INRETS, Villeneuve d’Ascq, December 15th-16th 2005
ETISEO ProjectETISEO Project
Evaluation processEvaluation process
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
ETISEO ProjectETISEO Project
Results submissionResults submission
File format transfer toolFile format transfer tool
Evaluation feed-backEvaluation feed-back
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
Results submissionResults submission
Result Submission Format :
• Based on PETS-metrics XML schema, with the addition of events.
• Some attributes will not be processed (segmentation = shape).
• Documentation on this format is available on the web site also with examples.
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
Results submissionResults submission
Result Submission Format :
Extended PETS metrics
developper details
algorithm details
run date
camera used
results
frame
tracked_target
info_2D
segmentation
row_seg
object
info_3D
parent target
event_target
physical_object
contextual_object
speed
Must occur once and only once in the parent element.
Must occur at least once.
Optional but can occur once and only once in the parent element.
Optional to occur but can occur numerously.
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
Results submissionResults submission
Submission content :
- For each sequence you processed, its xml results file using the naming convention:
sequence-name.xml
- The questionnaire describing how your system proceeded on all sequences.
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
Results submissionResults submission
Submission method :
- by email (<10Mo) to: [email protected]
- on ftp www.silogic.fr/etiseo. Connection parameters will be provide to all participants. Send also a notification to [email protected]. Warning : other participants can have access to your results.- by mail to:
Silogic, ETISEO project.Attention of Luc Barthelemy6, rue Camboulives BP 113331036 Toulouse Cedex 1France
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
Results submissionResults submission
Submission method :
In any case, you will receive an acknowledgement to your submission.
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
ETISEO ProjectETISEO Project
Results submissionResults submission
File format transfer toolFile format transfer tool
Evaluation feed-backEvaluation feed-back
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
File format transfer toolFile format transfer tool
Silogic made some tools:
• to convert different video results structures. From a frame basis format (like PETS) to a sequence basis format (like Viper).
• to address specific format incapability.
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
File format transfer toolFile format transfer tool
Silogic will use these tools to convert your xml result file into the ETISEO xml result structure.
Then metrics will be computed on your results.
We recommend that you use a result format as close as possible to the ETISEO result Xml
schema.
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
ETISEO ProjectETISEO Project
Results submissionResults submission
File format transfer toolFile format transfer tool
Evaluation feed-backEvaluation feed-back
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
Evaluation feedbackEvaluation feedback
Evaluation feedback :
• Metrics results are sent back to participants.
• Multiple submission is allowed.
• Statistics on metrics for each sequence will be available on the web-site.
• Global feedback to all participants.
INRETS, Villeneuve d’Ascq, December 15th-16th 2005
ScheduleSchedule
• First video corpus diffusion : starting January• Results collection : until end of March• Global metrics results diffusion : July• Second evaluation: May.
First evaluation
Seminar
AprilJan July Oct DecMay
Evaluation review
Seminar
CYCLE 1
Evaluation review
CYCLE 2
Etiseo evaluation