfunctionforairmovementyoumustremovethelock.
Afterremovingthefascia,removetheonescrewandplatetoallowthehandletobemovedinthefullmotionrighttoleft.SeeFigure3.14.
Discard the plate and screw. Replace fascia.
Theauxiliaryconvection lever is locatedunderneath thefrontlowerpanelasshowninFigure3.14.
Figure 3.14 Auxiliary Convection Air Lever
8-32 Screw
Convection Lock Bracket
NOTICE:If you live in an area with very cold winter months, you will want to use room air as opposed to bringing in ex-tremely cold air from outside of the home. This will eliminate creating a draft of cold outside air infiltrating your home. Definitely keep the lever to the LEFT when not using the fireplace if the duct has been installed.
18 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
DUCT RUN REQUIREMENTS
MAXIMUMDuctRun=40-ft.(12m)MINIMUMDuctRun=36in.(914mm)
DUCTING MATERIAL
6in.(152mm)B-VentOnlyDONOTductintoexistingfurnaceplenum
MINIMUM CLEARANCE TO COMBUSTIBLES
1in.(25mm)fromtheB-Vent1/2in.(13mm)fromtop&bottomofoutletbox0in.(0mm)fromthesidesofoutletbox12in.(305mm)fromwallregistertoceilingRefertoFigure3.15.
CAUTION! ALL wiring should be done by a qualified elec-trician and shall be in compliance with local codes and with the National Electric Code NFPA/NEC No. 70-current. CSC22.1 Canadian Electric Code.
Possible Air Duct Runs / Locations
Figure 3.15 Minimum Clearances to Combustibles
J. Heat Zone Kit (Optional)TheHeat-Zoneaccessorykitconveyswarmairfromthefireplacethroughairduct(s)toremotelocationsinthesameroomorotherroomsofthebuilding.Youmayinstall1or2Heat-Zonekitsonthefireplace.Installationofthiskit MUSTbeperformedbyaqualifiedservicetechnician.If any parts are missing or damaged, contact your local dealerbeforestartinginstallation.DONOTinstalladam-aged kit.
This kit is tested and safe when installed in accordance withthisinstallationmanual.Itisyourresponsibilitytoreadallinstructionsbeforestartinginstallationandtofol-low these instructions carefully during installations.
TheHeat-Zone®Woodkitiscarefullyengineeredandmustbeinstalledonlyasspecified.Ifyoumodifyitoranyofitscomponentsyouwillvoidthewarrantyandyoumaypossiblycauseafirehazard.Installationmustbedoneaccordingtoapplicablelocal,state,provincialand/ornational codes.
Planthelocationofthefireplaceandwarmairductrun(s).
Ceiling RegisterWall Register
Floor Register
Two Duct Kits
Ceiling Register
12 in. (305mm) minimum clearance from register to ceiling
17 in. (432mm) minimum clearance to allow for venting
19Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
Installation• Removetheknockoutorcoverplatefromthetopofthe
fireplaceanddiscardit.SeeFigure3.16.• Cuta3in.(76mm)holeintheinsulationboardasper
the dimensions shown in Figure 3.16.
Adapter
Mounting Plate
Starter Pipe
Knockout
Cut a 3 in. (76 mm)
hole in insulation board
3-13/16 in. (97 mm)
3-1/8 in. (79 mm)
CL
Run Length Cut Pipe20 - 40 ft (6-12 m) 2 in. (51 mm)*
*A minimum of 2 in. (51 mm) pipe must be used to cover the raw insulation to prevent it from blowing out through the return air grille.
10 - 20 ft (3 - 6 m) 8 in. (203 mm) 3 - 10 ft (1 - 3 m) No cut needed**
**Use full 16 in. (406 mm) as supplied
• Determine the necessary length of starter pipe from the Table3.1andcutasrequired.
Figure 3.16
• Slide the starter pipe into the fireplace,matching theholesintheplatetotheholesinthefireplace.
• Place the adapter on the mounting plate lining up holes. Using four sheet metal screws included in the kit, secure the adapter andmounting plate into fireplace.Aftersecuringtothefireplace,tapedowntheadapteredgestothetopofthefireplacewithaluminumtapetopreventleakage.
• Determine the location for the air register and fan housingassembly.Cuta7-5/8in.x13-5/8in.(143mmx346mm)holebetweenframingmembers(wallstudsorfloor joists).Thebracketscanberotated180°andmountedtothebacksideofthe2x4ifnecessary.SeeFigure 3.18.
NOTICE: The fan and electrical connections must be accessible for servicing per local code requirements.
NOTICE: If the fan housing is installed in a 2 x 4 wall, the front of the housing will protrude approximately 1/4 in. (6 mm) from the finished wall.
• Attachenough6 in. (152mm)B-Ventas required foryour installation to the fan housing. A maximum of (4) 90° elbows is recommended. Securely twist lock the B-Vent to the adapter. AlsoscrewtheB-Venttotheoutletboxonthefan
housing. See Figure 3.19. Supportductatintervalsofnogreaterthan4ft(1m)asrequiredbylocalcode.
Figure 3.17
WARNING! Risk of Fire! Comply with all minimum clearances specified.• A minimum 1 in. (13 mm) air clearance must be
maintained at the back and 1 in. (25mm) to the sides of the fireplace assembly.
NOTE: It is important the pipe length be adhered to or it will affect the performance of your fireplace.
• Onthemountingplate,handbendthetabsdownward.Slidethetabsovertheoutsideofthestarterpipe.Securewith four sheet metal screws included in fasteners package. Figure 3.17.
Table 3.1
20 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
Securely Twist Lock B-Vent to Adapter
Secure B-Vent to Fan Housing with sheet metal screws
Return Air GrilleInstall with Louvers pointed down
Bracket
Can rotate 180o
2 x 4 Wall
Fan Housing
1/2 in. (13mm)clearance tocombustiblesmust bemaintained.
2 x 4 wall
Sheet Rock
Leave 1/4" (6mm) clearance from all 4 outer edges
Seal grille using gasketing supplied with the kit
• Installthevariablespeedwallrheostat(withsettingon“OFF”)inaconvenientlocation.ThisswitchwillcontroltheHeat-Zonefanoperation.
• Remove the junctionbox.Wire110VACserviceTOthewall rheostatandFROM thewall rheostat to thefanjunctionbox.Usewirenutstosecurethe110VACservicewirestothehot(black)andneutral(white)fanwires and screw the 110 VAC ground wire to the junction box.SeeFigure3.21.
• Secure the return air grille to the fan housing making sure it is flush.Thegrillemust be installedwith thelouverspointingdown.
NOTICE: DO NOT USE ADJUSTABLE REGISTERS.
Junction Box Removed
Wire Clamp
Wire Nuts
Junction Box
Bla
ck
White
NOTICE: Secure the duct so that clearance to the fire-place outer wrap is maintained. Tape all seams with alumi-num tape 1-1/4 in. (32 mm) minimum width or as specified by local codes.)• Seal all the way around the inside of the return air grille to
preventhotairbeingdrawnbackintotheventingsystemusinggasketingsuppliedwiththekit.Leave1/4in.(6mm)clearancefromallfourouteredges.Trimexcessgasketing. See Figure 3.20.
Figure 3.18
Figure 3.19
Figure 3.20
Figure 3.21
21Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
14-2 w/ground
Standard wall mount with Junction Box
14-3 w/ground
WIRE NUT
WHITE
GREEN
BLACK
BLAC
K
RED
WHITEMatch colors to wire harness (red to red, white to white, etc) and secure with a wire nut
Incoming Power(110V)
Power to the FireplaceSnap Disc bypass switch
Figure 4.1 Fan Wiring Diagram
NOTICE: The manual override switch, rheostat speed control and cover plate are supplied. You will need to supply: 14-3 wire with ground; 14-2 wire with ground; standard wall mount junction box; wire nuts.
• Remove junctionboxcoverplateon thebottomrightsideofthefireplace.
• Threadthe14-3withgroundwirethroughtheopeningwiththestrainreliefonthecoverplate.
• Matchcolorstowireharness,(redtored,whitetowhite,etc.)andsecurewithwirenuts.
WARNING! Risk of Fire! DO NOT apply combustible fin-ishing materials over any part of the front of this fireplace.• The metal fireplace face may only be covered with
noncombustible materials such as ceramic tile, brick, or stone.
• Do not cover or block any cooling air slots.
NOTICE: Wiring for fans must be done before framed enclosure is completed. If using a Heat Zone kit, it also must be installed before enclosure is complete.
4 Electrical Wiring
22 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
6 ft (1.8 m) max.unsupportedrun
20 ft (6.10 m) max.pipe between anoffset & return
Ceiling firestop
35 ft (10.7 m)max. straightunsupported
chimney height
14.5 ft (4.42 m) min. height/single offset-return20 ft. (6.10 m) min. height/double offset-return
50 ft (15.24 m) max. height
6 ft (1.83 m) max.unsupported chimneyabove roof
45 3/4 in.(1162 mm)to top of standoffs
Attic Insulation Shield
Chimney Air Kit required with SL
chimney
Figure 5.1 Chimney Requirements
NOTICE: A maximum of two pairs of offsets and returns may be used.
Minimum overall straight height 13 ft 3.96 mMinimum height with single offset/return
14.5 ft 4.42 m
Double offset/return minimum height 20 ft 6.1 mMaximum height 50 ft 15.24 mMaximum chimney length between an offset and return
20 ft 6.1 m
Maximum distance between chimney stabilizers
35 ft 10.67 m
Maximum unsupported chimney length between the offset and return
6 ft 1.83 m
Maximum unsupported chimney height above the fireplace
35 ft 10.67 m
Maximum unsupported chimney above roof
6 ft 1.83 m
WARNING! Risk of Fire! You must maintain 2 in. (51 mm) air space clearance to insulation and other combustible materials around the chimney system. Failure to do so may cause overheating and fire.
NOTICE: You must provide support for the pipe during construction and check to be sure inadvertent loading has not dislodged the chimney section from the fireplace or at any chimney joint.
A. Chimney RequirementsVerticaldistancesaremeasuredfromthebaseofthefireplaceasshowninFigure5.1.
5 Chimney and Termination Requirements
Table 5.2 Chimney Component DimensionsTable 5.1 Chimney Requirements
HEIGHT OF CHIMNEY COMPONENTS in. mm
Chimney Stabilizer
SL3 4-3/4 121
Offsets/Returns
SL315 13-3/8 340
SL330 15-1/2 394
Chimney Sections*
SL306 4-3/4 121
SL312 10-3/4 273
SL318 16-3/4 425
SL324 22-3/4 578
SL336 34-3/4 883
SL348 46-3/4 1187
* Dimensions reflect effective height.
Note: 8in.DuraPluscanalsobeused.
23Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
Table 5.3 Offset Dimensions
B. Offsets/Returns• Useanoffset/returntobypassoverheadobstructions.• Anoffsetandreturncanbeusedasasingleentityorseparatedbychimneysection(s).
WARNING! Risk of Fire! DO NOT use offset/returns greater than 30°. Chimney draft will be restricted and could cause overheating and fire. Secure offsets with screws ( not to exceed 1/2” / 13 mm in length) Secure returns with strapping. Straight chimney sections may be secured with screws. Keep chimney sections from separating or twisting.
• Measuretheshiftneededtoavoidtheoverheadobstruction.RefertodimensionAinFigure5.2.• FindtheappropriateAdimensionlistedinTable5.3.TheBdimensioncoincidingwiththeAdimensionmeasurementin
Table5.3representstherequiredverticalclearanceneededtocompletetheoffset/return.• Readacrossthecharttofindthenumberofchimneysections/modelnumbersneededbetweentheoffsetandreturn.
A
B
1-1/4 in. (32 mm)OVERLAP
Figure 5.2 Chimney Offset/Return
Example: Your“A”dimensionfromFigure5.2is14-1/2in.(368mm).UsingTable5.3thedimensionclosestto,butnotlessthan14-1/2in.(368mm)is14-1/2in.(368mm)us-inga30°offset/return.
Youdeterminefromthetablethatyouneed34-1/8in.(867mm)(Dimension“B”)betweentheoffsetandreturn.
ThechimneycomponentthatbestfitsyourapplicationisoneSL324.
15-degree 30-degree
SL306 SL312 SL318 SL324 SL336 SL348A B A B
in. mm in. mm in. mm in. mm15/8 41 133/8 340 35/8 92 151/2 394 - - - - - -
27/8 73 173/4 451 51/2 140 185/8 473 1 - - - - -
41/8 102 223/8 568 71/4 184 213/4 552 2 - - - - -
41/2 114 235/8 600 81/2 216 233/4 603 - 1 - - - -
53/4 146 281/4 718 101/4 260 27 686 1 1 - - - -
6 152 293/8 746 111/2 292 29 737 - - 1 - - -
71/4 184 34 864 131/4 337 321/8 816 - 2 - - - -
73/4 197 361/8 918 141/2 368 341/8 867 - - - 1 - -
83/4 222 393/4 1010 161/4 413 373/8 949 1 - - 1 - -
103/8 264 455/8 1159 191/4 489 421/2 1080 - - 2 - - -
105/8 270 463/4 1187 201/2 521 445/8 1133 - - - - 1 -
117/8 302 513/8 1305 221/4 565 473/4 1213 1 - - - 1 -
131/2 243 571/4 1454 251/4 641 527/8 1343 - - - 2 - -
133/4 349 583/8 1483 261/2 673 55 1397 - - - - - 1
15 381 63 1600 281/4 718 581/8 1476 1 - - - - 1
161/2 419 683/4 1746 311/4 794 631/4 1607 - 1 - - - 1
18 457 745/8 1895 341/4 870 681/2 1740 - - 1 - - 1
195/8 498 803/8 2042 371/4 946 733/4 1873 - - - 1 - 1
205/8 524 841/8 2137 391/8 994 767/8 1953 1 - - 1 - 1
223/4 578 917/8 2334 431/4 1099 841/8 2137 - - - - 1 1
24 610 961/2 2451 451/8 1146 871/4 2216 1 - - - 1 1
257/8 657 1031/2 2629 491/4 1251 941/2 2400 - - - - - 2
Properassemblyofair-cooledchimneypartsresultinanoverlapatchimneyjointsof1-1/4in.(32mm).Effectivelengthisbuiltintothischart.
24 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
Slanted Roofs
Flat Roofs
Chimney mustextend 3 ft (.9 m)above the roof
Chimney must extend 2 ft (.6 m)above any portion of the roof oradjacent structures within 10 ft (3 m) of the chimney
Chimney mustextend 3 ft (.9 m)above the roof
Chimney must extend 2 ft (.6 m)above any portion of the roof oradjacent structures within10 ft (3 m) of the chimney
Multiple Chimney Locations
A B6 in. (minimum) up to 20 in.
152 mm/508 mm18 in. minimum
457 mm20 in. and over 0 in. minimum
Gas, Wood or Fuel OilTermination Cap
WoodMinimum
(Seeillustration
above)
B
GasTermination
Cap **
A *
Per
pend
icul
ar W
all
* If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.
** In a staggered installation with both gas and wood terminations, the wood termination cap must be higher than the gas termination cap.
Figure 5.3 Multiple Chimney Locations
C. Termination Requirements• Installacapapprovedandlistedforthisfireplacesystem.• Locatecapwhereitwillnotbecomepluggedbysnoworothermaterials.• Locate cap away from trees or other structures.• Thebottomoftheterminationcapmustbeatleast3ft(.91m)abovetheroofANDatleast2ft(.61m)aboveanyportion
ofroofwithin10ft(3.05m)asshowninFigure5.3.• ThedistancerequiredbetweencapsisshowninFigure5.3.
25Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
6 Chimney Installation
Termination Cap
Additionalsupport fortall chimneys
Storm Collar
Maintain minimumclearances to combustibles asspecified
Chimney must extendbeyond combustibleroof structure
Maintain minimumheight of chimneyabove roof
Install roof flashingaccording to minimumrequirements
Offsets/returnsmay not exceed30° from vertical Support straps for offsets/
returns must be securedto adequate framing
Ceiling firestopsare required wherechimney passes through ceiling orfloor
Attic Shield isrequired where chimneypasses through attic
Figure 6.1 Typical Chimney System - Guidelines for Chimney System Installation
NOTICE: Chimney performance may vary.
• Trees, buildings, roof lines and wind conditions affect performance.• Chimney height may need adjustment if smoking or overdraft occurs.
A. Typical Chimney System
TheSL300serieschimney(UL127approvedforusewiththisfireplace)isshippedwithwraparoundwarninglabelsinstalled.Theselabelsmayberemovedfromthesectionsofchimneyexposedabovetheroofline.
26 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
Attach Flue First
CAK4A
Secure with Screws Provided
Push TogetherSecure to Top
C. Install Chimney Air kit (CAK4A)
NOTICE: Chimney Air Kit, Part CAK4A is required when using the SL-300 Pipe Series. Detailed instructions are supplied with the kit. If using the Dura-Plus System (must be 8 in./203 mm in diameter), the starter ring that came with the fireplace must be removed and replaced with the Dura-Plus Base Plate. The CAK4A is not required with a Dura-Plus System.
• Installthechimneypipefirst.• Handbend the tabs inpositionbeforeplacingon the
fireplace.• Placetheboxontopofthefireplacearoundthechimney
pipe,pushbothpiecestogetherandsecurewithscrewsprovided.
• Usethepre-punchedholesinthetabsasguidesanddrillholesthroughthefireplacetop.
• SecuretheCAK4Ainplace.SeeFigure6.3.• Seal around the kit at the flue and at the top of the
canwithhightempcaulkwithaminimumratingof500degrees. See Figure 6.3.
Figure 6.3 Installing the CAK4A
NOTICE: Chimney sections cannot be disassembled once locked together. Plan ahead!
• Lockchimneysectionsand/oroffsets/returnstogetherbypushing downward until the top section meets the stop beadonthelowersection.
• Pull on the top section to make sure it is fully engaged and will not separate.
• You may use #6 or #8 sheet metal screws no longer than 1/2in.(13mm)tofastenchimneysectionstogether.DoNOTpenetrateinnerflue.
WARNING! Risk of Fire! You MUST use screws to fas-ten offset/returns to chimney sections to keep the chim-ney parts from twisting. Failure to do so could cause fire.
• Fasten offset/returns to chimney sections. DoNOTpenetrateinnerflue.
• Secure chimney returnswithhanger strapsprovided;fasten to studs or joists.
• Verticalstraightrunsofchimneymustbesupportedevery35ft(10.7m).
B. Assemble Chimney Sections Useonlythosecomponentsdescribedinthismanual.
Substituteordamagedchimneycomponentscouldimpairsafeoperationandcauseoverheatingandfire.
Attach either a straight chimney section or an offset to the topofthefireplace(dependingonyourinstallationrequire-ment).Chimneysectionsare locked togetherbypushingdownwarduntilthetopsectionmeetsthestopbeadonthelower section.
Theinnerflueisplacedtotheinsideofthefluesectionbelowit.Theoutercasingisplacedoutsidetheoutercas-ingofthechimneysectionbelowit.SeeFigure6.2.
WARNING! Risk of Fire! DO NOT install substitute or damaged chimney components.
Figure 6.2 Assembling Chimney Sections
27Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
NOTES: • TheCAK4Aterminationcapmustbeaminimumof4ft
(1219mm)abovethegroundandkeptfreeofdebris.• If theCAK4A is installed inachase, theCAK4Aside
terminationcapmustbeat least3ft(914mm)belowthe chimney top.
• Sealaroundthecapandflexwithcaulktostopairfromgettingintothechase(seeFigures6.4).
• The pipe cannot lay on top of the unit.
Wire TiesSeal
Seal
4" Duct - Use UL181 Class 0 or Class 1 ducting.
NOTE: The pipe cannot lay on top of the unit.
Figure 6.4 Installing Flex Pipe
WARNING! Risk of Fire!• The flex pipe must never be compressed or deformed!• Restricting the airflow inside the flex pipe may increase
flue pipe temperatures causing a chase fire.
28 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
D. Secure Offset/Return
E. Install Ceiling Firestops CAUTION! Risk of Fire! Ceiling firestops must be used
whenever the chimney penetrates a ceiling/floor.• Chase construction requires ceiling firestops at each
floor or every 10 ft. (3.05 m) of clear space.• The ceiling firestop slows spread of fire and reduces
cold air infiltration.
• Installaceilingfirestopwheneverchimneypenetratesceiling/floor.
• Mark and cut an opening in ceiling as shown in Figure 6.6.• Frametheopeningwiththesamesizelumberusedin
the ceiling joists.• Nailtheceilingfirestoptothebottomoftheceilingjoists
whenthereisaroomabove.• Use an attic insulation shield if the ceiling is insulated.
Theceilingfirestopmaythenbeattachedaboveorbelowthe joists.
ROOM ABOVE (non-insulated ceiling)
ATTIC ABOVE (insulated ceiling)
B A
Ceilng firestop attached to bottom
of framing
Ceiling firestop attached to top of
framing
Note: Use same dimensional lumber for framing ceiling firestop and joists.
2 in. (51mm) clearance
2 in. (51mm) clearance
WARNING! Risk of Fire! DO NOT seal area between firestop opening and chimney pipe except where they en-ter the attic or leave the warm air envelope of the home (use 600° F sealant).
Figure 6.6 Installing the Ceiling Firestop
When offsets and returns are joined to straight pipe sec-tions,theymustbelockedintopositionwithscrews(outeronly).Topreventgravityfrompullingthechimneysectionsapart,thereturnsandthechimneystabilizershavehangerstraps for securing these parts to joists or rafters. See Fig-ure6.5.
* Use # 6 or # 8 sheet metal screw, or larger, no longer than1/2in.(13mm).
WARNING! Risk of Fire!• Secure offsets with screws (not to exceed 1/2 in./13 mm
In length).• Secure returns with strapping.• Straight chimney sections may be secured with screw
(not to exceed 1/2 in./13 mm In length) at the joints.• Keep chimney sections from separating or twisting.
CeilingFirestop
Straps
OptionalAdditionalSupport
JointBand
(Optional)
Figure 6.5 Secure the Chimney
Catalog #A B
in. mm in. mm
FS338 14-1/2 368 14-1/2 368
FS339 14-1/2 368 18-3/8 467
FS340 14-1/2 368 23 584
29Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
Installationofaceilingfirestopisrequired:
• RefertoFigures5.5,5.6,5.7.• Iftheatticshieldispre-rolledcontinue.Ifitisaflatpart,
try and roll it up to aid in wrapping it around the chimney.• Pre-bendallthetabsinatthetopto45°.• Wraptheshield(aroundthechimneyifalreadyinstalled)
untilyouhaveanoverlapandthethreeholesoneachsidematchup(largeholesontop).
• Insert three screws into the matching holes to form a tubestartingatthebottom.
• Bendthetabsonthebottomofthetubeinwardto90°tomaintain chimney air space.
• Resttheinsulationshieldontheceilingfirestopbelow.• Tapeoffanyopeningaroundthebottom.
Ifyouwishtomakeacustomshieldorbarrier,followtheseguidelines:
• Metal is preferred, although any material stiff enough to holdbacktheinsulationcanbeused.
WARNING! Risk of Fire! Use of cardboard or other materials that can deflect under humidity or other envi-ronmental conditions is not recommended.
• The shield or barriermust be tall enough to extendabovetheinsulationandpreventblown-ininsulationfromspillingintothecavity.
• Maintainspecifiedairspacesaroundchimney.• Check instructions and local codes for further details.
Insert three screws
Pre-bend the tabs to rest against pipe to prevent insulation from falling in.
(5)Tabs bent in 90°
Figure 5.5 Prepare Attic Insulation Shield
F. Install Attic Insulation ShieldWARNING! Risk of Fire! You MUST install an attic insu-lation shield when there is any possibility of insulation or other combustible material coming into contact with the chimney. • DO NOT pack insulation between the chimney and the
attic insulation shield. • Failure to keep insulation and other materials away from
chimney pipe could cause fire.• DO NOT offset chimney inside insulation shield.• Combustible material may come in contact with the attic
insulation shield as long as the required clearances are maintained to the chimney pipe.
Double-check the Chimney AssemblyContinueassemblingthechimneysectionsupthroughthe ceiling firestops as needed. While doing so, beaware of the height and unsupported chimney length limitationsgivenunderSection5.
Checkeachsectionbypullingupslightlyfromthetoptoensureproperengagementbeforeinstallingthesuc-ceedingsections.Iftheyhavebeenconnectedcorrect-ly, they will not disengage when tested.
Figure 5.6 Install Attic Insulation Shield (firestop above ceiling)
5 Tabs bentin 90°
Tabs bent in to rest against pipe
Attic Insulation Shield
Ceiling Firestop
10-1/2 in.(267 mm)
14-1/2 in. (368 mm)diameter
InsulationInsulation
Pipe
Pipe
2 in. (51 mm)air space
Seal with tape
5 Tabs bentin 90°
Tabs bent in to rest against pipe
Attic Insulation Shield
Ceiling Firestop10-1/2 in.(267 mm)
14-1/2 in. (368 mm)diameter
InsulationInsulation
Pipe
Pipe
2 in. (51 mm)air space
Seal with tape
Figure 5.7 Install Attic Insulation Shield (firestop below ceiling)
30 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
G. Roof Penetration• Refer to Figure 6.10.• Plumbfromrooftocenterofchimney.• Driveanailupthroughrooftomarkcenterofpipe.• Measuretoeithersideofnailandmarkthe14-1/2in.x
14-1/2in.(368mmx368mm)openingrequired.• Measure opening on the horizontal; actual length may
belargerdependingonroofpitch.• Cut out and frame opening.• Refer to Chapter 25 of the Uniform Building Code for
roof framing details.
Figure 6.10 Ceiling/Attic Construction
Install Flashing• Assemblechimneysoitpassesthroughtheframed
opening.• Sliptheflashingoverthechimney.
NOTICE: Roofing shingles must be below the flashing plate on the lower side of a sloped roof and over the flashing plate on the sides and top.
• Nailtheflashingtotheroof.Keepgapsbetweentheflashingplateandtherooftoaminimum.
• Caulktheflashingplateandroofjunctionaswellastheverticalseamontheflashing.Allnailheadsmustbecaulkedwitharoofingsealant.
• Caulktheoverlapseamofanyexposedpipesectionsthatarelocatedabovetherooflinetopreventleaks.
CHIMNEY
FLASHING PLATE
JOISTS
NAIL
THIMBLE
FLASHING
Figure 6.11 Installing Part: 12966A, Configuration 1
NOTICE: REQUIRED for manufactured homes.
• Locatethepointwherethechimneywillexittheroofbyplumbingdowntothecenterofthechimney.Layout,cutand framea14-1/2 in. (368mm)squareopening(measuredonthehorizontal)throughtheceilingandroofstructure. Consult local codes for framing details.
• The thimblemustextendcompletely through theroofstructureshieldingcombustiblematerials.Fivelocationholeshavebeenprovidedtoallowforavarietyofceiling/roofthicknesses.Athimbleextensionisrequiredwhentheceiling/roofthicknessexceeds12-1/2in.(318mm).Theextensionshouldoverlapthethimbleoneinch.
• Toattachtheextensiontothethimble,drill1/8in.(3mm)holesthroughtheoutershieldofthethimbleusingthepredrilled holes in the extension as guides. Attach the extensiontothethimbleusingthescrewsprovidedwiththe extension.
• Installthethimbleassemblyandnailitsecurelytotheframingmembers.
H. Manufactured Home Installation SL-300 Series Ceiling/Roof Thimble
• Centertheflashingoverthechimneyandnailittotheroof.Keepgapsbetweentheflashingplateandtherooftoaminimum.Caulktheflashingplateandroofjunctionaswellastheverticalseamontheflashing.Allnailheadsmustbecaulkedwitharoofingsealant.
• Finish assembling the chimney storm collar andtermination cap following the installation instructions providedwiththem.
31Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
NAIL
FLASHING PLATE
CHIMNEY
THIMBLE EXTENSION
SCREW
FLASHING
THIMBLE ADJUSTABLE EXTENSION HOLES
Figure 6.13 Installing Part 12966A Configuration 3
I. Install Chase/Chase Top• You MUST use a chase top in a chase installation.
Chase tops are available from yourQuadra-Firedealerormaybefieldconstructed.
• Includeaturndownanddripedgetopreventwaterfrom seeping into the chase.
• Includea2 in. (51mm)soldered,weldedorspuncollar around pipe opening to keep water out.
• Providea1/8in.(3mm)gaparoundthefluepipe.• Slope the chase top downward away from the
opening.
WARNING! Risk of Fire! DO NOT caulk the pipe to the chase top collar. • Caulkallseamstopreventleaks.
Slope Downward(1/4 in. per footminimum)
Turn-down Drip Edge
Chase
2 in. (51 mm) Collar on Chase Top
.018 (26 ga) min. Galvanized Chase Top
Figure 6.14 Chase Top Construction
FLASHING
CHIMNEY
FLASHING PLATE
NAIL THIMBLE
SCREW
THIMBLE EXTENSION
Figure 6.12 Installing Part 12966A, Configuration 2
32 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
J. Termination Cap Requirements• Installacapapprovedandlistedforthisfireplacesystem.• Locatecapwhereitwillnotbecomepluggedbysnow
or other materials.• Locate cap away from trees or other structures.• Thebottomoftheterminationcapmustbeatleast3ft
(.91m)abovetheroofANDatleast2ft(.61m)aboveanyportionofroofwithin10ft(3.05m).
StormCollar
ChimneyPipe
Chase Top
TerminationCap
Chase
6 in. (153 mm)Minimum top ofchase to top ofchimney pipe
Collar2 in. (51 mm)
Minimum Height
Do NOTblock air holes
Caulk gaps between storm collar & pipe,
and storm collar& chase top.
Termination cap pipe and chimney section must be snapped together to maintain an overlap of 1-1/2 in. (38 mm).
Slipstorm collar
around chimney pipebefore termination
cap pipe is snapped into the chimney
pipe.
Figure 6.15 Installing a TR344 Round Termination Cap
K. Install Termination CapInstall the chimney sections up through the chase enclo-sure.
• Caulktheoverlapseamofanyexposedpipesectionsthatarelocatedabovetherooflinetopreventleaks.
• Refer to termination cap instructions.
WARNING! Risk of Fire! The minimum overlap of cap to pipe (as shown in the following illustrations) MUST be met or chimney may separate from cap. Separation allows sparks, heat and embers to escape.
NOTICE: Paint the termination cap with a rust-resistant paint to protect against the effects of corrosion on those parts exposed to the weather.
Figure 6.16 Installing a TR342-B Round Telescoping Termination Cap
StormCollar
ChimneyPipe
Chase Top
TerminationCap
Chase
4 3/4 in. (121 mm)Maximum
Collar2 in. (51 mm)
Minimum Height
Caulk gaps between storm collar & pipe,
and storm collar& chase top.
Do NOT block air
holes3 clip brackets.
Slip over chase collarand attach with screws
provided.
Assemblestorm collar
around extended termination cap
pipeonce cap is
installed.
The last section of pipe must stop between 2 in. (51 mm) above the top of the chase and 4 3/4 in. (121 mm) below the top of the chase.
2 in. (51 mm)maximum
33Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
Figure 6.19 Installing a TCT375 Terra Cotta Cap
Figure 6.17 Installing an ST375 Square Termination Cap
ChimneyPipe
Chase Top
Termination Cap
Chase
Collar2 in. (51 mm)
Minimum Height
Place waterproof caulk or sealer under each flange of the termination cap and on top of each screw to help prevent leaks.
Flange
2 in. (51 mm)maximum
4 3/4 in. (121 mm)maximum
The last section of pipe must stop between 2 in. (51 mm) above the top of the chase and 4 3/4 in. (121 mm) below the top of the chase.
ChimneyPipe
Chase Top
Termination Cap
Chase
Collar2 in. (51 mm)
Minimum Height
Place waterproof sealer under each flange of the termination cap and on top of each screw to help prevent leaks.
2 in. (51 mm)maximum
4 3/4 in. (121 mm)maximum
The last section of pipe must stop between 2 in. (51 mm) above the top of the chase and 4 3/4 in. (121 mm) below the top of the chase.
Figure 6.18 Installing a TS345/TS345P Square Termination Cap
ChimneyPipe
Chase Top
Termination Cap
Chase
Collar2 in. (51 mm)
Minimum Height
Remove 2 screws from front & back to lift the top off
Place waterproof sealer under each flange of the termination cap and on top of each screw to help prevent leaks.
The last section of pipe must stop between 2 in. (51 mm) above top of chase and 4-3/4 in. (121 mm) below top of chase
2 in. (51 mm)
4-3/4 in. (121 mm)
34 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
7 Finishing
A. TemplateAcardboardtemplateofthefrontisprintedontheoutsideoftheshippingbox.Cutoutthetemplatealongtheout-side of the line for use in your installation. A metal tem-plate(seecatalog)isavailableformoredurablecontin-ueduse,remainingaccurateovertime.Bothmeasure1/8in.(3mm)largerallthewayaroundthantheactualfront.
Note:This1/8in.ofthenon-combustiblematerialmustbepaintedortheredwillbevisible.
Tools Required: 1/8in.Allenwrench.• Removethedoorsonthefireplace(ifinstalled).• Removethescrewsfromthefasciaandremovefascia
fromthefireplace(ifinstalled).Savethescrews.Storethefasciainasafe,protectedareatopreventscratchingor other damage.
• Installthetemplateonthefrontofthefireplace(Figure7.1)usingthescrewssavedinthepreviousstep.
You are now ready to continue your installation with the desireddecorativematerial.Thetemplatealsoservesasaprotectivecoveringandpreventsdamagetothefrontofthefireplace.
NOTE: The decorative fascia must be removable for future serviceability of the automatic combustion control.
Figure 7.1 Install the Finishing Template
Note: DO NOT remove hang tags until installing finishmaterials.
B Finish the WallUseawetordrytowelorasoftbrushtoremoveanydustordirtfromthenon-combustiblefacingmaterial.
Applyanon-combustibleadhesivetoattachtile,stoneorothernon-combustiblefinishingmaterialspermanufac-turer’s instructions.
1. Stone, Brick FinishWARNING! Risk of Fire! DO NOT apply tar paper or water resistive barrier over non-combustible board.
• Applymetallathtothe1/2in.thicknon-combustibleboardwith corrosion resistant self-tapping screwscapableofpenetratingthemetalsurfacebehindthenon-combustibleboard.
• HHT recommendsusing typeNor typeSmortar.Duetohightemperatures,reviewpolymermodifiersspecificationsheetbeforeusing.
2. Tile, Granite, Marble Finish• Duetohightemperatures,HHTrecommendsusing
unmodifiedthinsetwhenapplyingtile.• Whenapplyinggraniteormarble,HHTrecommends
usingthinsettoadhere.Ifusingadifferentadhesive,review specification sheet for application in hightemperature areas.
Figure 7.2 Template Dimensions
38.25”
27.44”
(R37.13)
32.75”
35Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
►
C. Mantel and Wall ProjectionsAcombustiblemantelmaybepositionednolowerthan60in.(1524mm)fromthebaseofthefireplace.
Minimum clearance faceplate to sidewall is 16 in.
Thecombustiblemantelmayhaveamaximumdepthof12in.(305mm).Combustibletrimpiecesthatprojectnomorethan3/4in.(19mm)fromthefaceofthefireplacecanbeplacednocloserthan6in.(152mm)fromthesideofthedecorativefront.Surroundlegsthatprojectmorethan3/4in.must be 16 in. away from the side of the decorativefront.Combustibletrimmustnotcover:
• themetalsurfacesofthefireplace• where the non-combustible board is placedover the
metal surfaces• thespacebetweenthemetalfaceofthefireplaceand
framingmembers
60 in.(1524 mm)
Mantel
Clearances are from bottom of appliance to lower edge of mantel or trim
Trim
48 in.(1219 mm)
36 in. (914 mm)
Ceiling/enclosure
Trim 3/4 in. max
Figure 7.3 Mantel Specifications - Combustible Mantel
D. Finishing the Hearth Extension
Table 7.1
R = 1/k x inches of thickness
Table 7.2
WARNING! Risk of Fire! High temperatures, sparks, em-bers or other burning material falling from the fireplace may ignite flooring or concealed combustible surfaces.• Protective metal hearth strips MUST be installed.• Hearth extensions MUST be installed exactly as
specified.
Ahearthextensionmustbeinstalledwithallfireplacestoprotectthecombustiblefloorinfrontofthefireplacefrombothradiantheatandsparks.
• YouMUSTuseahearthextensionwiththisfireplace.
• RefertoFigure7.5forminimumdimensions.• Thisfireplacehasbeentestedandapprovedforusewith
ahearthextensioninsulatedtoaminimumRvalueof2.06.
• ThehearthextensionmaterialMUSTbecoveredwithtile,stoneorothernon-combustiblematerial.
• Manufactured hearthmaterials will usually have apublishedR value (resistance to heat) or k value (conductivityofheat).RefertotheformulainTable7.1toconvertakvaluetoanRvalue,
• Refer to Table 7.3 for hearth extension insulationalternatives.
Hearth Extension Insulation Alternatives, R Value = 2.06
Materialk per inch
thickr per inch
thick
Minimum thickness required
Hearth&HomeHX3,HX4 0.49 2.06 1 in.
USG Micore 300™ 0.49 2.06 1 in.
USG Durock™ Cement Board 1.92 0.52 4in.
Cement Mortar 5.0 0.20 101/2in.
Common Brick 5.0 0.20 101/2in.
Ceramic Tile 12.50 0.08 253/4in.
Armstrong™PrivacyGuardPlus 0.46 2.18 1 in.
Marble 14.3-20.0 0.07-0.05 29 1/2 - 41 1/4 in.
Anoncombustiblemantelmaybepositionednolowerthan46in.(1168mm)fromthebaseofthefireplace.
Noncombustible framingmaterialsmust be used abovethefireplacetoaheightof82in.(2083mm)ortotheceilingfromthebaseofthefireplaceforallconstructionmaterials,framingmembers,sheeting,andallfinishmaterials.
Figure 7.4 Mantel Specifications - Non-Combustible Mantel
46 in.(1168 mm)
Noncombustible Mantel
Clearances are from bottom of appliance to lower edge of mantel or trimAll construction materials, framing members, sheeting and finish materials MUST be noncombustible.
WARNING! Risk of Fire!
You must comply with all minimum air space clearances to combustibles as specified. Framing or finishing material used on the front of, or in front of, the fireplace closer than the minimums listed must be constructed entirely of non-combustible materials (i.e., steel studs, concrete board, etc.). Failure to comply may cause fire.
36 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
8 in. (203mm) minimum from each side offuel opening
AB
Figure 7.5 Minimum Hearth Extension Dimensions
Model # 7100FP A Bin. 41 20mm 1041 508
• FireplaceandHearthExtensionflushonthefloor Non-combustibleflooringaminimumof20in.(508mm)
infrontofand8in.(203mm)toeithersideofthefuelopeningisrequiredasshowninFigure7.5.
The construction of, and materials used for a hearth extension are shown in Figure 7.6. A hearth extension of this constructionmay be coveredwith any non-combustible decorativematerial andmay have aminimumthicknessasperFigure7.6.Sealgapsbetweenthehearthextensionandthefrontofthefireplacewithabeadofnon-combustiblesealantorgrout.
FasciaOuter Can Flange
Protective metalhearth strip
Tile,marble or other non-combustible finish material
Minimum 4 in. (102 mm) Cement Board or equivalent, (or two pieces HX4)
Minimum 20 in. (508mm) in front and 8 in. (203mm) on sides to fuel opening
Combustible Floor
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .
. . .
. . .
. .
Non-combustible material supplied with unit.
. . .
. . .
. . .
. .
Non-combustible sealant or groutTile,marble or other non-combustible finish material
Figure 7.6 Fireplace and Hearth Extension Flush on the Floor.
• RaisedHearthExtensionFraming The hearth framing must be constructed of non-
combustible materials (such as metal framing orequivalentmaterial) and toppedwith twoHX4s, orequivalentmaterial(Table7.3).
When creating the platform, allow for the thickness of the non-combustible finishing materials (Figure7.7).
Outer Can Flange
Non-combustible material supplied with unit
Fascia
Protective metalhearth strip
Minimum 4 in. (102 mm) Cement Board or equivalent, (or two pieces HX4)
Minimum 20 in. (508 mm) in front and 8 in. (203 mm) on sides to fuel opening
Combustible Floor
Non-combustible sealant or groutTile,marble or other non-combustible finish material. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . .
. . .
. . .
. .
. . .
. . .
. . .
. .
Non-combustibleframing materials
Figure 7.7 Raised Hearth Extension to Bottom of Fascia
• Fireplaceinstalledflushonthefloorandhearthextensionraisedtobottomoffascia:
Non-combustibleflooringaminimumof20in.(508mm)infrontofand8in.(203mm)toeithersideofthefuelopeningisrequired(seeFigure7.4).
WARNING! Risk of Fire!
Hearth extensions are to be installed only as illustrated to prevent high tempertures from occurring on concealed combustible materials.
37Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
E. Non-Combustible Sealant Material• After completing the installation of non-combustible
materialintherequirednon-combustiblezoneandthenon-combustiblefinishingmaterialoverthat,removethetemplate.
• Abeadofnon-combustiblesealant(orSuperCalstick)mustbeusedtocloseoffanygapsatthetopandsidesbetween the fireplace and non-combustible facing(Figure7.6)topreventcoldairleaksandtheriskoffire.Largegapscanbebridgedwithfiberglassropegasket.
• Wheninstallationofthedecorativematerialiscomplete,replace/installthefasciaandfireplacedoors.
WARNING! Risk of Fire! • Maintain clearances. • Use only non-combustible material below standoffs,
material such as cement board is acceptable. • Framing or finishing material used on the front of
the fireplace closer than the minimums listed, must be constructed entirely of non-combustible materi-als (i.e., steel studs, concrete board, etc.).
WARNING! Risk of Fire! Hearth & Home Technologies is not responsible for
discoloration, cracking or other material failures of finishing materials due to heat exposure or smoke.
• Choose finishing materials carefully.
Seal inside perimeter of fireplace finished opening with non-combustible grout to prevent risk of fire and cold air infiltration.
7100
45-1/4 in.(1150 mm)
47-1/2 in.(1207 mm)
NON-COMBUSTIBLE ZONE
Figure 7.6
WARNING! Risk of Fire! Seal around finishing material to fireplace.
38 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
8 Fireplace Setup
A. Firebrick PlacementThefireboxofyourfireplaceislinedwithhighqualityfire-brick,whichhasexceptionalinsulatingproperties.
Donotuseagrate;simplybuildafireonthefireboxfloor.
Donotoperatethefireplacewithoutbricks.Makesurebricksareinstalledasshown.
IMPORTANT:Thebricksareverysimilarinsize.Becertainyouhavetheproperbrickinthecorrectlocation.Measurethebricksizeforaccuracy.
- Remove new brick set from box and lay out todiagram as shown in Figure 8.2.
- Laybottombricksinfirebox.- Install rearbrickson the topof thebottombricks.
Slidetopofbricksundercliponbackoffireboxwallandpushbottomofbrickback.
- Installsidebricks.Slidetopofbrickunderclipsonsideoffireboxandpushthebottomofthebrickuntilitisflushwiththesideofthefirebox.
4
5 5 5 5 5 5
5
5
3
5 5 5 5 5
222224
5
5
5
3
11
5 5 5 5 5
5 5 5 5 5 11
4 2 2 2 2 2 4
5
5
5
3
5
5
5
3
Left Side Right SideBack
Floor
1-1/4"3-1/4"
9.0"
1
# Brick Size Qty. In Set1 9”x3-1/4”x1-1/4”Angled(see drawing) 22 6-1/4”x4-1/2”x1-1/4” 53 9”x2”x1-1/4” 24 6-1/4”x3-1/2”x1-1/4” 25 9”x4.5”x1-1/4” 16
Figure 8.1 Fire Brick Configurations
Figure 8.2 Fire Brick Configurations
Table 8.1
39Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
B. Baffle and Blanket PlacementEnsurecorrectbaffleandbaffleprotectionchannelplace-ment;replacebafflecomponentsifdamagedormissing.
TheceramicblanketandbaffleboardMUSTbeincontactwiththebackofthefireboxandevenwitheachotherinthe front.ThebaffleprotectionchannelMUSTbeinposi-tion.
Figure 8.3
Ceramic BlanketBack of Firebox
Baffle Board
Baffle Protection Channel in position
C. Install Fascia (Fronts)Frontsarerequiredtocompletetheinstallation.The7100fireplaceallowsachoiceoffronts,thereforetheyareshippedseparatelyfromthefireplaceduetocustomerpreference and selection. Instructions for attachment of the fronts are included with them. Contact your local dealerwithanyquestionsonofferingsorinstallation.
40 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
A. Chimney ComponentsThefollowingdrawingsshowtheSL-300Serieschimneyandfireplacecomponentswhichmaybesafelyusedwiththisfireplace.The8in.DuraPluscanalsobeused.
ID4 Insulated Duct
UD4 Uninsulated Duct
42 in. (1067 mm)
4 in. (102 mm) i.d.
42 in.(1067 mm)
4 in. (102 mm) i.d.
8 in.(203 mm)
10-1/2 in.(267 mm)
A
B
10-1/2 in.(287 mm)
12 in.(305 mm)
5-1/4 in.(133 mm) 4 in. (102 mm)
12 in.(305 mm)
CAK4A Chimney Air Kit (shipped with fireplace)
Catalog #A B
in mm in mmSL306 6 152 4-3/4 121
SL312 12 305 10-3/4 273
SL318 18 457 16-3/4 425
SL324 24 610 22-3/4 578
SL336 36 914 34-3/4 883
SL348 48 1219 46-3/4 1187
9 Reference Materials
Catalog # DescriptionCAK4A ChimneyAirKit(shippedwithfireplace)
ID4 InsulatedDuct(usedwithchimneyairkit)
UD4 UninsulatedDuct(usedwthchimneyairkit)
SL306 ChimneySection-6in.(152mm)long
SL312 ChimneySection-12in.(305mm)long
SL318 ChimneySection-18in.(457mm)long
SL324 ChimneySection-24in.(610mm)long
SL336 ChimneySection-36in.(914mm)long
SL348 ChimneySection-48in.(1219mm)long
SL3 ChimneyStabilizer
SL315 ChimneyOffset/Return-15deg
SL330 ChimneyOffset/Return-30deg
FS338 Ceiling Firestop - Straight
FS339 CeilingFirestop-15deg
FS340 Ceiling Firestop - 30 deg
AS8 SL300StraightAtticInsulationShield,24in.(610mm)(shippedwithfireplace)
JB877 Chimney Joint Band
CB876 Chimney Bracket
RF370 RoofFlashing-Flatto6/12Pitch
RF371 RoofFlashing-6/12to12/12Pitch
DTO134/146 OctogonalDecorativeCaps
DTS134/146 SquareDecorativeCaps
ST375 SquareTerminationCap
TCT375 Terra Cotta Termination Cap
TR344 Round Termination Cap
TR342-B Round Telescoping Termination Cap
TR-TVK TR Top Vent Kit
TS345 SquareTerminationCap
TS345P SquareTerminationCap-Painted
12966A ManufacturedHomeThimble
MH841 ManufacturedHomeThimbleExtension20in./508mm
HX4 MicoreHearthExtension,20in./508mmwide
LDS33 DecorativeShroud-3ftx3ft(.91mx.91m)
LDS46 DecorativeShroud-4ftx6ft(1.22mx1.83m)
LDS-BV DecorativeShroud-26in.x26in.(660mmx660mm)
FieldConstructedShrouds(See“WoodburningTerminationCap”)
CT-3A-B Adapter-Maybeusedwiththefollowingcaps
CT Series
DT Series
8DP-BP DuraplusBasePlate(requiredifusingDuraPlusChimney)
41Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
RF370 - Roof Flashing Flat to 6/12 Pitch
RF371 - Roof Flashing 6/12 to 12/12 Pitch
Firestop Spacer
A = Actual LengthB=Effectivelength(lengthofchimneypart
afterithasbeensnappedtoanother)
A
B 14-1/2 in.(368 mm)
24-5/8 in.(625 mm)
27-3/8 in.(695 mm)
12 in.(305 mm)
31 in.(787 mm)
24-5/8 in.(625 mm)
12 in.(305 mm)
Catalog # A BFS338 0-deg. 14-1/2in. 368 mm
FS339 15-deg. 18-3/8in. 467mm
FS340 30-deg. 23 in. 584mm
20-3/4 in.(527 mm)
InsideDiameter
8 in.(203 mm)
OutsideDiameter10-1/2 in.(267 mm)
4-3/4 in. (121 mm)Effective Height
SL3 Chimney Stabilizer
AS8 SL300 Straight Attic Insulation Shield (shipped with unit)
2 in. (51 mm)
10-1/2 in.(267 mm)
JB877 Chimney Joint Band
10-1/2 in.(267 mm)
CB876 Chimney Bracket
MH841 Manufactured Home Thimble Extension
24-5/8 in.(625 mm)
16-5/8 in.(422 mm)
29 in.(737 mm)
16-5/8 in.(422 mm)
12966A Manufactured Home ThimbleAssembled
Diameter: 14 1/2 in./368 mmHeight: 24 in./610 mm
20 in.(508 mm)
66 in.(1676 mm)
1/2 in.(13 mm)
HX4 Micore Hearth Extension
InsideDiameter
8 in. (203 mm)
OutsideDiameter10-1/2 in.(267 mm)
SL315 Chimney Offset/Return - Effective Height 13-3/8in. (380 mm)SL330 Chimney Offset/Return - Effective Height 15-1/2in. (394 mm)
42 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
B
A
C
B
C
A
DTS134/DTS146 DTO134/DTO146Decorative Caps
DTO134 A B Cin 34 20 24mm 864 508 610
DTO146in 46 22.7 26mm 1168 576 660
DTS134 A B Cin 34 21.18 24mm 864 538 610
DTS146in 46 21.18 26mm 1168 538 660
15-3/4 in.(400 mm)
TR344 Round Termination Cap
TCT375 Terra Cotta Cap
TR342-B Round Telescoping Termination Cap
ST375 Square Termination Cap
43Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
TR-TVK Top Vent Kit
A
B
C
D
Catalog #A B C D
in. mm in. mm in. mm in. mmLDS33 36 914 36 914 8.5 216 11 279
LDS46 48 1219 72 1829 8.5 216 11 279
LDS33/LDS46 Decorative Shroud
Catalog # A B C D E
LDS-BVin. 26 12.5 15.5 22 23
mm 660 318 394 533 584
ED
A
CB
LDS-BV Decorative Shroud
TS345/TS345P Square Termination Cap
CT-3-B
44 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
B. Accessories
Fronts (Required to Complete)Mission Hill FrontDF-7100MH-B MissionHillfront,classicblacksmoothfinishRolling Meadows FrontDF-7100RM RollingMeadowsFront,classicblacksmoothfinishDF-7100RM-NL RollingMeadowsFront,classicblacksmoothfinishValley Forge FrontDF-7100VF-B ValleyForgefront,classicblackhammeredfinish
FirescreensSCR-433 FirescreenLintel BarLINTEL-433 LintelBarFinishing TemplateTMP-433 MetalFinishingTemplate
45Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
This page intentionally left blank.
46 Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18
Quadra-Fire,abrandofHearth&HomeTechnologies1915WestSaundersStreet,MountPleasant,Iowa52641
www.quadrafire.com
PleasecontactyourQuadra-Firedealerwithanyquestionsorconcerns.ForthelocationofyournearestQuadra-Firedealer,pleasevisitwww.quadrafire.com.
47Quadra-Fire • 7100 FP • 433-3610 Installation Manual • Rev Q • 01/18