Installation, Last mile and last meter challenges and issues
The Quality Connection
Presenter: Karl Bauer
Managing Director LEONI NBG Fiber Optics GmbH
LEONI NBG Fiber Optics GmbH, 7.12.2007
Presentation Outline
LEONI AG
Last mile challenges when building FTTH networks
Lessons learned rolling out FTTH networks throughout Europe and recommendations
2
LEONI NBG Fiber Optics GmbH, 7.12.2007
LEONI_AG___________________
3
LEONI NBG Fiber Optics GmbH, 7.12.2007
LEONI-Group in few wordsWorldwide one of the largest manufacturer of wires, cables and wiring systems, as well as a provider of related development services
More than 47.000 employees
About 70 locations in 46 countries
Tailor-made products and solutions for different fields of application
at MDAX listed on the stock exchange
LEONI NBG Fiber Optics GmbH, 7.12.2007
Sales/Employees 2007
LEONI GroupGroup sales: € 2.4 bn
Employess: approx. 37.000 worldwide
Wire & Cable SolutionsSales: approx. €1.381 m
Employees: approx. 9.000 worldwide
Wiring SystemsSales: approx: € 986 m
Employees: approx: 28.000 worldwide
LEONI NBG Fiber Optics GmbH, 7.12.2007
Last mile challenges when building FTTH networks________
6
LEONI NBG Fiber Optics GmbH, 7.12.2007 7
Regulatory Framework
Regulation vs. Public policy
A stable and predictable regulatory and public policy environment is key to enabling FTTH investment
The current Regulatory Framework is being reviewed – to conclude in Summer 2008?
We are pleased to see that Next Generation Access (NGA) is a major component of the Review
We believe a strong pro-investment NGA based on FTTH position needs to be further developed
LEONI NBG Fiber Optics GmbH, 7.12.2007
Outside plant challengesCivil costs are still prominent in most projects varying from 65 to 85%
• The costs for civil vary between the European countries from about €15/m to €125/m
• The rules regarding rights of ways are different between the European countries
Speed of the roll-out defines the success of the business planSpace limitations within dense cities to build larger POPs Larger scale compressed roll-outs do result into disturbing the city live through traffic issues
8
LEONI NBG Fiber Optics GmbH, 7.12.2007
In-House challenges
New MDU• The Fiber cabling needs to be
foreseen during the planning phase of the architecture and the landlords need to be convinced from day one
• The cabling system needs to be protected during the building of the in-house infrastructure
• The cabling system needs to become an easy to install solution enabling lower skilled labor to be used
Existing MDU• Customised solutions for the
different buildings need to be engineered.
• Each building requires a site survey prior to installation
• The cabling solutions needs to be prepared both to connect the customer on day one and the future customers
• MDU - (Multi Dwelling Unit)
9
LEONI NBG Fiber Optics GmbH, 7.12.2007
Lessons learned rolling out FTTH networks throughout Europe and recommendations
10
LEONI NBG Fiber Optics GmbH, 7.12.2007 11
Innovation
NEXT GENERATION ACCESS SYSTEMCombination of the advantages of
• Tube-system• Direct buried cable• In-house cabling
integrated into one product offering
Our goal with this system is:
Reduction of the costs for installation byreducing the requirement for highly skilled resources
LEONI NBG Fiber Optics GmbH, 7.12.2007 12
Network ConceptSingle Tube Cable
14/10 mm 96f
12/8 mm 72f
10/6 mm 24f
7/4 mm 12f
Single Tube
Cable
14/10 mm 96f
12/8 mm 72f
HandholeStreet Cabinet 01
Access Node
Connector
SC 1
SC 1
SC 1
Handhole
SC 1
Up to 3 km
up to 500 m
1.000 to 10.000subscriber
Connector
Multi Tube Cable
7 x 14/10 mm
96f
7 x 12/8 mm 72f
7 x 10/6 mm 24f
12 x 7/4 mm 12fMulti Tube Cable
7 x 14/10 mm
96f
7 x 12/8 mm 72f
LEONI NBG Fiber Optics GmbH, 7.12.2007 13
Network Concept for Existing Ducts
HandholeStreet Cabinet 01
Access Node
Y-Connector
SC 1
SC 1
SC 1 SC 1
Handhole
existingduct ø 50 mm
Mini Cable 96f
SC 1
existing duct ø 50 mmSingle Tubes 7 x 7/5,5 mm
Micro Cable 2f to 24f
Up to 3 km
Up to 500 m
1.000 to 10.000 subscriber
Single Tube 14/10 mm
Single Tubes for later installation(blowing process)5x 12/10 mm
Single Tube 10/6 mm
Micro Cable 2f to 24f
Y-Connector
Mini Cable 96f
LEONI NBG Fiber Optics GmbH, 7.12.2007 14
Termination Boxes
Network Concept In-House
In-House Cable 1f to 4f
Single Tube Cable
14/10 mm 96f
12/8 mm 72f
10/6 mm 24f
7/4 mm 12f
LEONI NBG Fiber Optics GmbH, 7.12.2007
Alternative FTTH roll-out conceptsReutilisation of existing ductsUtilisation of the Sewer –Drainage networksMicrotrenching
Areal cable ultisation where possibleTechnologies for extraction of the copper elements in copper legacy cables and exchange them with ducts for FO cable
15
LEONI NBG Fiber Optics GmbH, 7.12.2007 16
NGA network concept
Multi Tube forMini Cables
96 fibers Single Tube with pre-installed cable
2 to 96 fibers
ODF
…..
1
n
Closure with splitter
1
2 n
……
……
.
...
•No splice point at the building inlet•Possibility to cut the outer sheath anchange the material to LSOH
Single Tube with Mini Cable96 fibers
LEONI NBG Fiber Optics GmbH, 7.12.2007 17
Next Generation Access Cabling SystemNext Generation Access Cabling
Benefits:• Reduction of the required skilled human
resourcesNew development of blowing process → higher pressure → longer distancesNo splice point at the building inlet → reduction of the number of splices (-40%)
• Direct buried (no blowing process needed)• Homes past with pre-installed or empty tubes
possible (possibility to blow in the cables)• Possibility to change the material of the tube in
the in-house area (to LSOH)• Bending insensitive through cable construction
supported with G657 fiber
LEONI NBG Fiber Optics GmbH, 7.12.2007
ODF solution Rack system 03Rack-system 03
• 19” frame with roof and patch-cord guidance• Distribution box 46 for the dividing of FO cables
and MCS• Patch-cord management set for differential
lengths and excessive length management• Rack system 03 splice and patch-shelves
Offered capacity• Up to 2.256 can be spliced-connected and
managed in a 2,2m high 19 rackExperience in Europe
• Up to today already >200.000 FTTH connections have been realized Utilizing the Rack system 03 including the projects FTTH in The Netherlands – Germany – Denmark –Sweden – Slovenia - …
18
LEONI NBG Fiber Optics GmbH, 7.12.2007 19
Thank you for your attention!
Weitergabe an Dritte nur mit Genehmigung der Firma LEONI NBG Fiber Optics GmbH – Alle Rechte vorbehalten.Technische Änderungen und Irrtümer behalten wir uns vor.
LEONI NBG Fiber Optics GmbH, 7.12.2007 20
Notizen
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
LEONI NBG Fiber Optics GmbH, 7.12.2007 21
Notizen
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
LEONI NBG Fiber Optics GmbH, 7.12.2007 22
Notizen
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
LEONI NBG Fiber Optics GmbH, 7.12.2007 23
Notizen
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
LEONI NBG Fiber Optics GmbH, 7.12.2007 24
Notizen
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________