    Localizacin de la obra

    Piled Foundation for the Chiapas Bridge

    in Mexico

    Wolfgang G. Brunner

    Maschinen

    God Morgen mine Damer og Herrer !

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    2/52

    Localizacin de la obraLocation of State Chiapas in Mexico

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    3/52

    Localizacin de la obraState Chiapas in Mexico

    Chiapas BridgeChiapas Bridge

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    4/52

    Localizacin de la obra

    OaxacaOaxacaChiapasChiapas

    VeracruzVeracruz

    Puente ChiapasPuente Chiapas

    Procedimiento no. 1Procedimiento no. 1Chiapas 1

    Procedimiento no. 2Procedimiento no. 2Chiapas 2

    Location of the Jobsite

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    5/52

    Datos generales de proyectoData of Chiapas Bridge

    Length 1208 m

    Height above water 10 m

    Maximum total length of

    drilling string 148.5 m

    Maximum water depth 92.5 m

    Drilling depth 56.0 m

    Contract amount including

    VAT 100 million US $

    Execution period of

    foundation 7 month

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    6/52

    Datos generales de proyectoConstruction of Pier Foundations

    Stage 1:Fabrication on land of steel jacket on its side comprising four 2.80

    m dia. steel tubes and struts.Stage 2:Floating jacket into position of pier with side buoyancy tanks.Stage 3:

    Up-ending of jacketDriving four 1000 mm dia. tubular support leg piles withstructural connections to jacket.Stage 4:Construction of working platform on top of jackets, liftinghydraulic casing oscillator onto platform and fixing it ontoplatform. Installation of 2500 mm dia. drill casing comprising asacrificial section jointed onto the bottom of the main casingsection.

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    7/52

    Datos generales de proyectoConstruction of Pier Foundations

    Stage 5:Mounting and connecting BA 2500 top drill on drill casing.

    Stage 6:Installation of drill head, ballast rods and air-lift pipe assemblywith casing guides.Stage 7:

    Drilling down with air-lift flushing as the casing oscillator rotatesthe 2500 mm dia. drill casing and jacks it down with its powerfulhydraulic rams.In order to reduce the frictional resistance on the drill casing,three hydraulically operated roller bits are extend laterally duringdrilling. They underream the casing shoe.Embedment of drill casing in conglomerate up to 20m.Stage 8:Drilling with fully extended roller bits to final depth.

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    8/52

    Datos generales de proyectoConstruction of Pier Foundations

    Stage 9:Lifting top drill off drill casing, removing drill string and drill head.

    Cutting drill casing inside steel jacket tube approximately 5 mabove bottom end of steel tube.Stage 10:Raising upper section of drill casing and holding it in position withcasing oscillator.Stage 11:Installation of reinforcement cage, which extends from the base ofthe pile to 5 m above the top of the enlarged pile head.Stage 12:

    Lowering tremie pipe assembly into drill casing and concretingpile to top of reinforcing cage.Stage 13:Extracting upper drill casing string.

    Stage 14:Constructing remaining three piles.

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    9/52

    Steel Jackets:

    Fabrication

    Launching

    Floating into Position

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    10/52

    Jacket Manufacturing Yard

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    11/52

    Fabricacin de jacketsFabrication of Jackets

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    12/52

    step 1: pull jacket

    step 1: retract jacket

    step 1: float jacket

    winch

    Launching of Jacket

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    13/52

    Botado de los jackets 8, 7, 6 y 5

    Jacket no 7Jacket no 8

    Jacket no 5Jacket no 6

    Launching of Jacket

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    14/52

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    15/52

    Step 1: float to position

    Step 5: remove floating body

    Step 3: continue turningStep 2: turn through water inflow

    Step 4: vertical position Step 6: install steel pileswith diesel hammer

    Floating Jacket into Position

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    16/52

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    17/52

    Transporte

    length70m

    Floating Jacket into Position

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    18/52

    Ziele der BodenverbesserungFloating Jacket into Position

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    19/52

    Drilling with RC DrillDrilling with RC Drill:

    Installation of Casing

    Mounting of RC Drill

    Drilling in Conglomerate and Rock

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    20/52

    Principle of RC (Reverse Circulation) System

    0

    -20

    -20/25

    -30/35

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    21/52

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    22/52

    Preparation of Drill Casing

    Dia 2500 mm

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    23/52

    Installation of Casing with Oscillator

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    24/52

    Installation of Casing and RCD Drill

    RC Drill BA 2500

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    25/52

    Installation of Casing and Drilling into Rock

    oscillator BV 2500

    casing dia 2500 mm

    Rock

    RCD drill rig BA 2500

    open hole drilling

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    26/52

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    27/52

    Stabilizer and Flanged Drill Pipes

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    28/52

    Stabilizer and Flanged Drill Pipe

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    29/52

    Stabilizer and Flanged Drill Pipe

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    30/52

    Drilling with RC Drill and Oscillator

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    31/52

    Drilling with RC Drill and Oscillator

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    32/52

    movable

    roller

    hydraulic power pack for movingout the underreamer rollers

    rock

    casing

    Underreaming the Casing during Drilling

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    33/52

    Drilling at Jacket No. 8

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    34/52

    oscillator BV 2500

    casing dia 2500 mm

    Rock

    cutting drill casing with diver, max water depth 80 mand recover the cut off casing section

    Remove Casing

    cut casing by diver

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    35/52

    Completion of Pile:Completion of Pile:

    Installation of Reinforcement Cage

    Placing Concrete

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    36/52

    Pipes for concrete

    inspection

    Installation of Reinforcement Cage

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    37/52

    Installation of Reinforcement Cage

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    38/52

    Installation of Reinforcement Cage

    casing dia 2500 mm

    Rock

    placing reinforcement cage into the borehole

    uncased bore in rock

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    39/52

    Concreting the Pile

    conc

    rete

    concrete

    tremie pipe

    casing dia 2500 mm

    Rockuncased bore in rock

    conc

    rete

    concrete

    C S

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    40/52

    Concrete Pipe Line from the Shore to the Pier

    R k d Pil

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    41/52

    Raked Piles

    Pile diameter: 1300 mm Inclination: 1: 3Pile length: up to 50 m

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    42/52

    Bridge Deck ConstructionBridge Deck Construction:

    Construction of Pier Heads

    Pushing Bridge Deck

    C ti f Pi H d

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    43/52

    Concreting of Pier Head

    Concreting of Pier Head

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    44/52

    22.7.2000

    Concreting of Pier Head

    Concreting of Pier Head

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    45/52

    Concreting of Pier Head

    Concreting of Pier Head

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    46/52

    Concreting of Pier Head

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    47/52

    Pier Overview

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    48/52

    Pier 8

    Pier 7

    Pier 6

    Pier Overview

    Installation of Bridge Deck by Jacking

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    49/52

    Installation of Bridge Deck by Jacking

    Abutment9

    152.0 m

    Pier6

    Pier7

    Pier8

    Abutment9

    152.0 m

    Pier6

    Pier7

    Pier8

    jacking attachment

    Fabricacin de dovelasInstallation of Bridge Deck by Jacking

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    50/52

    Installation of Bridge Deck by Jacking

    Fabricacin de dovelasCompleted Chiapas Bridge

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    51/52

    Completed Chiapas Bridge

  • 8/10/2019 Instalacion de Puente Chiapas Mexico

    52/52

    Thank you for your kind attention !