INSPECTION LOG BOOKPT. Sertco Quality
Page : 1 / 10
PROJECT / CONTRACT : PRODUCTION SEPARATOR / BETARA COMPLEX DEVELOPMENT (PRESSURE VESSEL INSPECTION)
SQ Job Ref. : SQ-014-15
Client : PetroChina Jabung Limited End User : PetroChina Jabung Limited
ITEMS / SUBJECT TO BE INSPECTED :RADIOGRAPHY TEST RESULT VERIVICATION DURING CONSTRUCTION :
- V210- V220- V230- V240- V250- V910- V920- V930
Welding Joint
See continuation sheet Yes NoManufacturer : PT. Prakarsa Langgeng Maju Bersama (PLMB)See continuation sheet Yes No
DOCUMENTS OF REFERENCE :Title : Detail :
Welding Map & Tolerances as per code ASME and PetroChina International Jabung Spesification
- V210- V220- V230- V240- V250- V910- V920- V930
See continuation sheet Yes No
INSPECTION LOG BOOKPT. Sertco Quality
Page : 2 / 10
INSPECTION
1. INSPECTION PLACE : PT. PLMB, Banten - Indonesia
2. INSPECTION DATE :August 20, 2015
3. STAGE OF INSPECTION
A. Verification RT FilmB. Verification Material PlateC. Verification Wall ThicknessD. Verification Plate RollingE. Witness Cutting
4. DOCUMENT REVIEW :Pressure Vessel Toterances
5. KIND OF INSPECTIONVisul Verification & Inspection During Construction
6. Type of Activity- See detail at continuation sheets7. ATTENDANCE
PT. Sertco Quality :- Rahmad DesmanPT. PLMB- Djudjuk Djunaidi- Ari Prima
8. NEXT VISIT SCHEDULED :T.B.A
ATTACHMENT Yes (Total number of pages : 6 )
INSPECTION LOG BOOKPT. Sertco Quality
Page : 3 / 10
RD-056
ATTACHMENT
Pressure Vessel Tolerances As Per Petrochina International Jabung
INSPECTION LOG BOOKPT. Sertco Quality
Page : 4 / 10
RD-056
Dimensional Verification Record
INSPECTION LOG BOOKPT. Sertco Quality
Page : 5 / 10
RD-056
rification RT filmV240
Dimensional Verification Record
Surveillance performed by : Rahmad Desman
Inspection Center : PT. Sertco Quality
Diffusion : 1. PT. SQ Office 2. Client 3. Manufacturer
INSPECTION LOG BOOKPT. Sertco Quality
Page : 6 / 10
RD-056