11
Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer Service at 844-358-0107 with all your Technical Questions Products Included Approved Grade Levels Approved Installation Methods All Engineered Hardwood HDF with click lock joints. Above Grade. On Grade. Below Grade Primary Method: Floating. Optional Method: Full Spread Glue. Approved Grade Levels Above Grade. On Grade. Below Grade Owner/Installer Responsibility The owner is advised to be at home during the installation for consultation/direction. The owner and installer should discuss installation and layout to maximize satisfaction. If this is not possible, consultation should be done prior to installation. Installers should be familiar with installation guidelines from National Wood Flooring Association (woodfloors.org). The owner/installer assumes all responsibility for product quality of completed installation. PERFORM PRE-INSTALL INSPECTION. FOR CLAIMS PURPOSES, YOU ARE ALLOWED TO OPEN UP TO 2 BOXES FOR PRODUCT INSPECTION. DO NOT OPEN ALL THE BOXES. OPENING ALL THE BOXES CONSTITUTES YOUR ACCEPTANCE OF THE PRODUCT. INSPECT ALL THE PLANKS IN THESE 4 BOXES CAREFULLY. EXAMINE FLOORING FOR COLOR, FINISH AND QUALITY. IF YOU DISCOVER THAT PRODUCTS ARE DEFECTIVE, OR IF MATERIAL IS QUESTIONABLE, YOU SHOULD CONTACT THE RETAILER. IF YOU ARE SATISFIED, PROCEED WITH INSTALLATION. The length of the each plank in any box can vary from 12 inches to the maximum full length stated on the packaging or other product descriptions. Each box can contain all full length boards or a combination of full length and shorter boards. There is no specific percentage of product length distribution. Prior to installation, rack up planks from several boxes to ensure uniform distribution of colors, shades and characters in the installed flooring. Planks having similar widths should be placed together in the same row to minimize gaps between boards. Wood floors are natural products containing natural variations. Variations in color, tone, grain, mineral streaks, small knots and other characters are found from plank to plank. Similar variations exist between samples, pictures and purchased flooring. They are normal and it does not mean the product is defective. Flooring to be installed in one large area should be purchased at the same time. Product purchased at a later time than the first purchase may vary beyond your expectations. Accessories, trims and moldings are manufactured to coordinate with the varied appearances of the floor planks. Any exact matches are coincidental. Non-matching accessories are not defective products. PROPOSITION 65 WARNING: This product contains chemicals known to the state of California to cause cancer and/or reproductive harm CAUTION: ASBESTOS IN EXISTING FLOOR Home Modern product does not contain asbestos. Existing installed resilient flooring and asphaltic adhesive may contain asbestos fillers or crystalline silica. Do not sand, dry sweep, dry scrape, drill, saw, bead-blast, or mechanically chip or pulverize existing resilient flooring, backing, lining felt, asphaltic “cutback” adhesive or other adhesive. See “Recommended Work Practices for Removal of Resilient Floor Coverings” (rfci.com) for detailed information and instructions on removing all resilient covering structures. CAUTION: WOOD DUST Sawing, sanding and machining wood products can produce wood dust. It can cause respiratory, skin and eye irritation. Avoid prolonged exposure to wood dust. Power tools should be equipped with a dust collector. If possible, perform wood dust generating activities outdoors. If high dust levels are encountered use an appropriate NIOSH-designated dust mask.

Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page1of11

InstallationInstructionsEngineeredHardwoodHDFFlooringDocumentID#:VBHF080116_ENGHDF

ContactCustomerServiceat844-358-0107withallyourTechnicalQuestionsProductsIncluded ApprovedGradeLevels ApprovedInstallationMethods

AllEngineeredHardwoodHDFwithclicklockjoints.

AboveGrade.OnGrade.BelowGrade

PrimaryMethod:Floating.OptionalMethod:FullSpreadGlue.

ApprovedGradeLevels

AboveGrade.OnGrade.BelowGrade

Owner/InstallerResponsibilityTheownerisadvisedtobeathomeduringtheinstallationforconsultation/direction. Theownerandinstallershoulddiscussinstallationand layouttomaximizesatisfaction. Ifthisisnotpossible,consultationshouldbedonepriortoinstallation.Installersshouldbefamiliarwith installationguidelinesfromNationalWoodFlooringAssociation(woodfloors.org).

Theowner/installerassumesallresponsibilityforproductqualityofcompletedinstallation.PERFORMPRE-INSTALLINSPECTION. FORCLAIMSPURPOSES,YOUAREALLOWEDTOOPENUPTO2BOXESFORPRODUCTINSPECTION. DONOTOPENALLTHEBOXES. OPENINGALLTHEBOXESCONSTITUTESYOURACCEPTANCEOFTHEPRODUCT. INSPECTALLTHEPLANKSINTHESE4BOXESCAREFULLY.EXAMINEFLOORINGFORCOLOR,FINISHANDQUALITY. IFYOUDISCOVERTHATPRODUCTSAREDEFECTIVE,ORIFMATERIALISQUESTIONABLE,YOU SHOULDCONTACTTHERETAILER. IFYOUARESATISFIED,PROCEEDWITHINSTALLATION.

Thelengthoftheeachplankinanyboxcanvaryfrom12inchestothemaximumfulllengthstatedonthepackagingorotherproductdescriptions. Eachboxcancontainallfulllengthboardsoracombinationoffulllengthandshorterboards. Thereisnospecificpercentageof productlengthdistribution.

Priortoinstallation,rackupplanksfromseveralboxestoensureuniformdistributionofcolors,shadesandcharactersintheinstalledflooring. Plankshavingsimilarwidthsshouldbeplacedtogetherinthesamerowtominimizegapsbetweenboards.

Woodfloorsarenaturalproductscontainingnaturalvariations. Variationsincolor,tone,grain,mineralstreaks,smallknotsandothercharactersarefoundfromplanktoplank. Similarvariationsexistbetweensamples,picturesandpurchasedflooring. Theyarenormalandit doesnotmeantheproductisdefective.

Flooringtobeinstalledinonelargeareashouldbepurchasedatthesametime. Productpurchasedatalatertimethanthefirstpurchase mayvarybeyondyourexpectations.

Accessories,trimsandmoldingsaremanufacturedtocoordinatewiththevariedappearancesofthefloorplanks. Anyexactmatchesare coincidental. Non-matchingaccessoriesarenotdefectiveproducts.

PROPOSITION65WARNING:ThisproductcontainschemicalsknowntothestateofCaliforniatocausecancerand/or reproductiveharm

CAUTION:ASBESTOSINEXISTINGFLOORHome Modern product does not contain asbestos. Existing installed resilient flooring and asphaltic adhesive may containasbestos fillers or crystalline silica. Do not sand, dry sweep, dry scrape, drill, saw, bead-blast, or mechanically chip orpulverize existing resilient flooring, backing, lining felt, asphaltic “cutback” adhesive or other adhesive. See“Recommended Work Practices for Removal of ResilientFloorCoverings”(rfci.com)fordetailedinformationandinstructionsonremovingallresilientcoveringstructures.

CAUTION:WOODDUSTSawing,sandingandmachiningwoodproductscanproducewooddust. It cancauserespiratory,skinandeye irritation. Avoidprolonged exposure to wood dust. Power tools should be equipped with a dust collector. If possible, perform wood dustgeneratingactivities outdoors. IfhighdustlevelsareencountereduseanappropriateNIOSH-designateddustmask.

Page 2: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page2of11

Thisproductismanufacturedaccordingtostrictqualitystandards. Intheeventthatdefectsarediscoveredinthefield,theindustry standardspermitadefecttolerancenottoexceed5%. Thedefectsmaybeofanytype,whethermanufacturedornatural. Orderan additional5%extraforcuttingwastageandgradingallowances(10%fordiagonalinstallations).

Duringinstallation,inspecttheplankscontinuously. Defectsthatcanbeseenfromastandingpositionshouldbecutofforheldout.Installingdefectiveplanksimpliesacceptance.Squeakingandclickingnoisesaretheresultofinteractionsamongflooring,joistsandsubfloorswhentheymove. Limitingthemovementsof theflooringsystemusuallyeliminatesmostofthesenoises. Sometimes,itisimpossibletoeliminatethemcompletelyandminorsqueaking orclickingnoisesaretobeacceptedasnormalflooringphenomenon. Minorscratchescangenerallyberepairedwiththeuseofputty,stain orfiller. Itisanindustrystandardpracticeofflooringinstallationanditshouldbeacceptedasnormalbythehomeowner.

Toassurethewarrantyisnotinadvertentlyvoided,beforeproceedingwithanyactivitythatisnotcoveredinthismanual,pleasecontactour TechnicalSupportDepartment.CallTollFree844-358-0107

AcclimationandIn-serviceConditionsAcclimationistheprocessofadjusting(conditioning)themoisturecontentofhardwoodflooringtotheenvironmentinwhichitisexpected toperform. Thehardwoodflooringisfullyacclimatedwhenitsmoisturecontentanddimensions(widthandlength)arestable.Engineered hardwoodflooringtypicallydoesnotneedacclimationaslongastheenvironmentitisbeinginstalledinisfullyacclimated.ThismeanstheHVACsystemisfullyoperationalandthehomeisbeingmaintainedinlivedinconditionsduringandaftertheinstallation.Ifthetemperatureandrelativehumidityfallsoutsidenormalrangesof 60°F-80°Fandrelativehumidity(RH)of30%-50%thentheproductmustbeacclimatedforaminimumof3daysorlongerdependingonconditions.Tproperlyacclimateyoumust openboxes,openplasticwrap. Elevatecartonsfromthefloorbyplacingthemon2”X2”lumberorequivalence. Placespacers(3/4”to1”sticks)betweeneachlayeror crossstackthelayersformaximumexposuretoambientconditions. Acclimationtemperaturerangeis60°F-80°Fandrelativehumidity(RH)of30%-50%. Conditionsinwhichthefloorwasacclimatedshouldbemaintainedcontinuouslythereafter. Documentasmuchacclimation informationaspossiblebelow.Date: RelativeHumidity(%):_ Temperature(°F): SubfloorType: Subfloor Avg.MoistureContent(%): Acclimation Period:

Pre-acclimationFlooringAvg.MoistureContent(%): Pre-acclimationFlooringWidth:_______Pre-acclimationFlooringLength:_______

Post-acclimationFlooringAvg.MoistureContent(%): Post-acclimationFlooringWidth:_____Post-acclimationFlooringLength:____

JobSiteCondition

Priortoinstallation,theinstallermustensurethatatthetimeofinstallation,thejobsiteconditionsincludingsubfloor/substrate,ambient temperatureandrelativehumidity,andallimpactingvariableswillnotnegativelyaffectfloor. HomeModernwilldeclineresponsibilityfor damagesassociatedwithimproperinstallationorpoorsiteconditions.

StorageandConditions

Donotstoreflooringinuncontrolledenvironmentalconditions. Forexample,garagesandexteriorpatiosarenotacceptableareastostore flooring. Handleandunloadwoodflooringwithcareandstorewithintheenvironmentallycontrolledsiteinwhichitisexpectedtoperform. Flooringstoredonconcreteslabshouldbeelevatedatleastfourinchestoallowaircirculationundercartons.

ExistingHome

Existinghomeshouldhaveaconsistentroomtemperatureof60°F-80°Fandrelativehumidity(RH)of30%-50%. Continualdeviationfrom theseconditionswillaffectthedimensionsofflooring. Duringheatingseason,humiditymaybemuchlowerthantheacceptablerange. Duringheatingseason,ahumidifierisrecommendedtopreventexcessshrinkageflooringtolowhumiditylevels.Duringthenon-heating season,humiditylevelscanbemaintainedbyusinganairconditioner,dehumidifier,orbyturningonyourheatingsystemperiodically.

NewConstructionorRemodel

Allworkinvolvingwater,suchaspouringbasementconcretefloors,drywallandplasterwork,plumbing,etc.mustbecompletedwellin advanceofthefloordelivery. Ensurethatthebuildingisenclosed. Wherebuildingcodesallow,permanentheatingand/orairconditioning systemsshouldbeoperatingatleastfivedaysprecedinginstallationtopromoteproperacclimationandshouldbemaintainedduringandafter installation. Ifitisnotpossibleforthepermanentheatingand/orairconditioningsystemtobeoperatingbefore,duringandafterinstallation, atemporaryheatingand/ordehumidificationsystemthatsimulatenormalliving(occupied)conditionscanenabletheinstallationtoproceeduntilthepermanentheatingand/orairconditioningsystemisfullyoperational.

Page 3: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page3of11

Yourjobsiteshouldhaveaconsistenttemperatureof60°F-80°Fandrelativehumidity(RH)of30%-50%whichshouldbemaintainedcontinuouslythereafter.

BasementsandCrawlSpaces

Concreteslaborgroundmustbedry. Thegroundinthecrawlspacesmustbecompletelycoveredusing6milblackpolyethylene.Crawl spaceclearancebetweentheearthandundersideofjoistsshouldbenolessthan18inchesandtheperimeterventareashouldbeequalto1.5%ofthetotalsquarefootageofthecrawlspaceorasmandatedbycode.

ConcreteSubfloorRequirements

Itmusthaveminimumratedstrengthof3000psi.

Itmustbeflat. Itshouldbeflattowithin1/8”ina6-footspan;nobumpsorlowspots. Highspotscanberemovedbygrinding;depressions canbefilledwithpatchingcompoundformulatedforuseinfloorinstallation.

Itmustbeclean;noconstructiondebris,soil,mudandanyotherobjectson/oradheringtothefloor;ifnecessary,scrapeandsweepaway beforetheinstallation;noprotrusionsofnails,debris,metalsshouldremain.

Newconcreteslabmustcureforatleast60days. Itmusthaveaminimum10-milpolyethylenesheetbetweenthegroundandtheconcrete. Itmustmeetconcretemoisturerequirementbelow.

Itmustbefreefrommoisturerelatedconditionswhichcandamagetheinstalledflooring.

LightWeightConcrete

Itisconcretewhichratedstrengthislessthan3000psi.

Performaquickcheckbydrawinganailacrossthetop;ifitleavesindentation,itisprobablylightconcrete.

Forglue-downapplication,theconcretemustpossessshearstrengthgreaterthantheglue. Ifconcreteratedpsiisunknown,contactthe adhesivemanufacturerforguidance.

ConcreteMoisture

Allconcretesubfloorsshouldbetestedformoisturecontentandtheresultsdocumented. Visualchecksarenotreliable. Performtestsat locationsaroundexteriordoorways,nearwallscontainingplumbing,nearfoundationwallsandinthecenteroftheroom.Minimumsample sizeis3per1000squarefeetofareaandonetestforeveryadditional1000squarefeetthereafter.Itsmoisturecontentshouldmeetoneofthefollowingcriteriabelow:• 4.5%whentestedusingTramexConcreteMoistureEncounter

• Lessthan3poundsper1000squarefeetper24hourswhenusingCalciumChloridetest(ASTMF1869)• 75%whenusingRelativeHumidityTesting(ASTMF-2170).Pleasenote: Concretemoisturecontentmaybeacceptablethetimeofthetestbutthesetestsdonotguaranteeaperpetual“dry”concrete slab. Theconcreteslabmoisturecontentcanvaryatothertimesoftheyear.Wearenotresponsibleformoisturerelateddamagetoinstalled flooring.

WoodSubfloorRequirements

Itmustbeclean;nopresenceofconstructiondebris,soil,mudandanyotherobjectsonoradheringtothefloor;noprotrusionsofnails, debris,metalsshouldremain. Ifnecessary,scrapeandsweepthesubfloorbeforetheinstallation.

Itmustbestructurallysoundandstable:nomovementsorsqueaks,noloosepanelsorloosenails,nosignsofplyde-laminationorother damages. Repairallshortcomingsbeforeinstallation.

Itmustbeflatwithnovisiblebumpsorlowspots;thesubfloorshouldbeflattowithin1/8”in6feetspan.

Testformoistureusingreliablemoisturemeter. Performtestsatlocationsaroundexteriordoorways,nearfoundationwalls,nearwallscontainingplumbinglinesandinthecenteroftheroom. Measure20locationsper1000squarefeet.

Moisturecontentofsubfloorshouldbelessthan12%.

Moisturecontentdifferencebetweensubfloorandacclimatedflooringshouldbe4%orless.

PlywoodorOrientedStrandBoard(OSB)Specifications

Ontruss/joistspacingof16”(406mm)O/Corless,theindustrystandardforsingle-panelsubflooringisminimum5/8”(19/32”,15.1mm)CDExposure1plywoodsubfloorpanels(CDExposure1)or23/32”OSBExposure1subfloorpanels,4’x8'sheets. Expansiongapbetweenpanels shouldbe1/8”(3mm). Ifpanelsarenottonguedandgroovedandthereisnotsufficientspacingorisinadequate,cutintherequiredspacingwithacircularsaw.Donotcutinexpansionspaceontongueandgroovepanels.Iftruss/joistspacingis19.2"apartthenminimumthickness ofplywoodorOSBpanelsis23/32".Iftruss/joistspacingislargerthan19.2"apartthenminimumplywoodthicknessis1"andminimumthicknessforOSBis1.125".Ifthesubstratedoesnotmeettheseminimumguidelinesthenadd1/2"ofplywoodtothesubstratebeforeproceeding

ParticleBoardorFiberBoard

Page 4: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page4of11

Onlyforfloatinginstallation.

ExistingFloors

Installationoverexistingfloorrequirestheinstallertoconsiderpotentialissuesrelatedtomoisturedamage,adhesive failureandfastener failure. Contacttheadhesiveandfastenermanufacturersrespectivelyfortheirspecificinstructions,recommendationsandrequirements. Acceptable floor coverings include: solid hardwood, linoleum, terrazzo, ceramic tile and other “moisture sealingfloors.”

Unacceptablefloorcoveringsinclude:carpet,needlepunchfelt,edgegluedlinoleumandother“moistureabsorbingflooring.”

RadiantHeatedSubfloor

Thisproductcanbeinstalledoverradiantheatedsubfloor. Operatingsurfacetemperaturemustbelessthan82°F. Decreasetemperaturebeforeinstallation. Increasetemperaturegraduallyafterinstallation. Gluedowninstallationmayrequireadditionalinstallationrequirement.Contactgluemanufacturerforspecificrecommendation. Contactheatermanufacturerforspecificinstallationinstruction.

MoistureBarrierandMoistureRetarder

ConcreteSubfloor: Forfloatinginstallation,use6-milpolyethylenefilmorothermeanswithequivalentpermeability. Overlaptheedge seamsandtapeittogether. Extendmoisturebarrieruptothewallabout1inchhigh. Wheninstalledonabovegradeconcreteandthe concretemoisturecontentmeetstheconcretemoisturestandard,amoisturebarrierisnotrequired. Fordirectglueinstallation,useamoisturebarrierifmoisturelevelexceedsrequirement(seeConcreteMoisturesectionabove).

WoodSubfloor: Useasphalt-saturatedpaperor#15or#30feltthatmeetsASTMStandardD4869orUU-B-790,GradeD.Overlapalongtheedgeseams2”-4”wide. Thisretardsmoisturemovementfrombelow.

SoundControlUnderlayment

Checkwithsoundcontrolmanufacturerforapplicationguidelines. Generally,thelesscompressiveunderlaymentispreferred.

ExpansionGap

Requiredgapwidthis1/2”. Itisrequiredaroundtheperimeterofthefloorandbetweenfloorandallverticalobstructions.Donotplacepermanentlyinstalledstructuressuchaskitchencounter/cabinetontheinstalledfloor.

TransitionMoldingFloatinginstallation,transitionT-moldingisrequiredinthefollowingcases:floorspanninggreaterthan35feetinlengthorwidth;wallopenings-withorwithoutdoor;

Note:Floorareasinterruptedbywallsectionsextendingoutofthewall;floorareaswhicharenotrectangularmayexperiencebucklingor gappingifthereisexcessivefloorexpansionorshrinkage.

Adhesive

Usepremiumflooringadhesivewhichisnon-waterbased,formulatedforhardwoodflooringinstallation.Preferredtype:moisturecureurethanefloorglue.

ToolsandMaterials

Basics:

Tapemeasure•Moisturemeter(wood,concreteorboth)•Chalkline&chalk•Hammer•Electricpowersaw•Carbidetippedsawbladefor finecut•NIOSH-designateddustmask•Handsaworjambsaw•Eyeprotection•StraightedgeorSpacers•PryBar•Mallet•Broom•Colormatchedwoodputty•Tappingblock•Pullbar

AdditionalSuppliesforGlue-DownMethod:

Flooringadhesive•Trowels•Adhesiveremoverforselectedadhesive•Cleanrags•Weightroller•3MBluetape

BondFailure

BondfailureisNOTflooringproductdefect. Mostinstallationfailures,includingbondfailure,resultfromjobsitemoisture. Donotunpackor deliverflooringtothejobsiteuntilmoistureproblemsarecorrected. Readadhesivemanufacturer’sinstructioncarefully.Certainwood flooringadhesivesmayhavespecialrequirementsandlimitationsofuse. Someexistingfloormaynotbeacceptable.

SafetyandHealthPrecautionsPowertoolscanbedangerous. Operateinstrictaccordancetomanufacturer’soperatinginstructionsandsafetyprecautions.Unsafeand improperusecancauseseriousinjuries.Avoidinhalationandexposurestowooddustbymechanicalmeansandbywearingpersonalprotectiveequipment.Wearappropriatepersonalprotectiveequipment(PPE)whichincludeNIOSHorOSHAapprovedustmasks,safetygoggleandworkgloves.

Page 5: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page5of11

Notfollowingthe adhesivemanufacturer’srecommendationscanleadtoinstallationfailureorproductdamageandwillvoidyourwarranty.

GlueSpotsonFaceofFinishedFloor

Adhesivecandamagethefloor’sfinish,especiallywhenithasdried. ItisextremelyimportanttotakeprecautionarystepsNOTtoleavefinger printsorfootprintsmarksonthefaceoftheboard. Ifgluecomesincontactwiththefaceoftheboard,removeimmediatelywiththeadhesive removerrecommendedbytheadhesivemanufacturer. Usecleantowels,changingfrequentlytopreventhazeandadhesiveresidue.Ifthespotremovaldamagestheappearanceoftheboards,replacetheboard.

HelpfulPointersGeneralTips• Makesureyourworkareaiswelllit. Goodvisibilityensuresthatcolorisconsistentandthatvisuallydefectiveplanksaredetectedand removed.

• Theminimumlengthofthefirstandlastplankis12”. Ifthelastplankwillbelessthan12”,adjustthelengthofthefirstplank. The remainderofthelastplankcanbeusedasastarterboardonthefollowingrows.

• Usingashorterpieceatundercutdoorjamswillhelpwhenfittingflooringinplace.Glue-DownInstallationTips• ALWAYSREFERTOTHESPECIFICINSTRUCTIONSONTHEFLOORINGADHESIVELABEL. Theinformationgivenhereisfortypicalinstallation. Adjustitaccordingtoadhesivemanufacturer’sinstruction.

• Dry-laymeansthegluehastosetbeforeplacingfloorplanksinit. Wet-laymeansthegluedoesnotneedtosetbeforeplacingflooronit.

• Usetrowelasspecifiedbyadhesivemanufacturer.• ContinuouslycheckthetransferofadhesiveTHROUGHOUTtheinstallationprocess. Iftheadhesivenolongertransferstothebackofthe flooringmaterial,itmustberemovedandnewadhesiveapplied.

• Workyourwayoutoftheroom.• Aftertheinstallationiscompleted,keepthefloorfreefromdailyfoottrafficforaminimumof24hourstoallowadhesivetoproperlycure.

CuttingtheLastRowtoWidth• Mostoftentheentirelengthofthelastrowwillneedtobecutsothatitisnarrowenoughtofittheremainingspace.• Measurethedistancebetweenthefloorfaceedge(excludethetongue)tothewall. Subtract1/2“fromthismeasurementforexpansion gap. Drawaline. Cutthroughtheline. Discardtheexcesspiece. Proceedwithinstallation.

Pre-InstallActivities

• Subfloorsshouldbeincleancondition.• Understandthepartsofthelockingpartoftheflooringplank. Thetongueisthethinnerextensioncomingoutofthesideofthe planks. Thegrooveisthewiderextensioncomingoutoftheothersideofthefloorplank. Theendsdonothavetongueandgroove. Thereisanupperdrop-lockendononesideandalower-droplockendontheotherside.

• Layoutseveralcartons. Randomlyrackplankstoensuregoodcolorandshademixtureandendjointspacing. Minimumendstagger is6”. Inspectplankqualityandgrading.

• Layouttrimmoldingsinadvanceandfindplankswhoseshadecloselymatches. Settheseasideforfutureuse.• Removeexistingbase,shoemoldingorthresholdcarefully.Theycanbeusedtocoverthe1/2”expansiongapleftaroundtheedgeof theroom.

• Undercutdoorsandcasingsusingahandsawlaidflatonapieceofscrapflooring.

Page 6: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page6of11

• Installmoisturebarrieronconcrete. Forconcrete,letthemoisturebarrierrunupthewallabitbeforecuttingtosizeandtapeall seams

• Installtheunderlayment(ifused)accordingtounderlaymentmanufactureinstructions.

ContactCustomerServiceTollFreeat844-358-0107withallyourTechnicalQuestions

FloatingInstallation

Step1–InstalltheFirstRow• Whenpossible,begininstallationfromthestraightestwall. Ifpossible,installtheflooringperpendiculartothejoists.• Cutoffthetonguefromthefirstrowplanks.• Allow1/2”expansiongapbetweenplankandthewalls. Usespacersorboard.• Placethefirstplankwiththegroovesidefacingawayfromthewalls.• Placetheupperdrop-lockendofthesecondplankonthelowerdrop-lockendofthefirstplank. Theendsdonotclicklock.Maintain straightedgealongtherows.

• Continueplacingthesucceedingplankstocompletetherow

Page 7: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page7of11

Step2–InstalltheSecondandRemainingRows• Cutoffasectionthefirstplanklengthwisetoensure6”jointsstaggering.• Holdtheplankwiththetonguefacingthepreviousrow. Keepitatabout30°angle.• Insertthetongueintothegroove.• Makesurethetonguearesnugglyandsecurelyengagedinthegroovebyexertingaconstantpressureinthedirectionofthegroove.

• Maintainthepressurewhilepressingtheplankflattolocktheedgejoints.• Ifthereisaslightgapalongtheedgejoints,itcanbeeliminatedwiththehelpofatappingblockandaplasticmallet. Usecautionto preventimpactdamage.

Step3-InstalltheLastRow• Usethepullbartodrawthelastrowtofittightlytothepreviousrow.

GlueDownInstallation

PLEASENOTE:ANYEXCESSGLUEWHICHGETSONTOTHESURFACEOFTHEFLOORMUSTBEREMOVEDIMMEDIATELYWITHADHESIVEREMOVER

Thestepsingluedownmethodareverysimilartothefloatinginstallationmethod. Theonlydifferenceistheapplicationofthegluetothe subfloorpriortoinstallation. Formoredetailinstruction,seethefloatinginstallationsectionabove.

Step1–Setup• Cutoffthetonguefromthelongedgeoftheboardsforthefirstrows.• Ensureexpansiongapbymarkingoffastartingline1/2”awayfromthestartingwall. Markoffapproximately2plankswidthareato spreadglue.

Page 8: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page8of11

Step2–Spreadingtheglue• Spreadthegluefromthestartinglineoutinthedirectionofthecenteroftheroom,thewidthoftwoplanks. Orspreadonlyenough gluetoinstallwhatcanbesetwithin45minutes(15minutesofOPENTIMEandanadditional30minutesforactualinstallation. Usuallyabouttworowswidthcoverage). Differentmanufacturermayrequiredifferentopentimeandsettime.Usespacersorboards tomaintainexpansiongapduringinstallation.

• Repeatwiththenexttworows,etc.

Step3–Installthefirsttworows• Installthefirstrowofstarterplanks.• Thelastplankofthefirstrowmayhavetobecuttosize. Discardremainderbecausethetonguehasbeenremoved.• Installthesecondrow. Makesurethereisarandomstaggeringattheendjointsofatleast6”apart.• Beattentivetostaggeringtheendsoftheboardscorrectlyinadjacentrowstoavoidclusteringendjoints.• Anygluethatcomesincontactwiththefaceoftheboardshouldberemovedimmediatelyusingadhesiveremoverformulatedforthe gluebeingused. Followadhesivemanufacturer’sinstructiononadhesiveremoval.

ContactCustomerServiceTollFreeat844-358-0107withallyourTechnicalQuestions

Step4–InstalltheremainingRowsSpreadanothersectionofglue. Neverspreadmorethatcanbecoveredbeforetheadhesiveisset. Ifadhesiveissetandwillnot transfertothebackoftheplank,scrapeofftheadhesiveandapplyfreshadhesive.Continuetoinstallthenextrows. Makesurethereisarandomstaggeringattheendjointsofatleast6”apart.Maintain1/2”expansiongapbetweenfloorandthewalls.Repeattheprocessforadditionalrows.Makesurethatthereis100%contactbetweenthewoodfloorandtheadhesive.

Page 9: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page9of11

FinishingTouches

• Cleanthefloor.• Usematchingputtywherenecessary• Installorreinstallallwalltrimpieces. Nailthemthroughthewall,butnottothesubfloortoavoidrestrictingtheexpansiongap.• Installtransitiontrimpieces. Nailthemtothesubfloor,nottheflooring.• Atdoorways,transitionsshouldbeusedtoprotecttheedgesofthefloorandtoprovideadecorativetransitionfromonefloortypeto another.

• Iftheflooristobecovered,useabreathablematerialsuchascardboard. Donotcoverwithplastic.Donotapplyanytapetothefaceof theproductforprotectionoranyotherreasons.Finishdamagethatmayoccuristheresponsibilityofthepersonapplyingthetapeandisnotcoveredundertermsofthewarranty

Page 10: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page10of11

ContactCustomerServiceTollFreeat844-358-0107withallyourTechnicalQuestions

AccessoriesPicturesareforgeneralillustrativepurposesonly.Actualproductsmaydifferfrompicture. T-Moldingisusedtocreateatransitionbetweenfloorcoveringsofsimilarheightsorto

coveran expansiongap.

StairNoseisusedinconjunctionwithflooringinstalledonstairstepsorfinishededgeofahigher levelfloorlikeinasunkenlivingroom.

CarpetReducer(alsocalledBabyThresholdorEndCap)isusedtotransitionfloorcoveringsof differingheights.Thisreducerstripisalsocommonlyusedtoborderafireplace,slidingglassdoor andotherexteriordoorjambs.

HardSurfaceReducerisusedtotransitiontoanotherhardsurfaceflooringofdifferentheights suchastile,vinyl,concrete.

QuarterRoundisusedtocovertheexpansionspacebetweentheWallBaseandyourflooring.It canalsobeusedthemtomakesmoothtransitionsbetweenthefloorandcabinetry. Itcanbeused withorwithoutWallBasemolding.

WallBaseisusedtogiveafinishedlookatthebaseofthewalls. Itcanbeusedwithorwithout QuarterRound.

TechnicalSupportForinstallationinformationandtechnicalquestionsnotcoveredinthisinstallationguide,pleasecontactourTechnicalSupportRepresentativebycallingthetollfreenumberbelow.

ContactCustomerServiceToolFreeat844-358-0107withallyourTechnicalQuestionsCareandMaintenanceDailyMaintenance1. Sweepdustmoporvacuumyourfloorregularlytoremoveanyparticlesthatcouldcauseabrasionorscratchyourfloor.CAUTION: Vacuumswithabeaterbarorpowerrotarybrushheadcandamageafloorandshouldneverbeused.

2. Applyappropriatecleaningsolutiontothecleaningcloth/mop. Useacleanerspecificallymanufacturedforhardwoodflooring.DoNotUseWaterorVinegar.DoNOTapplydirectlytothefloor.

• Fortougherspots,useahigherconcentrationofisopropylalcoholanddistilledwater.• Forextremecases,asolutionofnailpolishremover(acetone)anddistilledwatercanbeused.

HINT: Forbestresults,cleanthefloorinthesamedirectionoftheplanks. Whenthecleaningcloth/mopbecomessoiled,rinseorreplaceit withacleanone. Followingupwithaclean,dryclothwillremoveresidualstreakmarksandspots.

Page 11: Installation Instructions Engineered Hardwood HDF Flooring...Page 1 of 11 Installation Instructions Engineered Hardwood HDF Flooring Document ID#: VBHF080116_ENGHDF Contact Customer

Page11of11

3. DoNOTleaveanyamountofliquids(water,juice,softdrinks,spills,etc.)onthefloor. Cleananywetspotsimmediately.4. DoNOTuseasteamcleaner.5. DoNOTuseawetmopordousefloorwithwaterorliquidcleaners.Liquidcanseepbetweenthecracksandcausemoisturedamage.6. DoNOTuseanycleaningagentscontainingwax,oilorpolish. Leftoverresiduewillformadullfilm.7. DoNOTusesteelwoolorscouringpowderwhichwillscratchthefloor.

BrandedorOff-the-shelfFloorCareProducts• Ifnoneoftheaboveareeffectiveandyouchoosetouseastoreboughtproduct,testtheproductinanon-conspicuousarea(i.e.,closet, corner,orscrappieces)forpotentialadversesideeffects.

PreventativeMaintenance• Protectyourfloorwhenusingadollyformovingfurnitureorappliances.Protectivesheetsand/orplywoodmaybeneeded.Neverslide orrollheavyfurnitureorappliancesacrossthefloor.

• Placeprotectivepadsbeneathfurniturelegsandotherheavyobjects.• Avoidexcessiveexposuretowaterfrombeingtrackedinduringperiodsofinclementweather.• Minimizeabrasivematerialanddirtbyplacingmatsonbothsidesofexteriordoorsandbyusingarearugsinhigh-trafficareas• Rearrangefurnitureandrugsperiodicallytoavoidunevencolorandshadechangesfromlightexposure.• Useprotectivematsbeneathrollingchairsandkeepfurniturecastersclean.• Keeppets’nailstrimmed.• Removeshoeswithcleats,spikesorexceptionallypointyheelsbeforewalkingonthefloor.

ClimateMaintenance• Careshouldbetakentocontrolhumiditylevelswithinthe30%-50%range. Hardwoodflooringcanbeaffectedbyvaryinglevelsof humidity.

• DryClimates:Ahumidifierisrecommendedtomaintainhumiditylevels. Woodstovesandelectricheattendtocreateverydry conditionsduringthewintermonthsthisalsowillcauseshrinkageinflooring.

• Humid,WetClimates: Byusinganairconditioner,heater,ordehumidifierproperhumiditylevelscanbemaintainedtoprevent excessiveexpansionduetohighmoisturecontent.

FloorRepair• Verylightandsmallsurfacescratchescanberepairedwithastaining“touchup”penoftheappropriatecolor.• Slightlydeeperscratchescanberepairedbymeansofcoloredputtyandorstains. Fillthescratcheswiththeputty. Levelwithputty knife. Wipeoffexcessputty.

• Verydeepscratchesmayrequirethereplacementoftheplanks.

ContactCustomerServiceTollFreeat844-358-0107withallyourTechnicalQuestions.