1. During the framing and rough-in stage, frame the opening in the wall to allow for installation of the recessed Headwall. Refer to shop drawings for your particular headwall dimensions. Framing should provide adequate support for the weight of the headwall, including any accessories that may be mounted on the headwall during use.
2. Review a copy of the final approved shop drawing(s). These documents will provide you with technical information specific to your installation, such as:
• Equipment types and quantities
• Room numbers and locations
• Shop drawings of each unit type
• Wiring diagrams and rough-in locations
3. Locate the unit inside the crate that you wish to install. The contents of each crate are listed on the shipping document(s) and crate label.
One unit is shipped complete (see Figure 1)
Remaining units are shipped as components for ease of installation (see Figure 2):
• Console assembly
• Front frame with fascia
• Cover plates for devices (not shown)
• Hardware if applicable (not shown)
Before Installation
The installation instructions provided are for Amico standard products. Slight modifications to the installation instructions may be required. The product shipped to the job site may not be exactly as shown in the installation drawings used in this manual.
Figure 1
Figure 2
Front Frame with Fascia
Console Assembly
www.amico.com 3
Installation
1. Install the console assembly into the wall opening (see Figure 3).
2. The unit should be mounted in such a way that allows for project specific drywall thickness (see Figure 5 for reference, using a 5/8" [16 mm] drywall setup).
3. Ensure that the mounting location corresponds to the on-site rough-in locations for medical gas and electrical rough-ins.
4. Once the console assembly is in the correct position, attach the console assembly to the studs using the holes on the side and the frame provided with the unit. (see Figure 4) Use hardware that is compliant with applicable local building codes (supplied by others).
5. The unit should be mounted in such a way that, once drywall is installed, the frame will protrude 5/8" (16 mm) out of the wall (see Figure 5 for reference, using a 5/8" [16 mm] drywall set up).
Figure 3
Figure 4
mounting holes
Figure 5
5/8"[16 mm]
Support BracketSupplied by Amico
5/8"[16 mm]
drywallthickness
Building stud:face to line up with
unit stud frame
4 Amico Corporation
Installation
1. Connect on-site medical gas and electrical sources to the unit as per local building codes. The Headwall is manifolded for a single point of connection for each medical gas. Electrical devices are terminated at junction locations at the top of the unit. See Figure 6 for reference. See project specific rough in drawings for exact rough-in locations.
2. Proceed with drywall installation. See Figure 7 for drywall setup.
3. Remove the fascias from the frame using the lift method (See Figure 8).
Figure 6
medical gas from source
medical gas terminations from unit
electrical conduits from source
connectors provided with the console assembly
Figure 7
Front frame shown for reference only. It will get installed after drywall and paint.
Drywall
Drywall
Figure 8
www.amico.com 5
4. Install the front frame into the console assembly. See Figure 9 for frame set up.
5. Using hardware provided, secure the frame to the console assembly using existing holes as shown below (See Figure 9).
6. Replace the fascias into the frames (loosen devices as required). See Figure 11.
7. Install the cover plates, trims and devices in final locations. See Figure 12.
8. Remove laminate strips located into the vertical rails (one on each side of the unit). Using existing holes and the hardware provided, install the screws through the rails into the wall studs located behind. See Figure 12 for reference.
9. Replace laminate strips back into the rail, two places typical.
Installation
Figure 9
Figure 10
Figure 11 Figure 12
laminate strip
vertical rail
Install the screws as shown, using the existing holes and provided hardware as required