INSTALLATION INSTRUCTIONS Interlude Transit Shelter BRASCO INTERNATIONAL, INC. www.brasco.com | 1-800-893-3665 © 2015 Brasco International, Inc. All Rights Reserved. The Interlude Series offers an aluminum transit shelter with twin wall or Alucabond roof panels, and perforated aluminum or acrylic wall glazing. Options include: bench(es), solar lighting package with battery box, bike rack(s), waste receptacle, windscreen(s), map case or advertising box (lit or unlit).

INSTALLATION INSTRUCTIONS...INSTALLATION INSTRUCTIONS Interlude Transit Shelter BRASCO INTERNATIONAL, INC. Electrical Components 1) Light Fixture 2) Battery Enclosure 3) Rigid and

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INSTALLATION INSTRUCTIONS...INSTALLATION INSTRUCTIONS Interlude Transit Shelter BRASCO INTERNATIONAL, INC. Electrical Components 1) Light Fixture 2) Battery Enclosure 3) Rigid and

INSTALLATION INSTRUCTIONS Interlude Transit Shelter

BRASCO INTERNATIONAL, INC.

www.brasco.com | 1-800-893-3665

© 2015 Brasco International, Inc. All Rights Reserved.

The Interlude Series offers an aluminum transit shelter with twin wall or Alucabond roof panels, and perforated aluminum or acrylic wall glazing.

Options include: bench(es), solar lighting package with battery box, bike rack(s), waste receptacle, windscreen(s), map case or advertising box (lit or unlit).

Page 2: INSTALLATION INSTRUCTIONS...INSTALLATION INSTRUCTIONS Interlude Transit Shelter BRASCO INTERNATIONAL, INC. Electrical Components 1) Light Fixture 2) Battery Enclosure 3) Rigid and

Side Wall / Windscreen

INSTALLATION INSTRUCTIONS Interlude Transit Shelter

BRASCO INTERNATIONAL, INC.

Short Checklist and Reminders Prior to Installation

1) Each installation team is advised to always carry a copy of Brasco shop drawings during installation.

2) Concrete pad should be monolithic and level as much as possible.

3) The electrical stub outs for Column 2 are properly located . Column 2 base plate is shown below.

4) Ensure that all shelter components are present to avoid any delay.

5) It is recommended to have at least four (4) crew members equipped with basic installation tools per installation team.

6) Unless otherwise specified, all mechanical fasteners shall not be torqued more than exceed 30-40 foot-lbs (torque) and/or until it’s snug tight. Do not use any power tools to torque any other fastener except for anchor bolts.

7) If you have any questions, feel free to call Brasco at (313) 393 0393. You may ask for Brian Bauman (Engineering Manager).

Shelter Components

Roof Panels

Solar Panel

Map Case / Display Panel

Column

Wall Panels

Anchor Base Plate

Rafter

Brasco International, Inc. 32400 Industrial Dr. Madison Heights, MI 48071

P (313) 393-0393 F (313) 393-0499 [email protected]

Product information is subject to change without notice. © 2015 Brasco International, Inc. All Rights Reserved.

www.brasco.com

Page 3: INSTALLATION INSTRUCTIONS...INSTALLATION INSTRUCTIONS Interlude Transit Shelter BRASCO INTERNATIONAL, INC. Electrical Components 1) Light Fixture 2) Battery Enclosure 3) Rigid and

INSTALLATION INSTRUCTIONS Interlude Transit Shelter

BRASCO INTERNATIONAL, INC.

Electrical Components

1) Light Fixture

2) Battery Enclosure

3) Rigid and Flexible Conduits

4) Junction Box

5) Lens Cover

6) Wiring, etc.

*See Equipment Schedule and Electrical Schematic for more details. Electrical components must be installed by a duly-licensed electrician.

Mechanical Components

1) Arm / Strut

2) Stainless Steel Fasteners and Washers

3) Base Plate Covers

4) Pressure Caps

Solar Panel Lighting Lens Cover Battery Enclosure Light Fixture

Brasco International, Inc. 32400 Industrial Dr. Madison Heights, MI 48071

P (313) 393-0393 F (313) 393-0499 [email protected]

Product information is subject to change without notice. © 2015 Brasco International, Inc. All Rights Reserved.

www.brasco.com

Page 4: INSTALLATION INSTRUCTIONS...INSTALLATION INSTRUCTIONS Interlude Transit Shelter BRASCO INTERNATIONAL, INC. Electrical Components 1) Light Fixture 2) Battery Enclosure 3) Rigid and

INSTALLATION INSTRUCTIONS Interlude Transit Shelter

BRASCO INTERNATIONAL, INC.

Insulation Steps

1) Using the Column Placement Template™, determine the right location of columns using column 2 as your reference

point. Column Placement Templates™ can be ordered from Brasco ($ 495.00 + shipping and handling). Please contact

Brasco @ (313) 393-0393 to place your order.

2) Attach the rafters to the column using the supplied fasteners and washers, ¾-10 x 2” & ¾-10 x 7” hex head bolt. Then

the strut to the rafter and column. (See illustrations below). Don’t use any mechanical device to assemble these parts

together, snug-tight should be enough to secure connection.

Brasco International, Inc. 32400 Industrial Dr. Madison Heights, MI 48071

P (313) 393-0393 F (313) 393-0499 [email protected]

Product information is subject to change without notice. © 2015 Brasco International, Inc. All Rights Reserved.

www.brasco.com

Page 5: INSTALLATION INSTRUCTIONS...INSTALLATION INSTRUCTIONS Interlude Transit Shelter BRASCO INTERNATIONAL, INC. Electrical Components 1) Light Fixture 2) Battery Enclosure 3) Rigid and

INSTALLATION INSTRUCTIONS Interlude Transit Shelter

BRASCO INTERNATIONAL, INC.

Installation Steps Cont.

3) Using the appropriate tools, embed the anchor bolts of each column to the required depth. Secure columns to the anchor

bolts using the nuts provided.

4) With its base plate touching the concrete pad, secure side wall to column 1 perpendicularly using ¼-20 x 1” stainless

steel vandal-resistant bolt, washer and lock washer. Embed anchor bolts of side wall using the same procedure

discussed on Step 3. (Pre-tapped holes are provided on both side wall and column 1 to help ensure accuracy).

5) With the columns standing and securely fastened, install the Map Case Display followed by the two back panels using

¼ - 20 x 1 ¼” tamper resistant bolt with washer and lock washer to connect each column and provide rigidity to the

shelter.

6) Attach purlins in between rafters using # 10-24 x ¾” flat head thread cutting screw together with the 1-inch conduit for the

light fixture. Rafters should be parallel and square at this point.

7) Install roof material (choice of ACP [aluminum composite] or PCSS (polycarbonate structured sheet) using the provided

pressure caps and ¼-20 x 1” stainless steel hex head bolt.

8) Attach the universal mounting bracket on top rafters 2 and 3 pressure caps using ¼-20 x 1” stainless steel vandal-

resistant bolt, washer and lock washer.

9) Attach cover plates for columns 1, 3, 4 and side wall using ¼ -20 x 1” stainless steel hex bolt with washer and lock

washer (back columns) and #10 x ½” stainless steel tech screws (side wall). Cover plate for column 2 can only be

installed once the bent electrical conduits are in place and secured to column 2 using 3/16 x ¼” aluminum pop rivets.

10) Interlude benches can now be installed between

columns 2 & 3 and columns 3 & 4 using the provided

anchor bolts 3/8-16 x 3 ¾” stainless steel wedge anchor

bolt. Make sure that the benches are placed 1 inch

away from any shelter surface. Photo of installed

benches to the right.

Brasco International, Inc. 32400 Industrial Dr. Madison Heights, MI 48071

P (313) 393-0393 F (313) 393-0499 [email protected]

Product information is subject to change without notice. © 2015 Brasco International, Inc. All Rights Reserved.

www.brasco.com