GPM Pty Limited PO Box 835
Castle Hill NSW 1765
ABN: 97 094 165 563 Ph/Fax: (02) 8850 4408
Email: [email protected]
POST CONSTRUCTION DILAPIDATION REPORT Commissioned By: XXXXX Property Address: XX XXXXX Road, XXXXX NSW XXXX Report Number: RG XXXX Inspection Date: 19 October 2013
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 2 of 21
ACCOUNT AND PROPERTY DETAILS
Client : XXXX Billing Address : XXXX Phone : XXXX Facsimile : XXXX Email : XXXX Invoice No. : XXXX Property Address : XX XXXX Road, XXXXX NSW XXXX Developer : XXXX Date of inspection : 19/10/2013 Inspector : Romeo George NOTE: This report is comprised of both Part A and Part B and should be read and understood in its entirety. ACCESS DETAILS
• The weather conditions at the time of inspection were fine and sunny. • The property was furnished and lived in at the time of the inspection. • Power was connected at the time of inspection. • Water was connected at the time of inspection.
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 3 of 21
PART A – GENERAL DETAILS
1.0 AUTHOR AND EXPERIENCE I am the author of this report and have the following relevant background:
• Over 20 years experience in construction, project management, building defects investigation and property development, • Civil engineering and building qualifications, • Member of NSW Master Builders Association.
I am the director of GPM Pty Limited located at Castle Hill. Its core business is to provide building reports to:
• Clients prior to purchasing properties, • Solicitors whose client’s are in dispute with builders/owners, • Developers/authorities prior to and after undertaking construction works adjacent to established areas.
2.0 TERMS OF REFERENCE In response to your request we have undertaken a post construction condition survey of the property and council assets adjacent to the recently constructed duplex development at XX XXXXX Road, XXXXX. The specific purpose of this report is to document the general condition of the structures present on the adjoining properties and council land after the completed construction works and compare these to the general condition prior to construction as per Item # 89 in the Development Application Conditions of Consent for DA/XX/2012 determined by XXXX City Council on 21 May 2012. It should be noted that the pre-construction Dilapidation report prepared by XXXXX Consultants and dated 30 July 2012 has been used as a reference point and the Photograph numbers indexed in this report correlate to the same numbers (where applicable) in the original report. As we are not structural engineers we have not inspected, assessed, recorded or commented on any property or structure in terms of its structural capability or suitability. 3.0 IMPORTANT INFORMATION Nothing contained in the Report implies that any inaccessible or partly inaccessible area(s) or section(s) of the property being inspected by the Inspector on the date of the inspection were free from defects latent or otherwise. No responsibility can be accepted for defects, which are latent or otherwise not reasonably detected on a visual inspection without interference with or removal of any of the structure including fixtures or fittings within the building. No liability shall be accepted on account of failure of the Report to notify any problems in any areas(s) or section(s) of the subject property physically inaccessible for inspection, or to which access for Inspection is denied by or to the Inspector (including but not limited to any area(s) or section(s) so specified by the Report). It is impossible to predict what alterations, additions or extensions may be made to a property after our site inspection and the liability of GPM Pty Limited extends only to the status of the property when GPM Pty Limited inspected it. That liability does not extend to any alteration, addition or extension to the property after our site inspection.
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 4 of 21
This report is made solely for the use and benefit of the Client named at the front of this report and must not be distributed to anyone else without the agreement of GPM Pty Limited, which agreement will not be unreasonably withheld. It is intended that this report will be read in full and GPM Pty Limited accepts no responsibility for later extractions, amendments, interpretations or partial distribution of the contents of this report. 4.0 REASONABLE ACCESS AS DEFINED IN AS 4349.1 Only the areas to which reasonable access was available were inspected. The Australian Standard AS4349.1 defines reasonable access as “areas where safe, unobstructed access is provided and the minimum clearances specified below are available, or where these clearances are not available, areas within the Inspector’s unobstructed line of sight and within arm’s length. Reasonable access does not include removing screws and bolts to access covers.” Reasonable access does not include the use of destructive or invasive inspection methods nor does it include cutting or making access traps or moving furniture, floor coverings or stored goods. Roof Interior - Access opening = 450 x 450mm, Crawl Space = 600 x 600mm, Height accessible from 2.1m step ladder or 3.6m ladder placed against a wall. Subfloor - Access opening = 500 x 400mm, Crawl Space (timber floor) = 400mm to
bearer, joist or other obstruction, (concrete floor) = 500mm. Roof Exterior - Must be accessible from a 3.6m ladder or 2.1m step ladder.
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 5 of 21
PART B – PHOTOGRAPHS AND COMMENTS
Photograph 1: XX XXXX Road, XXXXX
General condition of council assets
Photograph 2: XX XXXX Road, XXXXX
General condition of council assets
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 6 of 21
Photograph 3: XX XXXX Road, XXXXX
General condition of council road
Photograph 4: XX XXXX Road, XXXXX
General condition of council road
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 7 of 21
Photograph 5: XX XXXX Road, XXXXX
General condition of council road
Photograph 6: XX XXXX Road, XXXXX
General condition of council footpath outside XX XXXX Road, XXXXX
NOTE: Pre-existing cracks in kerb and gutter depicted in Photographs 7 to 9 of original report now replaced with new kerb and gutter
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 8 of 21
Photograph 10: XX XXXX Road, XXXXX
General condition of council road
Photograph 11: XX XXXX Road, XXXXX
Pre-existing alligator/fatigue cracking along some sections of the road NOTE: Pre-existing alligator/fatigue cracks along some sections of the road and depicted in Photographs 11 to 16 of original report have not changed significantly and a 500mm section adjacent to the gutter has now been replaced
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 9 of 21
Photograph 14: XX XXXX Road, XXXXX
Pre-existing Alligator/Fatigue cracking along some sections of the road
Photograph 17: XX XXXX Road, XXXXX
General condition of council road
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 10 of 21
Photograph 18: XX XXXX Road, XXXXX General condition of dwelling’s driveway
Photograph 19: XX XXXX Road, XXXXX
General photograph of Northern external wall
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 11 of 21
Photograph 20: XX XXXX Road, XXXXX
General photograph of Eastern external wall
Photograph 21: XX XXXX Road, XXXXX
General condition of front yard porch
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 12 of 21
Photograph 22: XX XXXX Road, XXXXX
Condition of the ceilings. This situation is likely to be caused by moisture gathered in the roof that has not been properly ventilated, therefore allowing mould to form
Photograph 23: XX XXXX Road, XXXXX
General condition of the living room
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 13 of 21
Photograph 24: XX XXXX Road, XXXXX
General photograph of the hallway
Photograph 25: XX XXXX Road, XXXXX
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 14 of 21
Photograph 26: XX XXXX Road, XXXXX
Condition of the ceilings.
Photograph 27: XX XXXX Road, XXXXX
Condition of the ceilings.
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 15 of 21
Photograph 28: XX XXXX Road, XXXXX Condition of walls and ceiling in bathroom
Photograph 29: XX XXXX Road, XXXXX
General photograph of the living room ceiling and walls
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 16 of 21
Photograph 30: XX XXXX Road, XXXXX
General photograph of the living room ceiling and walls
Photograph 31: XX XXXX Road, XXXXX
General photograph of study/bedroom walls
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 17 of 21
Photograph 32: XX XXXX Road, XXXXX
General photograph of study/bedroom ceiling/walls
Photograph 33: XX XXXX Road, XXXXX
General photograph of kitchen walls/ceiling
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 18 of 21
Photograph 34: XX XXXX Road, XXXXX
General photograph of dining room ceiling/walls
Photograph 35: XX XXXX Road, XXXXX General photograph of backyard sunroom
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 19 of 21
Photograph 36: XX XXXX Road, XXXXX
General photograph of sunroom walls
Photograph 37: XX XXXX Road, XXXXX
General condition of laundry walls. No major cracks found.
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 20 of 21
Photograph 38: XX XXXX Road, XXXXX
General condition of laundry walls. No major cracks found.
Photograph 39: XX XXXX Road, XXXXX
General condition of laundry walls. Minor cosmetic cracks between the ceiling and walls.
XX XXXX Road, XXXXXX NSW XXXX
Report Number : RG XXXX Page 21 of 21
5.0 CONCLUSION On 19 October 2013 a photograph survey was conducted on the council assets and on the property at XX XXXX Road, XXXXX. The condition of the assets and structure identified in the original report prepared by XXXX Consultants and dated 30 July 2012 was compared to the condition after the completion of the construction works and no adverse structural damage that can be clearly attributed to the construction works at XX XXXX Road, XXXXX was observed. Yours faithfully, GPM Pty Limited
Romeo George BE (civil) Licensed Building Contractor
29 October 2013